Professional Documents
Culture Documents
B-00
B-00
18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 1' 2' 3' 4' 5' 6' 7' 8' 9' 10' 11' 12' 13' 14' - Dimensions on drawing must be checked on site
before constructing. All differences must be noticed to
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000
400 4000 4000 4000 4000 4000 4000 400 3600 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 consultant to modify in time.
PROJECT NAME:
A A
PARADISUS BALI
4000
4000
WALK IN WALK IN Location: Nusa Dua, Bali, Indonesia.
EMERGENCY
DOOR FREEZER FREEZER
B B OWNER:
4000
4000
POT WALK IN WALK IN WALK IN WALK IN
SMOKING
AREA
WASHER FREEZER CHILLER CHILLER CHILLER PT SURYALAYA ANINDITA
GARDEMANGER
C C INTERNATIONAL
PLONGE
4000
4000
Address: Jalan H.R. Rasuna Said Kav. X-O, Kuningan, 12950
GENERAL PURCHASING BUTCHER
BEVERAGE Jakarta, Indonesia.
SUPLIES OFFICE
STORAGE
D D
HOOD 3
4000
4000
CANTEEN
KITCHEN BANQUET MAIN PREPARATION BALI
KITCHEN KITCHEN ROOM
E E
BEVERAGE FB RECEIVING
ROOM STORE OFFICE STAFF
4000
4000
CANTEEN HOOD 2 HOOD 1
Director
AREA
FB
F
WALKING
F KEY PLAN:
WET FIRE EQUIPMENT CHOCOLATE
FREEZER
4000
4000
GARBAGE BRIGADE STORE ROOM
COOL STORE DISHWASHING
ROOM ROOM
G G
WALK IN
MEZZANINE
4000
4000
TO PARKING/ BOTTLE GLASS FREEZER
SIDE STORE STORE PASTRY BAKERY
CHEF STORE
ENTRANCE OVEN
H OFFICE H
WALK IN CORRIDOR ORIENTAL
LOADING UNLOADING CULINARY HOOD 4
CHILLER RESTAURANT
4000
4000
CORRIDOR
DOCK DOCK OFFICE AIR CONDITIONED
HK CLEANER COFFEE SHOP
I STORE I
AMENITY PANTRY
PANTRY SERVICE UNUSED
4000
4000
KOPERASI UNUSED STORE BAR WALK
OFFICE DRY GARBAGE BAR CORRIDOR AREA OFFICE TOILETS
LIFT IN
ROOM
CHILLER
J LINEN J
STORE INDEPENDENT CHECKER:
STORE LINEN CHINESE
4000
4000
STAFF WARE
ENTRANCE STORE
SOIL OFFICE
K LINEN K
ROOM STAFF WASHING COFFE
KOPERASI
4000
4000
ENTRANCE AREA SHOP/
KARYAWAN CORRIDOR RESTAURANT
PA/FLOWER
STORE
L L
FB STORE
4000
4000
EQUIPMENT PART 1
M M Director
4000
4000
PROJECT MANAGER:
PART 1
N N
TO
FIRST
4000
FLOOR
LOBBY
O
4000
P
Director
4000
DESIGN CONSULTANT:
Q
CRESPI MONTES VICH ASIA
4000
COMPANY, LIMITED
R VIETNAM OFFICE: Floor 24, Pearl Plaza,
561A Dien Bien Phu, Ward 25,
4000
Binh Thanh District, Ho Chi Minh City.
Tel : +84 28 6287 3389
S Email: infovietnam@cmv-architects.com
SPAIN OFFICE: C/Carmen, 6-07003 Palma de Mallorca
Tel : +34 971 720 839
Email: infopalma@cmv-architects.com
WATER DIRECTOR:
CASCADE TO BEACH
TO SWIMMING POOL
JOSE MANUEL VICH MONTANER
DESIGN PHASE:
DESIGN DEVELOPMENT
CORRIDOR
ARTICLE:
INTERIOR
B.O.H
DRAWING TITLE:
A A PROJECT NAME:
PARADISUS BALI
4000
4000
WALK IN WALK IN
FREEZER FREEZER
Location: Nusa Dua, Bali, Indonesia.
B B OWNER:
EMERGENCY
DOOR POT WALK IN WALK IN WALK IN WALK IN
PT SURYALAYA ANINDITA
4000
4000
SMOKING WASHER FREEZER CHILLER CHILLER CHILLER
AREA GARDEMANGER INTERNATIONAL
Address: Jalan H.R. Rasuna Said Kav. X-O, Kuningan, 12950
C C Jakarta, Indonesia.
PLONGE
GUARD CCTV
4000
4000
MONITOR GENERAL PURCHASING BUTCHER
BEVERAGE SUPLIES OFFICE
STORAGE
D D
HOOD 3
CHIEF SECURITY Director
CANTEEN
4000
4000
KITCHEN PREPARATION BALI ROOM KEY PLAN:
BANQUET MAIN KITCHEN
KITCHEN
E E
BEVERAGE FB STORE RECEIVING
BOUNDARY LINE
ROOM OFFICE STAFF
MEZZANINE
CANTEEN
4000
4000
AREA HOOD 2 HOOD 1
F F
WET FB WALKING
GARBAGE FREEZER EQUIPMENT
4000
4000
COOL ROOM
DISHWASHING STORE
CHOCOLATE
FIRE BRIGADE
ROOM
STORE ROOM
G G INDEPENDENT CHECKER:
WALK IN
FREEZER
4000
4000
TO PARKING/ BOTTLE STORE GLASS STORE
SIDE ENTRANCE PASTRY BAKERY OVEN
CHEF OFFICE STORE
H H
BOUNDARY LINE
WALK IN
UNLOADING CHILLER HOOD 4
LOADING DOCK CORRIDOR
DOCK
4000
4000
AIR CONDITIONED
COFFEE SHOP
Director
CULINARY HK CLEANER
OFFICE STORE PROJECT MANAGER:
I I
DRY GARBAGE ROOM
4000
STORE WALK IN CHILLER CORRIDOR
J J
LINEN STORE
LINEN CHINESE
4000
4000
KOPERASI WARE STORE
OFFICE Director
SOIL LINEN STAFF
ROOM ENTRANCE OFFICE
DESIGN CONSULTANT:
K K
STAFF
KOPERASI ENTRANCE
WASHING
AREA
COFFE SHOP/
RESTAURANT
CRESPI MONTES VICH ASIA
CORRIDOR
COMPANY, LIMITED
4000
4000
KARYAWAN
4000
SPAIN OFFICE: C/Carmen, 6-07003 Palma de Mallorca
Tel : +34 971 720 839
Email: infopalma@cmv-architects.com
BOUNDARY LINE
M DIRECTOR:
4000
JOSE MANUEL VICH MONTANER
TO FIRST
FLOOR
DESIGN PHASE:
LOBBY
N
DESIGN DEVELOPMENT
1 1' 2' 3' 4' 5' 6' 7' 8' 9' 10' 11' 12' 13' 14'
400 3600 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000
BOUNDARY LINE
ARTICLE:
I
BOUNDARY LINE
SERVICE
INTERIOR
B.O.H
4000
CORRIDOR
OFFICE TOILETS
GRADEN
EXISTING PLAN-1ST.FLOOR
BOUNDARY LINE
PART 2
LOTUS KITCHEN TOILETS
GRADEN
PANTRY
SORRENTO
RESTAURANT
ENTRANCE
SCALE: DRAWING No.:
1/150
2307 07/2024
NOTE:
18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 1' 2' 3' 4' 5' 6' 7' 8' 9' 10' 11' 12' 13' 14' - Dimensions on drawing must be checked on site
before constructing. All differences must be noticed to
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000
400 4000 4000 4000 4000 4000 4000 400 3600 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 consultant to modify in time.
PROJECT NAME:
A
BOUNDARY LINE
A
PARADISUS BALI
4000
4000
Location: Nusa Dua, Bali, Indonesia.
B B OWNER:
4000
4000
PT SURYALAYA ANINDITA
C
ROOF
C INTERNATIONAL
TERRACE
4000
4000
FEMALE MALE Address: Jalan H.R. Rasuna Said Kav. X-O, Kuningan, 12950
CHANGE ROOM CHANGE ROOM Jakarta, Indonesia.
D D
STORE
4000
4000
E E
MALE
4000
4000
CHANGE ROOM
Director
SHAFT
F F KEY PLAN:
MUSHOLLA
4000
4000
HRD
G G
MEZZANINE
4000
4000
BEDUGUL ROOM
PRINT
SHOP OFFICE EDP TAMPAK
CLINIC
ROOM SIRING
H H
CORRIDOR
4000
4000
CASHIER TO WATER PALACE RESTAURANT
I I
4000
4000
STORE HALL TO
ADMINISTRATION RESERVATION
BOUNDARY LINE
J LOBBY J
INDEPENDENT CHECKER:
4000
4000
DIRECTOR ASSISTANT
K K
EXISTING ROOF
SORRENTO
4000
ASSISTANT FINANCIAL LUGGAGE BUSSINES ROOM ROOM
CONTROLLER STORAGE CENTRE
L L
TROLLEY STORAGE
4000
4000
EXISTING ROOF
SORRENTO
M M Director
4000
4000
TO PROJECT MANAGER:
MAIN
LOBBY
N N
4000
TO
O
LOBBY/
ENTRANCE
4000
BOUNDARY LINE
21
text
Director
4000
DESIGN CONSULTANT:
Q
CRESPI MONTES VICH ASIA
4000
COMPANY, LIMITED
R VIETNAM OFFICE: Floor 24, Pearl Plaza,
561A Dien Bien Phu, Ward 25,
4000
Binh Thanh District, Ho Chi Minh City.
Tel : +84 28 6287 3389
S Email: infovietnam@cmv-architects.com
SPAIN OFFICE: C/Carmen, 6-07003 Palma de Mallorca
Tel : +34 971 720 839
Email: infopalma@cmv-architects.com
DIRECTOR:
DESIGN PHASE:
DESIGN DEVELOPMENT
ARTICLE:
INTERIOR
B.O.H
DRAWING TITLE:
4000 4000 4000 4000 4000 4000 4000 400 4000 4000 4000 4000 4000 4000 400 3600
PARADISUS BALI
Location: Nusa Dua, Bali, Indonesia.
BOUNDARY LINE
A A
OWNER:
4000
4000
PT SURYALAYA ANINDITA
INTERNATIONAL
B B Address: Jalan H.R. Rasuna Said Kav. X-O, Kuningan, 12950
Jakarta, Indonesia.
4000
4000
ROOF
TERRACE
C C
Director
FEMALE MALE
4000
4000
CHANGE ROOM CHANGE ROOM KEY PLAN:
D D
STORE
MEZZANINE
4000
4000
E E
MALE
CHANGE ROOM
4000
4000
SHAFT
F F
MUSHOLLA
INDEPENDENT CHECKER:
4000
4000
HRD
G G
BEDUGUL ROOM
4000
4000
PRINT
SHOP OFFICE
CLINIC EDP ROOM TAMPAK SIRING Director
H H PROJECT MANAGER:
CORRIDOR
4000
4000
I I
CASHIER
4000
4000
STORE HALL
ADMINISTRATION RESERVATION TO
MAIN
OFFICE Director
LOBBY
J J DESIGN CONSULTANT:
BOUNDARY LINE
4000
COMPANY, LIMITED
DIRECTOR ASSISTANT
VIETNAM OFFICE: Floor 24, Pearl Plaza,
561A Dien Bien Phu, Ward 25,
K K Binh Thanh District, Ho Chi Minh City.
Tel : +84 28 6287 3389
BATUR ROOM MADURA ROOM MADURA ROOM Email: infovietnam@cmv-architects.com
4000
4000
ASSISTANT FINANCIAL
LUGGAGE BUSSINES CENTRE SPAIN OFFICE: C/Carmen, 6-07003 Palma de Mallorca
CONTROLLER
STORAGE Tel : +34 971 720 839
Email: infopalma@cmv-architects.com
L L DIRECTOR:
TROLLEY STORAGE
4000
JOSE MANUEL VICH MONTANER
DESIGN PHASE:
M
TO
DESIGN DEVELOPMENT
LOBBY/
TO
4000
ENTRANCE
MAIN
LOBBY REVISION DESCRIPTION DATE
4000
O
INTERIOR
B.O.H
DRAWING TITLE:
EXISTING PLAN-2ND.FLOOR
2160
PARADISUS BALI
4000
4000
WALK IN WALK IN
FREEZER FREEZER
Location: Nusa Dua, Bali, Indonesia.
1420
1 4080
B B OWNER:
EMERGENCY
DOOR POT WALK IN WALK IN WALK IN WALK IN
PT SURYALAYA ANINDITA
4000
4000
3 SMOKING WASHER FREEZER CHILLER CHILLER CHILLER
AREA GARDEMANGER INTERNATIONAL
3100 980 1400 750 900 750 Address: Jalan H.R. Rasuna Said Kav. X-O, Kuningan, 12950
C C Jakarta, Indonesia.
1
PLONGE
2150
GUARD CCTV
4000
4000
MONITOR GENERAL PURCHASING BUTCHER
BEVERAGE SUPLIES OFFICE
STORAGE
1400
D D
HOOD 3
CHIEF SECURITY Director
CANTEEN
4000
4000
3650
KITCHEN PREPARATION BALI ROOM KEY PLAN:
1485
BANQUET MAIN KITCHEN
80
1150 1200
KITCHEN
E E
BEVERAGE FB STORE RECEIVING
BOUNDARY LINE
ROOM OFFICE STAFF
MEZZANINE
4400
3750
CANTEEN
2200
4000
4000
AREA HOOD 2 HOOD 1
A 8550
1
F F
WET FB WALKING
GARBAGE FREEZER THIS AREA WILL BE COMPLETED
EQUIPMENT
4000
4000
COOL ROOM UPON RECEIVING THE FINAL
2 DISHWASHING STORE
DRAWINGS FROM THE KITCHEN
2550
CHOCOLATE DESIGN CONSULTANT.
FIRE BRIGADE
250 ROOM
STORE ROOM 1
G G INDEPENDENT CHECKER:
1
WALK IN
1 FREEZER 1
4000
4000
TO PARKING/ BOTTLE STORE GLASS STORE
SIDE ENTRANCE PASTRY BAKERY OVEN
CHEF OFFICE STORE
6230
1 1
250
H H
BOUNDARY LINE
4000
AIR CONDITIONED
COFFEE SHOP
1 Director
CULINARY HK CLEANER 1
OFFICE STORE PROJECT MANAGER:
I I
1000 1500 1225
1 DRY GARBAGE ROOM
1
UNUSED LIFT AMENITY PANTRY BAR PANTRY BAR SERVICE
3690 3660 500 1500 2600 1500 360
4000
4000
STORE WALK IN CHILLER CORRIDOR
A
J J
LINEN STORE
1 1
1 LINEN CHINESE
4000
4000
KOPERASI WARE STORE
OFFICE 500 1 650 1500 Director
SOIL LINEN STAFF 900
570
4000
KARYAWAN
390
A
1
VIETNAM OFFICE: Floor 24, Pearl Plaza,
561A Dien Bien Phu, Ward 25,
L L Binh Thanh District, Ho Chi Minh City.
FB STORE Tel : +84 28 6287 3389
PA/FLOWER
EQUIPMENT 1 Email: infovietnam@cmv-architects.com
STORE
4000
SPAIN OFFICE: C/Carmen, 6-07003 Palma de Mallorca
Tel : +34 971 720 839
Email: infopalma@cmv-architects.com
BOUNDARY LINE
M DIRECTOR:
4000
JOSE MANUEL VICH MONTANER
TO FIRST
FLOOR
DESIGN PHASE:
LOBBY
N
DESIGN DEVELOPMENT
1 1' 2' 3' 4' 5' 6' 7' 8' 9' 10' 11' 12' 13' 14'
400 3600 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000
BOUNDARY LINE
ARTICLE:
I
1000 1500 1225
BOUNDARY LINE
SERVICE
INTERIOR
THIS AREA WILL BE COMPLETED
B.O.H
4000
CORRIDOR UPON RECEIVING THE FINAL OFFICE TOILETS
DRAWINGS FROM THE KITCHEN
DESIGN CONSULTANT.
UNUSED AREA STORE
DRAWING TITLE:
J
PANTRY
GRADEN
DEMOLISHED PLAN-1ST.FL.
BOUNDARY LINE
2307 07/2024
NOTE:
- Dimensions on drawing must be checked on site
before constructing. All differences must be noticed to
consultant to modify in time.
4000 4000 4000 4000 4000 4000 4000 400 4000 4000 4000 4000 4000 4000 400 3600
PARADISUS BALI
Location: Nusa Dua, Bali, Indonesia.
BOUNDARY LINE
A A
OWNER:
4000
4000
PT SURYALAYA ANINDITA
INTERNATIONAL
B B Address: Jalan H.R. Rasuna Said Kav. X-O, Kuningan, 12950
Jakarta, Indonesia.
4000
4000
ROOF
TERRACE
C C
Director
FEMALE MALE
4000
4000
CHANGE ROOM CHANGE ROOM KEY PLAN:
D D
STORE
MEZZANINE
4000
COMPLETED WHEN COMPLETED WHEN
THE DESIGN IS THE DESIGN IS
APPROVED. APPROVED.
E E
MALE
CHANGE ROOM
4000
4000
SHAFT
F F
MUSHOLLA
INDEPENDENT CHECKER:
1
4000
4000
100 1
HRD
G G
BEDUGUL ROOM
4000
4000
PRINT
1500
SHOP OFFICE
CLINIC 1
EDP ROOM TAMPAK SIRING Director
H H PROJECT MANAGER:
4000
1 1
I I
CASHIER
1
250
920
4000
4000
STORE HALL
ADMINISTRATION RESERVATION TO
MAIN
OFFICE 1 Director
1 A LOBBY
J J DESIGN CONSULTANT:
BOUNDARY LINE
1 1
CRESPI MONTES VICH ASIA
4000
4000
900400 COMPANY, LIMITED
DIRECTOR ASSISTANT A
VIETNAM OFFICE: Floor 24, Pearl Plaza,
561A Dien Bien Phu, Ward 25,
K K Binh Thanh District, Ho Chi Minh City.
Tel : +84 28 6287 3389
1 BATUR ROOM MADURA ROOM MADURA ROOM Email: infovietnam@cmv-architects.com
4000
4000
ASSISTANT FINANCIAL
LUGGAGE BUSSINES CENTRE SPAIN OFFICE: C/Carmen, 6-07003 Palma de Mallorca
CONTROLLER
1 STORAGE Tel : +34 971 720 839
Email: infopalma@cmv-architects.com
L L DIRECTOR:
3100 150
TROLLEY STORAGE
4000
JOSE MANUEL VICH MONTANER
A 1 DESIGN PHASE:
M
TO
DESIGN DEVELOPMENT
LOBBY/ 1
TO
4000
ENTRANCE
MAIN
LOBBY REVISION DESCRIPTION DATE
1 1
4000
O
INTERIOR
B.O.H
DRAWING TITLE:
DEMOLISHED PLAN-2ND.FLOOR
Demolished wall
TRINH MINH THANH
CHECKED BY:
Existing
NGUYEN THI THUC HUYEN
Removed finishing floor
SCALE: DRAWING No.:
1/150
1 Removed existing door and fixed glass.
INT-11- B-06
* Removed ceiling: All existing false ceilings in PROJECT NO: DATE:
the area will be removed 2307 07/2024
8 7 1 1' NOTE:
18 17 16 15 14 13 12 11 10 9 6 5 4 3 2
- Dimensions on drawing must be checked on site
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 400 4000 4000 4000 4000 4000 4000 400 before constructing. All differences must be noticed to
BOUNDARY LINE consultant to modify in time.
A A PROJECT NAME:
2
PARADISUS BALI
4000
4000
2240
Location: Nusa Dua, Bali, Indonesia.
BOH
B B BALLROOM
OWNER:
8450
5350
STAFF ENTRANCE CHILLER FRUITS & VEGGIES
PT SURYALAYA ANINDITA
4000
4000
+4 ºC COLD ROOM
1
INTERNATIONAL
Address: Jalan H.R. Rasuna Said Kav. X-O, Kuningan, 12950
C C Jakarta, Indonesia.
PLASTIC PLONGE CHILLER DAIRY
STORE 2 STORE 3 SECURITY +4 ºC
GUARD CCTV MAIN KITCHEN
4000
4000
MONITOR
PAPER
D D
SERVICE CORRIDOR
CHIEF SECURITY WET GARBAGE Director
CORRIDOR
GLASS STORE 1 UNIFORM CANTEEN KITCHEN
4000
4000
MEAT KEY PLAN:
CHILLER BALLROOM
+4 ºC
OIL
E E
BOUNDARY LINE
FREEZER CHILLER
MEZZANINE
-18 ºC +4 ºC
4000
4000
DRY GARBAGE FISH
A
DISHWASHING
F F
UNIFORM OFFICE
EQUIPMENT THIS AREA WILL BE COMPLETED
4000
4000
STORE UPON RECEIVING THE FINAL
DRAWINGS FROM THE KITCHEN
WAY OUT CORRIDOR CHOCOLATE DESIGN CONSULTANT.
FIRE BRIGADE ROOM CHEF
G STORE ROOM G INDEPENDENT CHECKER:
THIS AREA WILL BE COMPLETED
4000
1100mm
TO PARKING/ DRAWINGS FROM THE KITCHEN
LOADING DOCK LOADING DOCK CULINARY STORE STORE COLD BAKERY
SIDE ENTRANCE DESIGN CONSULTANT. STORE
F&B CHILLER
CHEF OFFICE
H H
BOUNDARY LINE
STORE
COLD
3
WAY INCORRIDOR STORE
4000
4000
3 AIR
CONDITIONED
Director
CHEMICAL STORE
I I
PROJECT MANAGER:
EMPTY AMENITY PANTRY
BOTTLES GENERAL STORE EHK OFFICE STORE BAR
4000
4000
LAUNDRY A
ACCESS
J J
OUT HK TEAM,
ORDER TAKER FLOWER SHOP
4000
4000
GENERAL STORE DIRTY LINEN CLEAN LINEN Director
DESIGN CONSULTANT:
K K
CHINESE
EXISTING
WASHING AREA
CRESPI MONTES VICH ASIA
IN
WARE
COMPANY, LIMITED
4000
4000
LINEN STORE A STORE
VIETNAM OFFICE: Floor 24, Pearl Plaza,
LAUNDRY OFFICE WASHER & DRIER 561A Dien Bien Phu, Ward 25,
L L Binh Thanh District, Ho Chi Minh City.
CHEMICAL PA Tel : +84 28 6287 3389
Email: infovietnam@cmv-architects.com
4000
SPAIN OFFICE: C/Carmen, 6-07003 Palma de Mallorca
Tel : +34 971 720 839
Email: infopalma@cmv-architects.com
BOUNDARY LINE
M DIRECTOR:
4000
JOSE MANUEL VICH MONTANER
DESIGN PHASE:
N
DESIGN DEVELOPMENT
ADD AREA
1 1' 2' 3' 4' 5' 6' 7' 8' 9' 10' 11' 12' 13' 14'
400 3600 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000
BOUNDARY LINE
BOUNDARY LINE
ARTICLE:
THIS AREA WILL BE COMPLETED
UPON RECEIVING THE FINAL
4000
DRAWINGS FROM THE KITCHEN
DESIGN CONSULTANT. INTERIOR
B.O.H
J
DRAWING TITLE:
Existing
TRINH MINH THANH
CHECKED BY:
Renovated wall
PART 2 NGUYEN THI THUC HUYEN
1 Add new floor.
SCALE: DRAWING No.:
2 Add new stair. 1/150
KEYPLAN 3
Reuse door : Repaint the existing door
according to code WD-01 (see Spec-
PROJECT NO: DATE:
INT-11- B-07
4000 4000 4000 4000 4000 4000 4000 400 4000 4000 4000 4000 4000 4000 400 3600
PARADISUS BALI
Location: Nusa Dua, Bali, Indonesia.
BOUNDARY LINE
A A
OWNER:
2
4000
4000
PT SURYALAYA ANINDITA
INTERNATIONAL
B B Address: Jalan H.R. Rasuna Said Kav. X-O, Kuningan, 12950
Jakarta, Indonesia.
4000
4000
ROOF
TERRACE
C C
Director
FEMALE MALE
4000
4000
LOCKER LOCKER KEY PLAN:
D D
SALES/MARKETING/
MEZZANINE
4000
MARCOM/RESERVATION
COMPLETED WHEN COMPLETED WHEN
OFFICES
THE DESIGN IS THE DESIGN IS
APPROVED. APPROVED.
E E
4000
4000
SHAFT
F F
INDEPENDENT CHECKER:
3
4000
4000
3 HRD
G G
OFFICE
3
4000
1100mm
3
3 NEW MEETING TAMPAK
STAFF CLINIC
ROOM SIRING Director
H H PROJECT MANAGER:
CORRIDOR
A
4000
4000
3
I I
3
GEX_QUALITY
AHU ROOM
4000
4000
HALL
ACCOUNTING
Director
A TO
BALLROOM
J J DESIGN CONSULTANT:
BOUNDARY LINE
4000
3 COMPANY, LIMITED
GUEST CLINIC A
3 3 3 VIETNAM OFFICE: Floor 24, Pearl Plaza,
561A Dien Bien Phu, Ward 25,
K K Binh Thanh District, Ho Chi Minh City.
BATUR ROOM Tel : +84 28 6287 3389
Email: infovietnam@cmv-architects.com
NEW MEETING BUYAN ROOM
4000
4000
LUGGAGE ROOM
ROOM SPAIN OFFICE: C/Carmen, 6-07003 Palma de Mallorca
TO MAIN
Tel : +34 971 720 839
KITCHEN
TO BACK OF Email: infopalma@cmv-architects.com
L L DIRECTOR:
HOUSE
HM (1)
TROLLEY GM SEC (1)
HM SEC (1) SERVER ROOM
STORAGE IT OFFICE
4000
JOSE MANUEL VICH MONTANER
A DESIGN PHASE:
3 3
DESIGN DEVELOPMENT
3 3 3
TO LOBBY/ENTRANCE
4000
WC OPERATOR REVISION DESCRIPTION DATE
GM (1)
N
FO (3)
4000
SAFETY 3
3 DEPOSIT BOX FOM (1)
TO MAIN LOBBY 3 3 3 TO MAIN LOBBY
INTERIOR
B.O.H
DRAWING TITLE:
RENOVATED PLAN-2ND.FL.
Existing
TRINH MINH THANH
CHECKED BY:
Renovated wall
NGUYEN THI THUC HUYEN
2 Add new stair.
SCALE: DRAWING No.:
Reuse door : Repaint the existing door
3 according to code WD-01 (see Spec- 1/150
DOOR ACCESSORIES). INT-11- B-08
PROJECT NO: DATE:
* Renovate wall, opening, ceiling, floor finishing,
wall finishing & door according new architecture. 2307 07/2024