32 GENERAL NOTES 32

11-1B04-U-000-17-
31 FWA-PTJ-00022-U-(B) 31
A. FOR DETAILS ABOUT FIRE PROTECTION PHILOSOPHY, REFER TO DOCUMENT

1M59-704-1
"FIREFIGHTING SYSTEM SPECIFICATION" CODED AS 079254C-0000-JSD-1900-001.
30 B. ALL FIREFIGHTING EQUIPMENT SHALL BE IN COMPLIANCE WITH PROJECT DOC 30

FROM/TO RIP
FIRE WATER
FIREFIGHTING SYSTEM SPECIFICATION CODED AS 079254C-0000-JSD-1900-001.
29 C. VERTICAL TRAFFIC POST (BOLLARDS) SHALL BE INSTALLED TO PROTECT HYDRANTS 29
AND MONITORS WHEN REQUIRED.
D. ALL HYDRANTS SHALL BE WET BARREL TYPE AND PROVIDED WITH A GATE VALVE

43688
28 28
TO BE INSTALLED ABOVEGROUND AND BELOW THE HYDRANT.
27
PLZ E. HYDRANT TO BE LOCATED NOT LESS THAN 1.5 m FROM THE CURB OF ROAD. 27
24"-FWA-59704301 -ADP0HU1-N 011
26 24" 44869 24"-FWA-02001301-ADP0HU1-N 26

24" 1C02-001-1 FIRE WATER NOTES


25
FROM/TO DHTU 25
IP-CI 1. DELETED.
24 TEMPORARY FLANGE 1M58-1C02-002
24
59-HLZ-010 MFR AG UG (REMOVED AFTER TEST)
23 23
6"
6"

ADP0HU1
ACS3A00
22 22

21 6"-FWA-59702307 -ACS3A00-N 21

1B04 - HPU
The present document or drawing is property of TECHNIP ENERGIES ITALY S.p.A. and shall not, under any circumstances, be totally or partially, drectly or undirectly, transferred, reproduced, copied, disclosed or used, without its prior written consent,

20 20

19 19
59-MLZ-003
MFR AG UG
18 6" 18
6"

ADP0HU1
ACS3A00
17 17

6"-FWA-59702306 -ACS3A00-N
16 11-1B04-U-000-17- 16

FWA-PTJ-00022-U-(A)
15 15
59-MLZ-004
14
UG AG
14
MFR
6"
13 1B03 - HCKU 13

ACS3A00
ADP0HU1
12 12
6"-FWA-59702305-ACS3A00-N
11
FIRE WATER
1C02 - DHTU 11

14"
10 1B04-701-1 45442 PLZ 10

TO HPU 026
09 09

24"
08 08
FIRE WATER
07 14" 07
1B04-701-1 45443
TO HPU
06 06

05 05
FIRE WATER
6"
04 1B04-701-1 43470 04
FROM/TO HPU
03 03
1B03-701-1
FROM/TO HCKU

02 24"-FWA-59702312 -ADP0HU1 -N 02
FIRE WATER

59-HLZ-008 59-HLZ-007
01 01
43692

MFR MFR
6" 6" PLZ
24"-FWA-03701301 -ADP0HU1 -N

1B03 027
1M59 6"-FWA-59702304 -ACS3A00 -N 6"-FWA-59702303 -ACS3A00 -N
24" AG ACS3A00 AG ACS3A00
PLZ 24"
ADP0HU1 ADP0HU1
018 UG UG
24"
for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use.

6" 24" 6" 24"-FWA-59702310 -ADP0HU1 -N


24"-FWA-59702301 -ADP0HU1 -N PLZ
24"
PLZ PLZ 010
021 MFR 020 24" 44868 24"-FWA-02001303-ADP0HU1-N
59-MLZ-005
1C02-001-1 FIRE WATER
12" 24" FROM/TO 1C02
59-HLZ-005 MFR
24"-FWA-59702313 -ADP0HU1 -N

6" UG AG 6"-FWA-59702308 -ACS3A00 -N IP-CI


6" 1M58-1C02-001
ADP0HU1

ACS3A00

6" 6"

ADP0HU1
ACS3A00
6"-FWA-59702302 -ACS3A00 -N
MFR
59-HLZ-009
FIRE WATER
6"-FWA-59702309 -ACS3A00 -N 6" PLZ
6" UG AG 1M59-703-1 45431
008
6" TO DELUGE
ADP0HU1
ACS3A00

STATION #1 24"

FIRE WATER
6"
1M59-703-1 45432
TO DELUGE
Alice Baldini
STATION #1 Alice Baldini (May 24, 2023 14:57 GMT+2)

24" Salvatore Oliva Sneider Tavera Corrado Pigna


PLZ Salvatore Oliva (May 24, 2023 14:54 GMT+2) Sneider Tavera (May 24, 2023 10:37 CDT) Corrado Pigna (May 24, 2023 15:46 GMT+2)

24 May ISSUE FOR CONSTRUCTION A. BALDINI/


019 1 S. OLIVA S.TAVERA
2023 (IFC) C. PIGNA

28 Apr ISSUE FOR CONSTRUCTION R.LIPPI/ C.PASCALI/


0 M.DELEONIBUS
43772

S.TAVERA
FROM/TO RR&L

(IFC) C.PIGNA
FIRE WATER

2022

1062 - RR&L B
27 Aug ISSUE FOR DETAILED DESIGN
(IDD1)
M.DELEONIBUS
R.LIPPI/
S.TAVERA
C.PASCALI/
C.PIGNA
2021
1062-702-1

FIRE WATER
24"-FWA-59702311 -ADP0HU1 -N 12 Feb ISSUE FOR REVIEW R.LIPPI/ C.PASCALI/
1062-702-1 43686 A S.OLIVA S.TAVERA
PLZ 2021 GENERAL REVISION C.PIGNA
FROM/TO RR&L PLZ
007 REV. DATE DESCRIPTION PREPARED APPROVED/
006 CHECKED
12" 12" AUTHORIZED

12"-FWA-50701301 -ADP0HU1 -N 12"-FWA-50701302 -ADP0HU1 -N


ANOPC
ASSIUT NATIONAL OIL PROCESSING COMPANY
43450

43448
FIRE WATER

FIRE WATER
FROM/TO FLAU

FROM/TO FLAU
‫ﴍﻛـﺔ ٔﺳـ ﯿﻮط اﻟﻮﻃﻨﯿـﺔ ﻟﺘﺼـﻨﯿﻊ اﻟﺒـﱰول‬

079254C-1M59-PID-1931-702-1.pid
1M50-701-1

1M50-701-1
ASSIUT HYDROCRACKING COMPLEX - ANOPC
PIPING & INSTRUMENT DIAGRAM
Refinery Interconnecting Process Unit (RIU)
FIRE WATER DISTRIBUTION

CAD Model:
1M50 - FLAU
Scale Project Unit Disc. Type Disc Subj Ser. No Sheet Rev.
NONE 079254C 1M59 PID 19 31 702 1 1 of 1

TECHNIP ENERGIES ITALY S.p.A. - 00148 ROMA - Viale Castello della Magliana, 68
32 GENERAL NOTES 32

31 31
A. FOR DETAILS ABOUT FIRE PROTECTION PHILOSOPHY, REFER TO DOCUMENT "FIREFIGHTING
30 SYSTEM SPECIFICATION" CODED AS 079254C-0000-JSD-1900-001. 30
B. ALL FIREFIGHTING EQUIPMENT SHALL BE IN COMPLIANCE WITH PROJECT DOC FIREFIGHTING
29
SYSTEM SPECIFICATION CODED AS 079254C-0000-JSD-1900-001. 29
C. VERTICAL TRAFFIC POST (BOLLARDS) SHALL BE INSTALLED TO PROTECT HYDRANTS
AND MONITORS WHEN REQUIRED.
28 28
D. ALL HYDRANTS SHALL BE WET BARREL TYPE AND PROVIDED WITH A GATE VALVE
TO BE INSTALLED ABOVE GROUND AND BELOW THE HYDRANT.
27 E. HYDRANT TO BE LOCATED NOT LESS THAN 1.5 M FROM THE CURB OF ROAD. 27

26 26

25 25

24 24

23 NOTES 23

22 22
1. FIRE EQUIPMENT TO BE PROVIDED WITH AN ADEQUATE UNIT ACCESS, IN ORDER TO
21 FACILITATE INGRESS / EXIT OPERATIONS BY FIRE BRIGADIERS. 21
The present document or drawing is property of TECHNIP ENERGIES ITALY S.p.A. and shall not, under any circumstances, be totally or partially, drectly or undirectly, transferred, reproduced, copied, disclosed or used, without its prior written consent,

20 20

19 19

18 18

17 17

16 16

15 15

14 14

13 13

12 12

11 11

10 10

09 09

08 08

07 07

06 06

05 05

04 04

03 03

02 02
24"-FWA-59704301 -ADP0HU1 -N
1062 1M59
01 PLZ 01
PLZ PLZ 030 PLZ PLZ
031 028 022 023
24"-FWA-59704316 -ADP0HU1 -N 24"-FWA-59704315 -ADP0HU1 -N 24"-FWA-59704313 -ADP0HU1 -N 24"-FWA-59704312 -ADP0HU1 -N
24" 6" 24"

14"
24" 24" 6" 24" 6" 6" 6"
10"

10"
6"

6"

6"

6"

6"

6"
6"

24"
UG ADP0HU1

8"
14"
UG ADP0HU1 UG ADP0HU1 UG ADP0HU1 UG ADP0HU1 UG ADP0HU1 UG ADP0HU1 UG ADP0HU1 UG ADP0HU1 UG ADP0HU1
AG ACS3A00 AG ACS3A00 AG ACS3A00 AG ACS3A00 AG ACS3A00 AG ACS3A00 AG ACS3A00 AG ACS3A00 AG ACS3A00 AG ACS3A00
for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use.

6"-FWA-59704305 -ACS3A00-N
6"-FWA-59704304 -ACS3A00-N
6"-FWA-59704302 -ACS3A00 -N

6" 6" 6" 6" 6"

6"-FWA-59704310 -ACS3A00-N
6"-FWA-59704311 -ACS3A00-N

6"-FWA-59704303 -ACS3A00-N

6"-FWA-59704309 -ACS3A00-N
6" 11-1B04-U-000-17-

6"-FWA-59704306 -ACS3A00-N

6"-FWA-59704307 -ACS3A00-N

6"-FWA-59704308 -ACS3A00-N
6" 6" 6" 6"
MFR MFR MFR MFR MFR MFR MFR MFR MFR MFR
FWA-PTJ-00022-U-(B)

59-HLZ-011 59-HLZ-012 59-HLZ-013 59-HLZ-014 59-HLZ-016 59-MLZ-006 59-HLZ-017 59-HLZ-006 59-MLZ-002


59-HLZ-015
1

1
24"-FWA-62702301 -ADP0HU1 -N

1M59-702-1
FROM/TO RIP
FIRE WATER
43688
Alice Baldini
Alice Baldini (May 24, 2023 14:57 GMT+2)
Salvatore Oliva Sneider Tavera Corrado Pigna
Salvatore Oliva (May 24, 2023 14:54 GMT+2) Sneider Tavera (May 24, 2023 10:37 CDT) Corrado Pigna (May 24, 2023 15:46 GMT+2)

24 May ISSUE FOR CONSTRUCTION A.BALDINI/


1 S.OLIVA S.TAVERA
2023 (IFC) C.PIGNA

28 Apr ISSUE FOR CONSTRUCTION R.LIPPI/ C.PASCALI/


0 M.DELEONIBUS S.TAVERA
2022 (IFC) C.PIGNA

27 Aug ISSUE FOR DETAILED DESIGN R.LIPPI/ C.PASCALI/


B M.DE LEONIBUS S.TAVERA
2021 (IDD1) C.PIGNA
TO DCU

TO DCU

TO DCU
FIRE WATER
TO DCU
FIRE WATER

FIRE WATER

FIRE WATER
TO DCU
FIRE WATER

1D05-701-1 43790

1D05-701-1 45434

1D05-701-1 45433

1D05-701-1 43791
1D05-701-1 43789

12 Feb ISSUE FOR REVIEW C.PASCALI/

43712
43701

43708

FROM/TO HPU
FIRE WATER
43710

43711
FROM/TO RR&L

FROM/TO DCU
FIRE WATER

FIRE WATER

FROM/TO RR&L

FROM/TO HCKU
FIRE WATER

FIRE WATER
R.LIPPI/
A S.OLIVA S.TAVERA
2021 GENERAL REVISION C.PIGNA

APPROVED/

1B04-701-1
1062-702-1

1D05-701-1

1062-702-1

REV. DATE DESCRIPTION

1B03-701-1
PREPARED CHECKED
AUTHORIZED

ANOPC
ASSIUT NATIONAL OIL PROCESSING COMPANY
‫ﴍﻛـﺔ ٔﺳـ ﯿﻮط اﻟﻮﻃﻨﯿـﺔ ﻟﺘﺼـﻨﯿﻊ اﻟﺒـﱰول‬

079254C-1M59-PID-1931-704-1.pid
ASSIUT HYDROCRACKING COMPLEX - ANOPC
PIPING & INSTRUMENT DIAGRAM
Refinery Interconnecting Process Unit (RIU)

1062-RR&L 1D05-DCU 1062-RR&L 1B03-HCKU 1B04-HPU FIRE WATER DISTRIBUTION

CAD Model:
Scale Project Unit Disc. Type Disc Subj Ser. No Sheet Rev.
NONE 079254C 1M59 PID 19 31 704 1 1 of 1

TECHNIP ENERGIES ITALY S.p.A. - 00148 ROMA - Viale Castello della Magliana, 68
32 GENERAL NOTES 32

31 A. FOR DETAILS ABOUT FIRE PROTECTION PHILOSOPHY, REFER TO DOCUMENT 31


"FIREFIGHTING SYSTEM SPECIFICATION" CODED AS 079254C-0000-JSD-1900-001.
30 B. ALL FIREFIGHTING EQUIPMENT SHALL BE IN COMPLIANCE WITH PROJECT DOC 30

1M59-704-1
FIREFIGHTING SYSTEM SPECIFICATION CODED AS 079254C-0000-JSD-1900-001.
C. VERTICAL TRAFFIC POST (BOLLARDS) SHALL BE INSTALLED TO PROTECT

FROM/TO RIP
29 29

FIRE WATER
HYDRANTS AND MONITORS WHEN REQUIRED.
28 D. ALL HYDRANTS SHALL BE WET BARREL TYPE AND PROVIDED WITH A GATE 28
VALVE TO BE INSTALLED ABOVE GROUND AND BELOW THE HYDRANT.
E. HYDRANT TO BE LOCATED NOT LESS THAN 1.5 m FROM THE CURB OF ROAD.

43712
27 27

26 26

25 25

24 6"-FWA-59704312 -ADP0HU1 -N 24

23 23
1M59
22
1B04 NOTES 22

21 1. VALVE SHALL BE ACCESSIBLE AND OPERABLE FROM GRADE. 21

2. BATTERY LIMIT FLANGE 2"-150#RF, LOCATED IN THE VERTICAL PIPE AT 1800 mm


The present document or drawing is property of TECHNIP ENERGIES ITALY S.p.A. and shall not, under any circumstances, be totally or partially, drectly or undirectly, transferred, reproduced, copied, disclosed or used, without its prior written consent,

20 20
ELEVATION FROM H.P.P. AND WITH AN HORIZONTAL OFFSET CORRESPONDING TO 600
mm RESPECT TO THE CENTER OF THE HOSE REEL. GASKETS AND BOLTS IN BATTERY
19 LIMIT FLANGE ARE OUTSIDE OF MANUFACTURER SCOPE OF WORK. 19
6"-FWA-04701301 -ADP0HU1 -N
18 3. BUTTERFLY VALVE UL/FM CERTIFIED AND WAFER TYPE TO BE PROVIDED BY MONITOR 18
UG MANUFACTURER.
17 AG 4. INLET FLANGE 4"-150#RF TO BE LOCATED AT 1100 mm ELEVATION FROM H.P.P. AND 17
SUITABLE TO CONNECT THE BATTERY LIMIT BUTTERFLY VALVE WAFER TYPE INSIDE
16 MANUFACTURER SCOPE. GASKETS AND BOLTS IN BATTERY LIMIT FLANGE ARE OUTSIDE 16
6"-FWA-03701301 -ADP0HU1 -N MIN OF MANUFACTURER SCOPE OF WORK.
MFR
15 15

3
UG AG 04-MLZ-006 6" 1
FIRE WATER
6"-FWA-04701309 -ADP0HU1 -N
14 43621 1B03-701-1 14
6"X4" 4"
ADP0HU1
ACS3A00
1B03
1B04

FROM HCKU

4
13 13

12 4"-FWA-04701308-ACS3A00-N 12
04-RLZ-003
11 MFR 11
HR
2"-FWA-04701319 -ACS3A00 -N
10 10
6"-FWA-03701301 -ADP0HU1 -N

6"-FWA-04701302 -ACS3A00 -N
2
09 09
04-MLZ-002
FIRE WATER UG AG MFR
08 08
6"-FWA-04701310 -ADP0HU1-N
43620 1B03-701-1
6"
ADP0HU1
ACS3A00

07 07
1B04

FROM HCKU
1B03

06 06
6"-FWA-04701307 -ACS3A00-N
05 05

04 04
10"-FWA-03701301 -ADP0HU1 -N
03 04-RLZ-002 03
FIRE WATER
10"-FWA-04701311 -ADP0HU1-N MFR
02 2"-FWA-04701318 -ACS3A00 -N 02
43619 1B03-701-1 HR
10"X8"
6"

2
1B03
1B04

01 FROM HCKU 01
UG ADP0HU1 8"X4"
AG ACS3A00
MIN
6"-FWA-04701305 -ACS3A00-N

04-RLZ-001
ADP0HU1 UG
ACS3A00 AG HR
4"-FWA-04701306 -ACS3A00-N
6"
4
MFR MFR
MFR 2
for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use.

2"-FWA-04701317 -ACS3A00-N
04-MLZ-001 4"
3
11-1B04-U-000-17-
FWA-PTJ-00022-U-(A)

04-MLZ-005
FIRE WATER 14"-FWA-59704301 -ADP0HU1-N FIRE WATER
14"-FWA-04701316 -ADP0HU1 -N
1B04-702-1 45593 1M59-702-1 45442
TO DELUGE PLZ 14" FROM RIP
6"-FWA-03701301-ADP0HU1 -N 001

1M59
STATION #1

1B04
04-HLZ-004
FIRE WATER UG AG MFR
6"-FWA-04701312 -ADP0HU1 -N
43618 1B03-701-1
6" 6" 1
ADP0HU1
ACS3A00

FROM HCKU
1B04
1B03

FIRE WATER FIRE WATER


14"-FWA-04701315 -ADP0HU1 -N 14"-FWA-59702312 -ADP0HU1 -N
1B04-702-1 45595 1M59-702-1 45443
6"-FWA-04701304 -ACS3A00-N AG TO DELUGE PLZ 14" FROM RIP
UG 002

1M59
STATION #1

1B04
Alice Baldini
Alice Baldini (May 24, 2023 14:55 GMT+2)

Salvatore Oliva Sneider Tavera Corrado Pigna


Salvatore Oliva (May 24, 2023 14:48 GMT+2) Sneider Tavera (May 24, 2023 10:39 CDT) Corrado Pigna (May 25, 2023 15:55 GMT+2)

24 May ISSUE FOR CONSTRUCTION A. BALDINI/


6"-FWA-03701301-ADP0HU1 -N 1 S. OLIVA S.TAVERA
2023 (IFC) C. PIGNA
04-HLZ-003 FIRE WATER
MFR
6"-FWA-04701314-ADP0HU1 -N 6"-FWA-59702312-ADP0HU1 -N 31 May ISSUE FOR CONSTRUCTION R.LIPPI/ C.PASCALI/
FIRE WATER UG AG 43470 1M59-702-1 0 M.DE LEONIBUS S.TAVERA
2022 (IFC) C.PIGNA
6"-FWA-04701313 -ADP0HU1 -N

1M59
1B04
43617 1B03-701-1 FROM/TO RIP 27 Aug ISSUE FOR DETAILED DESIGN R.LIPPI/ C.PASCALI/
6" D M.DE LEONIBUS S.TAVERA
2021 (IDD1) C.PIGNA
ADP0HU1
ACS3A00
1B04

FROM HCKU
1B03

12 Feb ISSUE FOR REVIEW R.LIPPI/ C.PASCALI/


C S.OLIVA S.TAVERA
2021 GENERAL REVISION C.PIGNA
6"-FWA-04701303 -ACS3A00-N
09 Aug ISSUE FOR EARLY WORKS C.PASCALI/
B M.GALLO S.TAVERA
2019 GENERAL REVISION C.PIGNA

REV. DATE DESCRIPTION PREPARED CHECKED APPROVED/


AUTHORIZED

ANOPC
ASSIUT NATIONAL OIL PROCESSING COMPANY
‫ﴍﻛـﺔ ٔﺳـ ﯿﻮط اﻟﻮﻃﻨﯿـﺔ ﻟﺘﺼـﻨﯿﻊ اﻟﺒـﱰول‬

079254C-1B04-PID-1931-701-1.pid
ASSIUT HYDROCRACKING COMPLEX - ANOPC
PIPING & INSTRUMENT DIAGRAM
Hydrogen Production Unit (HPU)

FIRE WATER DISTRIBUTION

CAD Model:
Scale Project Unit Disc. Type Disc Subj Ser. No Sheet Rev.
NONE 079254C 1B04 PID 19 31 701 1 1 of 1

TECHNIP ENERGIES ITALY S.p.A. - 00148 ROMA - Viale Castello della Magliana, 68
P IP ING SP EC. C. A . DES. P RESS. OP ER. P RESS. DES. TEM P . OP ER. TEM P . TEST P RESS. FLUID P A INT NDT P ED TEST IP S NP D INS. INS. THK TRA CING TRA CING
or reverse engineer the same, in any manner, without ANOPC prior written consent and/or Technip Energies Italy S.p.A. prior written consent, and shall not put in use the information for any purpose unrelated to that for which it has been transmitted to recipient. An y disclosure and use of the contents hereof shall be subject
P &ID
SP EC.
SP EC. M A T
RA TING (mm) (Kg/cm2g) (Kg/cm2g) (°C) (°C) (Kg/cm2g) P HA SE NO.
P WHT
RT / M T CA T. TYP E E (inch) TYP E (mm) CODE SIZE BILL OF MATERIAL SKETCH LIST
N
agreements between ANOPC, Technip Energies Italy S.p.A. and the intended recipient. The copyright in this document and/or attachments is owned by ANOPC and Technip Energies Italy S.p.A.. while the underlying IP is owned by other Tecnology Providers and an y reproduction or adaptation thereof to any subsisting
1M 59-PID-1931-704-1 A DP 0HU1 HDP E 150 lbs 0 12 7 50 37 L " per
NOme
P AilINT
grado di maturità
- di questo
- setting è tale
H che po ssa essere
24 passato
N in pro duzio
0 ne" (A FIO 12-A P R-2016) POS DESCRIPTION THK1 THK2 ASBL/ IDENT DIAMETER QTY
NO DEST (PCS/MM)
This document and its attachments, if any, contains confidential and proprietary information belonging to ANOPC, and/or other third parties, including Technip Energies Italy S.p.A. The intended recipient of the information contained here in shall not divu lge the same to any third part or sell, trade, publish, reproduce

ERECTION

1 Pipes (Length),ASTM D3035,ASTM D3350 Gr. PE 445574C,Butt Fusion SDR9 SDR9 7 C44JJJL8 24 11673

Ends,-, C44JJJL8, 7,

2 90° Elb LR,ASTM D3261,ASTM D3350 Gr. PE 445574C,Butt Fusion SDR9 SDR9 7 C44K99VC 24 1

Ends,Mnf Std, C44K99VC, 7,

3 Back Flg (SO Stub),Mnf Std,ASTM A536 Gr.60-40-18,FF,150 Lbs, 7 C451R3E3 24 1

C451R3E3, 7,

4 Stub SP,ASTM D3261,ASTM D3350 Gr. PE 445574C,Butt Fusion Ends,Mnf SDR9 7 C44K92DX 24 1

Std,

2
997 B.O.P.
EL.107445

3
2 FW
FW

90
83 997 32
83 FW
24X24"NS
356
CONT. ON
1M59U03-FWA-1M59704301-0001
1 1 W 1136900 24"NS
FW N S
2 4" N 288350
TB1 EL.107750

24"NS

F3/4
CONT. ON
STEM UP 1M59U01-FWA-1M59704312-0001
PLZ-023 W 1146643
N 292630
EL.107750
shall require ANOPC's and/or, when needed, Technip Energies Italy S.p.A.'s express written approval.

TOTAL NUMBER OF SPOOLS: 0


SUPPORT SYMBOLOGY
Y
COM STD or SPC support common SPC
to more than one line Special Piping Support
S-
e.g.: line support Refer to supp. dwgs collections 079254C-"UNIT"-DW-1360-00
PRF STD Z X
STD or SPC support welded to pipe at Standard Piping Support
workshop during pipe spools prefabrication Refer to supp. dwgs collection 079254C-0000-STC-1390-000 INPUT AND OUTPUT
DATA FOR PIPELINE
MRS EFFORT ANALYSIS
Itemized Piping Supports ARE BASED ON
SYSTEM OF
For Itemized Piping Supports refer to Material Requisition 079254C-0000-MR-1383-001 COORDINATES AS
IN THE DRAWING

ASSIUT HYDROCRACKING COMPLEX - ANOPC


1) ALL DIMENSIONS ARE IN MILLIMITERS
1) CONSTRUCTION LINE LIST: 079254C-'UNIT'-NM-1300-012 4) CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND N WELD
REFERENCE

SYMBOLOGY
2) DIMENSIONS AND LAYOUT OF SOCKET WELDED AND THREADED LINES ARE INDICATIVE ONLY AND SHALL BE CHECKED
AT JOB SITE BEFORE ERECTION
DOCUMENTS 2) PIPING MATERIAL CLASSES: 079254C-0000-JSD-1300-001 NON DESTRUCTIVE EXAMINATION: 079254C-0000-MS-1320-051 N FIELD WELD
NOTES - VALID ONLY FOR U/G PIPING SKETCHES -
3) TOTAL LENGTH OF U/G PIPING TO BE CONSIDERED INCLUSIVE OF EXPANSION JOINTS OR ANY EMBEDDED PIPE INTO PITS FOR DESIGN 3) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION 5) FOR STRESS ANALYSIS "FLEXIBILITY LEVELS" AND STRESS ANALYSIS TRACED LINE No. 24"-FWA-1M59704301-ADP0HU1-N ISOMETRIC ID. 1M59U01-FWA-1M59704301
4) ISOMETRIC SKETCHES PREVAIL ON 2D AREA DRAWINGS
5) FOR 45deg MITER BENDS, ONLY ONE CONSTRUCTION WELD SHALL BE CONSIDERED (REF. TO APPLICABLE STANDARD) CONDITION AND ERECTION: 079254C-0000-MS-1300-001 CALCULATIONS NUMBERS REFER TO DOC.: 079254C-'UNIT'-NM-1370-001 SUPPORT
6) THE INITIAL AND FINAL COORDINATES IN ELEVATION ARE SHOWN AT CENTER OF PIPELINE. WHILE AT EACH CHANGE IN PIPE ELEVATION (COMPONENTS)
IT IS SHOWN AS BOP (BOTTOM OF PIPE) POSITION
PROJ. AREA DOC. TYPE SERVICE UNIT SEQUENCE N. SUBLINE SHEET OF SHEETS REV
0 16/06/2022 ISSUED FOR CONSTRUCTION N.A. N.A. A.S./L.B
REV DATE DESCRIPTION STRESS INSTR APPR. REV DATE DESCRIPTION STRESS INSTR APPR. REV DATE DESCRIPTION STRESS INSTR APPR.
079254C 1M59U01 ISO FWA 1M59 704301 0001 01 01 0
EXTRACTION DATE: 15/06/2022 09:22 Technip Energies Italy S.p.A - 00148 ROMA - Viale Castello della Magliana, 68
TEMPORARY FLANGE
(REMOVED AFTER TEST)

TB2
TB3

TB4
TB5

TB6
TB7