Development of MFC at Nanded railway station

Rail Land Development Authority

PROJECT INFORMATION
MEMORANDUM

FOR

MULTIFUNCTIONAL COMPLEX

AT
NANDED

RailLand Development Authority


Near Safdarjung Railway Station, Moti Bagh-1
New Delhi – 110021

DISCLAIMER

Project Information Memorandum


Page 1
Development of MFC at Nanded railway station
Rail Land Development Authority

This Project Information Memorandum (the “PIM”)is issued by Rail Land Development Authority (RLDA)
in pursuant to the Request for Proposal videRFP Notice No. RLDA/RFP/MFC/1 of 2012 to provide
interested parties hereof a brief overview of plot of land (the “Site”) and related information about the
prospects for development of multifunctional complex at the Site on long term lease.

The PIM is being distributed for information purposes only and on condition that it is used for no purpose
other than participation in the tender process. The PIM is not a prospectus or offer or invitation to the
public in relation to the Site.

The PIM does not constitute a recommendation by RLDA or any other person to form a basis for
investment. While considering the Site, each bidder should make its own independent assessment and
seek its own professional, financial and legal advice. Bidders should conduct their own investigation and
analysis of the Site, the information contained in the PIM and any other information provided to, or
obtained by the Bidders or any of them or any of their respective advisers.

While the information in the PIM has been prepared in good faith, it is not and does not purport to be
comprehensive or to have been independently verified and neither RLDA nor any of its officers,
employees, advisers or consultants accept any liability or responsibility for the accuracy, reasonableness
or completeness of, or for any errors, omissions or misstatements, negligent or otherwise, relating to, or
makes any representation or warranty, express or implied, with respect to, the information contained in
the PIM or on which the PIM is based or with respect to any written or oral information made or to be
made available to any of the Bidder or its professional advisers and, so far as permitted by law and
except in the case of fraudulent misrepresentation by the party concerned, any liability therefore is hereby
expressly disclaimed.

The information contained in the PIM is selective and is subject to updating, expansion, revision and
amendment. It does not, and does not purport to, contain all the information that a Bidder may require.
Neither RLDA nor any of its advisers undertakes to provide any Bidder with access to any additional
information or to update the information in the PIM or to correct any inaccuracies therein, which may
become apparent. Each Bidder must conduct its own analysis of the information contained in the PIM and
is advised to carry out its own investigation into the prospects of developing the Site, the legislative and
regulatory regime which applies to commercial development in India, and all matters pertinent to the Site
and to seek its own professional advice on the legal, financial, regulatory and taxation consequences of
entering into any agreement or arrangement relating to the proposed Site.

The PIM is for use only by the Bidders. The PIM may not be copied, or distributed by any Bidder to third
parties (other than in confidence to that Bidder’s professional advisers) or prospective consortium
members. Under no circumstances should Bidders make contact with officers or employees of MOR
unless invited by the MOR or in accordance with the PIM.

Project Information Memorandum


Page 2
Development of MFC at Nanded railway station
Rail Land Development Authority

TABLE OF CONTENTS
S.NO PARTICULARS

1 Introduction 4

1.1 Process Chart 4

1.2 Project Potential 5

1.3 Executive Summary 5

1.4 Guidelines on Expression of Interest 5

2 NANDED 7

2.1 Nanded City Profile 7

2.2 Location On City Map and Connectivity 7

2.3 Demography 9

2.4 Rail Passenger Traffic 10

2.5 Site Location and Attributes 11

2.6 Site Photographs 12

2.7 Catchment Area 14

2.8 Plot Details and area Statement 15

2.9 Suggested Product Mix 15

2.10 Site Layout 16

Project Information Memorandum


Page 3
Development of MFC at Nanded railway station
Rail Land Development Authority

INTRODUCTION
 Multi-functional Complexes (MFC) are to be constructed in station premises for providing rail
users facilities like shopping, food stalls and restaurants, book stalls, PCO/STD/ISD/Fax booths,
medicine & variety stores, budget hotels, underground parking etc. Accordingly development of
Multi-functional Complexes is being taken up in different parts of the country at various railway
stations. As part of this initiative of Railways, three sites at Dehradun, Ujjain & Nanded have been
identified.

 Rail Land Development Authority (RLDA) a statutory authority under the Ministry of
Railwaysoffersdevelopment of MFC on a Railway Land at Dehradun, Ujjain & Nanded.

 Lease Period - 45 years lease.

 Nature of offer - Lease on an “as is where is basis”.

 RLDA has adopted a single stage two packet system i.e. submission of eligible proposal and
financial proposal for selection of the bidder for award of the Project.

1.1 PROCESSCHART
Advertisement release and
uploading of RFP and PIM
Opening & scrutiny of
document on RLDA website
financial bid and
for prospective bidders
declaration of the highest
along with EOIs from end
bidder.
users

Pre - Bid meeting with


prospective bidders. Issue of Acceptance letter.

Submission of Bids.
Signing of Development
Agreement with the
successful Bidder.
Scrutiny and selection of
eligible bidders for opening
of financial bid.

Project Information Memorandum


Page 4
Development of MFC at Nanded railway station
Rail Land Development Authority

1.2 PROJECT POTENTIAL


All the3 sites at Dehradun, Nanded and Ujjain offer an excellent opportunity for a successful
commercial real estate development owing to the following factors :

 The sites are located near the Railway station.

 Easy accessibility to Railway Station, Bus stand and in the city area.

 Good visibility from station approach road.

 Opportunity to create a land mark in the city.

 Land form and topography suitable for the construction

 A vibrant commercial catchment area

1.3 EXECUTIVE SUMMARY

Location - The Site is located at the corner of the Exit gate to the Nanded Railway
Station.

Area - 1500 sqm. (Approx.)

Built up Area - 2625sqm

Structure - There are railway offices which are to be dismantled by the Developer.

Surroundings -South: Station Road


East: Railway land and colony
West: Station Exit road
North: Vacant Railway land

Accessibility - The site is accessible from the station approach road.

Topographical Features - The site is virtually level land and has a rectangular shape.

1.4 GUIDELINES ON EXPRESSION OF INTEREST


Objective: The Objective of the EOI is to increase the base for the participation in the MFC
projects by end users like retailers, hoteliers, banks, pharmacies, bookstores, who operate
individually or as large corporate entities, who may or may not be interested in development of the
project. The EOI is not a valid bid in the development process, but instead serves as an offer for
leasing of the eventual premises.

Expressions of interest are invited from end users like large chain retailers, hoteliers, and small
individual entrepreneurs interested in leasing the premises on a short term basis (min of 9 years) as
an indicative rental for developers who might be interested in leasing the land and developing the
project.

Project Information Memorandum


Page 5
Development of MFC at Nanded railway station
Rail Land Development Authority

Expressions of interest are also invited from large developers who have executed projects in
multiple cities, who may have a standard set of tenants

Since the process followed is an open tender, retailers and hoteliers who are interested in
development are advised to send in expressions of interest, as the EOI would provide indicative
rentals to the final winner of the bidding process.

 The EOIs may be annexed to the amended tender document to enable greater transparency for
bidders.

 Retailers and Hoteliers interested in leasing space may send in expressions of interest, as this
will provide an indicative rental for final leasing from the winner of the final bid.

 EOI must be stamped and signed by the authorized signatory of the company.

 EOI will not be the final contract between the winner of the bid and the end user, which will be
subject to negotiations etc. as in the case of any private commercial deal.

 EOI from developers will not be considered as a valid bid for the project, since the valid bid will be
only considered as per the normal rules of tendering by RLDA.

2 NANDED

2.1CITY PROFILE
Nanded is the second largest city in the Marathwada region of Maharashtra, India and is also
the headquarters of Nanded district. Nanded has a history that dates back to over 7 centuries.
The city is famous for its religious significance in the history. Famous among all is the
TakhatSachkhandShriHazurAbchalnagar Sahib Gurudwara (SachkhandGurudwara), one of the
five Takhatsof the Sikh religion. It is in Nanded that Shri Guru Gobind Singh, the last living Sikh
Guru consecrated the Holy Granth Sahib as the eternal Guru of Sikhism in 1708. The event and
location where the consecration took place is referred to as the Gur ta Gaddi (Throne of the
Guru).
The name Nanded is widely believed to have originated from "NANDI" Vahan of Lord Shiva,
who performed penance on the banks (TAT) of River Godavari. This "NANDI TAT" became
NANDED.

SachkhandGurudwara

Project Information Memorandum


Page 6
Development of MFC at Nanded railway station
Rail Land Development Authority

2.2 LOCATION AND CONNECTIVITY


Nanded city is about 260 km each from Aurangabad and Hyderabad and about 350 km from
Nagpur.

Location of Nanded on the Map of Maharashtra

The district of Nanded lies in the border of Maharashtra and shares boundaries with Yavatmal
District in the north, Parbhani, Latur and Osmanabad Districts in the west, Bidar District of
Karnataka in the south and Nizamabad&Adilabad Districts of Andhra Pradesh in the east.

The city of Nanded is surrounded by three Trunk National Highways of India – NH 6, NH 7 and NH
9. Besides these national connections, there are many state level highways linking it to the major
regional and state centers. Approximate distances of Nanded from major cities are:

Project Information Memorandum


Page 7
Development of MFC at Nanded railway station
Rail Land Development Authority

Distance of Important City Center from Nanded City

Cities Distance (Km)


Mumbai 700
Nagpur 350
Pune 490
Nasik 530
Hyderabad (A.P.) 295
Aurangabad 301
Wardha 255

The city is well connected by rail, road and air transport services. Indian Railways has its own
Division of the South Central Railways at Nanded. It is well connected by train services to all parts
of the country, including the metropolitan cities important urban areas- Mumbai, Delhi, Nasik,
Chennai, Hyderabad, Pune, Lucknow, Bhopal and other major towns.
Recently, Nanded airport has become operational for commercial traffic with healthy connectivity
to Nagpur, Mumbai and Delhi. The air transport services to other major cities are expected become
operational in a year or two. This is a Greenfield airport developed on PPP model. The nearest
international airport is at Hyderabad, around 300 km away from Nanded. Other airport in the
vicinity is at Nagpur which is at about 350 Km away from the city center

2.3 DEMOGRAPHY
Nanded is a typical midsized city in Maharashtra. However due in part to its location and history, it
is more diverse than its peers. Majority of the people 95% speak Marathi. About 5% of its
population is Muslim and speaks a Deccan version of Urdu. Another 4% is Punjabi/Hindi speaking
Sikhs. Also there is substantial amount of Telugu speakers.

Demographic trends in Nanded


Year Population Area in Sq. Km Population Density Annual Growth rate
1971 126,518 15.26 8,291 1.36%
1981 191,269 15.26 12,534 4.22%
1991 309,316 20.62 15,001 4.92%
2001 430,733 51.76 8,322 3.37%
2011 606,000 152 3,987 3.47%
2021 852,000 152 5,605 3.47%

Source: Census of India


As per the recorded population in 2001 census, it became the second largest city in the Marathwada
region of Maharashtra state. Population of Nanded Municipal Area as per Census 2001 is about 4.3
Lakh. Based on the average annual growth rate of the population, it is expected that the population
of the city will reach 8.5 Lakh by 2021. The compounded annual growth rates of population for
decades of 1961- 71, 1971- 81, 1981-91 and 1991-01 are 1.4%, 4.2%, 4.9%, and 3.5% respectively.
The average growth rate of population in the past two decades is about 4.15% which is very high as
compared to the national average growth rate of about 1.5%.

Project Information Memorandum


Page 8
Development of MFC at Nanded railway station
Rail Land Development Authority

2.4 RAIL PASSENGER TRAFFIC


Nanded (NED) is the Divisional Headquarters of Nanded Division of South Central Railway (SCR)
zone of the Indian Railways. The entire Nanded Division was a part of Hyderabad Division but in
2003, Nanded Division was announced as a standalone division catering to a route network of
about 1,002 km.

Presently on the Indian Railway network, Nanded is positioned on the Mumbai-Secunderabad trunk
broad gauge lines connecting the Eastern & Western parts of the country. Nanded would become a
railways junction station after the construction of the proposed broad gauge line connecting
Nanded-Yawatmal-Wardha further to Nagpur.

Average no. of passengers per day – 14306

No. of passenger trains per day – 44

2.5 SITE LOCATION AND ATTRIBUTES


The site is a plot of land measuring 1500 sq m and located near Nanded Railway Station. The site is
bounded by station road on the north side and vacant railway land on south side. To the east is
railway colony and land and to the west is station exit road. There are few railway offices existing
on site which are to be dismantled by the Developer.

IMAGE - 1

Nanded Railway Station

Site

Project Information Memorandum


Page 9
Development of MFC at Nanded railway station
Rail Land Development Authority

IMAGE – 2

Site

2.6 SITE PHOTOGRAPHS

Photograph of Nanded Railway


Station. The site is behind the
advertisement board.

Project Information Memorandum Page


10
Development of MFC at Nanded railway station
Rail Land Development Authority

Site

Exit road of station.


Plot is on the left side
of the road and right
side is parking area.

Project Information Memorandum Page


11
Development of MFC at Nanded railway station
Rail Land Development Authority

Station road. Plot is on


left side of the road.

2.7 CATCHMENT AREA


The analysis of the catchment area of the station is illustrated pictorially in the figure below:

The area south of the railway line is the old city area and all the important government offices are
located in this area. This area is thickly populated and heavily congested due to the presence of
Railway Station, Govt. Hospital, Nanded Textile Mills, Government offices and Institutions, Old
Mondha, SachkandGurudwara and large scale commercial and residential buildings. Godavari River
flows through this area. Due to inadequate connectivity and the barrier posed by the railway line
development in the city is largely sandwiched between the river Godavari and the railway line.

Project Information Memorandum Page


12
Development of MFC at Nanded railway station
Rail Land Development Authority

The northern side of the station area is a lower order commercial development with small shops
like Xerox centers, sweet shops, garages variety stores etc. A major portion in this side of the
railway station is covered under Dhyanchand stadium out of which the municipality office of the
city also operates.
Beyond about 1 km from the station building on the northern side, there are newly developed
residential plotted developments with very limited commercial development.
The railway settlement area has railway quarters and railway offices. There are two road over
bridges which links the northern and southern side of the city and is at a distance of about 1.5 km
from the station area on each side.

2.8 PLOT DETAILS AND AREA STATEMENT


The considered area of the subject land plot is about 1,500 sq m,

Area Statement for the Proposed MFC

Area Statement
1500 in SQM
Site Area
16,140 In sft.
Maximum Built up Area 28,255.50 In sft.

2.9 SUGGESTED PRODUCT MIX


Nanded is famous for its SachkhandGurudwara and is an important pilgrimage site for the Sikhs.
Thus the MFC location could benefit from a budget hotel/guest house.

HOTEL RETAIL RETAIL AMENITIES


• Rooms (AC/ Non AC) • Retail • ATM
• Dormitory Retail Shops/Dining • Clinic
• Community Retail Shops/Dining • Internet
Center/Restaurant/Banquet • Anchor/Food Café/ISD/PCO
Court/Food Plaza • Variety Store
Anchor/Food • Pharmacy/Book Stalls
Court/Food Plaza • Bank Branch + ATM
• Vanilla Shops • Prepaid Taxi Car
Vanilla Shops Rentals
• Lounge S • Cloak Rooms
Lounge Shops • Tourist Information
Boot

Project Information Memorandum Page


13
Development of MFC at Nanded railway station
Rail Land Development Authority

2.10 SITE LAYOUT PLAN


Plot Area: Approximately 1,500 square meter

Project Information Memorandum Page


14