9.5m Pole GA - Rev B

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

1 2 3 4 5 6

REVISIONS ULTIMATE BASE REACTIONS PILE


REV. DESCRIPTION DATE APPROVED
Part No. Pole Type Axial - P Shear - V Torque - T Moment - M Depth
A Drawing created 12.01.21 AS (kN) (kN) (kNm) (kNm) (m)
B Update drawing 26.03.21 AS 900.0 900.0
MFP-016 M2B - 9.6m 3 12 3 66 2.6

A A
WIND SPEED DATA NOTE:
Banners to be removed prior
Wind Region C
VL - LUMINAIRE to Cyclonic Conditions.
We-ef RFL530 Terrain Category TC3
(By others)

OPTIONAL
Double Light Arm

Mast
B B

130.0

OPTIONAL
Fabric Banner Kit
(0.9 x 2.0m) ELECTRICAL
9600.0 - Overall Height

EQUIPMENT HATCH

710.0
8200.0 - VL Height

3408.0
MAST - Ø215

170.0
Material: Extruded Aluminium SECTION B-B
Finish: Anodised Clear SCALE 1 : 5

B B 380.0 - PCD
C ELECTRICAL C
EQUIPMENT HATCH

600.0
6000.0

Low Level
GPO

SPLIT CLADDING

493.0
CLADDING - Ø250
Equipment Hatches
Material: Extruded Aluminium
Finish: Anodised Clear Equipment
A A FGL
Plate
Low Level
2258.0

GPO Box
Slots suit to
M24 HD Bolts
SECTION A-A STEEL CORE
SCALE 1 : 10 SCALE 1 : 20
1000.0

D STEEL CORE D
Material: Mild Steel 350
PROJECT DATE SHEET MATERIAL
Finish: HD Galvanised 573 - Tondoon Botanical Gardens 12.01.21 A3 N/A
FGL DWG TITLE DRAWN CHECKED FINISH

TOLERANCE
MFP sys t ems 9.6m Pole GA
DWG No. PART No.
A.SMITH J.McLEOD
REVISION SCALE
N/A
WEIGHT
x.x ± 1.0 multi function pole 9.6m Pole MFP-016 B 1:40 341.1 kg
FRONT VIEW x.xx ± 0.5
SIDE VIEW www.mfpsystems.com.au Ph: +61 2 8593 6092 C Copyright 2012
1 2 3 4 5 6

You might also like