Savannakhet Daily progress report

Manufacture & installation of climate change


adaptive flood forecasting and warning system in
Xe Banghieng River Basin, Lao PDR

Anajack Phatana Construction Sole Co., Ltd.

Mon 7/01/2024
Savannakhet Daily progress report
Manufacture & installation of climate change adaptive flood forecasting and warning
Project system in Xe Banghieng River Basin, Lao PDR
Step

Work Foundation construction Name Date Mon 01/7/2024

Index

1. DAILY ACTIVITY OVERVIEW..........................................................................................2

2. HOURLY ACTIVITY DETAILS..........................................................................................2

3. ISSUES AND COOPERATION DETAILS...........................................................................2

4. PHOTOS................................................................................................................................3

5. tomorrow's plan...............................................................................................................................................4

1
Savannakhet Daily progress report
Manufacture & installation of climate change adaptive flood forecasting and warning
Project system in Xe Banghieng River Basin, Lao PDR
Step

Work Foundation construction Name Date Mon 01/7/2024

1. Daily activity overview


- Water Level (WLG-05): Pole, Solar panel, Rain gauge Equipment Install, Cable connection and pipe of
Sensor cable.
· Name of participants: Vongkham, Tong, Kai, Kone, Serm, Bounphone, Phonexai, Soubin, An, Sone.

2. Hourly activity details

Time Activity name Activity details Issues Confirmation and


decision

08:00 - Water Level (WLG-05) - Pole, Solar panel, Rain


~ gauge Equipment Install
12:00

13:00 - Water Level (WLG-05) -Cable connection and pipe


~ of Sensor cable.
18:00

1. Issues and cooperation details


Issues Issues and cooperation details Remark

- -

2
Savannakhet Daily progress report
Manufacture & installation of climate change adaptive flood forecasting and warning
Project system in Xe Banghieng River Basin, Lao PDR
Step

Work Foundation construction Name Date Mon 01/7/2024

2. Photos at site

- (WLG-05): Dig foundation and casting concrete for foundation - (WLG-05): Install pole

- (WLG-05): Install pole and equipment - (WLG-05): Install fence and cable connection.

3
Savannakhet Daily progress report
Manufacture & installation of climate change adaptive flood forecasting and warning
Project system in Xe Banghieng River Basin, Lao PDR
Step

Work Foundation construction Name Date Mon 01/7/2024

3. tomorrow's plan
Date: 7 / 02 /2024
- Repair some work