Professional Documents
Culture Documents
101-A-001 Interior Finish schedule-1 (REV 3)
101-A-001 Interior Finish schedule-1 (REV 3)
101-A-001 Interior Finish schedule-1 (REV 3)
L L
121 HOT WATER TANK ROOM TROWEL FINISH EPOXY PAINT F8 - - - THK12 GYPSUM BOARD 2PLY WATER BASED PAINT W1 - EXPOSED STEEL DECK - -
W1
F 122 DRIVER REST AREA TROWEL FINISH THK3 PVC TILE F2 VINYL SKIRTING (H=100) - B1 THK12 GYPSUM BOARD 2PLY WATER BASED PAINT T-BAR MF ACOUSTIC CEILING TILE 2,700 C1 F
W4
123 LOCKER ROOM(M, F) TROWEL FINISH WOOD TILE F7 WOODEN SKIRTING (H=100) - B2 THK12 GYPSUM BOARD 2PLY WATER BASED PAINT W1 T-BAR MF ACOUSTIC CEILING TILE 2,700 C1
D D
DESIGN CONSULTANT
DESIGN
C C
PROJECT TITLE
HYUNDAI ENERGY
INDONESIA BSA PROJECT
DRAWING TITLE
[ASSEMBLY SHOP]
INTERIOR FINISH SCHEDULE-1
SCALE(A1) DAWON GROUP HEC
101-A-001 3
A A
16 15 14 13 12 11 10 7 6 5 4 3 2 1