SCHEDULE OF TIE BEAM (TB), FLOOR BEAM (FB),
ROOF BEAM (RB) & HALF LANDING BEAM (HLB)
B B 7 7
B
5250
5250
FB-16
FB-16
FB-16
FB-16
FB-16
FB-16
FB-16
FB-16
FB-16
B B B B B C2 C2 REINFORCEMENT
B C4 C4 C4 C4 C3 SIZE
BEAM TOP BOTTOM TOP (EXTRA) BOTTOM (EXTRA) STIRRUPS
MARKED BXD (ALTH.) (ALTH.) (AT SUPPORT) (AT SPAN)
HLB-1
AT SUPPORT AT SPAN
6500
6500
HLB-1
RB-1
RB-1
B C UP FB-8 300X650 ----------
5035
5035
3 3 FB-9 300X650
C3 C3 FB-16 C3 FB-16 C3 FB-16 C4 FB-16 C4 FB-16 C4 FB-16 C4 FB-16 C3 FB-16 C3 HLB-2 FB-10 325X675 ----------
C
1975
FB-11 325X675
RB-1 HLB-2 FB-12 350X650
8 8 8 8
C3 C3 C3 C3 FB-13 300X550 ---------
B B B 4340 4340
6500
6500
FB-16
FB-16
FB-16
FB-16
FB-16
FB-16
FB-16
FB-16
B B B FB-14 300X550 ---------
B B C E C E FB-15 300X500 --------- ---------
FB-16 300X500 ---------
STAIR ROOM BEAM LAYOUT HALF LANDING BEAM LAYOUT FB-17 300X500 ---------
TOP LEVEL: +14.90m TOP LEVEL: +2.50m, +6.45m & +10.35m FB-18 325X675 ---------
4 4 FB-19 325X675 --------- ---------
C3 C2 FB-16 C1 FB-16 C1 FB-16 C1 FB-16 C1 FB-16 C1 FB-16 C1 FB-16 C3 RB-1 300X550 --------- ---------
B WTB-1 300X550
B
FB-16
FB-16
3625
6500
350X650 --------
FB-16
FB-16
FB-16
FB-16
FB-16
FB-16
B B B RSB-1
5 B RSB-2 300X600 --------
FB-16 C2 C2 FB-16 6
B C2
FB-16
FB-16
B WTB-1
7
FB-16
4340
FB-16
B FB-16 C2
6
B FB-16 C2 FB-16 C1 FB-16 C1 FB-16 C1 FB-16 C1 FB-16 C3
6500
WTB-1
WTB-1
7 DOWN
D
5035
C3 FB-16 C2 FB-16 C2
C
FB-16
B
FB-16
FB-16
FB-16
6500
B B
B
FB-17
B WTB-1
FB-16
FB-16
FB-16
FB-16
5035
B B 8 8
C3 C3 FLOOR LEVEL
4340
C E
8 8
C3 FB-16 C3 FB-16 C3 C3 FB-16 C3 FB-16 C3 FB-16 C3 FB-16 C3 FB-16 C3 FLOOR BEAM
WATER TANK BEAM LAYOUT
150
7075 3690 4340 5730 5730 5730 5730 6700
TOP LEVEL: AS PER ARCH. DWG.
A B C E F G H J L
300
12 @125C/C 8 @175C/C
HLB-2
8 @200C/C
0
110
200
12 @125C/C
FLOOR LEVEL 8 @200C/C
E F G H J K L E F G H J K L SLAB REINF.
5730 5730 5730 5730 3825 2875 5730 5730 5730 5730 3825 2875
TB-1 TB-1 RSB-1 FB-1 RSB-1
1 1
C3 C4 C4 C4 C4 C3 C3 C3 C4 C4 C4 C4 C3 C3 REINFORCEMENT DETAILING OF STAIR
UP UP
E E
RSB-2
RSB-2
FB-6
2625
2625
SCALE = NOT TO SCALE
TB-4
FB-1
TB-3 RSB-1 RSB-1 RSB-1 RSB-1 RSB-1 RSB-1 RSB-1 RSB-1 RSB-1 RSB-1 RSB-1
2 2
RSB-1 C4 C4 C4 C4 C3 C4 C4 C4 C4 C3
RSB-1
RSB-1
LEV: 4.5m
LEV: 0.5m LEV: 0.6m LEV:2.55m LEV:6.45m
RSB-2
RSB-2
RSB-2
RSB-2
RSB-2
RSB-2
RSB-2
RSB-2
RSB-2
RSB-2
FB-6
2625
2625
E UP E E UP E E E E UP E E UP E E E
TB-3 RSB-1 RSB-1 RSB-1 RSB-1 RSB-1 RSB-1 RSB-1 RSB-1 RSB-1 RSB-1 RSB-1 RSB-1
3 3
C3 TB-3 C4 C4 C4 C4 C3 C3 FB-1 C3 FB-1 C4 C4 C4 C4 C3 C3
NOTES
GENERAL ARRANGEMENT OF RAMP BEAM GENERAL ARRANGEMENT OF RAMP BEAM 1. ALL DIMENSIO NS ARE IN MILLIMETER AND LEVELS ARE IN METER UNLESS NOTED OTHERWISE.
TOP LEVEL: +0.60m TO +2.55m TOP LEVEL: +4.50m TO +6.45m 2. FOR LAY-OUT OF THE BUILDING REFER TO ARCHITECTURAL DRAWING.
3. PILE & PILE CAP WORK SHALL BE M35 AND OTHER R.C.C. WORK SHALL BE M25.
4. CLEAR COVER TO MAIN STEEL AS FOLLOWS:
a) PILE / PILE CAP - 75mm. b) PEDESTAL- 50mm C)COLUMN - 40mm. d) BEAMS - 30mm. e) SLAB - 20mm.
5. TMT BARS OF GRADE Fe-500 SHALL BE USED.
6. MINIMUM WATER CEMENT RATIO SHALL BE ADHERED TO.
7. BOND LENGTH 50 x DIA OF BAR.
8. ALL OTHER SPECIFICATIONS CONFORMING RELEVANT I.S. CODE.
9. UNLESS SPECIFIED OTHERWISE FOUNDATIONS ARE SYMMETRICALLY PLACED ABOUT THE COLUMN CENTER LINES.
10.LAPS SHALL BE STAGGERED AND NOT MORE THEN 50% OF BARS SHALL BE LAPPED AT ONE PLACE.
11.SLAB BARS IN SHORTER DIRECTION, SHALL BE BELOW OF BARS IN LONGER DIRECTION.
12. ALL GRID LINES ARE CENTER LINE OF BEAMS.
E F G H J K L E F G H J K L 13.FULL STRUCTURE HAVE BEEN DESIGNED FOR THREE FLOORS (G+2).
5730 5730 5730 5730 3825 2875 14.THIS DRAWING SHALL BE READ WITH REFERENCE TO SHEET 1 OF 3 & 2 OF 3.
5730 5730 5730 5730 3825 2875 15. PILE CAPACITY AT TERMINATION LEVEL AS PER SOIL REPORT IS AS FOLLOWS:
FB-1 RSB-1 FB-12 FB-12 RSB-1 PILE DIA CUTOFF SHAFT TERMINATION AXIAL PULL-OUT LETARAL
1 1 (MM) LEVEL LENGTH DEPTH OF COMPRESSION CAPACITY CAPACITY
C3 RSB-1 C4 RSB-1 C4 RSB-1 C4 RSB-1 C4 RSB-1 C3 C3 C3 RSB-1 C4 RSB-1 C4 RSB-1 C4 RSB-1 C4 RSB-1 C3 C3 (M) (M) PILE(M) (ton) (ton) (ton)
UP UP
RSB-2
RSB-2
RSB-2
RSB-2
E UP E E E
RSB-2
E UP E -1.13 7.88 9.0 42.0 ----- -----
RSB-2
RSB-2
RSB-2
RSB-2
UP E
2625
E E E
RSB-2
FB-6
E UP E
2625
2 2
FB-12 C4 C4 C4 C4 C3
RSB-1
RSB-1 C4 C4 C4 C4 C3
RSB-1
LEV:2.55m LEV:6.45m
RSB-2
FB-14
2625
RSB-2
FB-6
2625
E E
DOWN
DOWN
RSB-1 RSB-1
3 3
FB-1 C3 FB-1 C4 C4 C4 C4 C3 C3 FB-10 C3 FB-10 C4 C4 C4 C4 C3 C3
S.E. RAILWAY CONSTRUCTION ORGANISATION
GENERAL ARRANGEMENT OF RAMP BEAM GENERAL ARRANGEMENT OF RAMP BEAM
NYA-BHC 3RD. LINE
TOP LEVEL: +2.55m TO +4.50m TOP LEVEL: +6.45m TO +8.40m
PROJECT
DESIGN AND DRAWING FOR PROPOSED THREE STORIED
SUBJECT (G+2) UTILITY BUILDING AT BALASORE OF S. E. RAILWAY
XEN/CON/D&D-II/GRC AXEN/CON-II/GRC
SSE/D&D/CON/GRC SSE/W/CON/SRC
MEGACON
CONTRACTOR & ENGG. CONSULTANCY