Professional Documents
Culture Documents
HYDROTESTING
HYDROTESTING
Hydrotesting
Risk Analysis Risk Analysis
CONTROL MEASURES
Job Steps (Before) (After)
Potential Affected
Step No. Break the job into several steps Effects Severity Severity
Hazards Probabilit Risk Engineering Probabilit Risk Regulation
make sure the correct (consequential Administrative Control PPE (consequential
y Rating Control y Rating
sequence is observed effects) effects)
Hardhat,
Conduct site inspection,
Install temporary safety shoes,
Poor illumination Minor Injury 3 3 9 ensure proper illumination 1 1 1 D.O 13
lightings safety
at the area
goggles
Close monitoring of
supervisor, charging and Hardhat,
Standard Parts /hose /
Charging - pressurizing of pipe increasing the pressure of safety shoes,
Hoses & Pressure Serious fiitings must be used.
6 using industrial oil and manual 4 5 20 pipe must be gradually, safety 2 2 4 D.O 13
Equipment Injury Ensure proper
hydrostatic pump strictly observe any sign of goggles,
connection.
deviation on testing set-up faceshield
and standard.
Ensure stand-by worker or
Barricade / isolate the watchman with radio on Hardhat,
area, provide the identified control safety shoes,
Damage to
Pipe leak 4 4 16 protection on points(joints, welded part, safety 1 2 2 D.O 13
property
machine / equipment flanges). Secure protection goggles,
near the pipe testing on utilities and machine at faceshield
the area.