A&A consultants

LETTER
TO: FROM:

Eng: Project Manager A&A


DATE:
COMPANY:
ORASCOM & ROWAD JOINT VENTURE 13/05/2024
PROJECT:
High SPEED RAILWAY PROJECT-MAIN
DEPOT
SUBJECT:
Inspection of foundation Level – Building SC-3
(B16-03)
Dear Sirs,

Reference is made to the above-mentioned subject, and the site visit carried
out on 07-05-2024, to inspect the excavation bottom at level (+96.42).

Please note that, the existing formation at the excavation levels consists of
limestone which is in agreement with the geotechnical report.

Accordingly, the site preparation guidelines as mentioned in the related


geotechnical report can be followed.

Regards
Dr/ Mohamed Abdel Hamid.

Attachment:
Attachment (1):site pictures

39 Mohamed Fahmy El-Mohdar St. - Seventh District - Nasr City - Cairo - Egypt. Tel/Fax.: 202 226141198 – 226141178
E-mail: mail@a-aconsultants.com
A&A consultants

Attachment (1)
site pictures

39 Mohamed Fahmy El-Mohdar St. - Seventh District - Nasr City - Cairo - Egypt. Tel/Fax.: 202 226141198 – 226141178
E-mail: mail@a-aconsultants.com

You might also like