CALIBRATION CALENDER OF LAB EQUIPEMENTS & PLANTS (IN HOUSE)

Manufacture/ Re-Calibration Ist Last


Name of Equipements / Specification/ Upcoming
Sl No Make Eastablished sheduled as per Calibration Calibration
Plants Capasity Calibration Date
year specifications Date Date

1 Batching Plant Sunny 2016 30cum/hr Every 3 Month 14.12.2023 12.06.2024 11.09.2024

2 Batching Plant KYB& CONMAT 2023 45cum/hr Every 3 Month 30.01.2024 23.04.2024 22.07.2024

3 Batching Plant Schwing Stetter 2016 30cum/hr Every 3 Month 19.04.2024 19.04.2024 18.07.2024

4 Vicat Test Apparatus Devine 2023 IS 5513 Every Year 25.11.2023 24.11.2024

Every Year/ Wheen


5 Hot Air Oven Devine 2022 25.11.2023 24.11.2024
Required
Aggregate Impact Value
6 Devine 2023 As per IS 9377 Every Year 25.11.2023 24.11.204
Test Apparatus
Every Year/ Wheen
7 Slump Test Apparatus Devine 2023 IS 7320 25.11.2023 24.11.2024
Required
Every Year/ Wheen
8 CBR Test Apparatus Devine 2023 IS 9669 25.11.2023 24.11.2024
Required
Every Year/ Wheen
9 Proctor Test Apparatus Devine 2023 IS 10074/IS 9189 25.11.2023 24.11.2024
Required
Every Year/ Wheen
10 Casagrande Test Apparatus Devine 2023 IS 9259 25.11.2023 24.11.2024
Required
Mortar Cube Moulds Every Year/ Wheen
11 Devine 2023 IS 10086 25.11.2023 24.11.2024
70.6x70.6x70.6mm Required
Concrete Cube Moulds Every Year/ Wheen
12 Devine 2023 IS 10086 25.11.2023 24.11.2024
150x150x150mm Required
Every Year/ Wheen
13 Moisture Container Devine 2023 100ml 25.11.2023 24.11.2024
Required

14 Rapid Moisture Meter Devine 2023 RMM-1 Every 3 Month 25.11.2023 26.02.2024 24.05.2024

Sand Pouring Cylinder for 200mm dia


15 Devine 2023 Every 3 Month 26.11.2023 24.04.2024 23.05.2024
Sand density Cylinder No 1&2
Sand Pouring Cylinder for 100mm dia
16 Devine 2023 Every Month 26.11.2023 24.04.2024 23.05.2024
Sand density Cylinder No 1&2

EPC Rep. A.E.Rep.


NATIONAL HIGHWAYS AUTHORITY OF INDIA
Project : Construction of 6-lane Durg-Raipur Bypass Section of NH 53 from design Ch 0+000 (Tendesara) to design Ch 44+500 (Parsaada) in the State of
Chhattisgarh on EPC mode Under Bharatmala (Package) A

Authority Engineers : Bloom Companies LLC (JV) with Almondz Global Infra Consultant Limited

EP Contractor : SMSL -MBPL (JV) Durg Package-A

CALIBRATION CALENDER OF LAB EQUIPEMENTS & PLANTS (OUT SIDE)

Re-Calibration
Manufacture/ Specification/ Ist Calibration Last Calibration Upcoming
Sl No Name of Equipements / Plants Make sheduled as per
Eastablished year Capasity Date Date Calibration Date
specifications

1 Electronic Balance Microtech 2023 100kg One in a Year 11.03.2024 11.03.2024 10.03.2025

2 Electronic Balance Sharp 2023 60kg One in a Year 11.03.2024 10.03.2025

3 Electronic Balance Danwer 2023 15kg One in a Year 11.03.2024 10.03.2025

4 Electronic Balance Konica 2023 10kg One in a Year 11.03.2024 10.03.2025

5 Electronic Balance K.Roy 2023 5kg One in a Year 11.03.2024 10.03.2025

6 Electronic Balance Atom 2023 600gm One in a Year 11.03.2024 10.03.2025

7 Compressive Testing Machine EIE 2023 2000KN One in a Year 01.01.2024 25.01.2025

8 Mortar Cube Vibrator Devine 2024 12000RPM Six month 04.03.2024 03.09.2024

9 Proving Ring Sl No 22.94 Devine 2023 50KN One in a Year 25.11.2023 24.11.2024

10 Proving Ring Sl No 453 Devine 2023 25KN One in a Year 25.11.2023 24.11.2024

11 PLT Pressure Gauge Devine 2024 500KN One in a Year 27.12.2023 26.12.2024

12 Dial Gauge ASAHI 2023 25mm One in a Year 27.12.2023 26.06.2024