OWNER: SUBJECT: Bill of Materials & Cost Estimates
NO. ITEM PARTICULAR UNIT UNIT PRICE TOTAL COST
1 CONCRETE AND MASONRY WORKS
Roofdeck stair case inclusure with roof framing Portland Cement 24 bags 225.00 P 5,400.00 4" CHB 120 pcs 10.00 P 1,200.00 Fine Sand 3.0 cu.m 950.00 P 2,850.00 10mmo Deform bars x 6m 30 pcs 142.00 P 4,260.00 Material Cost P 13,710.00 Labor Cost P 5,484.00 sub-total P 19,194.00
roof not included 2 X 3 C -PURLINS 4 pcs 560.00 P 2,240.00 2 X 6 C- PURLINS 2.0 pcs 750.00 P 1,500.00 BI PIPE 2" 2.0 pcs 1,200.00 P 2,400.00 welding rod 5 box 120.00 P 600.00 Material Cost P 6,740.00 Labor Cost P 2,696.00 sub-total P 9,436.00
TOTAL CONSTRUCTION COST P 28,630.00
Total Material Cost P #REF! Total Labor Cost P #REF!