Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 12

Construction of 4/6 laning Pavement from km 132.375 to km 153.058(length 20.

683km) on
Daboka Dimapur section(Dimapur by pass)on NH36&NH39 on EPC basis under phase -A of
SARDP-NE in the State of Nagaland

EPC Contractor Consultant Client


M/S Simplex Infrastructures M/S Yongma Engineering Co. Ltd in association with M/S Sterling Indo Tech Consultants Pvt National highways and Infrastructure developm
Limited Ltd Corporation Limited

Calibration of Batching Plant for Aggregate

Date:12.03.20
Display In Display In Display In
Individual Combined Individual Individual Display In
Computer Computer Combined Computer
Sl No weight Loading Average Average Sl No weight Loading Computer Average
(Forward) (Reverse) Loading (kg) (Forward)
Loading (kg) (kg) Different % (kg) (Reverse) Kg
kg Kg kg

121 10 1210 1210 1210 0.0 0.0 91 151 1510 1510 1510 0.0

122 10 1220 1220 1220 0.0 0.0 92 152 1520 1520 1520 0.0

123 10 1230 1230 1230 0.0 0.0 93 153 1530 1530 1530 0.0

124 10 1240 1240 1240 0.0 0.0 94 154 1540 1540 1540 0.0

125 10 1250 1250 1250 0.0 0.0 95 155 1550 1550 1550 0.0

126 10 1260 1260 1260 0.0 0.0 96 156 1560 1560 1560 0.0

127 10 1270 1270 1270 0.0 0.0 97 157 1570 1570 1570 0.0

128 10 1280 1280 1280 0.0 0.0 98 158 1580 1580 1580 0.0

129 10 1290 1290 1290 0.0 0.0 99 159 1590 1590 1590 0.0

130 10 1300 1300 1300 0.0 0.0 100 160 1600 1600 1600 0.0

131 10 1310 1310 1310 0.0 0.0 101

132 10 1320 1320 1320 0.0 0.0 102

133 10 1330 1330 1330 0.0 0.0 103

134 10 1340 1340 1340 0.0 0.0 104


105
135 10 1350 1350 1350 0.0 0.0

136 10 1360 1360 1360 0.0 0.0 106


107
137 10 1370 1370 1370 0.0 0.0

138 10 1380 1380 1380 0.0 0.0 108

139 10 1390 1390 1390 0.0 0.0 109

140 10 1400 1400 1400 0.0 0.0 110

141 10 1410 1410 1410 0.0 0.0 111

142 10 1420 1420 1420 0.0 0.0 112

143 10 1430 1430 1430 0.0 0.0 113

144 10 1440 1440 1440 0.0 0.0 114

145 10 1450 1450 1450 0.0 0.0 115

146 10 1460 1460 1460 0.0 0.0 116


117
147 10 1470 1470 1470 0.0 0.0
118
148 10 1480 1480 1480 0.0 0.0
119
149 10 1490 1490 1490 0.0 0.0
120
150 10 1500 1500 1500 0.0 0.0

EPC Contractor Representative Client Representative Authority Engineer Representative


cture development
ited

Individual
Average
Different %

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

EPC Contractor Representative Client Representative Authority Engineer Representative


Construction of 4/6 laning Pavement from km 132.375 to km 153.058(length 20.683km) on
Daboka Dimapur section(Dimapur by pass)on NH36&NH39 on EPC basis under phase -A of
SARDP-NE in the State of Nagaland

EPC Contractor Consultant Client


M/S Simplex Infrastructures M/S Yongma Engineering Co. Ltd in association with M/S Sterling Indo Tech Consultants Pvt National highways and Infrastructure developm
Limited Ltd Corporation Limited

Calibration of Batching Plant for Aggregate

Date:12.03.20
Display In Display In Display In
Individual Combined Individual Individual Display In
Computer Computer Combined Computer
Sl No weight Loading Average Average Sl No weight Loading Computer Average
(Forward) (Reverse) Loading (kg) (Forward)
Loading (kg) (kg) Different % (kg) (Reverse) Kg
kg Kg kg

61 10 610 610 610 610 0.0 91 10 910 910 910 0.0

62 10 620 620 620 620 0.0 92 10 920 920 920 0.0

63 10 630 630 630 630 0.0 93 10 930 930 930 0.0

64 10 640 640 640 640 0.0 94 10 940 940 940 0.0

65 10 650 650 650 650 0.0 95 10 950 950 950 0.0

66 10 660 660 660 660 0.0 96 10 960 960 960 0.0

67 10 670 670 670 670 0.0 97 10 970 970 970 0.0

68 10 680 680 680 680 0.0 98 10 980 980 980 0.0

69 10 690 690 690 690 0.0 99 10 990 990 990 0.0

70 10 700 700 700 700 0.0 100 10 1000 1000 1000 0.0

71 10 710 710 710 710 0.0 101 10 1010 1010 1010 0.0

72 10 720 720 720 720 0.0 102 10 1020 1020 1020 0.0

73 10 730 730 730 730 0.0 103 10 1030 1030 1030 0.0

74 10 740 740 740 740 0.0 104 10 1040 1040 1040 0.0
105 1050 1050 1050
75 10 750 750 750 750 0.0 10 0.0

76 10 760 760 760 760 0.0 106 10 1060 1060 1060 0.0
107 1070 1070 1070
77 10 770 770 770 770 0.0 10 0.0

78 10 780 780 780 780 0.0 108 10 1080 1080 1080 0.0

79 10 790 790 790 790 0.0 109 10 1090 1090 1090 0.0

80 10 800 800 800 800 0.0 110 10 1100 1100 1100 0.0

81 10 810 810 810 810 0.0 111 10 1110 1110 1110 0.0

82 10 820 820 820 820 0.0 112 10 1120 1120 1120 0.0

83 10 830 830 830 830 0.0 113 10 1130 1130 1130 0.0

84 10 840 840 840 840 0.0 114 10 1140 1140 1140 0.0

85 10 850 851 851 851 0.1 115 10 1150 1150 1150 0.0

86 10 860 861 861 861 0.1 116 10 1160 1160 1160 0.0
117 1170 1170 1170
87 10 870 871 871 871 0.1 10 0.0
118 1180 1180 1180
88 10 880 882 882 882 0.0 10 0.0
119 1190 1190 1190
89 10 890 892 892 892 0.0 10 0.0
120 1200 1200 1200
90 10 900 902 902 902 0.0 10 0.0

EPC Contractor Representative Client Representative Authority Engineer Representative


cture development
ited

Individual
Average
Different %

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

EPC Contractor Representative Client Representative Authority Engineer Representative


Construction of 4/6 laning Pavement from km 132.375 to km 153.058(length 20.683km) on
Daboka Dimapur section(Dimapur by pass)on NH36&NH39 on EPC basis under phase -A of
SARDP-NE in the State of Nagaland

EPC Contractor Consultant Client


M/S Simplex Infrastructures M/S Yongma Engineering Co. Ltd in association with M/S Sterling Indo Tech Consultants Pvt National highways and Infrastructure developm
Limited Ltd Corporation Limited

Calibration of Batching Plant for Aggregate

Date:12.03.20
Display In Display In Display In
Individual Combined Individual Individual Display In
Computer Computer Combined Computer
Sl No weight Loading Average Average Sl No weight Loading Computer Average
(Forward) (Reverse) Loading (kg) (Forward)
Loading (kg) (kg) Different % (kg) (Reverse) Kg
kg Kg kg

1 10 10 10 10 10 0.0 31 10 310 310 310 310

2 10 20 20 20 20 0.0 32 10 320 320 320 320

3 10 30 30 30 30 0.0 33 10 330 330 330 330

4 10 40 40 40 40 0.0 34 10 340 340 340 340

5 10 50 50 50 50 0.0 35 10 350 350 350 350

6 10 60 60 60 60 0.0 36 10 360 360 360 360

7 10 70 70 70 70 0.0 37 10 370 370 370 370

8 10 80 80 80 80 0.0 38 10 380 380 380 380

9 10 90 90 90 90 0.0 39 10 390 390 390 390

10 10 100 100 100 100 0.0 40 10 400 400 400 400

11 10 110 110 110 110 0.0 41 10 410 410 410 410

12 10 120 120 120 120 0.0 42 10 420 420 420 420

13 10 130 130 130 130 0.0 43 10 430 430 430 430

14 10 140 140 140 140 0.0 44 10 440 440 440 440


45 450 450 450 450
15 10 150 150 150 150 0.0 10

16 10 160 160 160 160 0.0 46 10 460 460 460 460


47 470 470 470 470
17 10 170 170 170 170 0.0 10

18 10 180 180 180 180 0.0 48 10 480 480 480 480

19 10 190 190 190 190 0.0 49 10 490 490 490 490

20 10 200 200 200 200 0.0 50 10 500 500 500 500

21 10 210 210 210 210 0.0 51 10 510 510 510 510

22 10 220 220 220 220 0.0 52 10 520 520 520 520

23 10 230 230 230 230 0.0 53 10 530 530 530 530

24 10 240 240 240 240 0.0 54 10 540 540 540 540

25 10 250 250 250 250 0.0 55 10 550 550 550 550

26 10 260 260 260 260 0.0 56 10 560 560 560 560


57 570 570 570 570
27 10 270 270 270 270 0.0 10
58 580 580 580 580
28 10 280 280 280 280 0.0 10
59 590 590 590 590
29 10 290 290 290 290 0.0 10
60 600 600 600 600
30 10 300 300 300 300 0.0 10

EPC Contractor Representative Client Representative Authority Engineer Representative


cture development
ited

Individual
Average
Different %

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

EPC Contractor Representative Client Representative Authority Engineer Representative


Construction of 4/6 laning Pavement from km 132.375 to km 153.058(length
20.683km) on Daboka Dimapur section(Dimapur by pass)on NH36&NH39 on EPC
basis under phase -A of SARDP-NE in the State of Nagaland

EPC Contractor Consultant Client


M/S Yongma Engineering Co. Ltd in association with M/S Sterling Indo Tech National highways and Infrastructure
M/S Simplex Infrastructures Limited
Consultants Pvt Ltd development Corporation Limited

Calibration of Batching Plant for Cemnent/ Mineral Admixture

Individual Display In Display In Individual Display In Display In


Combined Different Combined
Sl No weight Loading Computer Computer Sl No weight Loading Computer Computer Different %
Loading (kg) % Loading (kg)
(kg) (Forward) kg (Reverse) Kg (kg) (Forward) kg (Reverse) Kg

1 0 0 0 0 0.0

2 20 20 20 20 0.0

3 20 40 40 40 0.0

4 20 60 60 60 0.0

5 20 80 80 80 0.0

6 20 100 100 100 0.0

7 20 120 120 120 0.0

8 20 140 140 140 0.0

9 20 160 160 160 0.0

10 20 180 180 180 0.0

11 20 200 200 200 0.0

12 20 220 220 220 0.0

13 20 240 240 240 0.0

14 20 260 260 260 0.0

15 20 280 280 280 0.0

16 20 300 300 300 0.0

17 20 320 320 320 0.0

18 20 340 340 340 0.0

19 20 360 360 360 0.0

20 20 380 380 380 0.0

21 20 400 400 400 0.0

22 20 420 420 420 0.0

23 20 440 440 440 0.0

24 20 460 460 460 0.0

25 20 480 480 480 0.0

26 20 500 500 500 0.0

EPC Contractor Representative Client Representative Authority Engineer Representative


EPC Contractor Representative Client Representative Authority Engineer Representative
Construction of 4/6 laning Pavement from km 132.375 to km 153.058(length
20.683km) on Daboka Dimapur section(Dimapur by pass)on NH36&NH39 on EPC
basis under phase -A of SARDP-NE in the State of Nagaland

EPC Contractor Consultant Client


M/S Yongma Engineering Co. Ltd in association with M/S Sterling Indo Tech National highways and Infrastructure
M/S Simplex Infrastructures Limited
Consultants Pvt Ltd development Corporation Limited

Calibration of Batching Plant for Water

Display In
Individual Display In Display In Individual Display In
Combined Different Combined Computer
Sl No weight Loading Computer Computer Sl No weight Loading Computer Different %
Loading (kg) % Loading (kg) (Reverse)
(kg) (Forward) kg (Reverse) Kg (kg) (Forward) kg
Kg

1 0 0 0 0 0.0

2 20 20 20 20 0.0

3 20 40 40 40 0.0

4 20 60 60 60 0.0

5 20 80 80 80 0.0

6 20 100 100 100 0.0

7 20 120 120 120 0.0

8 20 140 140 140 0.0

9 20 160 160 160 0.0

10 20 180 180 180 0.0

11 20 200 200 200 0.0

12 20 220 220 220 0.0

13 20 240 240 240 0.0

14 10 250 250 250 0.0

EPC Contractor Representative Client Representative Authority Engineer Representative


EPC Contractor Representative Client Representative Authority Engineer Representative
Construction of 4/6 laning Pavement from km 132.375 to km 153.058(length
20.683km) on Daboka Dimapur section(Dimapur by pass)on NH36&NH39 on EPC
basis under phase -A of SARDP-NE in the State of Nagaland

EPC Contractor Consultant Client


M/S Yongma Engineering Co. Ltd in association with M/S Sterling Indo Tech National highways and Infrastructure
M/S Simplex Infrastructures Limited
Consultants Pvt Ltd development Corporation Limited

Calibration of Batching Plant for Chemical Admixture

Display In
Individual Display In Display In Individual Display In
Combined Different Combined Computer
Sl No weight Loading Computer Computer Sl No weight Loading Computer Different %
Loading (kg) % Loading (kg) (Reverse)
(kg) (Forward) kg (Reverse) Kg (kg) (Forward) kg
Kg

1 0 0 0 0 0.0

2 1000 1000 1000 1000 0.0

3 500 1500 1500 1500 0.0

4 1000 2500 2500 2500 0.0

5 1000 3500 3500 3500 0.0

6 1000 4500 4500 4500 0.0

7 500 5000 5000 5000 0.0

8 1000 6000 6000 6000 0.0

9 1000 7000 7000 7000 0.0

EPC Contractor Representative Client Representative Authority Engineer Representative


EPC Contractor Representative Client Representative Authority Engineer Representative