Work Load Mapping Nov - DeS 2023
Work Load Mapping Nov - DeS 2023
Legend
Yg belum ada tool sama sekali
tool lengkap
tool konstruksi by order
tool pribadi , hanya alat ukur by kantor
Durati
Description on Start
PM 12/12/2022
Retrofit Battery Charger 1/26/2023
Install , SAT UPS PXP Baging Area 14/12/2022
Troubleshoot, conmmon 1/16/2023
SAT 12/18/2022
Install BAT
SAT SDC
Oncall (instalasi sparepart CB03) 1/10/2023
PM + Discharge Battery 1/10/2023
Pekerjaan Oncall (Instalasi power modul)
Install Part 1 1/29/2023
SAT UPS 1/11/2023
Troublesshot 1 1/9/2023
Troublesshot 1/12/2023
Install Part 1/26/2023
Install Part 2 1/26/2023
Upgrade Battery 1/23/2023
Troublesshot 1 1/16/2023
Refresh Training 1 1/8/2023
Site survey location 1 1/13/2023
KOM PM 1 1/22/2023
Test Battery Bulanan 1/16/2023
Stop KODE
1/18/2023
1/27/2023
9/1/2023
1/20/2023
1/31/2023
1/14/2023
2/3/2023
1/31/2023
1/19/2023
1/12/2023
1/14/2023
1/27/2023
1/30/2023
1/27/2023
1/17/2023
1/18/2023
1/13/2023
1/23/2023
1/17/2023
Januari
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18
4 4 4
19 19 19 19 19 19 19 19 19 19 19
3 3 3 3 3 3 3 3 3 12 12 12 12 12 12 12 12
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
8 8 8 8 8 18 18
3 3 3 3 3 3 3 3 3 20 Cuti
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
9 9 9 9 9 9 9 9 9
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
13 13 13 13, 13 14 14
12 12 12 12 12 12 12 12
9 9 9 9 9 9 9 9 9
12 12 12 12 12 12 12 12
Febuari
19 20 21 22 23 24 25 26 27 28 29 29 30 01 02 03 04 05 06 07 08 09 10 11 12
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
21 21
12
Cuti 11 11 11
5 5 5 5 5 5 5 5 5 5 5 5 5
9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9
15 15
12
9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9
12
13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 01 02 03 04
9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9
9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9
Maret
05 06 07 08 09 10 11 12 13 14
15 16 17 18 19 20 21 22 23 24
25 26 27 28 29 29 30
2022 - 2023
Legend
Yg belum ada tool sama sekali
tool lengkap
tool konstruksi by order
tool pribadi , hanya alat ukur by kantor
Durati
Description on Start
PM 12/12/2022
Retrofit Battery Charger 1/26/2023
Install , SAT UPS PXP Baging Area 14/12/2022
Troubleshoot, conmmon 1/16/2023
SAT 12/18/2022
Install BAT
SAT SDC
Oncall (instalasi sparepart CB03) 1/10/2023
PM + Discharge Battery 1/10/2023
Pekerjaan Oncall (Instalasi power modul)
Install Part 1 1/29/2023
SAT UPS 1/11/2023
Troublesshot 1 1/9/2023
Troublesshot 1/12/2023
Install Part 1/29/2023
Install Part 2 2/26/2023
Upgrade Battery 1/23/2023
Troublesshot 1 1/16/2023
Refresh Training 1 1/8/2023
Site survey location 1 1/13/2023
KOM PM 1 1/22/2023
Test Battery Bulanan 1/16/2023
indoction & PM +Service UPS & 1/30/2023
Site survey location 2/7/2023
Presentasi di PLN UP3 Cianjur 1/26/2023
85-UPS-003A PLN Metering 2/7/2023
witness material onsite 1/27/2023
Install Part , Troubleshoot 2/16/2023
Install Part 2/21/2023
Install PDE Commisioning 2/24/2023
Assessment 2/21/2023
PM 3/6/2023
Assesment PEW 1120-220/110EAN 3/10/2023
PM 3/28/2023
PM, Discharge Battery and Install Part 3/6/2023
SAT 3/16/2023
a,3,12,2b,31,32
11,20,25,29,34
3,14,15,16,21,27,28
2,23,27,29,33,34
Stop KODE
1/18/2023
1/27/2023
9/1/2023
1/20/2023
1/31/2023
1/14/2023
2/3/2023
1/31/2023
1/19/2023
1/12/2023
1/14/2023
1/31/2023
3/5/2023
1/27/2023
1/17/2023
1/18/2023
1/13/2023
1/23/2023
1/17/2023
1/5/2023
2/11/2023
1/27/2023
2/16/2023
1/28/2023
2/17/2023
2/22/2023
3/6/2023
2/24/2023
3/9/2023
3/11/2023
3/18/2023
3/17/2023
3/31/2023
Maret
27 28 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17
34 34 34 34 34 34 34 34 34 34 34 34
30 30 30 30 30 30 30 30
31 31 31 31 32 32
16 16 16 16 16 16
34 34 34 34 34 34 34 34 34 34 34 34
5b 5b
9 9
33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33
16 16 16 16 16 16
33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33
9 9
18 19 20 21 22 23 24 25 26 27 28 29 29 30
5b 5b 5b 5b 5b 5b 5b 5b 5b 5b 5b 5b 5b 5b
33
33
2022 - 2023
Legend
Yg belum ada tool sama sekali
tool lengkap
tool konstruksi by order
tool pribadi , hanya alat ukur by kantor
AMC
Projek
Cansel
Perubahan Jadwal
022 - 2023
Durati
Description on Start
PM 12/12/2022
Retrofit Battery Charger 1/26/2023
Install , SAT UPS PXP Baging Area 14/12/2022
Troubleshoot, conmmon 1/16/2023
SAT 12/18/2022
Install BAT 3/23/2021
SAT SDC
Oncall (instalasi sparepart CB03) 1/10/2023
PM + Discharge Battery 1/10/2023
Pekerjaan Oncall (Instalasi power modul)
Install Part 1 1/29/2023
SAT UPS 1/11/2023
Troublesshot 1 1/9/2023
Troublesshot 1/12/2023
Install Part 1/29/2023
Install Part 2 2/26/2023
Upgrade Battery 1/23/2023
Troublesshot 1 1/16/2023
Refresh Training 1 1/8/2023
Site survey location 1 1/13/2023
KOM PM 1 1/22/2023
Test Battery Bulanan
1/16/2023
indoction & PM +Service UPS & 1/30/2023
Site survey location 2/7/2023
Presentasi di PLN UP3 Cianjur 1/26/2023
85-UPS-003A PLN Metering 2/7/2023
witness material onsite 1/27/2023
Install Part , Troubleshoot 2/16/2023
Install Part 2/21/2023
Install PDE Commisioning 2/24/2023
Assessment 2/21/2023
PM 3/6/2023
Assesment PEW 1120-220/110EAN 3/10/2023
PM 3/28/2023
PM, Discharge Battery and Install Part
3/6/2023
SAT 3/16/2023
Conmon 11/3/2023
Pembindahan Floating Ground 4/14/2023
Site survey location 6/6/2023
Meeting 3/28/2023
Install Battery 3/20/2023
Site survey location 3/14/2023
Install Unit
Install Unit
Troubleshoting 3/30/2023
Install Part 4/1/2023
Trobleshooting 3/22/2023
Trobleshooting 4/06/023
Assessment 3/8/2023
Traning 4/10/2023
PM 4/22/2323
Con Mon 4/10/2023
Site survey 4/12/2023
Site survey 4/10/2023
9,21,24,30,37,38,45,41 A, 41B,41C, 47
a,3,12,2b,31,32,48,24B
11,20,25,29,34,40,,49
3,14,15,16,21,27,28,6,36
2,23,27,29,33,34,49
Stop KODE
1/18/2023
1/27/2023
9/1/2023
1/20/2023
1/31/2023
3/31/2023
1/14/2023
2/3/2023
1/31/2023
1/19/2023
1/12/2023
1/14/2023
1/31/2023
3/5/2023
1/27/2023
1/17/2023
1/18/2023
1/13/2023
1/23/2023
1/17/2023
1/5/2023
2/11/2023
1/27/2023
2/16/2023
1/28/2023
2/17/2023
2/22/2023
3/6/2023
2/24/2023
3/9/2023
3/11/2023
3/29/2023
3/17/2023
10/4/2023
3/31/2023
4/18/2023
3/7/2023
3/28/2023
4/6/2023
3/16/2023
4/1/2023
4/12/2023
3/25/2023
4/7/2023
11/3/2023
4/14/2023
4/23/2023
4/20/2023
4/12/2023
4/13/2023
Maret
27 28 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17
34 34 34 34 34 34 34 34 34 34 34 34
30 30 30 30 30 30 30 30 45 34 45
31 31 31 31 32 32
16 16 16 16 16 16
46 46 46 46 35 35 35 35 35 35
34 34 34 34 34 34 34 34 34 34 34 34
5b 5b
9 9
33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33
16 16 16 16 16 16
33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33
9 9
April
18 19 20 21 22 23 24 25 26 27 28 29 29 30 01 02 03 04 05 06 07 08 09 10 11 12 13
45 45 45 45 45 45 45 45 45 45 45 45
41B41B 41B 41B 41C 41C 47 47 47 47
24B 24B 24B 24B
35 35 35 35 35 35 35 35 35 35 35 35 35 35 47 47 47 47
40 40 40 40 40 35 40 40 40 40 40 40 40 40 40 40 40 40 51
5b 5b 5b 5b 5b 5b 5b 5b 5b 5b 5b 5b 5b 5b 5b 5b 5b 5b 5b 5b 5b 5b 5b 5b
38 44 44 47 47 47 47
33 33 33 33 33 33 33 33 33 33 33 33 50 50 50 50
6 6 6 6 6 6 6 6 6
33 33 33 33 33 33 33 33 33 33 33 33 51
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 29 30
47
47
47
50 50 50 50 50 50
36 36 36 36 36
2022 - 2023
Legend
Yg belum ada tool sama sekali
tool lengkap
tool konstruksi by order
tool pribadi , hanya alat ukur by kantor
AMC 55
Projek
Cansel
Perubahan Jadwal
Durati
on Start Stop
12/12/2022 1/18/2023
1/26/2023 1/27/2023
14/12/2022 9/1/2023
1/16/2023 1/20/2023
12/18/2022 1/31/2023
5/14/2023 5/25/2023
1/10/2023 1/14/2023
1/10/2023 2/3/2023
5/11/2023 6/1/2023
1 1/29/2023 1/31/2023
1/11/2023 1/19/2023
1 1/9/2023 1/12/2023
1/12/2023 1/14/2023
1/29/2023 1/31/2023
2 2/26/2023 3/5/2023
1/23/2023 1/27/2023
1 1/16/2023 1/17/2023
1 1/8/2023 1/18/2023
1 1/13/2023 1/13/2023
1 1/22/2023 1/23/2023
1/16/2023 1/17/2023
1/30/2023 1/5/2023
2/7/2023 2/11/2023
1/26/2023 1/27/2023
2/7/2023 2/16/2023
1/27/2023 1/28/2023
2/16/2023 2/17/2023
2/21/2023 2/22/2023
2/24/2023 3/6/2023
2/21/2023 2/24/2023
3/6/2023 3/9/2023
3/10/2023 3/11/2023
3/28/2023 3/29/2023
3/6/2023 3/17/2023
3/16/2023 10/4/2023
11/3/2023 3/31/2023
4/14/2023 4/18/2023
6/6/2023 3/7/2023
3/28/2023 3/28/2023
6/28/2023 7/26/2023
3/14/2023 3/16/2023
6/5/2023 6/21/2023
3/30/2023 4/1/2023
4/1/2023 4/12/2023
3/22/2023 3/25/2023
4/06/023 4/7/2023
3/8/2023 11/3/2023
4/10/2023 4/14/2023
5/18/2023 5/22/2023
4/10/2023 4/20/2023
4/12/2023 4/12/2023
4/10/2023 4/13/2023
5/31/2023 6/7/2023
6/19/2023 6/28/2023
5/21/2023 5/26/2023
4/6/2023 6/10/2023
6/26/2023 6/27/2023
6/22/2023 6/28/2023
5/14/2023 5/19/2023
5/25/2023 6/30/2023
6/20/2023 6/21/2023
5/15/2023 5/17/2023
5/15/2023 5/17/2023
17/05/2023 17/05/2023
7/9/2023 7/17/2023
6/12/2023 7/21/2023
6/19/2023 6/21/2023
6/22/2023 6/25/2023
5/12/2023 5/12/2023
14/6/2023 20/6/2023
5/31/2023 5/31/2023
5/23/2023 5/25/2023
5/26/2023 5/27/2023
6/19/2023 6/25/2023
6/10/2023 6/16/2023
5/30/2023 5/30/2023
6/12/2023 6/18/2023
6/19/2023 6/25/2023
6/22/2023 6/27/2023
6/14/2023 6/20/2023
6/27/2023 7/2/2023
Juni
###01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18
57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57
47,50,54,14B,56,50,67,63,64 50 50 50 50 50 50 50 14b 14b
10 66a 66a 66a 66a 66a
69 69 69 69 69 69 69
57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57
57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57
66 66 66 66 66 62 62 62 62 62 62 62 62
### 53 53 53 53 53
53 53 71 71 71 71 71 71 71
57 57 57 57 57 57 57 57
57 57 57 57 57 57 57 57 57 57
42 42 42 42
42 42 42 42 42 42 42 42 42 42
69 69 69 69 69 69 69
### 42 42 42 42 42 42 42 42 42 42 42 42 42 42
62 62 62 62 62 62 62 62
19 20 21 22 23 24 25 26 27 28 29 29 30 31 02 03 04 05 06 07 08 09 10 11 12 13 14
57 57 57 57 57 57 57 57 57 57 57 57 57
63 63 63 64 64 64 64 54 54
66a 66a 76 76 76 76 76 76 76
55a 55a 55a 55a 55a 55a 55a
57 57 57 57 57 57 57 57 57 57 57 57 57
57 57 57 57 57 57 57 57 57 57 57 57 57
62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62
23b 23b
57 57 57 57 57 57 57 57 57 57 57 57 57
51 51 51 51 51 51 51 51 51 51
62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62
Juli
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 29 30
62 62 62 62 62 62 62 62 62 62 62 62
62 62 62 62 62 62 62 62 62 62 62 62
2022 - 2023
Legend
Yg belum ada tool sama sekali
tool lengkap
tool konstruksi by order
tool pribadi , hanya alat ukur by kantor
AMC 55
Projek
Cansel
Perubahan Jadwal
Durati
on Start Stop
12/12/2022 1/18/2023
1/26/2023 1/27/2023
14/12/2022 9/1/2023
1/16/2023 1/20/2023
12/18/2022 1/31/2023
5/14/2023 5/25/2023
1/10/2023 1/14/2023
1/10/2023 2/3/2023
5/11/2023 6/1/2023
1 1/29/2023 1/31/2023
1/11/2023 1/19/2023
1 1/9/2023 1/12/2023
1/12/2023 1/14/2023
1/29/2023 1/31/2023
2 2/26/2023 3/5/2023
1/23/2023 1/27/2023
1 1/16/2023 1/17/2023
1 1/8/2023 1/18/2023
1 1/13/2023 1/13/2023
1 1/22/2023 1/23/2023
1/16/2023 1/17/2023
1/30/2023 1/5/2023
2/7/2023 2/11/2023
1/26/2023 1/27/2023
2/7/2023 2/16/2023
1/27/2023 1/28/2023
2/16/2023 2/17/2023
2/21/2023 2/22/2023
2/24/2023 3/6/2023
2/21/2023 2/24/2023
3/6/2023 3/9/2023
3/10/2023 3/11/2023
3/28/2023 3/29/2023
3/6/2023 3/17/2023
3/16/2023 10/4/2023
11/3/2023 3/31/2023
4/14/2023 4/18/2023
6/6/2023 3/7/2023
3/28/2023 3/28/2023
7/27/2023 8/12/2023
3/14/2023 3/16/2023
6/5/2023 6/21/2023
3/30/2023 4/1/2023
4/1/2023 4/12/2023
3/22/2023 3/25/2023
4/06/023 4/7/2023
3/8/2023 11/3/2023
4/10/2023 4/14/2023
5/18/2023 5/22/2023
4/10/2023 4/20/2023
4/12/2023 4/12/2023
4/10/2023 4/13/2023
5/31/2023 6/7/2023
6/19/2023 6/28/2023
5/21/2023 5/26/2023
4/6/2023 6/10/2023
6/26/2023 6/27/2023
6/22/2023 6/28/2023
5/14/2023 5/19/2023
5/25/2023 6/30/2023
6/20/2023 6/21/2023
5/15/2023 5/17/2023
5/15/2023 5/17/2023
17/05/2023 17/05/2023
7/9/2023 7/17/2023
6/12/2023 7/21/2023
6/19/2023 6/21/2023
6/22/2023 6/25/2023
5/12/2023 5/12/2023
14/6/2023 20/6/2023
5/31/2023 5/31/2023
5/23/2023 5/25/2023
5/26/2023 5/27/2023
6/19/2023 6/25/2023
6/10/2023 6/16/2023
5/30/2023 5/30/2023
6/12/2023 6/18/2023
7/5/2023 7/5/2023
6/22/2023 6/27/2023
6/14/2023 6/20/2023
6/4/2023 6/7/2023
6/27/2023 7/2/2023
7/5/2023 8/4/2023
7/4/2023 7/6/2023
7/11/2023 7/13/2023
7/17/2023 7/22/2023
7/11/2023 7/15/2023
7/26/2023 8/14/2023
7/30/2023 9/17/2023
7/13/2023 7/27/2023
7/13/2023 7/16/2023
7/24/2023 7/27/2023
7/9/2023 8/10/2023
7/27/2023 8/12/2023
7/24/2023 7/29/2023
7/19/2023 7/26/2023
7/9/2023 7/12/2023
7/24/2023 7/28/2023
Juli
###
###31 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21
### 78 78 78 61 61 61 61 61 61 61 61 61 61 61 61
47,50,54,14B,56,50,67,63,64,77,83 77 77 77 77 77 77 77 77 83 83 83 83 83 83 83 83 83
6a,74,76,10b,12b,87 ### 66a 66a 66a 66a 66a66a66a
66b66b 66b 66b
### 77 77 77 77 77 77 77 77 77 77 77 77 77 77 77 77 77
### 88 88 88 88
62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62
0,71,55b,79,82,72b ### 79
###
72 79 36B 36B36B 80 80 80 80 80
85 85 85 85 85 85 85 85 85 85 85 85
###
62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62
85 85 85 85 85 85 85 85 85 85 85 85
Agus
22 23 24 25 26 27 28 29 29 30 31 02 03 04 05 06 07 08 09 10 11 12 13 14 15
83 83 83 83 83
12b 12b 12b 12b 12b 12b 12b 12b 12b 12b 12b 12b 12b12b 12b 12b 12b
81 81 81 81 81 81 81 81 81 81 81 81 81 81 81 81 81 81 81
77 77 77 77 77 77 77 77 77 77
62 62 62 62 62
72b 72b 72b 72b 72b 72b 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82
80 81 81 81 81 81 81 81 81 81 81 81 81 81 81 81 81 81 81 81
85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85
72b 72b 72b 72b 72b 72b 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82
62 62 62 62 62 12b 12b 12b 12b 12b 12b 12b 12b 12b 12b 12b 12b 12b12b 12b 12b 12b
85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85
Agus
16 17 18 19 20 21 22 23 24 25 26 27 28 29 29 30 31 02 03 04 05 06 07
82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82
82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82
Sep
08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
82 82 82 82 82 82 82 82 82 82
82 82 82 82 82 82 82 82 82 82
27 28 29 29 30
2022 - 2023
Legend
Yg belum ada tool sama sekali
tool lengkap
tool konstruksi by order
tool pribadi , hanya alat ukur by kantor
AMC 55
Projek
Cansel
Perubahan Jadwal
Durati
on Start Stop
12/12/2022 1/18/2023
1/26/2023 1/27/2023
14/12/2022 9/1/2023
1/16/2023 1/20/2023
12/18/2022 1/31/2023
5/14/2023 5/25/2023
1/10/2023 1/14/2023
1/10/2023 2/3/2023
5/11/2023 6/1/2023
1 1/29/2023 1/31/2023
1/11/2023 1/19/2023
1 1/9/2023 1/12/2023
1/12/2023 1/14/2023
1/29/2023 1/31/2023
2 2/26/2023 3/5/2023
1/23/2023 1/27/2023
1 1/16/2023 1/17/2023
1 1/8/2023 1/18/2023
1 1/13/2023 1/13/2023
1 1/22/2023 1/23/2023
1/16/2023 1/17/2023
1/30/2023 1/5/2023
2/7/2023 2/11/2023
1/26/2023 1/27/2023
2/7/2023 2/16/2023
1/27/2023 1/28/2023
2/16/2023 2/17/2023
2/21/2023 2/22/2023
2/24/2023 3/6/2023
2/21/2023 2/24/2023
3/6/2023 3/9/2023
3/10/2023 3/11/2023
3/28/2023 3/29/2023
3/6/2023 3/17/2023
3/16/2023 10/4/2023
11/3/2023 3/31/2023
4/14/2023 4/18/2023
6/6/2023 3/7/2023
3/28/2023 3/28/2023
7/27/2023 8/12/2023
3/14/2023 3/16/2023
6/5/2023 6/21/2023
3/30/2023 4/1/2023
4/1/2023 4/12/2023
3/22/2023 3/25/2023
4/06/023 4/7/2023
3/8/2023 11/3/2023
4/10/2023 4/14/2023
5/18/2023 5/22/2023
4/10/2023 4/20/2023
4/12/2023 4/12/2023
4/10/2023 4/13/2023
5/31/2023 6/7/2023
6/19/2023 6/28/2023
5/21/2023 5/26/2023
4/6/2023 6/10/2023
6/26/2023 6/27/2023
6/22/2023 6/28/2023
5/14/2023 5/19/2023
5/25/2023 6/30/2023
6/20/2023 6/21/2023
5/15/2023 5/17/2023
5/15/2023 5/17/2023
17/05/2023 17/05/2023
7/9/2023 7/17/2023
6/12/2023 7/21/2023
6/19/2023 6/21/2023
6/22/2023 6/25/2023
5/12/2023 5/12/2023
14/6/2023 20/6/2023
5/31/2023 5/31/2023
5/23/2023 5/25/2023
5/26/2023 5/27/2023
6/19/2023 6/25/2023
6/10/2023 6/16/2023
5/30/2023 5/30/2023
6/12/2023 6/18/2023
6/19/2023 6/25/2023
6/22/2023 6/27/2023
6/14/2023 6/20/2023
6/4/2023 6/7/2023
6/27/2023 7/2/2023
7/5/2023 8/4/2023
7/4/2023 7/6/2023
7/11/2023 7/13/2023
7/13/2023 7/20/2023
7/17/2023 7/22/2023
7/11/2023 7/15/2023
7/26/2023 8/14/2023
7/30/2023 9/17/2023
7/13/2023 7/27/2023
7/13/2023 7/15/2023
7/31/2023 8/4/2023
7/9/2023 8/10/2023
7/26/2023 8/12/2023
8/10/2023 8/14/2023
9/1/2023 9/12/2023
7/20/2023 7/26/2023
7/9/2023 7/12/2023
8/6/2023 8/11/2023
8/28/2023 9/14/2023
8/20/2023 9/2/2023
7/10/2023 7/20/2023
8/15/2023 9/8/2023
8/7/2023 8/25/2023
8/29/2023 9/9/2023
8/29/2023 9/5/2023
7/24/2023 8/28/2023
08/14/203 8/18/2023
08/14/203 8/18/2023
8/21/2023 8/25/2023
7/22/2023 7/27/2023
8/24/2023 9/14/2023
8/10/2023 8/10/2023
8/14/2023 8/17/2023
8/14/2023 8/17/2023
8/24/2023 8/24/2023
8/27/2023 8/31/2023
8/29/2023 9/1/2023
8/24/2023 8/31/2023
9/4/2023 9/4/2023
9/2/2023 9/2/2023
9/1/2023 9/1/2023
8/13/2023 8/30/2023
9/5/2023 9/7/2023
9/8/2023 9/8/2023
9/11/2023 9/17/2023
9/14/2023 9/19/2023
9/5/2023 9/15/2023
8/15/2023 9/8/2023
8/31/2023 10/5/2023
Juli
31 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18
78 78 78 61 61 61 61 61 61 61 61 61 61
47,50,54,14B,56,50,67,63,64,77,83,,105,108,110,116 77 77 77 77 77 77 77 77 83 83 83 83 83 83
6a,74,76,10b,87 66a 66a 66a 66a 66a
66c 66c 66c
77 77 77 77 77 77 77 77 77 77 77 77 77 77
,103,113,117 88 88 88 88
62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62
0,71,55b,79,82,72b 79
62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62
85 85 85 85 85 85 85 85 85
19 20 21 22 23 24 25 26 27 28 29 29 30 31 02 03 04 05 06 07 08 09 10 11
61 61 12b 12b 12b 12b 12b
83 83 83 83 83 83 83 83
66a 66a 12b 12b 12b 12b 12b 12b 12b 12b 12b 12b 12b 12b 12b12b 12b 12b
81 81 81 81 81 81 81 81 81 81 81 81 81 81 81 81 81
77 77 77 77 77 77 77 77 77 77 77 77 77
12b 12b 12b 12b 12b 103
62 62 62 62 62 62 62 62
82 82 82 82 82 82 82 82 82 82 82 82 82
96 96 96 96 96
80 80 80 80 81 81 81 81 81 81 81 81 81 81 81 81 81 81 81 81 81
85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85
82 82 82 82 82 82 82 82 82 82 82 82 82
62 62 62 62 62 62 62 62
85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85
Agus
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 29 30 31
113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 120 120
105 105 105 105 108 108 108 108
12b 120 120
81 81 81 119 119 119 119 119 119 119 119 119 119 119 119 119 119 119 119 119
113 113 113 113 113 113 113 113 113 113 113 113 113 113 107 107 107 107 107
113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113
104 104 104 104 109 109 109 109 109 109 109 109 112
82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82
96 96 96 106 120 120
81 81 81 119 119 119 119 119 119 119 119 119 119 119 119 119 119 119 119 119
113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113 113
82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82
104 104 104 104
Sep
02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22
120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
110 116 116 116 116 116 116 116
120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
119 119 119 119 119 119 119 119 119 119 119 119 119 119 119 119 119
114 114 114 115
117 117 117 117 117 117
111
82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82
120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
119 119 119 118 118 118 118 118 118 118 118 118 118 118 118 118 118
82 82 82 82 82 82 82 82 82 82 82 82 82 82 82 82
23 24 25 26 27 28 29 29 30 31 02 03 04 05
120 120 120 120 120 120 120 120 120 120 120 120 120 120
120 120 120 120 120 120 120 120 120 120 120 120 120 120
120 120 120 120 120 120 120 120 120 120 120 120 120 120
06 07 08 09 10 11 12 13 14 15
OCT
16 17 18 19 20 21 22 23 24 25
26 27 28 29 29 30
2022 - 2023
Legend
Yg belum ada tool sama sekali
tool lengkap
tool konstruksi by order
tool pribadi , hanya alat ukur by kantor
AMC
Projek
Cansel
Perubahan Jadwal
Durati
Description on Start Stop
PM 12/12/2022 1/18/2023
Retrofit Battery Charger 1/26/2023 1/27/2023
Install , SAT UPS PXP Baging Area 14/12/2022 9/1/2023
Troubleshoot, conmmon 1/16/2023 1/20/2023
SAT 12/18/2022 1/31/2023
Install BAT 5/14/2023 5/25/2023
SAT SDC
Oncall (instalasi sparepart CB03) 1/10/2023 1/14/2023
PM + Discharge Battery 1/10/2023 2/3/2023
PM + Site Survey ( Ofshore ) 5/11/2023 6/1/2023
Install Part 1 1/29/2023 1/31/2023
SAT UPS 1/11/2023 1/19/2023
Troublesshot 1 1/9/2023 1/12/2023
Troublesshot 1/12/2023 1/14/2023
Install Part 1/29/2023 1/31/2023
Install Part 2 2/26/2023 3/5/2023
Upgrade Battery 1/23/2023 1/27/2023
Troublesshot 1 1/16/2023 1/17/2023
Refresh Training 1 1/8/2023 1/18/2023
Site survey location 1 1/13/2023 1/13/2023
KOM PM 1 1/22/2023 1/23/2023
Test Battery Bulanan
1/16/2023 1/17/2023
indoction & PM +Service UPS & 1/30/2023 1/5/2023
Site survey location 2/7/2023 2/11/2023
Presentasi di PLN UP3 Cianjur 1/26/2023 1/27/2023
85-UPS-003A PLN Metering 2/7/2023 2/16/2023
witness material onsite 1/27/2023 1/28/2023
Install Part , Troubleshoot 2/16/2023 2/17/2023
Install Part 2/21/2023 2/22/2023
Install PDE Commisioning 2/24/2023 3/6/2023
Assessment 2/21/2023 2/24/2023
PM 3/6/2023 3/9/2023
Assesment PEW 1120-220/110EAN 3/10/2023 3/11/2023
PM 3/28/2023 3/29/2023
PM, Discharge Battery and Install Part
3/6/2023 3/17/2023
SAT 3/16/2023 10/4/2023
Conmon 11/3/2023 3/31/2023
Pembindahan Floating Ground 4/14/2023 4/18/2023
Site survey location 6/6/2023 3/7/2023
Meeting 3/28/2023 3/28/2023
Install Battery 7/27/2023 8/12/2023
Site survey location 3/14/2023 3/16/2023
Install Unit, Modif Punchlist 6/5/2023 6/21/2023
Install Unit
Troubleshoting 3/30/2023 4/1/2023
Install Part 4/1/2023 4/12/2023
Trobleshooting 3/22/2023 3/25/2023
Trobleshooting 4/06/023 4/7/2023
Assessment 3/8/2023 11/3/2023
Traning 4/10/2023 4/14/2023
PM 5/18/2023 5/22/2023
Con Mon 4/10/2023 4/20/2023
Site survey 4/12/2023 4/12/2023
Site survey 4/10/2023 4/13/2023
HCO Replace & SAT 5/31/2023 6/7/2023
Instal AC & DC UPS 6/19/2023 6/28/2023
PM 5/21/2023 5/26/2023
PM 4/6/2023 6/10/2023
Retensi Projek 6/26/2023 6/27/2023
Install & Commsioning
6/22/2023 6/28/2023
Troubleshoting 5/14/2023 5/19/2023
PM 5/25/2023 6/30/2023
KOM PSA/ Meeting 6/20/2023 6/21/2023
Troubleshoting 5/15/2023 5/17/2023
Install Battry 5/15/2023 5/17/2023
Site Surve 17/05/2023 17/05/2023
PM 7/9/2023 7/17/2023
PM 6/12/2023 7/21/2023
PM 6/19/2023 6/21/2023
PM 6/22/2023 6/25/2023
Install CB02 5/12/2023 5/12/2023
Install Gum 14/6/2023 20/6/2023
Site Survey 5/31/2023 5/31/2023
Site Survey 5/23/2023 5/25/2023
Install 5/26/2023 5/27/2023
Service &Install 6/19/2023 6/25/2023
SAT & Install 6/10/2023 6/16/2023
Traning 5/30/2023 5/30/2023
Troubleshoting 6/12/2023 6/18/2023
Service &Install 6/19/2023 6/25/2023
Install Battry 6/22/2023 6/27/2023
Install & SAT Gum
6/14/2023 6/20/2023
28### 29 30 31 31
34,45,43,61,57,78,61,12b,113,126,121 57### 57 57 121
1,24,30,37,38,45,41 A, 41B,41C, 47,50,54,14B,56,50,67,63,64,77,83,105,108,110,116,120,125,122 108
,12,2b,31,32,48,24B,10,43,23b,,66a,74,76,10b,87,121 76### 76 76 121
,43,69,55a,81,66c,92,119,125 55a 119
,35,46,47,52,57,77,107.114,115,124,125 57### 57 57
,20,25,29,34,,49,43,57,88,40,12b,103,113,117,62b 57### 57 57
b,2c,62,66,40,104.,109.111,112,123,62b 62 112
8,44,47,58,59,53,60,23b,65,66b,70,71,55b,79,82,72b,120 82
,33,48,57,96,106,121 57### 57 57 121
4,15,16,21,27,28,6,36,42,79,80,36B,40,81,92,118,119 119
3,27,29,33,34,49,51,42,,65,69,85,113,119,123 51 119
,42,82,72b,123,125 82
2,65,119,62b,120 62
55
Sep
02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
121 121 121 121 121 121 121 121 121 121 121 121 121 121 121 121 121 121 121 121 121 121 121
110 122 122 116 116 116 116 116 116 116
121 121 121 121 121 121 121 121 121 121 121 121 121 121 121 121 121 121 121 121 121 121 121
119 119 119 119 119 119 119 119 119 119 119 119 119 119 119 119 119 125
114 114 114 115 124 124 124 124 124 124 124 125
117 117 117 117 117 117
111 123 123 123 123 123 123 123
82 82 82 120 120 120 120 120 120 120 120
121 121 121 121 121 121 121 121 121 121 121 121 121 121 121 121 121 121 121 121 121 121 121
119 119 119 118 118 118 118 118 118 118 118 118 118 118 118 118 118
119 119 119 119 123 123 123 123 123 123 123
82 82 82 123 123 123 123 123 123 123
120 120 120 120 120 120 120 120 119 119 119
122 123 123 123 123 123 123 123
25 26 27 28 29 29 30 31 02 03 04 05 06 07 08 09 10 11 12 13 14 15
121 121 121 121 121 121 121 121 121 121 121 121
125 125 125 125 125 125 125 125 125 125
121 121 121 121 121 121 121 121 121 121 121 121
125 125 125 125 125 125 125 125 125 125 125 125 125 125 125 125 125 125 123 123 123 123
125 125 125 125 125 125 125 125 125 125 125 125 125 125 125 125 125 125
62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b
62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b
121 121 121 121 121 121 121 121 121 121 121 121
124 124 124 124 124 124 124
125 125 125 125 125 125 125 125 125 125
62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b
Oct
16 17 18 19
20 21 22 23 24 25 26 27 28 29 29 30
126 126 126 126 126 126 126 126 126 126
125 125 125 125 125 125 125 125 125
Legend
Yg belum ada tool sama sekali
tool lengkap
tool konstruksi by order
tool pribadi , hanya alat ukur by kantor
AMC
Projek
Cansel
Perubahan Jadwal
Durati
Description on Start Stop
PM 12/12/2022 1/18/2023
Retrofit Battery Charger 1/26/2023 1/27/2023
Install , SAT UPS PXP Baging Area 14/12/2022 9/1/2023
Troubleshoot, conmmon 1/16/2023 1/20/2023
SAT 12/18/2022 1/31/2023
Install BAT 5/14/2023 5/25/2023
SAT SDC
Oncall (instalasi sparepart CB03) 1/10/2023 1/14/2023
PM + Discharge Battery 1/10/2023 2/3/2023
PM + Site Survey ( Ofshore ) 5/11/2023 6/1/2023
Install Part 1 1/29/2023 1/31/2023
SAT UPS 1/11/2023 1/19/2023
Troublesshot 1 1/9/2023 1/12/2023
Troublesshot 1/12/2023 1/14/2023
Install Part 1/29/2023 1/31/2023
Install Part 2 2/26/2023 3/5/2023
Upgrade Battery 1/23/2023 1/27/2023
Troublesshot 1 1/16/2023 1/17/2023
Refresh Training 1 1/8/2023 1/18/2023
Site survey location 1 1/13/2023 1/13/2023
KOM PM 1 1/22/2023 1/23/2023
Test Battery Bulanan
1/16/2023 1/17/2023
indoction & PM +Service UPS & 1/30/2023 1/5/2023
Site survey location 2/7/2023 2/11/2023
Presentasi di PLN UP3 Cianjur 1/26/2023 1/27/2023
85-UPS-003A PLN Metering 2/7/2023 2/16/2023
witness material onsite 1/27/2023 1/28/2023
Install Part , Troubleshoot 2/16/2023 2/17/2023
Install Part 2/21/2023 2/22/2023
Install PDE Commisioning 2/24/2023 3/6/2023
Assessment 2/21/2023 2/24/2023
PM 3/6/2023 3/9/2023
Assesment PEW 1120-220/110EAN 3/10/2023 3/11/2023
PM 3/28/2023 3/29/2023
PM, Discharge Battery and Install Part
3/6/2023 3/17/2023
SAT 3/16/2023 10/4/2023
Conmon 11/3/2023 3/31/2023
Pembindahan Floating Ground 4/14/2023 4/18/2023
Site survey location 6/6/2023 3/7/2023
Meeting 3/28/2023 3/28/2023
Install Battery 7/27/2023 8/12/2023
Site survey location 3/14/2023 3/16/2023
Install Unit, Modif Punchlist 6/5/2023 6/21/2023
Install Unit
Troubleshoting 3/30/2023 4/1/2023
Install Part 4/1/2023 4/12/2023
Trobleshooting 3/22/2023 3/25/2023
Trobleshooting 4/06/023 4/7/2023
Assessment 3/8/2023 11/3/2023
Traning 4/10/2023 4/14/2023
PM 5/18/2023 5/22/2023
Con Mon 4/10/2023 4/20/2023
Site survey 4/12/2023 4/12/2023
Site survey 4/10/2023 4/13/2023
HCO Replace & SAT 5/31/2023 6/7/2023
Instal AC & DC UPS 6/19/2023 6/28/2023
PM 5/21/2023 5/26/2023
PM 4/6/2023 6/10/2023
Retensi Projek 6/26/2023 6/27/2023
Install & Commsioning
6/22/2023 6/28/2023
Troubleshoting 5/14/2023 5/19/2023
PM 5/25/2023 6/30/2023
KOM PSA/ Meeting 6/20/2023 6/21/2023
Troubleshoting 5/15/2023 5/17/2023
Install Battry 5/15/2023 5/17/2023
Site Surve 17/05/2023 17/05/2023
PM 7/9/2023 7/17/2023
PM 6/12/2023 7/21/2023
PM 6/19/2023 6/21/2023
PM 6/22/2023 6/25/2023
Install CB02 5/12/2023 5/12/2023
Install Gum 14/6/2023 20/6/2023
Site Survey 5/31/2023 5/31/2023
Site Survey 5/23/2023 5/25/2023
Install 5/26/2023 5/27/2023
Service &Install 6/19/2023 6/25/2023
SAT & Install 6/10/2023 6/16/2023
Traning 5/30/2023 5/30/2023
Troubleshoting 6/12/2023 6/18/2023
Service &Install 6/19/2023 6/25/2023
Install Battry 6/22/2023 6/27/2023
Install & SAT Gum
6/14/2023 6/20/2023
###30 31 02 03 04 05 06 07
34,45,43,61,57,78,61,12b,113,126,121,128 ### 121 121 121 121 121 121
1,24,30,37,38,45,41 A, 41B,41C, 47,50,54,14B,56,50,67,63,64,77,83,105,108,110,116,120,125,122,127 127 127
,12,2b,31,32,48,24B,10,43,23b,,66a,74,76,10b,87,121,132,87,95 121 121 121 121 121 121
,43,69,55a,81,66c,92,119,125,131 125 125 125 125 125 125 125 125
,35,46,47,52,57,77,107.114,115,124,125,114,130,134 ### 125 125 125 125 125 125 125 125
,20,25,29,34,,49,43,57,88,40,12b,103,113,117,62b ### 62b 62b 62b 62b 62b 62b
b,2c,62,66,40,104.,109.111,112,123,62b 62b 62b 62b 62b 62b 62b
8,44,47,58,59,53,60,23b,65,66b,70,71,55b,79,82,72b,120,113b,133,134,95 ###
,33,48,57,96,106,121,129 ### 121 121 121 121 121 121
4,15,16,21,27,28,6,36,42,79,80,36B,40,81,92,118,119,126,135 ### 126 126 126 126 126 126
3,27,29,33,34,49,51,42,,65,69,85,113,119,123,113b,130,131
,42,82,72b,123,127 ### 127 127
2,65,119,62b,120 62b 62b 62b 62b 62b 62b
55
Oct
08 09 10 11 12 13 14 15 16 17 18 19
20 21 22 23 24 25 26 27 28 29
126 126 126 126 126 126 126 126 126 126
127 127 127 127 127 127 127 127 127 127 127 127 127 127 127 127 127
125 125 125 125 123 123 123 123 131 131 131 131 131 131 131
125 125 125 125 130 113c 134 134
62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b
62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b 62b
113b 113b 134 134
129 129 129 129
29 30 31 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20
128 128 128 128 128 128 128 128 128 128 128 128 128 128 128 128 128 128 128 128
134 134 134 133 133 133 133 133 133 133 133 133 133 133
131 131 131 131 131 131 131 131 131 131 131 131 131 131 131
62b 62b
21 22 23 24 25 26 27 28 29 29 30
Legend
Yg belum ada tool sama sekali
tool lengkap
tool konstruksi by order
tool pribadi , hanya alat ukur by kantor
AMC
Projek
Cansel
Perubahan Jadwal
Durati
Description on Start Stop
PM 12/12/2022 1/18/2023
Retrofit Battery Charger 1/26/2023 1/27/2023
Install , SAT UPS PXP Baging Area 14/12/2022 9/1/2023
Troubleshoot, conmmon 1/16/2023 1/20/2023
SAT 12/18/2022 1/31/2023
Install BAT 5/14/2023 5/25/2023
SAT SDC
Oncall (instalasi sparepart CB03) 1/10/2023 1/14/2023
PM + Discharge Battery 1/10/2023 2/3/2023
PM + Site Survey ( Ofshore ) 5/11/2023 6/1/2023
Install Part 1 1/29/2023 1/31/2023
SAT UPS 1/11/2023 1/19/2023
Troublesshot 1 1/9/2023 1/12/2023
Troublesshot 1/12/2023 1/14/2023
Install Part 1/29/2023 1/31/2023
Install Part 2 2/26/2023 3/5/2023
Upgrade Battery 1/23/2023 1/27/2023
Troublesshot 1 1/16/2023 1/17/2023
Refresh Training 1 1/8/2023 1/18/2023
Site survey location 1 1/13/2023 1/13/2023
KOM PM 1 1/22/2023 1/23/2023
Test Battery Bulanan
1/16/2023 1/17/2023
indoction & PM +Service UPS & 1/30/2023 1/5/2023
Site survey location 2/7/2023 2/11/2023
Presentasi di PLN UP3 Cianjur 1/26/2023 1/27/2023
85-UPS-003A PLN Metering 2/7/2023 2/16/2023
witness material onsite 1/27/2023 1/28/2023
Install Part , Troubleshoot 2/16/2023 2/17/2023
Install Part 2/21/2023 2/22/2023
Install PDE Commisioning 2/24/2023 3/6/2023
Assessment 2/21/2023 2/24/2023
PM 3/6/2023 3/9/2023
Assesment PEW 1120-220/110EAN 3/10/2023 3/11/2023
PM 3/28/2023 3/29/2023
PM, Discharge Battery and Install Part
3/6/2023 3/17/2023
SAT 3/16/2023 10/4/2023
Conmon 11/3/2023 3/31/2023
Pembindahan Floating Ground 4/14/2023 4/18/2023
Site survey location 6/6/2023 3/7/2023
Meeting 3/28/2023 3/28/2023
Install Battery 7/27/2023 8/12/2023
Site survey location 3/14/2023 3/16/2023
Install Unit, Modif Punchlist 6/5/2023 6/21/2023
Install Unit
Troubleshoting 3/30/2023 4/1/2023
Install Part 4/1/2023 4/12/2023
Trobleshooting 3/22/2023 3/25/2023
Trobleshooting 4/06/023 4/7/2023
Assessment 3/8/2023 11/3/2023
Traning 4/10/2023 4/14/2023
PM 5/18/2023 5/22/2023
Con Mon 4/10/2023 4/20/2023
Site survey 4/12/2023 4/12/2023
Site survey 4/10/2023 4/13/2023
HCO Replace & SAT 5/31/2023 6/7/2023
Instal AC & DC UPS 6/19/2023 6/28/2023
PM 5/21/2023 5/26/2023
PM 4/6/2023 6/10/2023
Retensi Projek 6/26/2023 6/27/2023
Install & Commsioning
6/22/2023 6/28/2023
Troubleshoting 5/14/2023 5/19/2023
PM 5/25/2023 6/30/2023
KOM PSA/ Meeting 6/20/2023 6/21/2023
Troubleshoting 5/15/2023 5/17/2023
Install Battry 5/15/2023 5/17/2023
Site Surve 17/05/2023 17/05/2023
PM 7/9/2023 7/17/2023
PM 6/12/2023 7/21/2023
PM 6/19/2023 6/21/2023
PM 6/22/2023 6/25/2023
Install CB02 5/12/2023 5/12/2023
Install Gum 14/6/2023 20/6/2023
Site Survey 5/31/2023 5/31/2023
Site Survey 5/23/2023 5/25/2023
Install 5/26/2023 5/27/2023
Service &Install 6/19/2023 6/25/2023
SAT & Install 6/10/2023 6/16/2023
Traning 5/30/2023 5/30/2023
Troubleshoting 6/12/2023 6/18/2023
Service &Install 6/19/2023 6/25/2023
Install & SAT Gum
6/14/2023 6/20/2023
55
Nov
28 29 29 30 31 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18
126 126 128 128 128 128 128 128 128 128 128 128 128 128 128 128 128 128 128 128
149 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149
156 156 156 156 156 156 156 132 132 132 132 132
131 131 131 131 131 131 131 131 131 131 131 131 131 131 131 131 131 131 131
134 134 134 134 134 147 147 147 147 147 147 147 147 147
62b 62b 62b 62b 148 148 148 148 148 148 148 148 148 148 148 148 148
149 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149
134 134 134 134 134 157 157 157 157 157 133 133 133 133 133 133 133 133
149 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149
148 148 148 148 148 148 148 148 148 148 148 148 148
131 131 131 131 131 131 131 131 131 131 131 131 131 131 131 131 131 131 131
149 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149
62b 62b 62b 62b 148 148 148 148 148 148 148 148 148 148 148 148 148
149 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149 149
19 20 21 22 23 24 25 26 27 28 29 29 30 31 02 03 04 05 06 07 08
128 128
149 149 149 149 149 149 149 149 149 149 149 149 149
148 148 148 148 148 148 148 148 148 148 148 148 148
149 149 149 149 149 149 149 163 163 163 163 163 163 163 163 163 163 163 163 163 163
133 133 133 133 133 133 133 159 159 159 159 159 159 159 159 159 159 159 159 159 159
149 149 149 149 149 149 149 149 149 149 149 149 149
148 148 148 148 148 148 148 148 148 148 148 148 148
149 149 149 149 149 149 149 149 149 149 149 149 149
148 148 148 148 148 148 148 148 148 148 148 148 148
149 149 149 149 149 149 149 149 149 149 149 149 149
Desember
09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
163 163 163 163 163 163 163 163 163 163 163 163 163 163 163 163 163 163
159 159 159 159 159 159 159 159 159 159 159 159
28 29 29 30