NORTH

General Notes
6
A1 B
Roof pitch = 4O
IBR roofing sheets on
9220 75x50x20x2 lipped channel purlins.
6mm ceiling board fixed Purlins on welded steel truss: 50X50X5 angle for top
220 3000 110 2000 110 3560 220
150x150mm
to steel ceiling buttens
at 600mm c/c.
and bottom cord; 40x40x5 angle for vertical and
diagonal webs. 1. All dimensions and relevant details to be
989 1022 989 867 533 600 544 1022 644 950 620
verified on site before construction
Aluminium gutter

commences and all disrepencies to be

1470
220
NC7 NE 1 NC7 ELECTRICAL LEGEND
w.c
Ceiling light fitting reported to the draftsman immediately.

461
Shower D-1
Single light switch @ 1200mm Lintel beam over window
Kitchen above finished floor level

3970
949
10.7 m 2 External wall mounted light fitting @
A A 2500mm above ground level Concrete beam 2.Manufacturers of fabricated

2700
Ceramic tiles

3000

2500
Bathroom Single three-pin outlet @
components to verify dimensions on site

2350
Bedroom 2 Kitchen Passage
6.0 m 2 300mm above finished floor level
9.0 m 2 Double three-pin outlet @300mm Living room

1270
Ceramic tiles
7
with contractor prior to manufacture.
Ceramic tiles
above finished floor level
Double light switch @
A1 D-2 D-2 1200mm above finished floor level

250 800 120


Ground level

950 150
110 1110 110

Stove plug in - 1200mm above Hardcore filling Hardcore filling


1850 850 300 300 850 850 1560
Passage
2000 finished floor level
3. Prestressed reinforced concrete lintel
9.7m 2
2250 850 400
Ceramic tiles
Electrical board
beams above all the openings.
8770

600 2565 600 620 600 2265 600 650 600


320x320mm brick column
WEST EAST

664
D-2
4. Kitchen outlets placed @ 1200 mm
3060 30 mm cement sand resting on 600x600x300 Concrete pad footing.
250x600mm Concrete strip footing screed(1:4mix) laid on a 120 10mm sand cement plaster rendered.
Living room
Bedroom 1 (1:2:4 mix) on well compacted mm concrete floor slab (1:2:4
above finished floor level.

NC7

1022
13.7 m 2 natural earth. Foundation trenches mix) on dpm on 150mm
14.0 m 2
Ceramic tiles treated with anti-termite solution to compacte hardcore filling 220mm wall reinforced every third course and rendered
Ceramic tiles
manufacturer's (free of organic materials) on with 13mm sand cement external plaster(1:6 mix) and
4000

5. Unless otherwise stated, manufactured

4220
specification.Depth of foundation well compacted earth treated 10mm sand cement internal plaster.Painted one coat primer

220 1014
trenches to be 900mm below with anti-termite solution to and two finishing coats.
D-1
NC7
natural ground level. manufacturer's specification.
bricks shall be tested and approved.

Section B-B
Verandah

1300
6.9 m 2
Ceramic tiles 6. Brick columns to be constructed with
6

320
210 x 100 x 100 super cement bricks.
220

NC4

2410 320 2230 320


1 : 100
995 1511 995 1273 1022 1415 950 620

220 3500 220 5060 220

B
Bathroom
Bedroom 2
SOUTH Kitchen

Floor plan Ground level

1 1 : 100

Section A-A
7
Doors Windows
850 1511

1 : 100 NC4 F7

949
D-1

No.1 Description Date


Required number: 1
Steel pressed frame

2100
Required number: 2
Steel pressed frame
1022
Plaster and paint
Concrete beam over NC7 F7
Plaster and paint

949
Required number: 4
850
Steel pressed frame

D-1 D-2
NC 4 NC 7 533
NC 7 NE 1
Required number: 3

2000
Steel pressed frame

654
Required number: 1
Steel pressed frame
Ground level Ground level

South East Door and window legend


2 1 : 100
4 1 : 100 1 : 100

D-1
Plaster and paint

NC 7
NE 1
NC 7
PROJECT TITLE
Two-bedroom house to be constructed at
Plaster and paint
Kanyenvu village, Zilitene Area.
Ground level Ground level

DRAWING TITLE
North West Floor plan,Elevations, Sections, door and
3 1 : 100
5 1 : 100
window legend; and 3D
CLIENT Ms. Regina Mwanangombe
DRAWN BY Liseho Mutu
CHECKED Dean Mutu
DATE 06/13/2023 11:21:30 pm

SCALE As shown SHEET NO A1


General Notes
NORTH
1. All dimensions and relevant details to be
verified on site before construction
commences and all disrepencies to be
reported to the draftsman immediately.

B
6
A1
2.Manufacturers of fabricated
components to verify dimensions on site
9220 with contractor prior to manufacture.

220 3000 110 2000 110 3560 220 3. Prestressed reinforced concrete lintel
beams above all the openings.
989 1022 989 867 533 600 544 1022 644 950 620
4. Kitchen outlets placed @ 1200 mm
above finished floor level.

220
NC7 NE 1 NC7 ELECTRICAL LEGEND
w.c 5. Unless otherwise stated, manufactured
Shower D-1 Ceiling light fitting bricks shall be tested and approved.
Single light switch @ 1200mm
Kitchen above finished floor level 6. Brick columns to be constructed with
10.7 m2 External wall mounted light fitting @
210 x 100 x 100 super cement bricks.
Ceramic tiles 2500mm above ground level
3000

Bathroom Single three-pin outlet @


A Bedroom 2
9.0 m2
6.0 m2
Ceramic tiles
A 300mm above finished floor level
Double three-pin outlet @300mm
Ceramic tiles
7 above finished floor level
A1 Double light switch @
D-2 D-2 1200mm above finished floor level
110 1110 110

Stove plug in - 1200mm above


1850 850 300 300 850 850 1560 2000 finished floor level
Passage
9.7m2 Electrical board
2250 850 400
8770

Ceramic tiles

WEST EAST

664
D-2
3060
Living room
Bedroom 1

NC7

1022
14.0 m2
13.7 m2 No.1 Description Date
Ceramic tiles
Ceramic tiles
4000

4220
220 1014
D-1
NC7

Verandah

1300
6.9 m2
Ceramic tiles

320
220

NC4

2410 320 2230 320

995 1511 995 1273 1022 1415 950 620

220 3500 220 5060 220


PROJECT TITLE
Two-bedroom house to be constructed at
B Kanyenvu village, Zilitene Area.

DRAWING TITLE
Floor and electrical plan

SOUTH CLIENT Ms. Regina Mwanangombe


DRAWN BY Liseho Mutu

Floor plan CHECKED Dean Mutu


1 1 : 50
DATE 06/13/2023 9:27:38 pm

SCALE As shown SHEET NO A2


General Notes
1. All dimensions and relevant details to be
Plaster and paint
verified on site before construction
Concrete beam over commences and all disrepencies to be
Plaster and paint reported to the draftsman immediately.

2.Manufacturers of fabricated
components to verify dimensions on site
D-1 with contractor prior to manufacture.
NC 4 NC 7
NC 7

3. Prestressed reinforced concrete lintel


beams above all the openings.

Ground level Ground level 4. Kitchen outlets placed @ 1200 mm


above finished floor level.

East 5. Unless otherwise stated, manufactured


South 3 1 : 60
bricks shall be tested and approved.
1 1 : 60 6. Brick columns to be constructed with
210 x 100 x 100 super cement bricks.

D-1
No.1 Description Date
Plaster and paint

NE 1

NC 7 NC 7

Plaster and paint

Ground level Ground level

North West
2 1 : 60 4 1 : 60

PROJECT TITLE
Two-bedroom house to be constructed at
Kanyenvu village, Zilitene Area.

DRAWING TITLE
Building elevations

CLIENT Ms. Regina Mwanangombe


DRAWN BY Liseho Mutu
CHECKED Dean Mutu
DATE 06/13/2023 10:00:07 pm

SCALE As shown SHEET NO A3


Roof pitch = 4O General Notes
IBR roofing sheets on
75x50x20x2 lipped channel purlins. 1. All dimensions and relevant details to be
6mm ceiling board fixed Purlins on welded steel truss: 50X50X5 angle for top verified on site before construction
to steel ceiling buttens and bottom cord; 40x40x5 angle for vertical and commences and all disrepencies to be
150x150mm at 600mm c/c. diagonal webs. reported to the draftsman immediately.
Aluminium gutter
2.Manufacturers of fabricated

components to verify dimensions on site

1470
461 with contractor prior to manufacture.

3. Prestressed reinforced concrete lintel


Lintel beam over window beams above all the openings.

3970
949

Concrete 4. Kitchen outlets placed @ 1200 mm

2700
2500
beam above finished floor level.

2350
Kitchen Passage
Living room 5. Unless otherwise stated, manufactured
1270

bricks shall be tested and approved.

6. Brick columns to be constructed with


250 800 120

Ground level

950 150
Hardcore filling Hardcore filling 210 x 100 x 100 super cement bricks.

600 2565 600 620 600 2265 600 650 600


320x320mm brick column
30 mm cement sand resting on 600x600x300 Concrete pad footing.
250x600mm Concrete strip footing(1:2:4 screed(1:4mix) laid on a 120 10mm sand cement plaster rendered.
mix) on well compacted natural earth. mm concrete floor slab (1:2:4
Foundation trenches treated with anti- mix) on dpm on 150mm
termite solution to manufacturer's compacted hardcore filling 220mm wall reinforced every third course and rendered
specification.Depth of foundation (free of organic materials) on with 13mm sand cement external plaster(1:6 mix) and
trenches to be 900mm below natural well compacted earth 10mm sand cement internal plaster.Painted one coat primer
ground level. treated with anti-termite and two finishing coats.
solution to manufacturer's
specification.
No.1 Description Date

Section B-B
1 1 : 50

Bathroom
PROJECT TITLE
Bedroom 2
Two-bedroom house to be constructed at
Kitchen
Kanyenvu village, Zilitene Area.
Ground level
DRAWING TITLE
Buliding sections

CLIENT Ms. Regina Mwanangombe

Section A-A DRAWN BY Liseho Mutu


2 1 : 75 CHECKED Dean Mutu
DATE 06/13/2023 10:27:27 pm

SCALE As shown SHEET NO A4


General Notes
1. All dimensions and relevant details to be
verified on site before construction
commences and all disrepencies to be
reported to the draftsman immediately.

Septic tank
2.Manufacturers of fabricated
components to verify dimensions on site
with contractor prior to manufacture.

3. Prestressed reinforced concrete lintel


beams above all the openings.

4. Kitchen outlets placed @ 1200 mm

Sewer piping
above finished floor level.

5. Unless otherwise stated, manufactured


bricks shall be tested and approved.

6. Brick columns to be constructed with


210 x 100 x 100 super cement bricks.

20mm HDPE Pipe

NC7 NE 1 NC7
w.c
Shower D-1

Kitchen
10.680 m2
Ceramic tiles
Bedroom 2 Bathroom
9.0 m2 6.0 m2
Ceramic tiles Ceramic tiles

D-2 No.1 Description Date


Water connection

D-2

Passage
9.746 m2
Ceramic tiles

D-2

Living room
Bedroom 1

NC7
15.180 m2
14.0 m2 Ceramic tiles
Ceramic tiles

D-1
NC7
PROJECT TITLE
Verandah
5.280 m2 Two-bedroom house to be constructed at
Ceramic tiles Kanyenvu village, Zilitene Area.
NC4
DRAWING TITLE
Connection to existing water Plumbing networks
supply network
CLIENT Ms. Regina Mwanangombe
DRAWN BY Liseho Mutu
CHECKED Dean Mutu
Plumbing networks
1 1 : 50
DATE 06/13/2023 10:55:45 pm

SCALE As shown SHEET NO A5