Download as pdf or txt
Download as pdf or txt
You are on page 1of 21

PT.

Berkah Kawasan Manyar Sejahtera

ENGINEERING SERVICES FOR THE DESIGNING OF PROJECTS


PEKERJAAN ARSITEKTUR PAGAR DINDING ENTRANCE JIIPE

DESIGN DRAWINGS

JUNI 2024
ISSUED

DESCRIPTION

KEYPLAN

NOTE :

3.33
UDITCH

TOP OF PAVING
EKSISTING
+2.87

80
700
X=679645.356

10 145

R150
Y=9216776.411 X=679651.805
Y=9216773.686

182
TOP OF CONCRETE
U-DITCH COVER
+3.00

807
TOP OF PAVING
+3.50

400
X=679642.167
Y=9216765.348 50

X=679645.830
Y=9216763.742

30
30
2.6466m

2.2594m

2.0209m
C

04
D
A 03
B

2
B
01
A

A
1

RMB
B RMB EP
02
C

C
D

X=681013.747
D

Y=9216375.324
X=681016.208
Y=9216373.983

X=681027.842
Y=9216340.664

X=681027.954
Y=9216339.988

X=681027.840
Y=9216326.242
X=681025.923 X=681031.923
Y=9216326.242 Y=9216326.242

X=681025.923 X=681031.923
Y=9216322.242 Y=9216322.242

LOKASI
C1

1
C2
2
A4
A3

A2

A1
B2
B1

PT. BERKAH KAWASAN MANYAR SEJAHTERA

PROYEK

PT. ITS TEKNO SAINS


A

+4.50mLWS
KE TUBAN

+3.00mLWS 10.585
5.000 B
5.600
3.800 PUMP
ELEC.

15.000 +4.50mLWS
B

10.000 ELEC. PUMP


3
A

DIESEL PUMP

+4.50mLWS 2 TANK
WATER
73 m3
35.000
1

CAP. CULVERT
2

BOX
1000X1000
1

(BY OTHERS);
L=6M
A

COMP-02 STA 0+075


COMP-01

+4.50mLWS
PILAR
HYDRANT 2.475
MRS-001

+4.95mLWS
0.220
SEE DETAIL

2.4752.475

+4.50mLWS 2.4752.475

2.4752.4752.475
5.840 2.475
2.475
0.6880.791 +4.50mLWS
1.500
HYDRANT PILAR
2.4752.475
1.097
1.098
HYDRANT PILAR 0.645 0.800

F2 0.909
F3
GUDANG

2.98
GAS
4.09
GAS
F1
3.88
GAS
PC1

TB2
PC1

3.49
GAS

3.27
GAS
MUSHALA
WUDHU
SHOWER

3.15
JAGA

RUANG

KM/WC

GAS
KM/WC
KM/WC
LOCKER
R. GANTI

PANTRY

JAGA
RUANG
RUANG
KANTOR
SECURITY

INTEROGASI

3.05
GAS
3.42
3.39 BOX
3.55
BOX
BOX
3.56
3.52
BOX

PARKIR
MOTOR
PC1
TB2
1000

Toren Air
Kapasitas

PC1
L

1000 L
Toren
Kapasitas

Air

20

SARANA VOKASI
LUAS LAHAN
±5.316 M2
2.77
GAS

50,08

3.13
GAS
KE GRESIK

SARANA IBADAH
LUAS LAHAN ±3.944 M2
30

3.38
GAS
PARKIR MOTOR
MASJID
2,928,13

LAPANGAN
VOLI
KELUAR -
MASUK
DAN VOKASI PARKIR MOTOR
MASJID GEDUNG
SAT
GEDUNG SPKT
SAMAPTA
40,8

POS
3.85 JAGA
GAS

MASUK POLRES KAWASAN


6

GEDUNG GEDUNG
& NARKOBA
MAKO UTAMA RESKRIM
LUAS LAHAN ±3.356 M2
9
6

KELUAR PARKIR
MOBIL
3.81
GAS
8

99,73

SITEPLAN PAGAR DINDING ENTRANCE JIIPE


SKALA 1:30000
ISSUED
WS
+4.50mL

AN
5.000
WS 10.585
+3.00mL
5.600
3.800

KE T UB
15.000 ELEC. PUMP WS
B
+4.50mL
10.000 ELEC. PUMP

WS A PUMP

+4.50mL
DIESEL
3 TANK WATER

LY-01
2 m3
CAP. 73
35.000 1
2
3 4

BOX
CULVER
T

00 );
1000X10
OTHERS
1 (BY
L=6M

STA 0+075
COMP-02
COMP-01

DESCRIPTION
B

WS
+4.50mL
PILAR
HYDRANT
2.475

MRS-001
WS 2.475
+4.95mL

SEE DETAIL
0.220
2.475
WS 2.475
+4.50mL
2.475
2.475
2.475
2.475
5.840 2.475
2.475
WS
+4.50mL
0.688
0.791 1.500
T PILAR
2.475
HYDRAN
2.475
1.097 KEYPLAN
LY-02
1.098
T PILAR 0.645
HYDRAN 0.800

F2 0.909
GUDANG
F3

2.98
GAS

4.09
GAS
F1
3.88
GAS

LY-03

PC
1
2
TB

PC
1
3.49
GAS

3.27
GAS

MU
SHA
LA
WU
DHU
SHO
WE
3.15

R
RU
JAG
ANGA
GAS

KM
/WC
KM
/WC
KM
/WC
LOC
KER

PAN
R.
GAN

TRY
TI

RUA A
JAG
NG
NOTE :

KAN URI
SEC

TORTY

INT
RUA GAS
ERO
NG
3.05

I
GAS
3.42
3.55
BOX
3.39
3.56 BOX
BOX
3.52
BOX

IR
RK
PA TOR
MO

PC
1
2
TB

PC
Kapas L
Torenitas
1000

Air

1
Kapa L
Toren
1000

sitas
Air
LY-04

20
LY-05 SARANA VOKASI
LUAS LAHAN
±5.316 M2
2.77
GAS

LY-06
,08
50

LY-07

LY-08
3.13
GAS

PT. BERKAH KAWASAN MANYAR SEJAHTERA


IK
RES

SARANA IBADAH
KE G

LUAS LAHAN ±3.944 M2

30
PT. ITS TEKNO SAINS

MOTOR
3.38

PARKIR
GAS

MASJID
2,92

AN
LAPANG
VOLI
SUK
KELUAR - MA KASI MO TOR
8,13

N VO PARKIR
MASJID DA GEDUNG
GEDUNG
SAT SPKT
SAMAPTA

40,8
POS
3.85 JAGA
GAS

MASUK POLRES KAWASAN GEDUNG OBA


6

GEDUNG
AMA & NARK
MAKO UT RESKRIM
LUAS LAHAN ±3.356 M2
9

LAYOUT PAGAR DINDING ENTRANCE JIIPE


6

KELUAR PARKIR
MOBIL
3.81
GAS
SKALA 1:1000

99,73
8
PEKERJAAN ARSITEKTUR PAGAR
SISI UTARA
ISSUED

WS
+4.50mL
DESCRIPTION

KEYPLAN

DETAIL AS 1
SKALA 1:30
NOTE :

-001
AIL MRS
SEE DET
DETAIL AS 2,3,4
SKALA 1:30

PT. BERKAH KAWASAN MANYAR SEJAHTERA

PT. ITS TEKNO SAINS

DETAIL AS 5 LAYOUT 01
SKALA 1:100
SKALA 1:30
1.097 ISSUED

1.098
HYDRANT PIL
AR 0.645
DESCRIPTION

KEYPLAN

F2 0.909
GUDANG
F3

2.98
GAS NOTE :

4.09
GAS
F1
3.88
GAS

LAYOUT 02
SKALA 1:100

PT. BERKAH KAWASAN MANYAR SEJAHTERA

PT. ITS TEKNO SAINS

DETAIL AS 6,7 DETAIL AS 8


SKALA 1:30 SKALA 1:30
ISSUED

DESCRIPTION

KEYPLAN

NOTE :

LAYOUT 09 LAYOUT 10 LAYOUT 11


SKALA 1:30 SKALA 1:30 SKALA 1:30

PT. BERKAH KAWASAN MANYAR SEJAHTERA

PT. ITS TEKNO SAINS

LAYOUT 13 LAYOUT 14
SKALA 1:30 SKALA 1:30
WS
+4.50mL
ISSUED

1.500 2.475
HYDRA NT PILAR
DESCRIPTION

2.475

KEYPLAN

0.645
0.800

0.909
NOTE :

F2
GUDANG
F3

LAYOUT 02
SKALA 1:100
F1

PT. BERKAH KAWASAN MANYAR SEJAHTERA

PT. ITS TEKNO SAINS

DETAIL AS 15, 16, 17, 18


SKALA 1:30
ISSUED

DESCRIPTION

KEYPLAN

NOTE :

ISOMETRI PAGAR SISI UTARA 1


SKALA N.T.S.

LTOTAL SISI UTARA : 90,86 M

PT. BERKAH KAWASAN MANYAR SEJAHTERA

PT. ITS TEKNO SAINS

ISOMETRI PAGAR SISI UTARA 2


SKALA N.T.S.
ISSUED

DESCRIPTION

KEYPLAN

NOTE :

TAMPAK DEPAN "LETTER"


SKALA N.T.S.

PT. BERKAH KAWASAN MANYAR SEJAHTERA

PT. ITS TEKNO SAINS

NOTES :
1) Logo "SPECIAL ECONOMIC ZONE" Acrylic 3mm;t=25cm, Stainless Steel Back Plate, Sticker Printing UV dengan Lampu, Font Arial Bold
2) Letter "JIIPE" Acrylic 3mm; t=25cm, Stainless Steel Back Plate, Sticker Printing UV dengan Lampu
3) Letter "JAVA INTEGRATED INDUSTRIAL AND PORTS ESTATE" Acrylic 3mm; t=25cm, Stainless Steel Back Plate, Sticker Printing UV dengan Lampu, Font Arial Narrow
4) + Rangka Logo By Vendor

TAMPAK DEPAN "LETTER"


SKALA N.T.S.
ISSUED

DESCRIPTION

BALOK ANAK
15x20
KEYPLAN

KOLOM PRAKTIS
15x15

TAMPAK TYPICAL FINISH DINDING NOTE :

SKALA 1:100

5 4

6 3

1 2
ANCHOR SCREW Ø8-100 HOLLOW GALVANIS
PENGUNCI (6 TITIK) HOLLOW GALVANIS
50.50.1
PLAT t:1mm 50.50.1
FIN. MARINE COAT
CHEMICAL ANCHOR Ø8 JARAK 50mm
WARNA APPROVAL BY OWNER
FIN. MARINE COAT
WARNA APPROVAL BY OWNER DETAIL FINISH "D2"
SKALA 1:40

PT. BERKAH KAWASAN MANYAR SEJAHTERA

PEMASANGAN SELANG SAMBUNGAN DENGAN


SELING PLAMIR

CHEMICAL ANCHOR Ø8-100


PT. ITS TEKNO SAINS
PLAT t:1mm

ANCHOR SCREW Ø8-100

ANCHOR SCREW Ø8-100

PLAT t:1mm
CHEMICAL ANCHOR
Ø8-100
ANCHOR SCREW Ø8-100
TAMPAK SAMPING TAMPAK ATAS

CONWOOD PLANK 2"


25x50mm
FIN. CAT PRIMER, FINISH, CLEAR COAT
DETAIL PENGUNCI "D2" ANCHOR + SCREW Ø8-100

WARNA APPROVAL BY OWNER SKALA 1:10

DETAIL FINISH "D1" DETAIL CONWOOD PLANK


SKALA 1:50
SKALA 1:10
PEKERJAAN ARSITEKTUR PAGAR
SISI SELATAN
ISSUED

DESCRIPTION

KEYPLAN

NOTE :

PT. BERKAH KAWASAN MANYAR SEJAHTERA

PT. ITS TEKNO SAINS

DETAIL AS 19, 20, 21, 22, 23


LAYOUT 04 SKALA 1:30
SKALA 1:100
ISSUED

DESCRIPTION

KEYPLAN

NOTE :

LAYOUT 05
SKALA 1:100

PT. BERKAH KAWASAN MANYAR SEJAHTERA

PT. ITS TEKNO SAINS

DETAIL AS 30, 31 DETAIL AS 26, 27, 28, 29 DETAIL AS 24, 25


SKALA 1:30 SKALA 1:30 SKALA 1:30
ISSUED

DESCRIPTION

KEYPLAN

NOTE :

PT. BERKAH KAWASAN MANYAR SEJAHTERA

PT. ITS TEKNO SAINS

DETAIL AS 32
LAYOUT 06 SKALA 1:30
SKALA 1:100
ISSUED

DESCRIPTION

KEYPLAN

NOTE :

PT. BERKAH KAWASAN MANYAR SEJAHTERA

PT. ITS TEKNO SAINS

LAYOUT 07 LAYOUT 08 DETAIL AS 42, 43


SKALA 1:100 SKALA 1:100 SKALA 1:30
ISSUED

DESCRIPTION

KEYPLAN

NOTE :

PT. BERKAH KAWASAN MANYAR SEJAHTERA

PT. ITS TEKNO SAINS

ISOMETRI PAGAR SISI SELATAN


SKALA N.T.S. LTOTAL SISI SELATAN : 146,03 M
ISSUED

DESCRIPTION

BALOK ANAK
15x20
KEYPLAN

KOLOM PRAKTIS
15x15

TAMPAK TYPICAL FINISH DINDING NOTE :

SKALA 1:100

5 4

6 3

1 2
ANCHOR SCREW Ø8-100 HOLLOW GALVANIS
PENGUNCI (6 TITIK) HOLLOW GALVANIS
50.50.1
PLAT t:1mm 50.50.1
FIN. MARINE COAT
CHEMICAL ANCHOR Ø8 JARAK 50mm
WARNA APPROVAL BY OWNER
FIN. MARINE COAT
WARNA APPROVAL BY OWNER DETAIL FINISH "D2"
SKALA 1:40

PT. BERKAH KAWASAN MANYAR SEJAHTERA

PEMASANGAN SELANG SAMBUNGAN DENGAN


SELING PLAMIR

CHEMICAL ANCHOR Ø8-100


PT. ITS TEKNO SAINS
PLAT t:1mm

ANCHOR SCREW Ø8-100

ANCHOR SCREW Ø8-100

PLAT t:1mm
CHEMICAL ANCHOR
Ø8-100
ANCHOR SCREW Ø8-100
TAMPAK SAMPING TAMPAK ATAS

CONWOOD PLANK 2"


25x50mm
FIN. CAT PRIMER, FINISH, CLEAR COAT
DETAIL PENGUNCI "D2" ANCHOR + SCREW Ø8-100

WARNA APPROVAL BY OWNER SKALA 1:10

DETAIL FINISH "D1" DETAIL CONWOOD PLANK


SKALA 1:50
SKALA 1:10
PEKERJAAN TARIKAN POWER
UNTUK LISTRIK LAMPU "LETTER" & CCTV FUTURE
35.000 ISSUED

DESCRIPTION

START
CONTROL ROOM
KEYPLAN

WS
+4.50mL

NOTE :

FOTO 1. BAK KONTROL ELEKTRIKAL

FOTO 5. KABEL TEPI PAGAR


5.840
FOTO 2. CROSSING HDPE EKS
FOTO 4. KABEL TEPI PAGAR

WS
+4.50mL
0.688
0.791 1.500
FOTO 3. BAK KONTROL ELEKTRIKAL
PILAR
2.475
HYDRANT
2.475
1.097
1.098
HYDRANT
PILA R 0.645
0.800
PT. BERKAH KAWASAN MANYAR SEJAHTERA

F2 0.909
GUDANG
F3 PT. ITS TEKNO SAINS

2.98
GAS
FOTO 6. KABEL TEPI PAGAR
4.09
GAS
END
F1
3.88 PANEL PAGAR
GAS

PC
LAYOUT PENARIKAN POWER LAMPU "LETTER"

1
SKALA 1:150
ISSUED

DESCRIPTION

KEYPLAN

NOTE :

POT. A
SKALA 1:7

POT. B PT. BERKAH KAWASAN MANYAR SEJAHTERA


SKALA 1:7

PT. ITS TEKNO SAINS

ISOMETRI KABEL
SKALA N.T.S.

POT. C
SKALA 1:7

You might also like