BILL NO.1:
General Notes :
The Bill of Quantities are prepared and grouped in sections. Within each
section the items are set out in trade order.
dump site area as designated by the employer. The General Contractor shall
allow all costs for proper housekeeping of the project site at all times. Item 3.00 600.00 1,800.00
2 DEMOLITION
(a) Rates for demolishing existing structure shall include; breaking up and pulling
down damage ceilingcomponent , and removing all incidental debris, cleaning
and stacking materials required for making good, casing, covering up and
protecting works to be retained or left intact, carrying out the works in sequence
or phases; including piecemeal works. Item 4.00 2,500.00 10,000.00
(a)
Rates shall include Supply of materials for fixing and replacing all damge
ceiling , and pointing materials; cleaning down and polishing. Item 4.00 4,500.00 18,000.00
All finishing works shall be in accordance with approved drawings,
specification and finishes schedule and subject to approval by owner
3 PAINTING
All paints shall be approved by the OWNER for colour, quality and type. All
painting work shall be carried out in accordance with the paint manufacturer’s
specifications unless otherwise directed by the Engineer.
Item 1.00 8,500.00 8,500.00
Rate shall include for putty and paint finish for interior surfaces of the ceilings
complete including application of two coats of sealer, two coats of putty finish
and three coats of final paint finish on top for Interior painting
3 ELECTRICAL
Rate shall include for replacing busted light on ponted signage , replacing track
light bulb and repairing sensor wire.. Item 4.00 3,500.00 14,000.00
All the light fittings to be provided under this Contract shall be of the best quality
without any defects to the complete satisfaction of the Owner/Engineer.