BILL OF QUANTITY CIVIL WORK

ITEM DESCRIPTION UNIT RATE

GENERALLY

The following Bills of Quantities are a guide only. It is the responsibility of


the Tenderer to measure and satisfy themselves of of the accuracy of the
quantities for works requiring payment. The descriptions provided herein
are for a guide only as to the required scope of Works which form part of
this Contract and should be cross-referenced with all drawings and
specifications. The format provided in these Bills should be followed in
order to assist in tender evaluation. Within each trade or section of works
space is provided for Tenderer to insert additional works items which
require payment.

Summary Instruction
- Duration of Works : 90 Days
- The BOQ is assumption, The Winner will have BOQ Syncronization refer
to For Construction Drawing

A PREPARATION
1 Mobilisasi, demobilisasi alat, perlengkapan kerja, scafolding, material dan 24,750,000.00
semua keperluan proyek
2 Staf pengelola Supervisi dan administrasi 107,250,000.00
3 Kantor, toilet pekerja, workshop & gudang lapangan termasuk segala 85,800,000.00
perlengkapan dan pemeliharaan sampai proyek selesai
4 Perawatan jalan masuk serta perbaikan jalan kawasan yang ada setelah 10,010,000.00
proyek selesai
5 Penyediaan peralatan keselamatan dan kesehatan kerja /PPE (sepatu, 41,800,000.00
helm dll), pencegahan kebakaran, kesejahteraan pekerja dll.
6 Biaya keamanan proyek dan pengamanan lapangan termasuk keamanan 44,550,000.00
barang kontraktor lain yang terlibat selama pekerjaan PCC (jika ada
kehilangan barang kontraktor lain menjadi tanggung jawan kontraktor
PCC)
7 Pagar sementara, Pembatas, Barikade, Partisi dan perlindungan 16,500,000.00
sementara terhadap bangunan existing, listrik, saluran dan instalasi lainnya
yang sudah ada
8 Laporan kemajuan pekerjaan dan foto kerja 6,000,000.00
9 Pengukuran ketepatan As & CL bangunan, pematokan, pengecekan 10,725,000.00
bangunan existing, pemakaian laser thedolite untuk pengecekan
permukaan finishing dan lain-lain termasuk pekerjaan sub Kontraktor
10 Air kerja, listrik, penerangan lapangan, telepon & faximile 17,050,000.00
11 Asuransi pekerja (BPJS Ketenagakerjaan) 22,500,000.00
12 Biaya gambar kerja (shop drawing) dan Gambar Terlaksana (As-built 11,550,000.00
drawings)
13 Pembersihan, kebersihan lapangan dan perapihan akhir termasuk 10,500,000.00
koordinasi kebersihan sub kontraktor
14 Biaya pekerjaan baik di dalam atau di luar area proyek seperti Tebang 100,000,000.00
Pohon dalam lokasi / Pembuangan / pemindahan,
Penambahan/Penggantian dan Peninggian Tiang Telepon, pembongkaran
tembok, penarikan kabel PLN / telepon diluar volume tercantum, fasum
fasos, ijin lokal, biaya non teknis, dan lain-lainnya.

15 Pekerjaan Pre-Boring 7,500,000.00


16 Temporary CCTV connect internet untuk monitoring site selama pekerjaan 1,500,000.00
(setelah proyek selesai dapat di remove)

B CIVIL WORKS

B.1. LAND DEVELOPMENT


1 Cut soil works (excavation) 52,872.02
2 Back filling soil to +0.00 elevation (imported soil from outside) compacted 104,400.00
to reach CBR >5%, including CBR test per 50cm thickness, per 25m2 area.

B.2. RETAINING WALL AND GEOGRID

1 Excavation 52,872.02
2 Sand Layer 264,550.00
3 Stone masonry works 771,621.27
4 Concrete K175 for Tie Beam (sloof) 963,050.00
5 Pipe Dia 1 inch (PVC) 28,416.67
6 Geogrid Polyfelt PEC 50 works (including supervision from Geosinindo and 65,550.00
soil testing by Third party)
7 Hebel works including plestering and finishing 466,650.00
8 Rebar for sloof and column 15x15 cm 14,368.75
9 Formworks for sloof and column 15x15 cm 147,950.00
10 Concrete K175 for sloof and column 15x15 cm 965,550.00

B.3. FENCE
Pekerjaan pemasangan pagar V-Crimp sepanjang batas lahan type 645
040 color white (Surftmist) termasuk rangka L 70.70.7, pondasi beton,
angkur, tie beam dan kolom praktis
1 Excavation 52,872.02
2 Stone masonry works 771,621.27
3 Backfil 45,550.00
4 V crimp 203,550.00
2 L 70 21,353.75
3 Tie beam 965,550.00
4 Bekisting 147,950.00
5 Rebar D13 14,368.75
6 Stirrup dia 10-150 14,368.75
7 Angkur 55,550.00
8 Base plate PL 16 21,353.75

B.4. DRAINAGE
1 Concrete Pipe D300 (Dusaspun) 284,104.47
2 Concrete Pipe D400 (Dusaspun) 378,702.84
3 Concrete Pipe D500 (Dusaspun) 495,301.21
4 Manhole with grating 2,200,000.00
5 Manhole with concrete 2,365,000.00
6 Gutter (U Ditch In Situ) 500x500 with Steel Grating UNP 150 & L70
7 Soak Well Dusaspun depth 4 m complete with concrete cover, INCL PVC 6,701,804.63
PIPE Dia 100 mm and layer as per drawing reference
8 Inlet Pipe to drainage, PVC 6inch 225,525.00

B.5. MONITORING WELL


1 Pekerjaan Monitoring Well (tank farm) / (PVC Rucika by Indeco) 7,000,000.00
2 Pekerjaan Observation Well (indeco) 12,500,000.00
3 Tutup Monitoring Well (UJB), Soak Well dan Manhole 2,777,700.00

C PEKERJAAN PONDASI BORED PILE / MINIPILE

C.1. MOB DEMOB EQUIPMENT 22,000,000.00

C.2. FORECOURT
1 Bore Pile 40x40 cm, (supply & install)
2 Bore Pile 30x30 cm, (supply & install)
3 Bore Pile 20x20 cm, (supply & install)
4 Minipile 20x20 cm, (supply & install)
5 Minipile 25x25 cm, (supply & install) 264,000.00
6 Welding of pile jointing point 5,500.00
7 Handling Material 5,500.00
8 Dolly 70,000.00
9 Cutting of pile head 65,000.00
10 PDA Test 7,500,000.00

C.3. BUILDING

1 Bore Pile 40x40 cm, (supply & install)


2 Bore Pile 30x30 cm, (supply & install)
3 Bore Pile 20x20 cm, (supply & install)
4 Minipile 20x20 cm, (supply & install)
5 Minipile 25x25 cm, (supply & install) 264,000.00
6 Welding of pile jointing point 5,500.00
7 Handling Material 5,500.00
8 Dolly 70,000.00
9 Cutting of pile head 65,000.00

C.4. UNDERGROUND STORAGE TANK

1 Bore Pile 40x40 cm, (supply & install)


2 Bore Pile 30x30 cm, (supply & install)
3 Bore Pile 20x20 cm, (supply & install)
4 Minipile 20x20 cm, (supply & install)
5 Minipile 25x25 cm, (supply & install) 264,000.00
6 Welding of pile jointing point 5,500.00
7 Handling Material 5,500.00
8 Dolly 70,000.00
9 Cutting of pile head 65,000.00
C.5. MONOLITH

1 Bore Pile 40x40 cm, (supply & install)


2 Bore Pile 30x30 cm, (supply & install)
3 Bore Pile 20x20 cm, (supply & install)
4 Minipile 20x20 cm, (supply & install)
5 Minipile 25x25 cm, (supply & install) 264,000.00
6 Welding of pile jointing point 5,500.00
7 Handling Material 5,500.00
8 Dolly 70,000.00
9 Cutting of pile head 65,000.00

D STRUCTURAL

D.1. FORECOURT

D.1.1. FORECOURT PILE CAP


1 Excavation 52,872.02
2 Soil backfill 45,550.00
3 Soil disposal 71,598.21
4 Sand Layer 264,550.00
5 Lean Concrete 894,850.00
6 Formworks 147,950.00
7 Rebar 14,368.75
8 Concrete K-300 1,342,550.00

D.1.2. FORECOURT SLAB


1 Excavation 52,872.02
2 Sub basecoarse 4/6 CBR 40% 319,000.00
3 Limestone CBR 80% 336,325.00
4 Lean Concrete 894,850.00
5 Formworks 147,950.00
6 Rebar 14,368.75
7 Concrete K-300 1,342,550.00
8 Besi siku L40x40x4 21,903.75
9 Construction joint
- Rebar D19 14,368.75
- Pipa Dia 1 inch steel 28,450.00
- Joint sealant & styrofoam 17,550.00
- Joint filler to paving block 8,000.00

D.1.3. FORECOURT STEEL STRUCTURE


1 Steel material, HT bolts, anchors, fabrication, delivery, erection incl crane
rental, paint, and painting (120 micron & 80 micron)
a. Column 21,903.75
b. Roof 21,903.75
c. fascia 21,903.75
d. Canopy Extension (pipe & roof Agtex/ Heytex) 1,555,000.00
2 Hydraulic Jack Rental for TCC method erection (optional) 30,000,000.00
3 NDT and Penetrant Testing (welding) 18,775,000.00

D.2. BUILDING
D.2.1. BUILDING 1ST FLOOR
D.2.1.1. CONCRETE PILE CAP
1 Excavation 52,872.02
2 Soil backfill 45,550.00
3 Soil disposal 71,598.21
4 Sand Layer 264,550.00
5 Lean Concrete 894,850.00
6 Formworks 147,950.00
7 Rebar 14,368.75
8 Concrete K-300 1,342,550.00

D.2.1.2. CONCRETE TIE BEAM


1 Excavation 52,872.02
2 Soil disposal 71,598.21
3 Formworks 147,950.00
4 Rebar 14,368.75
5 Concrete K-300 1,342,550.00

D.2.1.3. CONCRETE SLAB


1 Lean Concrete 894,850.00
2 Formworks 147,950.00
3 Rebar 14,368.75
4 Concrete K-300 1,342,550.00

D.2.2. BUILDING 2ND FLOOR


D.2.1. SLAB
1 Formworks 147,950.00
2 Rebar wiremesh 186,343.10
3 Concrete K-300 1,342,550.00
4 Supply & install Bondex 96,950.00

D.2.3. STEEL STAIRCASE


1 Formworks 147,950.00
2 Rebar 14,368.75
3 Concrete K-300 1,342,550.00
4 Steel material, HT bolts, anchors, fabrication, delivery, erection incl crane 21,903.75
rental, paint, and painting (120 micron & 80 micron)

D.2.4. STEEL STRUCTURE BUILDING


D.2.4.1. STEEL STRUCTURE BUILDING 1st FLOOR
1 Steel material, HT bolts, anchors, fabrication, delivery, erection incl crane
rental, paint, and painting (120 micron & 80 micron)
a. Column 21,903.75
b. Beam 21,903.75
c. Roof 21,903.75
d. Fascia 21,903.75

D.2.4.1. STEEL STRUCTURE BUILDING 2nd FLOOR


1 Steel material, HT bolts, anchors, fabrication, delivery, erection incl crane
rental, paint, and painting (120 micron & 80 micron)
a. Column 21,903.75
b. Beam 21,903.75
c. Roof 21,903.75
d. Fascia 21,903.75
D.3. UNDERGROUND STORAGE TANK
including Pump as supporting tools if required for dewatering
1 Excavation 52,872.02
2 Soil Fill (Pie Gravel) Tank 287,375.00
3 Back fill (slope area) 45,550.00
4 Soil disposal (Tank) 71,598.21
BOTTOM SLAB
5 Lean Concrete 894,850.00
6 Formworks 147,950.00
7 Wiremesh 186,343.10
8 Concrete K-300 1,342,550.00
9 Omega Anchore 32 mm Galvanized 852,500.00
UPPER SLAB
10 Subbase course 319,000.00
11 Base course 336,325.00
12 Lean Concrete 894,850.00
13 Formworks 147,950.00
14 Wiremesh 186,343.10
15 Concrete K-300 1,342,550.00
16 UST installation 8,000,000.00
17 Geo textile 30,800.00
18 Capping Beam 2,500,000.00

E. ARCHITECTURE
E.1. WALL
1 DINDING BAGIAN LUAR
Dinding bata ringan dengan adukan semen pasir trassraam (1:2) dengan &
berikut per-kuatan kolom praktis, balok praktis beserta kawat ayam untuk
plesterannya termasuk dowell mati denganjarak maximum 600 mm c/c ke 212.38
kolom praktis dan dowell hidup ke kolom struktur dan lantai

2 DINDING BAGIAN DALAM


Dinding bata ringan dengan thin bed mortar termasuk perkuatan kolom
praktis, balok praktis keliling lubang pintu & jendela; termasuk dowell mati
dengan jarak max. 600 mm c/c ke kolom praktis dan dowell hidup ke kolom 134,400
struktur dan ke lantai sampai 15 cm dari level ceiling bagian atas dibuat
rolaag.

3 Partisi Kaca (Kode GW) - Glass Wall (SHOP / QSR AREA) 951,600.00
PANASAP GLASS / EURO GREY / Thickness 12 mm / SIZE 2134X3210
mm
4 Plesteran dan acian 96,000
5 Waterproofing dinding AM100, setinggi 150 cm dari permukaan lantai
untuk semua dinding area basah (Toilet & Janitor) 82,400
6 Dinding BRC (Genset Room) 576,000

E.2. FLOOR
E.2.1. Demarcation line (Forecourt and Discharge) 89,650.00
E.2.1. Floor Finishes
1 F1 - BUILDING FLOOR 361,725.00
Ceramic Tile ROMAN / G559001 / Crystalline Bone / 50x50 – Gol. A
2 F2 - TERRACE BUILDING & ISLAND 223,391.67
Ceramic Tile ROMAN / G440503 / dDomica Volcanic / 40x40 – Gol. B
3 F3 - TOILET FLOOR 223,391.67
Ceramic Tile ROMAN / 33416RP / dBulgaria Beige / 30x30 – Gol. B
4 F4 - PRAYER ROOM 361,725.00
Ceramic Tile ROMAN / G557338 / dParquet Cream / 50x50 – Gol. A
5 F5 - GENSET ROOM & SERVICE BAY (LUBE BAY) 85,030.00
Concrete Floor - SIKA / DARK GREY / LEAN CONCRETE / CHAPDUR
FLOOR HARDENER
6 Epoxy for Lube Bay 185,550.00
7 F6 - ELECTRICAL ROOM 250,000.00
Rubber - ANTI-STATIC INSULATION RUBBER - T = 2mm

E.3. CEILING (incl all accessories)


1 C1 - INDOOR BUILDING AREA 168,850.00
SHEETROCK USG BORAL JAYABOARD, Thickness: 9mm
2 C2 - TOILET / WET AREA 168,850.00
WETAREA OPTIMUM USG BORAL JAYABOARD, Thickness: 9mm
3 C3 - EXTERIOR / TERRACE AREA 943,708.33
ALUMINIUM COMPOSITE PANEL EX. SEVEN / PVDF 0.3 / WHITE QS
3103
4 C4 - FORECOURT 451,000.00
HUNTER DOUGLAS / LUXALON 200F
5 Pekerjaan Aluminium Composit Panel Cover Kolom Baja 943,708.33

E.4. ROOF
Pekerjaan pengadaan & pemasangan atap LYSAGHT / KLIP-LOK 700 HI-
STRENGTH - COLOR SURFMIST - COVER WIDTH 700MM termasuk
semua fixing trapnya flasing dan accessories lainnya yang diperlukan
sesuai Gambar Detail dan Spesifikasi Teknis
1 Roof Forecourt 184,250.00
2 Roof Building 252,450.00
3 Gutter zincalum plat bending 600x150 mm, t = 0.4 mm 127,600.00

E.5. WALL FINISHES


1 W1 (INTERIOR BUILDING) 48,262.50
JOTUN / MAJESTIC TRUE BEAUTY SHEEN / CHI 7236
2 W2 (EKSTERIOR BUILDING) 54,450.00
JOTUN / JOTASHIELD CLASSIC WHITE 9918 / SOYA MILK 1105
*Jotashield primer (white) layer 1x, Antifade colors 2x.
3 W3 (WALL TOILET) 407,950.00
Ceramic Tile ROMAN / W63416R / dBulgaria Biege / 30x60 – Gol. B
4 PW (TOILET PARTITION) 835,000.00
CUBICLE PHENOLIC Height: 2000 mm
5 SK1 (Skirting Paint) 93,725.00
JOTUN MATRIX 9913 - For Interior H=10CM, For exterior H=30 cm from
floor finished level.

E.6. DOOR & WINDOW


1 (Receptionist & lounge) 6,000,000.00
900x2200 (Single)
DOOR PANEL: GLASS 12 mm thk. ACCESORIS DEKKSON:
PULL HANDLE DL 801 32x600 PSS. PATCH FITTING: US 10 PSS, PT 10
PSS, PT 20 PSS, PT 40 PSS.
2 (Select Shop)
1800x2200 (Double)
DOOR PANEL: GLASS 12 mm thk, ACCESORIS DEKKSON:
PULL HANDLE DL 801 32x600 PSS, PATCH FITTING: FH 84 SSS, PT 10
PSS, PT 20 PSS, PT 40 PSS.

3 (Office & Retailer Room) 5,423,000.00


900x2200
DOOR FRAME MATERIAL: STEEL PLATE Thickness 2mm
FRAME: 3", FRAME COLOR FINISH: POWDER COATING WHITE Ex.
JOTUN 9918 Morning Fog, DOOR PANEL MATERIAL: STEEL PLATE
2mm, DOOR PANEL FINISH: POWDER COATING WHITE Ex. JOTUN
9918 Morning Fog, ACCESORIS DEKKSON:
DOOR VIEW: DV 200 CP, HANDLE & LOCK: KC 8203
HINGE: ES-IR-5X3X3MM-4BB-SNn, DOOR CLOSER: DCL 105 NHO

4 (Locker Room, Prayer Room) 5,423,000.00


DOOR FRAME MATERIAL:
STEEL PLATE Thickness 2mm, FRAME: 3"
FRAME COLOR FINISH: POWDER COATING WHITE Ex. JOTUN 9918
Morning Fog
DOOR PANEL MATERIAL: STEEL PLATE 2mm
DOOR PANEL FINISH: POWDER COATING WHITE Ex. JOTUN 9918
Morning Fog
ACCESORIS DEKKSON:
HANDLE & LOCK: KC 8203
HINGE: ES-IR-5X3X3MM-4BB-SNn
DOOR CLOSER: DCL 105 NHO

5 (Electrical room, Lube storage, shop storage, office storage) 5,423,000.00


900x2200
DOOR FRAME MATERIAL: STEEL PLATE Thickness 2mm
FRAME: 3"
FRAME COLOR FINISH: POWDER COATING WHITE Ex. JOTUN 9918
Morning Fog
DOOR PANEL MATERIAL: STEEL PLATE 2mm WITH LOUVRE AT
BELOW THE PANEL
DOOR PANEL FINISH: POWDER COATING WHITE Ex. JOTUN 9918
Morning Fog
ACCESORIS DEKKSON:
HANDLE & LOCK: KC 8203
HINGE: ES-IR-5X3X3MM-4BB-SNn
DOOR CLOSER: DCL 105 NHO

6 (ACCESS DOOR TO TOILET) 5,423,000.00


800x2000, MANUFACTURER, BUILT ON SITE
7 (TOILET) 5,225,550.00
(750x1800)
CUBICLE TOILET Ex. PHENOLIC, Type S.02 with Pedestal
ACCESORIS DEKKSON:
LOCK: DB D02 3 SSS
DOOR STOPPER: DS 001 SSS
8 (Genset Room) 5,076,600.00
2350x2000
DOOR FRAME MATERIAL: PIPE STEEL
DOOR PANEL MATERIAL: BRC
ACCESORIES: HINGE & LOCK BRC STANDARD

9 (PANEL DOOR) 5,423,000.00


650x1400
FINISH: POWDER COATING WHITE Ex. JOTUN 9918 Morning Fog
ACCESORIS DEKKSON:
HINGE: ES-IR-4X3X3MM-4BB-CP
PADLOCK: PL-48MM-SP

10 (LUBE BAY ROLLING DOOR) 27,220,000.00


Manufacture (incl automatic machine), Galvalum 0.8 mm, machine import
japan / taiwan, kabel power (complete set)
11 (SHOP / QSR / OFFICE LUBE BAY AREA) 3,498,000.00
1200x2700 (CUTTING MODUL), DOOR PANEL: GLASS 12 mm
Thickness. FIXTURES: DEKKSON SILICONE NEUTRAL, SILICONE GUN
DEKKSON, GLASS SUCTION
12 (Office & bordes ) 3,498,000.00
1200x1500
WINDOW FRAME MATERIAL: ALUMUNIUM FRAME = 3" WHITE
COLOR Ex. YKK
WINDOW PANEL MATERIAL: GLASS 6 mm Thickness
GLASS FILM TWO WAY 60% visibility reduction Ex. 3M
FIXTURES: (all accessories using dekkson)

13 (Attendant/Staff Room) 3,498,000.00


1200x1500
WINDOW FRAME MATERIAL: ALUMUNIUM FRAME = 3" WHITE
COLOR Ex. YKK
WINDOW PANEL MATERIAL:GLASS 6 mm Thickness
GLASS FILM TWO WAY Ex. 3M
ACCESORIS DEKKSON: HANDLE: CH-423-LH-NA, FRICTION STAY:
HD-T250_20

14 (Prayer Room) 1,980,000.00


2000x1600, KRAWANGAN GRC, FINISH COATING GLOSSY
15 (Toilet Room) 4,081,100.00
OPEN VENTILATION, H = 600 mm from bottom ceiling surface, width
various follow toilet width

E.7. TOILET (SANITARY & FITTING)


1 Urinoir (TOTO - U57M Include Anti Ciprat) 3,993,000.00
2 Floor drain (TOTO - TX1CV2) 485,000.00
3 Closet (TOTO-CW660NJ-SW660J) 3,685,000.00
4 Jet Washer (TOTO - TX403SB-BLACK ) 456,600.00
5 Westafel Toto L521V1A including support 1,850,000.00
6 Kran (TOTO - T23B13V7NB) 420,200.00
7 Tissue holder (TOTO - TX720ACRB) 495,000.00
8 Mirror Built-in 600x600 (SINGLE), 1200x600 (DOUBLE) 1,072,500.00

F. PAYMENT BOOTH & PUMP ISLAND


1 Construction of payment booth (conventional) 28,444,500.00
2 Construction of payment booth (modular) - NEW -
3 Provision of pump island incl. dogbone and ceramics tile 5,555,000.00
4 Payment Booth Modular reparation, delivery, and installation -
(if Modular Payment Booth using Shell's stock)

G. FITTING, FURNITURE, & SECURITY BOX


1 Deposit box 210 kg at payment booth 10,000,000.00
Solingen Bernstein Size 1 T.43 x L.52 x D.50 cm (T.28 x L.37 x D.32 cm)

2 Deposit box 910 kg at cash room 32,550,000.00


Solingen Bernstein Size 8 T.180 x L.65 x D.70 cm (T.165 x L.50 x D.52
cm)
3 Furniture ; 50,000,000.00
- Locker at attendant rooms (4 unit)
- Big Table at Retailer (1 unit) and Chair at Retailer (6 unit)
- Chair "L" (1 unit) and chair (4 unit)
- Interior Payment booth TABLE BUILT-IN CASH CABINET (1 unit)

H. CIVIL EXTERNAL
H.1. OIL WATER SEPARATOR
1 Excavation 52,872.02
2 Soil disposal 71,598.21
3 Sand Fill 253,300.00
4 Formworks 147,950.00
5 Rebar 14,368.75
6 Concrete K-250 1,342,550.00
7 Aluminium angle 152,000.00
8 Manhole cover PL 6mm 21,903.75
9 Install Equipment Oil and Water Separator Cap. 1000L inlet unit, 1000L 1,500,000.00
outlet unit, and 1000L process unit (MATERIAL ZEPPINI SUPPLIED BY
OTHER, L3 PCC INSTALL ONLY)

H.2. MONOLITH
1 Excavation 52,872.02
2 Soil backfill 45,550.00
3 Soil disposal 71,598.21
4 Sand Layer 264,550.00
5 Plastic Sheet 0.5mm thick 6,200.00
6 Formworks 147,950.00
7 Rebar 14,368.75
8 Concrete K-300 1,342,550.00
9 Grouting ( t = 50mm) 1,716,000.00
10 Anchor Bolt M30x600 366,100.00
11 Base Plate 6mm x 420mm x 500mm 21,903.75
12 38mm dia. GI Pipe for electrical cable 100,000.00

H.3. PEKERJAAN CONBLOK PAVEMENT (PAVING BLOCK)


1 Conblok 20 x10 x 8 cm (Cisangkan / setara) 276,650.00
2 Sand layer / sand bedding t=5cm 264,550.00
3 Sub Base coarse 40% t = 15 cm 319,000.00
4 Limestone CBR 80% t = 42 cm 336,325.00

I. OTHER CIVIL WORKS


1 Landscape / taman 121,000.00
2 Concrete driveway (INGRESS EGRESS) (Concrete K300, wiremesh M8- 637,973.31
150)
3 Bollard 6 inch 1,265,000.00
4 Discharge point area (Steel greeting, drainage, painting) incl. excavation, 21,000,000.00
subgrade and concrete.
5 UPP Trench excavation and back fill 187,750.00
6 Flag pole 5,768,616.07
7 Cansteen beton 137,335.00
8 Steel Barricade 2,333,300.00
9 Tempat sampah (floor concrete), with 3 unit @ 150L 3,300,000.00
10 Painting parking area & zebra cross 84,535.00
11 Pekerjaan Drum Area 7,535,000.00
LEAN CONCRETE, PIPE 2” COLUMN, WALL BRC, PAINT MORNING
FOG 9918, COVER POLYCARBONATE
12 Pekerjaan pembuatan lantai Rabad Beton (teras / selasar) tebal 100mm 350,000.00
dengan tulangan susut (Mesh M6-150) dengan finishing kasar (rough
trowel) untuk dilapis keramik lantai dan dibuat dengan level kemiringan
sesuai gambar untuk lantai rabad beton keliling bangunan
13 Ceilling fan at prayer room 700,000.00
14 Carpet at Prayer room 77,500.00
15 Cash counter 3,000,000.00
16 Genset muffler with protection (glasswoll/antipanas) 1,000,000.00
17 H Beam for Genset (optional), will be MOC if any 1,000,000.00
18 Handling, Setting & install Genset (optional), Fork lift rental capacity 3 ton 1,500,000.00

19 Vent Pipe Frame including Foundation 5,000,000.00


20 Concrete oil trap / grease trap, will be MOC if any 15,000,000.00
21 Portable grease trap, will be MOC if any 8,000,000.00
22 Fondation V-Sat 1,000,000.00

J PLUMBING, SANITARY, AND FIRE SERVICES

J1 CLEAN WATER SUPPLY

Equipments (Water Pump, Tank)


Supply and install equipments Clean Water system, as specified and detail
drawing
1 Clean Water Tank Cap. 5,100L, incl filter and accessories 8,500,000.00
2 2 nos Water Pump; 14,415,500.00
- Cap. 135LPM
- Head: 35m
- Power: 2.7kW, 220V, 1Phase, 50Hz
3 Water Pump from Shallow well; 9,119,000.00
- Cap. 135LPM
- Head: 35m
- Power: 2.1kW, 220V, 1Phase, 50Hz
4 Water Meter 566,500.00
5 Sallow Well, depht min __ m 15,000,000.00

Supply and install Clean Water pipe, PPR PN10 including accessories or
fittings, and support as specified and detail drawing
6 Header Pipe PPN10 Ø 40mm 5 connections 305,000.00
7 PPR-PN10 Pipe Ø 15 mm 20,000.00
8 PPR-PN10 Pipe Ø 20 mm 25,000.00
9 PPR-PN10 Pipe Ø 25 mm 30,000.00
10 PPR-PN10 Pipe Ø 40 mm 42,000.00
11 Fittings, elbow, tee, reducer, flanged, etc 400,000.00
12 Hanger, clamp, bracket / support, etc 400,000.00

Supply and install Clean Water pipe, HDPE including accessories or


fittings, and support as specified and detail drawing
13 HDPE Pipe Ø 32 mm 42,000.00
14 Fittings, elbow, tee, reducer, flanged, etc 400,000.00
15 Hanger, clamp, bracket / support, etc 400,000.00

Accessories
Supply and install Clean Water pipe accessories, as specified and detail
drawing
16 Gate Valve (GV) dia.40mm, PN10 325,000.00
17 Check Valve (CV) dia.40mm, PN10 325,000.00
18 Optional Filter 525,000.00
19 Faucet Ø 32mm 265,000.00

Associate Civil Works


Supply and install associate civil works Clean Water system, as specified
and detail drawing
20 Foundation Water Tank 5,100L 3,240,000.00
21 Water Pump House 5,000,000.00
22 PDAM Connection fee 8,000,000.00

J2 SEWAGE & WASTE WATER

EXTERNAL
Supply and install Sewage and Waste Water system equipments, as
specified and detail drawing
1 Septic Tank Biofil Cap. 3m3 13,993,916.71
2 Soak Well Depth Ø 1.3m, Depth 3m 6,777,000.00

Installations
Supply and install Sewage and Waste Water PVC pipe (BS4514) including
accessories or fittings, and support as specified and detail drawing

3 PVC Ø 100 mm 97,550.00


4 PVC Ø 65 mm 45,550.00
5 PVC Ø 50 mm 37,550.00

Accessories
Supply and install Sewage and Waste Water pipe accessories, as specified
and detail drawing
6 Floor Clean Out (FCO) Ø 65 mm 485,000.00
7 Floor Drain (FD) Ø 50 mm 485,000.00

J3 TOILET AREA
Clean Water System
Installations
Supply and install Clean Water pipe, PPR PN10 including accessories or
fitting, and support as specified and detail drawing.
1 PPR-PN10 Pipe Ø 32 mm 62,500.00
2 PPR-PN10 Pipe Ø 25 mm 30,000.00
3 PPR-PN10 Pipe Ø 20 mm 25,000.00
4 PPR-PN10 Pipe Ø 15 mm 20,000.00

Accessories
Supply and install Clean Water pipe accessories, as specified and detail
drawing
5 Gate Valve (GV) dia.25mm, PN10 227,550.00

Vent Water System


Installations
Supply and install Vent pipe, PVC ( BS4514 ) including accessories or
fittings and support, as specified and detail drawing
6 PVC Ø 65 mm 45,550.00
7 PVC Ø 50 mm 37,550.00
8 PVC Ø 40 mm 42,000.00
9 PVC Ø 32 mm 62,500.00

Sewage and Waste Water System


Installations
Supply and install Sewage and Waste Water pipe, PVC (BS4514) including
accessories or fittings and support, as specified and detail drawing

10 PVC Ø 100 mm 97,550.00


11 PVC Ø 65 mm 45,550.00
12 PVC Ø 50 mm 37,550.00

Accessories
Supply and install Sewage and Waste Water pipe accessories, as specified
and detail drawing
13 Floor Drain Ø 50 mm 485,000.00
14 Floor Clean Out (FCO) Ø 100 mm 582,000.00
15 Clean Out Ø 50 mm

J4 RAIN WATER

Installations
Supply and install Rain Water pipe, PVC (BS4514) including accessories or
fittings and support as specified and detail drawing
1 PVC Ø 100 mm 97,550.00

Accessories
Supply and install Rain Water pipe accessories, as specified and detail
drawing
2 Cast Iron roof drain dia.4" at roof Building 303,000.00
3 Cast Iron roof drain dia.4" at roof Forecourt 303,000.00
4 Clean Out dia.4" at roof Forecourt

J5 FIRE PROTECTION SYSTEM


Supply and install Refill Fire Extinguisher system as specified and detail
drawing.
1 Dry Chemical Powder Fire Extinguisher Cap. 50kg complete with trolly 21,000,000.00
2 Multi Purpose Dry Chemical Powder Fire Extinguisher Cap. 6kg at Building 1,555,500.00

3 Multi Purpose Dry Chemical Powder Fire Extinguisher Cap. 6kg at 1,555,500.00
Forecourt
4 Carbon Dioxide Fire Extinguisher Cap. 5kg at Building 4,700,000.00

Associate Civil Works


5 Dry Chemical Powder Fire Extinguisher Cap. 50kg Fire Extinguisher House 7,500,000.00

J6 OIL TRAP
Installations
Supply and install Oil Trap pipe. PVC (BS4514) including accessories or
fittings, and support as specified and detail drawing
1 PVC Ø 100 mm 97,550.00

Accessories
Supply and install Oil Trap pipe accessories, as specified and detail
drawing
2 Floor Clean Out dia.4" at OWS area 582,000.00
3 Pekerjaan Oil Catcher (Steel Grating 50x5), at forecourt and lube bay 800,000.00
4 Oil Box Collection c/w Checkered Plate 5,500,000.00

K ELECTRICAL WORKS

K1 FORECOURT
Low Voltage Distrbution Board
Supply and install Distribution Board including support and accessories as
specified and detail drawing
1 DB-Forecourt

Mains and Sub-Main House Sub-circuits


Supply and install Mains and Sub-Main House Subcircuits including
accessories as specified and detail drawing
2 NYY 4x25mm2 + BC 16mm2 from Main Switch Board (MSB) to DB-
Forecourt

LIGHTING AND CABLING INCL SOCKET, CABLE TRAY

Lighting Fixtures
Install only Lighting Fixture (LUCI) including support and accessories as
specified and detail drawing
3 Mini LED 300 Gen 2 100W/150W (Install only)
4 TMS 012 MKII/ Red Bar Light (supply and install by other)
5 Shell Sign Logo Light (supply and install by other)

Supply and install Lighting Fixtures including support and accessories as


specified and detail drawing
6 Downlight FBH/S LED 18W (payment booth)
Accessories
Supply and install Socket Outlets and Switches including support and
accessories as specified and detail drawing
7 Junction Box (… pole, …Ampere), Provisional Quantities
8 Socket Outlet
9 Switch 1 pole
10 Socket Outlet 3Ph, 13A, 2 Pin outdoor for Air Compressor
11 Socket Outlet 15A 3 Pin c/w Switch
12 Socket Outlet 15A 3 Pin
13 Socket Outlet 13A 2 Pin

Installations
Supply and install cable from DB-Forecourt to the following; including pipe
and accessories as specified and detail drawing
14 NYFGBY 3x2.5mm2 to LUCI Light
15 NYFGBY 3x2.5mm2 to Shell Sign Logo and TMS 012 MKII/ Red Bar Light

16 NYFGBY 3x2.5mm2 to Junction Box (…pole, … Ampere) at


Paymentbooth-1 and Paymentbooth-2)

House Sub-circuit
Cable points; NYY 3x2.5mm2 in PVC conduit from Junction Box to the
following:
17 Cabling point for Downlight FBH/S LED 18W
18 Cabling point for Switch 1 pole
19 Cabling point for Socket Outlet 15A 3 Pin c/w Switch
20 Cabling point for Socket Outlet 15A 3 Pin
21 Cabling point for Socket Outlet 13A 2 Pin

Trays Cable
Supply and install hot dip galvanized steel Tray complete with cover
including accessories and support as specified and detail drawing
22 300mm x 300mm, H:100mm 2mm thickness c/w cover (Not applicable)

Associate Civil works


23 Excavation and backfill for LUCI and Red Bar cable
24 Allowance PVC 50mm dia.for cable to Canopy
25 Electrical Control Box Connection (size …mm x….mm)
26 Pelubangan Lampu LUCI

LIGHTNING PROTECTION & GROUNDING FORECOURT


LIGHTNING PROTECTION SYSTEM
Supply and install Lightning Protection system including accessories and
support as specified and detail drawing
27 Air terminal Lightning Protection at Canopy
28 BC 50 mm2 from Air Terminal to Grounding Control Box
29 BC 50 mm2 from Grounding Control Box to Grounding Control Box (link)
30 Grounding control box including cooper rod dia 5/8" depth 6 m or
resistance min < 2 ohm, cover, handle dimension 400mm x 400mm, pipe
sleeve
31 Excavation and Backfill

GROUNDING SYSTEM
Supply and install Grounding system including Grounding control box
including cooper rod dia 5/8" depth 6 m or resistance min < 2 ohm, cover,
handle dimension 400mm x 400mm, pipe sleeve, accessories and support
as specified and detail drawing
32 Steel Structure
33 Dispenser
34 Filling Point
35 Underground Storage Tank (UST)
36 BC 50mm2 from grounding control box to the following:
37 Steel Structure Canopy
38 Dispenser
39 Discharge Point
40 UST
41 Monolith
42 BC 50 mm2 from Grounding Control Box to Grounding Control Box (link) -
Incuded at forecourt
43 Excavation and Backfill Incuded at forecourt

K2 SELECT & DELI2GO

Low Voltage Distrbution Board


Supply and install Distribution Board including support and accessories as
specified and detail drawing
1 DB-Shop

Mains and Sub-Main Subcircuits


Supply and install Mains and Sub-Main Subcircuits including accessories
as specified and detail drawing
2 NYFGBY 4x25mm2 + BC 16mm2 from MSB to DB-Shop
Excavation and Backfill

Lighting Fixtures
Supply and install Lighting Fixtures including support and accessories as
specified and detail drawing
3 FBH-145 LED 2xPL-C 18W/840 (Supply and install by other)
4 TMS122 1X TL 5-28HFP (14watts) Shop Storage

Accessories
Suppply and install Socket Outlets and Switches including support and
accessories as specified and detail drawing
5 Switch 2 pole
6 Switch 1 pole
7 Socket Outlet 15A 3 Pin c/w Switch
8 Socket Outlet 15A 3 Pin
9 Socket Outlet 13A 2 Pin

House Subcircuit
Cabling points; NYM 3x2.5mm2 in PVC High Impact conduit 20mm dia.
including all necessary accessories, as specified and detail drawing.

10 Cabling point for FBH-145 LED 2xPL-C 18W/840


11 Cabling point for TMS122 1X TL 5-28HFP (14watts) Shop Storage
12 Cabling point for Shop Deli2Go logo
13 Cabling point for Switch 2 pole
14 Cabling point for Switch 1 pole
15 Cabling point for Socket Outlet 15A 3 Pin c/w Switch
16 Cabling point for Socket Outlet 15A 3 Pin
17 Cabling point for Socket Outlet 13A 2 Pin

K3 LUBE BAY

Low Voltage Distrbution Board


Supply and install Distribution Board including support and accessories as
specified and detail drawing
1 DB-Lube Bay

Mains and Sub-Main Subcircuits


Supply and install Mains and Sub-Main Subcircuits including accessories
as specified and detail drawing
2 NYY 4x25mm2 + BC 16mm2 from MSB to DB-Service Bay

Lighting Fixtures
Supply and install Lighting Fixtures including support and accessories as
specified and detail drawing
3 TBH-318 LED 2xPL-C 18W/840, Water Proof IP54 ex. Philips
4 TMS122 1X TL 5-28HFP (14watts)
5 TMS122 1X TL 5-28HFP (14watts) with Emergency Battery

Accessories
Suppply and install Socket Outlets and Switches including support and
accessories as specified and detail drawing
6 Switch 2 pole
7 Switch 1 pole
8 Socket Outlet 15A 3 Pin c/w Switch
9 Socket Outlet 15A 3 Pin
10 Socket Outlet 13A 2 Pin
11 Socket Outlet PDF 13A 2 Pin
12 Socket Outlet 3Phase 16A 5 Pin (for lube bay equipment)

House Subcircuit
Cable points; NYM 3x2.5mm2 in PVC High Impact conduit 20mm dia.
including all necessary accessories, as specified and detail drawing.
13 Cabling point for TBH-318 LED 2xPL-C 18W/840, Water Proof IP54 ex.
Philips
14 Cabling point for TMS122 1X TL 5-28HFP (14watts)
15 Cabling point for TMS122 1X TL 5-28HFP (14watts) with Emergency
Battery
16 Cabling point for Switch 2 pole
17 Cabling point for Switch 1 pole
18 Cabling point for Socket Outlet 15A 3 Pin c/w Switch
19 Cabling point for Socket Outlet 15A 3 Pin
20 Cabling point for Socket Outlet 13A 2 Pin
21 Cabling point for Socket Outlet PDF 13A 2 Pin
22 Pelubangan Lampu Downlight
Cable points; NYY 5x2.5mm2 in PVC High Impact conduit 32mm dia.
including all necessary accessories, as specified and detail drawing.

23 Cabling point for Socket Outlet 3Phase 16A 5 Pin (for lube bay equipment)

K4 OFFICE

Generator Sets
1 Genset Cap. … kVA, 3 Phase 380V 50Hz including AMF, Genset Control
Panel (Suppply and install by other)

Low Voltage Distribution Board


Supply and install Distribution Board including support and accessories as
specified and detail drawing
2 Main Switch Board ( MSB )
3 ATS Panel
4 Stabilizer 80kVA (supply and install by other)
5 DB-Fuel System
6 DB-Office-1 & 2
7 DB-Colocator/QSR

Mains and Sub-Main Subcircuits


Supply and install Mains and Sub-Main Subcircuits including accessories
as specified and detail drawing
8 NYFGBY 4x50mm2 + BC 50mm2 from PLN to ATS Panel via metering
9 NYFGBY 4x50mm2 + BC 50mm2 from Genset to ATS Panel
10 NYY 4x50mm2 + BC 50mm2 from ATS to Stabilizer
11 NYY 4x50mm2 + BC 50mm2 from Stabilizer to MSB
12 NYY 4x25mm2 + BC 16mm2 from Main Switch Board (MSB) to DB-Fuel
System
13 NYY 4x35mm2 + BC 16mm2 from Main Switch Board (MSB) to DB-Office
(1st Floor and 2nd Floor)
14 NYY 4x35mm2 + BC 16mm2 from Main Switch Board (MSB) to DB-QSR/
Colocator

Lighting Fixtures
Supply and install Lighting Fixtures including support and accessories as
specified and detail drawing
15 FBH-145 LED 2xPL-C 18W/840
16 TBH-318 LED 2xPL-C 18W/840, Water Proof IP54 ex. Philips
17 TMS122 1X TL 5-28HFP (14watts)
18 TMS122 1X TL 5-28HFP (14watts) with battery

Accessories
Suppply and install Socket Outlets and Switches including support and
accessories as specified and detail drawing
19 Switch 2 pole
20 Switch 1 pole
21 Socket Outlet 15A 3 Pin c/w Switch
22 Socket Outlet 15A 3 Pin
23 Socket Outlet 13A 2 Pin
24 Socket Outlet PDF 13A 2 Pin
25 Socket Outlet 3Ph, 13A, 2 Pin outdoor

House Subcircuit
Cabling points; NYM 3x2.5mm2 in PVC High Impact conduit 20mm dia.
including all necessary accessories, as specified and detail drawing.

26 Cabling point for FBH-145 LED 2xPL-C 18W/840


27 Cabling point for TBH-318 LED 2xPL-C 18W/840, Water Proof IP54 ex.
Philips
28 Cabling point for TMS122 1X TL 5-28HFP (14watts)
29 Cabling point for Switch 2 pole
30 Cabling point for Switch 1 pole
31 Cabling point for Socket Outlet 15A 3 Pin c/w Switch
32 Cabling point for Socket Outlet 15A 3 Pin
33 Cabling point for Socket Outlet 13A 2 Pin
34 Cabling point for Socket Outlet PDF 13A 2 Pin
35 Cabling point for Socket Outlet 3Ph, 13A, 2 Pin outdoor
36 Pelubangan Lampu Downlight

Trays Cable
Supply and install hot dip galvanized steel Tray complete with cover
including accessories and support as specified and detail drawing
37 300mm x 100mm, H:100mm 2mm thickness c/w cover
38 300mm x 100mm, H:100 c/w cover at riser
39 300mm x 100mm, H:100 c/w cover down to DB

TERMINAL LIGHTNING & GROUNDING BUILDING


LIGHTNING PROTECTION SYSTEM
Supply and install Lightning Protection system including accessories and
support as specified and detail drawing
40 Air terminal Lightning Protection at Building
41 BC 50 mm2 from Air Terminal to Grounding Control Box
42 Grounding control box including cooper rod dia 5/8" depth 6 m or
resistance min < 2 ohm, cover, handle dimension 400mm x 400mm, pipe
sleeve
43 Excavation and Backfill
44 Lightning counter (ERICO)

GROUNDING SYSTEM
Supply and install Grounding system including accessories and support as
specified and detail drawing
44 Grounding control box including cooper rod dia 5/8" depth 6 m or
resistance min < 2 ohm, cover, handle dimension 400mm x 400mm, pipe
sleeve for for Genset
45 Grounding control box including cooper rod dia 5/8" depth 6 m or
resistance min < 2 ohm, cover, handle dimension 400mm x 400mm, pipe
sleeve for MSB and Stabilizer
46 Grounding control box including cooper rod dia 5/8" depth 6 m or
resistance min < 2 ohm, cover, handle dimension 400mm x 400mm, pipe
sleeve for Cash Room
47 Grounding Terminal Box size …mm x…mm, … pole at Electrical Room
48 BC 50mm2 from grounding control box via grounding terminal box to the
following:
49 Genset
50 MSB and Stabilizer
51 Cash Room
52 Other Grounding Control Box
53 Excavation and Backfill

OFFICE BUILDING 2ND FLOOR

Low Voltage Distrbution Boards


Supply and install Distribution Board including support and accessories as
specified and detail drawing
DB-Shop-2 (QSR)
DB-Office 2nd floor (included in 1st floor)

Mains and Sub-Main Subcircuits


Supply and install Mains and Sub-Main Subcircuits including accessories
as specified and detail drawing
NYY 4x35mm2 + BC 16mm2 from MSB to DB-Shop-2
NYY 4x35mm2 + BC 16mm2 from MSB to DB-Office 2nd floor (included at
1st floor)

Lighting Fixtures
Supply and install Lighting Fixtures including support and accessories as
specified and detail drawing
FBH-145 LED 2xPL-C 18W/840
TMS122 1X TL 5-28HFP (14watts)

Accessories
Supply and install Socket Outlets and Switches including support and
accessories as specified and detail drawing
Switch 2 pole
Socket Outlet 15A 3 Pin c/w Switch
Socket Outlet 15A 3 Pin
Socket Outlet 13A 2 Pin

House Subcircuit
Cable points; NYM 3x2.5mm2 in PVC High Impact conduit 20mm dia.
including all necessary accessories, as specified and detail drawing.
Cabling point for FBH-145 LED 2xPL-C 18W/840
Cabling point for TMS122 1X TL 5-28HFP (14watts)
Cabling point for Switch 2 pole
Cabling point for Socket Outlet 15A 3 Pin c/w Switch
Cabling point for Socket Outlet 15A 3 Pin
Cabling point for Socket Outlet 13A 2 Pin

TELEPHONE SYSTEM
Equipments
Supply and install Telephone equipments including accessories as
specified and detail drawing.
54 PABX Capacity 3 line, 50 extention including:
- Operator Console; 1 no
- UPS 1Phase Cap…kVA, 4 hours backup time; 1 no
- Power supply 220V, Power Surge Arrester and grounding; 1 set
55 MDF-TP Cap. … pairs, complete with Line Surge Arrester and grounding

56 JB-TP Cap. 80 pairs


57 Internal wiring between UPS, PABX and MDF-TP
58 Telkom Connection fee
59 Faximile Machine

Accessories
Supply and install Telephone accessories as specified and detail drawing.

60 Telephone Outlet at Paymentbooth


61 Telephone Outlet at Building Office 2nd floor
62 Telephone Outlet at Building Select Deli2Go
63 Telephone Outlet at Building Lube Bay
64 Telephone Outlet at Building Office and Utility
65 Data Outlet for Faximile

Installations
Supply and install Telephone cable including conduit and accessories as
specified and detail drawing.
66 Jelly filled armoured cable 600x2x0.6mm from Telkom Box to MDF-TP
67 TTIC cable 80 pair in high impact conduit from MDF-TP to JB-TP
68 Cabling points; TTIC cable …x…x 0.6mm including conduit and
accessories as specified and detail drawing.
69 Cabling point for Telephone Outlet at Paymentbooth
70 Cabling point for Telephone Outlet at Building Office 2nd floor
71 Cabling point for Telephone Outlet at Building Select Deli2Go
72 Cabling point for Telephone Outlet at Building Lube Bay
73 Cabling point for Telephone Outlet at Building Office and Utility

Cabling points; UTP cable Cat6 2 pair including conduit and accessories as
specified and detail drawing.
74 Cabling point for Data Outlet Faximile

IP-CCTV SYSTEM

MECHANICAL WORKS (AC)

FORECOURT
Air Conditioning System

SELECT & DELI2GO


Air Conditioning System

LUBE BAY
Air Conditioning System

OFFICE
Air Conditioning System

Mechanical Ventilating System


Supply and install Exhaust Fan including: connections, accessories,
support, as specified and detail drawing
75 Exhaust Fan 1~4
Area Service : Toilet, Locker Room and Panel Room
Air Flow : 546 CMH
Type : Wall Mounted
Electrical Cap: 20W, 230V, 1Phase, 50Hz

Air Register
Exhaust Air Grille (EAG) or louvre, ….. color finished, including :
connections, etc. as specified.
76 … x … mm

Associate Electrical Works


Cabling points; NYM 3x2,5mm2 in conduit to Exhaust Fan including:
switch, accessories, support, as specified and detail drawing
Cabling point for Exhaust Fan 1~4

QSR BUILDING (2ND FLOOR)


Air Conditioning System

L ELECTRICAL EXTERNAL

STREET LAMP
1 Street Lamp including: Pole Hexagonal 4m height, foundation, LED dot
lamp (Philips Mini 500LED BY501W pole or equivalent/ other brand GE,
Bever, Sloan, Nexus LED)
Pole
Fondation
Armature
Bulb Lamp

2 NYFGBY 3x2.5mm2 from DB-Forecourt to External Lighting


3 NYFGBY 3x2.5mm2 from DB-Forecourt to Monolith
4 NYFGBY 5x2.5mm2 DB-Forecourt to Air Compressor
5 Excavation and backfill for External Light cable
6 Excavation and backfill for Monolith
7 Excavation and backfill for Air Compressor cable INCLUDED in Excavation
and Backfill cabling External Light)

ELECTRICAL CABLE

NYFGBY 3c x 2.5 mm² from DB-Fuel to the following:


8 Tank 1 (V-Power-1)
9 Tank 2 (V-Power-2)
10 Tank 3 (Super-1)
11 Tank 4 (Super-2)
12 Tank 5 (Diesel)

NYFGBY 10c x 1.5 mm² from DB-Fuel to the following:


13 Dispenser-1
14 Dispenser-2
15 Dispenser-3
16 Dispenser-4
17 Dispenser-5
18 Dispenser-6

ELECTRICITY CONNECTION
19 PLN Connection (incl BPUJL & Poles & Cables) - Permanent
20 Supply & Install NYFGBY 4c x 95 mm2
21 Temporary Electricity Connection for Work Construction

TYRE INFLATOR AND COMPRESSOR


22 Air compressor Cap. 285 lpm or m3/minutes, 2.2kW ex. Swan or equivalent

23 Tyre inflator (CUBE PCL) incl. civil works (Rumah compressor, foundation
inflator, Incl GIP pipe)
24 PVC Ø 20mm (include fittings)

SUMMARY

A PREPARATION
B CIVIL WORKS
C PEKERJAAN PONDASI BORED PILE / MINIPILE
D STRUCTURAL
E ARCHITECTURE
F PAYMENT BOOTH & PUMP ISLAND
G FITTING, FURNITURE, & SECURITY BOX
H CIVIL EXTERNAL
J OTHER CIVIL WORKS
K PLUMBING, SANITARY, AND FIRE SERVICES
L OIL TRAP
M ELECTRICAL WORKS
N IP-CCTV SYSTEM
P MECHANICAL WORKS (AC)
Q ELECTRICAL EXTERNAL
UNIT VOLUME AMMOUNT

ls 1.00 24,750,000

ls 1.00 107,250,000
ls 1.00 85,800,000

ls 1.00 10,010,000

ls 1.00 41,800,000

ls 1.00 44,550,000

ls 1.00 16,500,000

ls 1.00 6,000,000
ls 1.00 10,725,000

ls 1.00 17,050,000
ls 1.00 22,500,000
ls 1.00 11,550,000
ls 1.00 10,500,000

lot 1.00 100,000,000

ls - -
no 5.00 7,500,000

m3 -
m3 -

m3 -
m3 -
m3 -
m3 -
m' -
m2 -

m2 -
kg -
m2 -
m3 -

m 164.00 -

m3 57.40 3,034,854
m3 49.20 37,963,766
m3 8.20 373,510
m2 295.00 60,047,250
kg 4,440.00 94,810,650
m3 20.00 19,311,000
m2 131.00 19,381,450
kg 683.00 9,813,856
kg 944.00 13,564,100
pcs 221.00 12,276,550
kg 645.00 13,773,169

m' 64.00 18,182,686


m' 264.00 99,977,550
m' 15.00 7,429,518
unit 35.00 77,000,000
unit 5.00 11,825,000
m' -
unit 4.00 26,807,219

m 132.00 29,769,300

titik 4.00 28,000,000


titik 4.00 50,000,000
no 8.00 22,221,600

ls 1.00 22,000,000

m' - -
m' -
m' -
m' -
m' 108.00 28,512,000
joint 9.00 49,500
m' 108.00 594,000
m' - -
no 9.00 585,000
no 5.00 37,500,000

m' - -
m' -
m' -
m' -
m' 1,152.00 304,128,000
joint 96.00 528,000
m' 1,152.00 6,336,000
m' - -
no 96.00 6,240,000

m' - -
m' -
m' -
m' -
m' 3,693.58 975,105,331
joint 307.80 1,692,891
m' 3,693.58 20,314,694
m' 3,693.58 258,550,656
no 307.80 20,006,896
m' - -
m' -
m' -
m' -
m' 24.00 6,336,000
joint 2.00 11,000
m' 24.00 132,000
m' 24.00 1,680,000
no 2.00 130,000

m3 10.80 571,018
m3 5.28 240,504
m3 5.52 395,222
m3 0.69 182,540
m3 0.33 295,301
m2 14.40 2,130,480
kg 585.00 8,405,719
m3 4.50 6,041,475

m3 132.30 6,994,969
m3 28.35 9,043,650
m3 56.70 19,069,628
m3 9.45 8,456,333
m2 12.00 1,775,400
kg 3,216.78 46,221,108
m3 37.80 50,748,390
kg 145.80 3,193,567

kg 225.00 3,232,969
kg 257.10 7,314,495
m2 6.00 105,300
m2 6.00 48,000

kg 1,358.18 29,749,334
kg 6,327.78 138,602,023
kg 2,170.99 47,552,722
m2 27.90 43,384,500
ls - -
ls 1.00 18,775,000
m3 36.80 1,945,690
m3 18.56 845,408
m3 18.24 1,305,951
m3 1.92 507,936
m3 0.96 859,056
m2 103.68 15,339,456
kg 2,457.60 35,312,640
m3 15.36 20,621,568

m3 10.48 553,887
m3 10.48 750,063
m2 174.60 25,832,070
kg 2,619.00 37,631,756
m3 17.46 23,440,923

m3 13.34 11,935,509
m2 10.65 1,575,668
kg 2,907.68 41,779,784
m3 40.01 53,720,796

m2 - -
kg - -
m3 - -
m2 - -

m2 - -
kg - -
m3 - -
kg - -

kg 10,242.24 224,343,464
kg 3,894.00 85,293,203
kg 5,601.96 122,703,931
kg 2,587.24 56,670,258

kg - -
kg - -
kg - -
kg - -
m3 695.51 36,772,810
m3 399.14 114,701,995
m3 - -
m3 530.74 37,999,821

m3 7.40 6,620,995
m2 16.38 2,423,421
kg 2,518.62 469,327,394
m3 44.39 59,601,165
pcs 18.00 15,345,000

m3 28.24 9,009,836
m3 35.31 11,873,954
m3 7.06 6,318,536
m2 22.62 3,346,629
kg 2,694.48 502,097,320
m3 42.37 56,878,473
unit 3.00 24,000,000
m2 366.38 11,284,504
m3 8.74 21,840,000

m2 28,543,872

134,400

m2 18,861,360

140.34

m2 26,463,996
27.81

m2 705.44 67,721,760
m2 2,788,416
33.84
m2 9.00 5,184,000

m 98.00 8,785,700

m2 64.00 23,150,400

m2 80.26 17,929,694
m2 36.00 8,042,100

m2 12.00 4,340,700

m2 68.00 5,782,040

m2 68.00 12,617,400
m2 8.00 2,000,000

m2 77.00 13,001,450

m2 36.00 6,078,600

m2 80.26 75,743,210

m2 189.00 85,239,000

m2 27.90 26,329,463

m2 189.00 34,823,250
m2 266.76 67,343,562
m' 24.70 3,151,720

m2 742.80 35,849,385

m2 519.20 28,270,440

m2 94.40 38,510,480

m2 22.40 18,704,000

m2 18.57 1,740,473

unit 2.00 12,000,000


unit 1.00 -

unit 2.00 10,846,000

unit 1.00 5,423,000

unit 4.00 21,692,000

unit 2.00 10,846,000

unit 7.00 36,578,850


unit 1.00 5,076,600

unit 1.00 5,423,000

unit 1.00 27,220,000

unit 22.00 76,956,000

unit 3.00 10,494,000

unit 1.00 3,498,000

unit 1.00 1,980,000

unit 2.00 8,162,200

unit 3.00 11,979,000


unit 2.00 970,000
unit 7.00 25,795,000
unit 7.00 3,196,200
unit 2.00 3,700,000
unit 8.00 3,361,600
unit 7.00 3,465,000
unit 2.00 2,145,000

unit 2.00 56,889,000


unit -
unit 4.00 22,220,000
unit -

unit 2.00 20,000,000

unit 1.00 32,550,000

ls 1.00 50,000,000

m3 21.87 1,156,311
m3 21.87 1,565,853
m3 7.24 1,833,892
m2 58.50 8,655,075
kg 408.48 5,869,347
m3 6.97 9,357,574
m2 5.56 845,120
kg 336.90 7,379,373
unit 1.00 1,500,000

m3 7.44 393,368
m3 4.59 209,075
m3 2.85 204,055
m3 0.48 126,984
m2 4.80 29,760
m2 3.96 585,882
kg 173.55 2,493,697
m3 2.37 3,181,844
m3 0.02 34,320
pcs 8.00 2,928,800
kg 20.42 447,275
m' 1.00 100,000

m2 390.00 107,893,500
m3 19.50 5,158,725
m3 58.50 18,661,500
m3 163.80 55,090,035

m2 444.00 53,724,000
m2 544.00 347,057,482

unit 13.00 16,445,000


unit 1.00 21,000,000

m 60.00 11,265,000
unit 3.00 17,305,848
m 132.00 18,128,220
unit 24.00 55,999,200
ls 1.00 3,300,000
m 66.50 5,621,578
unit 1.00 7,535,000

m2 80.26 28,091,437

unit 1.00 700,000


m2 12.00 930,000
pcs 1.00 3,000,000
pcs 1.00 1,000,000
ls -
ls 1.00 1,500,000

ls 1.00 5,000,000
unit -
unit -
unit 1.00 1,000,000

unit 1.00 8,500,000


unit 1.00 14,415,500

unit 1.00 9,119,000

unit 1.00 566,500


ls 1.00 15,000,000

ls 1.00 305,000
m 140.00 2,800,000
m 7.00 175,000
m 6.00 180,000
m 3.00 126,000
ls 1.00 400,000
ls 1.00 400,000

m 60.40 2,536,800
ls 1.00 400,000
ls 1.00 400,000

pcs 3.00 975,000


pcs 3.00 975,000
pcs 1.00 525,000
pcs 1.00 265,000

unit 1.00 3,240,000


unit 1.00 5,000,000
ls 1.00 8,000,000

unit 1.00 13,993,917


unit 1.00 6,777,000

m 40.00 3,902,000
m 27.00 1,229,850
m 46.00 1,727,300

pcs 2.00 970,000


pcs 1.00 485,000
m 2.00 125,000
m 15.00 450,000
m 6.00 150,000
m 11.00 220,000

pcs 2.00 455,100

m -
m 3.00 112,650
m 1.00 42,000
m 18.00 1,125,000

m 8.00 780,400
m 4.00 182,200
m 12.00 450,600

pcs 4.00 1,940,000


pcs 4.00 2,328,000
pcs -

m 159.00 15,510,450

unit 8.00 2,424,000


unit 3.00 909,000
unit -
pcs 1.00 21,000,000
pcs 2.00 3,111,000

pcs 3.00 4,666,500

pcs 1.00 4,700,000

unit 1.00 7,500,000

m 82.00 7,999,100

unit 2.00 1,164,000


unit 6.00 4,800,000
unit 1.00 5,500,000

7,632,221,432
516,485,000
655,563,028
1,690,431,968
2,604,940,517
957,803,921
79,109,000
102,550,000
235,701,365
598,602,765
171,570,767
19,463,100
-
-
-
-

7,632,221,431