101-A-001 Interior Finish schedule-1 (REV 3)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

L L

INTERIOR FINISH SCHEDULE


FLOOR BASEBOARD WALL CEILING
ROOM
FLOOR ROOM NAME REMARKS
NO DETAIL DETAIL DETAIL DETAIL
BASE FINISHING NO. BASE FINISHING NO. BASE FINISHING NO. BASE FINISHING HEIGHT NO. 3

(ASSEMBLY SANDWICH PANEL


101 FACTORY TROWEL FINISH HARDENER W/POLISHING F1 - - - STEEL FRAME EW1 - EXPOSED STEEL DECK - -
K SHOP) (EXPOSED EXTERNAL WALL) K
1ST SANDWICH PANEL
102 MATERIAL UNLOADING DOCK TROWEL FINISH HARDENER F1 - - - STEEL FRAME EW1 - EXPOSED STEEL DECK - -
FLOOR (EXPOSED EXTERNAL WALL)
SANDWICH PANEL
103 PRODUCT LOADING DOCK TROWEL FINISH HARDENER F1 - - - STEEL FRAME EW1 - EXPOSED STEEL DECK - -
(EXPOSED EXTERNAL WALL)
SANDWICH PANEL KEY PLAN
104 CELL STORAGE TROWEL FINISH HARDENER F1 - - - STEEL FRAME EW1 - EXPOSED STEEL DECK - -
(EXPOSED EXTERNAL WALL) NOTE

M-BAR / THK12 1. ALL STEEL STRUCTURES SHALL


105 HALL-1, 2 TROWEL FINISH THK10 PORCELAIN TILE F3 - - - THK12 GYPSUM BOARD 2PLY WATER BASED PAINT W1 VINYL PAINT 3,000 C2
J GYPSUM BOARD 2PLY RECEIVE AN ANTI-CORROSION J
COATING CONSISTING OF
W1
106 STAILS-1, 2 TROWEL FINISH THK10 PORCELAIN TILE F3 - - - THK12 GYPSUM BOARD 2PLY WATER BASED PAINT T-BAR MF ACOUSTIC CEILING TILE - C1 READY-MIXED PAINT. THE COATING
W4
SHALL MEET THE PROJECT
W1 SPECIFICATIONS AND PROVIDE
107 QUALITY INSPECTION ROOM TROWEL FINISH THK3 PVC TILE F2 VINYL SKIRTING (H=100) - B1 THK12 GYPSUM BOARD 2PLY WATER BASED PAINT T-BAR MF ACOUSTIC CEILING TILE 3,000 C1
W4 ADEQUATE PROTECTION FOR THE
MORTAR W/URETHANE URETHANE RUBBER M-BAR / THK12 INTENDED SERVICE LIFE OF THE
108 RESTROOM-1, 2(M, F) THK10 PORCELAIN TILE F5 - - - CERAMIC TILE(300x600) W2 VINYL PAINT 2,700 C2 STRUCTURE.
RUBBER WATER PROOF WATERPROFING(H=1,200) GYPSUM BOARD 2PLY
W1 2. THE COLUMNS IN THE ASSEMBLY
109 STORAGE-1, 2, 3 TROWEL FINISH THK3 PVC TILE F2 VINYL SKIRTING (H=100) - B1 THK12 GYPSUM BOARD 2PLY WATER BASED PAINT T-BAR MF ACOUSTIC CEILING TILE 2,700 C1 SHOP SHALL RECEIVE A COAT OF
W4
I LIQUID COATING OR EMULSION PAINT I
W1 AFTER SURFACE TREATMENT.
110 MEETING ROOM-1, 2 TROWEL FINISH THK3 PVC TILE F2 VINYL SKIRTING (H=100) - B1 THK12 GYPSUM BOARD 2PLY WATER BASED PAINT T-BAR MF ACOUSTIC CEILING TILE 3,000 C1
W4
3. WATER BASED PAINT : STAIN
W1 RESISTANT PAINT FOR OFFICE
111 MEDIA MEETING ROOM TROWEL FINISH THK3 PVC TILE F2 VINYL SKIRTING (H=100) - B1 THK12 GYPSUM BOARD 2PLY WATER BASED PAINT T-BAR MF ACOUSTIC CEILING TILE 3,000 C1
W4 INTERIOR WALL
QC OFFICE & W1 4. FOR OPTIMAL POLISHING
112 TROWEL FINISH THK3 PVC TILE F2 VINYL SKIRTING (H=100) - B1 THK12 GYPSUM BOARD 2PLY WATER BASED PAINT T-BAR MF ACOUSTIC CEILING TILE 2,700 C1
QC LABORATORY W4 RESULTS, RECOMMEND USING
SUPPLIES W1 LIQUID HARDENER ON POWDER
113 TROWEL FINISH EPOXY PAINT F1 - - - THK12 GYPSUM BOARD 2PLY WATER BASED PAINT T-BAR MF ACOUSTIC CEILING TILE 2,700 C1 HARDENER. CHOOSE THE
STORAGE W4
H APPROPRIATE HARDENER BASED H
TENSILE STRENGTH W1 ON THE SPECIFIC SITE CONDITIONS
114 TROWEL FINISH THK3 PVC TILE F2 VINYL SKIRTING (H=100) - B1 THK12 GYPSUM BOARD 2PLY WATER BASED PAINT T-BAR MF ACOUSTIC CEILING TILE 2,700 C1
TEST ROOM W4 SUCH AS SURFACE CONDITION,
MAINTENANCE W1 TEMPERATURE, AND HUMIDITY.
115 TROWEL FINISH THK3 PVC TILE F2 VINYL SKIRTING (H=100) - B1 THK12 GYPSUM BOARD 2PLY WATER BASED PAINT T-BAR MF ACOUSTIC CEILING TILE 2,700 C1
MEETING ROOM W4 FOLLOW CONSULTING WITH A
MAINTENACE W1 PROFESSIONAL BEFORE
116 TROWEL FINISH THK3 PVC TILE F2 VINYL SKIRTING (H=100) - B1 THK12 GYPSUM BOARD 2PLY WATER BASED PAINT T-BAR MF ACOUSTIC CEILING TILE 2,700 C1 SELECTING THE TYPE OF
OFFICE & STORAGE W4
HARDENER TO USE TO ENSURE
- - - URETHANE RUBBER M-BAR / THK12 THE BEST OUTCOME.
117 ABLUTION AREA TROWEL FINISH THK10 PORCELAIN TILE F3/F5 CERAMIC TILE(300x600) W2 VINYL PAINT 2,700 C2
WATERPROFING(H=1,200) GYPSUM BOARD 2PLY
5. ABBREVIATION
G W1 - MF ACOUSTIC TILE G
118 PRAYER ROOM TROWEL FINISH THK3 PVC TILE F2 VINYL SKIRTING (H=100) B1 THK12 GYPSUM BOARD 2PLY WATER BASED PAINT T-BAR MF ACOUSTIC CEILING TILE 2,700 C1
W4 : MINERAL FIBER ACOUSTIC TILE
W1 - SMC CEILING PANEL
119 REST AREA TROWEL FINISH THK3 PVC TILE F2 VINYL SKIRTING (H=100) - B1 THK12 GYPSUM BOARD 2PLY WATER BASED PAINT T-BAR MF ACOUSTIC CEILING TILE 2,700 C1 : SHEET MOLDING COMPOUND
W4
CEILING PANEL
120 EPS TROWEL FINISH EPOXY PAINT F8 - - - THK12 GYPSUM BOARD 2PLY WATER BASED PAINT W1 - EXPOSED STEEL DECK - -

121 HOT WATER TANK ROOM TROWEL FINISH EPOXY PAINT F8 - - - THK12 GYPSUM BOARD 2PLY WATER BASED PAINT W1 - EXPOSED STEEL DECK - -

W1
F 122 DRIVER REST AREA TROWEL FINISH THK3 PVC TILE F2 VINYL SKIRTING (H=100) - B1 THK12 GYPSUM BOARD 2PLY WATER BASED PAINT T-BAR MF ACOUSTIC CEILING TILE 2,700 C1 F
W4

123 LOCKER ROOM(M, F) TROWEL FINISH WOOD TILE F7 WOODEN SKIRTING (H=100) - B2 THK12 GYPSUM BOARD 2PLY WATER BASED PAINT W1 T-BAR MF ACOUSTIC CEILING TILE 2,700 C1

MORTAR W/URETHANE URETHANE RUBBER


124 SHOWER ROOM(M, F) THK10 PORCELAIN TILE F5 - - - CERAMIC TILE(300x600) W2 CLIP-BAR SMC CEILING PANEL 2,700 C3
RUBBER WATER PROOF WATERPROFING(H=1,200) 3 CONSTRUCTION DOCUMENTS 2023.
REV.3 SEP, 27
SANDWICH PANEL
125 TRANSFORMER ROOM TROWEL FINISH EPOXY PAINT F8 - - - STEEL FRAME EW1 - EXPOSED STEEL DECK - 2 CONSTRUCTION DOCUMENTS 2023.
(EXPOSED EXTERNAL WALL) REV.2 JUN, 14

TRANSFORMER W1 CONSTRUCTION DOCUMENTS 2023.


E 126 TROWEL FINISH THK3 PVC TILE F2 VINYL SKIRTING (H=100) - B1 THK12 GYPSUM BOARD 2PLY WATER BASED PAINT T-BAR MF ACOUSTIC CEILING TILE 2,700 C1 1
REV.1 APR, 20 E
CONTROL ROOM W4
SANDWICH PANEL 0 CONSTRUCTION DOCUMENTS 2023.
127 GENERATOR ROOM TROWEL FINISH EPOXY PAINT F8 - - - STEEL FRAME EW1 - EXPOSED STEEL DECK - MAR, 31
(EXPOSED EXTERNAL WALL)
A DESIGN DEVELOPMENT 2023.
SANDWICH PANEL FEB, 28
128 MECHANICAL ROOM TROWEL FINISH EPOXY PAINT F8 - - - STEEL FRAME EW1 - EXPOSED STEEL DECK -
(EXPOSED EXTERNAL WALL) 2023.
A SCHEMATIC DESIGN FEB, 03

REV. DESCRIPTION DRAWN DATE


CLIENT

D D

DESIGN CONSULTANT

DESIGN

C C
PROJECT TITLE

HYUNDAI ENERGY
INDONESIA BSA PROJECT
DRAWING TITLE

[ASSEMBLY SHOP]
INTERIOR FINISH SCHEDULE-1
SCALE(A1) DAWON GROUP HEC

B NONE DRAWN APPROVED REVIEWED APPROVED B


DATE
2023
SEP, 27
GENERAL CONTRACTOR

DRAWING NO. REV.

101-A-001 3
A A
16 15 14 13 12 11 10 7 6 5 4 3 2 1

You might also like