PROJECT: PROPOSED ADITIONAL WORK

LOCATION: macanhan carmen cdo


OWNER:
SUBJECT: Bill of Materials & Cost Estimates

NO. ITEM PARTICULAR UNIT UNIT PRICE TOTAL COST

1 CONCRETE AND MASONRY WORKS


Roofdeck stair case inclusure with roof framing
Portland Cement 24 bags 225.00 P 5,400.00
4" CHB 120 pcs 10.00 P 1,200.00
Fine Sand 3.0 cu.m 950.00 P 2,850.00
10mmo Deform bars x 6m 30 pcs 142.00 P 4,260.00
Material Cost P 13,710.00
Labor Cost P 5,484.00
sub-total P 19,194.00

2 ROOF FRAMING ( roof deck staircase roof framing)


roof not included
2 X 3 C -PURLINS 4 pcs 560.00 P 2,240.00
2 X 6 C- PURLINS 2.0 pcs 750.00 P 1,500.00
BI PIPE 2" 2.0 pcs 1,200.00 P 2,400.00
welding rod 5 box 120.00 P 600.00
Material Cost P 6,740.00
Labor Cost P 2,696.00
sub-total P 9,436.00

TOTAL CONSTRUCTION COST P 28,630.00


Total Material Cost P #REF!
Total Labor Cost P #REF!

TOTAL CONSTRUCTION COST P #REF!


Prepared By:

Archt. Conforne:
PRC NO. Owner
PTR
DATE:
TIN: