DPR - New Vikramshila Setu Naugachia End-24.06.2024
DPR - New Vikramshila Setu Naugachia End-24.06.2024
CH. 0+000) to Km 13+375 (Design CH. 4+455) including approach road 35m on Naugachia side & 53m on Bhagalpur side
across river Ganga on newly declared NH-131B at Bhagalpur in the State of Bihar on EPC mode
Rainfall in
Temperature in °C Water Level (M) Weather Progress In Crs.
mm
Min. 28.2°C Progress In %
0.00 25.354 Sunny
Max. 37.6°C Billing upto ….. In Crs. DAILY PROGRESS REPORT
6/10/2024
6/11/2024
6/12/2024
6/13/2024
6/14/2024
6/15/2024
6/16/2024
6/17/2024
6/18/2024
6/19/2024
6/20/2024
6/21/2024
6/22/2024
6/23/2024
6/24/2024
6/25/2024
6/26/2024
6/27/2024
6/28/2024
6/29/2024
6/30/2024
6/1/2024
6/2/2024
6/3/2024
6/4/2024
6/5/2024
6/6/2024
6/7/2024
6/8/2024
6/9/2024
Total
Progress Upto Progress Upto This month
Item No. Description Unit Project Balance as on date REMARKS
Last Month this Month progress
Scope
MAIN BRIDGE
2 Well Steining RM 752.90 466.00 508.00 42.00 244.89 3.0 - - - 3.0 3.00 - - 3.0 3.0 3.0 - - - 6.0 3.0 - - 3.0 3.0 3.0 - 3.0 3.0 - - - - - -
3
Well Sinking (Well curb & RM 836.40 423.63 455.87 32.24 380.53 - - - 3.00 3.22 - - - - - - - 6.00 4.50 - - 2.12 - - - 5.50 - 7.90 - - - - - - -
Well steining)
8 Pier (RM) RM
A Main Bridge
1 Cutting Edge Nos. 17.00 12.0 12.0 - 70.59% 5.00
B
Casting Yard
Development
1 Long Line Gantry Track
Excavation (400x2) Mtr. 800.00 710.00 710.00 - 89% 90.00
Gantry Rail Line (400x2) Mtr. 800.00 600.00 600.00 - 75% 200.00
Long Bed
PCC (50x34.650) Sqm 1,732.50 1,732.50 1,732.50 - 100% -
2 Short Line - -
Gantry Rail Line (400x2) Mtr. 800.00 500.00 500.00 - 63% 300.00
Short Bed-1 - -
0.00
0.00
0.00
3 3 3 6 3 3 3 3 3 3 42.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Remarks
NAME OF PROJECT :- VIKRAMSHILA SETU
DATE:- 24/06/2024
SIDE:- Naugachaia End
4 P-1 Reinforcement & Shuttering Reinforcement fixing work Kripa Sagar Quantity Work
5 P-2
7 P-4
8 P-5 Mahalaxmi Sinking P-5 for sinking Work Ashish Mishra Quantity Work
11 P-11 Mahalaxmi 2 Sinking Work Sinking Work P-9/P-11 Rahul Kumar Quantity work
Parbatta
18 Mechenical 2 Helper Steel Boat Cleaning Work Sunil Sirvastav sir Supply Wok
Construction
Parbatta
20 Casting Yard 3 Curing Work Curing & Sand Bag Filling Junaid Alam Supply Wok
Construction
Parbatta
23 Site 1 Helper Meson Helper Ashish Mishra Supply Wok
Construction
26 Site Ranveer Singh Block Shifting Work Block Shifting From A-1 to P-1 Sharavan Choudhary Supply Wok
27 Lab Balram Mandal 4 3 Lab Helper Lab Helper, Plant Helper Pramod Diwedi Supply Wok
Parbatta
28 Survey 2 Helper Survey Helper Suman Pal Supply Wok
Construction
Parbatta
30 Store 1 Store Store Helper Manish Kr Supply Wok
Construction
32 Camp Ranveer Singh 5 Machine Helper TMT threading Work Siddharth Roy Quantity work
33 Site Ranveer Singh 1 8 Concreting Work Concrete Work P-7/Lift-12 Sharavan Choudhary Supply Wok
36 Tug Ranveer Singh 2 Helper Tug Helper Sharavan Choudhary Supply Wok
37 Barge Md Tasveer Jetty Reparing Barge Mould Fixching & Welding Sharavan Choudhary Supply Wok
38 Barge Zakir Ali Jetty Reparing Barge Assembling Sharavan Choudhary Supply Wok
39 Security Security Guard 8 18 Security Guard Security Guard Sharavan Choudhary Supply Wok
TOTAL 25 7 70 0 0 21
Name of Project-Construction of New Four lane Bridge (Parallel to the Existing Vikramshila Setu) from
(Design CH. 4+455) including approach road 35m on Naugachia side & 53m on Bhagalpur side acros
Bhagalpur in the State of Bihar on EPC mode
WEATHER REPORT
Naugachia End Bhagalpur End TEMPERATURE©
Sr No. Date
(Near P-5) (Near P-35) Min Max
132 24-Oct-2023
151 12-Nov-2023
EPORT
Rainfall (In
Weather Condition Remarks
mm)
51 Sunny& cloudy
2.8 Cloudy
0 Sunny
0 Sunny
0 Rainy
5.4 Cloudy
13.2 Rainy & Cloudy
51.4 Rainy & Cloudy
5.4 Rainy & Cloudy
4.2 Rainy & Cloudy
17 Rainy & Cloudy
4 Rainy & Cloudy
0 Sunny& cloudy
0 Sunny
0 Sunny
21.4 Sunny& Rainy
44 Sunny& Rainy
0 Sunny & cloudy
0 Sunny
0 Sunny
0 Sunny
0 Sunny & cloudy
0 Sunny & cloudy
34.4 Rainy & Cloudy
10.4 Rainy & Cloudy
5 Rainy & Cloudy
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
8 Sunny & cloudy
8 Sunny & cloudy
4 Sunny & cloudy
8 Sunny & Rainy
1.5 Sunny & cloudy
13 Rainy & Cloudy
10 Rainy & Cloudy
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
70 Rainy
0 Sunny
0 Sunny
0 Sunny
5 Sunny
0 Cloudy
0 Cloudy
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Sunny
0 Fog
1 Well Crub 3.250 3.250 STR/SPS/VIKRAMSHILA/170 29-Nov-23 89.00 Nov-2023 1 Well Crub 3.250 3.250 STR/SPS/VIKRAMSHILA/16 3-Oct-23 89.50 Oct-2023
2 L1 2.000 5.250 STR/SPS/VIKRAMSHILA/247 19-Dec-23 88.00 Dec-2023 2 L1 2.000 5.250 STR/SPS/VIKRAMSHILA/25 11-Oct-23 90.00 Oct-2023
3 L2 3.000 8.250 STR/SPS/VIKRAMSHILA/280 26-Dec-23 132.00 Dec-2023 3 L2 3.000 8.250 STR/SPS/VIKRAMSHILA/35 17-Oct-23 132.00 Oct-2023
4 L3 3.000 11.250 STR/SPS/VIKRAMSHILA/316 4-Jan-24 132.00 Jan-2024 4 L3 3.000 11.250 STR/SPS/VIKRAMSHILA/44 25-Oct-23 130.00 Oct-2023
5 L4 3.000 14.250 STR/SPS/VIKRAMSHILA/383 22-Jan-24 126.00 Jan-2024 5 L4 3.000 14.250 STR/SPS/VIKRAMSHILA/75 2-Nov-23 127.00 Nov-2023
6 L5 3.000 17.250 STR/SPS/VIKRAMSHILA/451 5-Feb-24 129.00 Feb-2024 6 L5 3.000 17.250 STR/SPS/VIKRAMSHILA/97 8-Nov-23 132.00 Nov-2023
7 L6 3.000 20.250 STR/SPS/VIKRAMSHILA/508 16-Feb-24 129.50 Feb-2024 7 L6 3.000 20.250 STR/SPS/VIKRAMSHILA/119 15-Nov-23 128.00 Nov-2023
8 L7 3.000 23.250 STR/SPS/VIKRAMSHILA/585 26-Feb-24 131.00 Feb-2024 8 L7 2.000 22.250 STR/SPS/VIKRAMSHILA/142 24-Nov-23 84.70 Nov-2023
9 L8 3.000 26.250 STR/SPS/VIKRAMSHILA/648 6-Mar-24 126.00 Mar-2024 9 L8 2.000 24.250 STR/SPS/VIKRAMSHILA/203 10-Dec-23 88.00 Dec-2023
10 L9 3.000 29.250 STR/SPS/VIKRAMSHILA/734 19-Mar-24 127.50 Mar-2024 10 L9 2.000 26.250 STR/SPS/VIKRAMSHILA/224 13-Dec-23 88.00 Dec-2023
11 L10 - 29.250 Jan-1900 11 L10 2.000 28.250 STR/SPS/VIKRAMSHILA/267 25-Dec-23 88.00 Dec-2023
20 L19 - 51.250
Well No. P-02 Well No. P-03
Total Ht RFI No. Date of Concrete as Total Ht RFI No. Date of Concrete
Sr No Welll ID Ht (Mtr ) Month Sr No Welll ID Ht ( Mtr ) Month
(Mtr) (Concrete pouring) casting per Site (Mtr) (Concrete pouring) casting as per Site
1 Well Crub 3.250 3.250 STR/SPS/VIKRAMSHILA/10 21-Sep-23 91.00 Sep-2023 1 Well Crub 3.250 3.250 STR/SPS/VIKRAMSHILA/78 3-Nov-23 89.00 Nov-2023
2 L1 2.000 5.250 STR/SPS/VIKRAMSHILA/22 9-Oct-23 89.50 Oct-2023 2 L1 2.000 5.250 STR/SPS/VIKRAMSHILA/104 13-Nov-23 84.00 Nov-2023
3 L2 3.000 8.250 STR/SPS/VIKRAMSHILA/28 14-Oct-23 132.00 Oct-2023 3 L2 3.000 8.250 STR/SPS/VIKRAMSHILA/148 25-Nov-23 133.00 Nov-2023
4 L3 3.000 11.250 STR/SPS/VIKRAMSHILA/41 21-Oct-23 132.00 Oct-2023 4 L3 3.000 11.250 STR/SPS/VIKRAMSHILA/183 3-Dec-23 128.50 Dec-2023
5 L4 3.000 14.250 STR/SPS/VIKRAMSHILA/59 31-Oct-23 132.00 Oct-2023 5 L4 3.000 14.250 STR/SPS/VIKRAMSHILA/206 11-Dec-23 132.00 Dec-2023
6 L5 3.000 17.250 STR/SPS/VIKRAMSHILA/88 7-Nov-23 130.50 Nov-2023 6 L5 3.000 17.250 STR/SPS/VIKRAMSHILA/241 18-Dec-23 132.00 Dec-2023
7 L6 3.000 20.250 STR/SPS/VIKRAMSHILA/111 13-Nov-23 132.00 Nov-2023 7 L6 3.000 20.250 STR/SPS/VIKRAMSHILA/283 27-Dec-23 132.00 Dec-2023
8 L7 2.000 22.250 STR/SPS/VIKRAMSHILA/134 22-Nov-23 83.00 Nov-2023 8 L7 2.000 22.250 STR/SPS/VIKRAMSHILA/337 10-Jan-24 84.00 Jan-2024
9 L8 2.000 24.250 STR/SPS/VIKRAMSHILA/194 8-Dec-23 66.00 Dec-2023 9 L8 2.000 24.250 STR/SPS/VIKRAMSHILA/367 18-Jan-24 68.00 Jan-2024
10 L9 3.000 27.250 STR/SPS/VIKRAMSHILA/232 16-Dec-23 92.00 Dec-2023 10 L9 3.000 27.250 STR/SPS/VIKRAMSHILA/426 31-Dec-24 90.00 Dec-2024
11 L10 3.000 30.250 STR/SPS/VIKRAMSHILA/261 22-Dec-23 92.00 Dec-2023 11 L10 3.000 30.250 STR/SPS/VIKRAMSHILA/478 11-Feb-24 89.00 Feb-2024
12 L11 3.000 33.250 STR/SPS/VIKRAMSHILA/301 29-Dec-23 92.00 Dec-2023 12 L11 3.000 33.250 STR/SPS/VIKRAMSHILA/549 23-Feb-24 92.50 Feb-2024
13 L12 3.000 36.250 STR/SPS/VIKRAMSHILA/331 8-Jan-24 90.00 Jan-2024 13 L12 3.000 36.250 STR/SPS/VIKRAMSHILA/619 2-Mar-24 90.00 Mar-2024
14 L13 3.000 39.250 STR/SPS/VIKRAMSHILA/361 16-Jan-24 91.00 Jan-2024 14 L13 3.000 39.250 STR/SPS/VIKRAMSHILA/696 14-Mar-24 88.00 Mar-2024
15 L14 3.000 42.250 STR/SPS/VIKRAMSHILA/393 25-Jan-24 90.00 Jan-2024 15 L14 3.000 42.250 STR/SPS/VIKRAMSHILA/764 23-Mar-24 90.00 Mar-2024
16 L15 3.000 45.250 STR/SPS/VIKRAMSHILA/438 3-Feb-24 92.00 Feb-2024 16 L15 3.000 45.250 STR/SPS/VIKRAMSHILA/810 4-Apr-24 90.00 Apr-2024
17 L16 3.000 48.250 STR/SPS/VIKRAMSHILA/800 2-Apr-24 90.00 Apr-2024 17 L16 3.000 48.250 STR/SPS/VIKRAMSHILA/1078 16-May-24 92.00 May-2024
FS L-1 - FS L-1 -
FS L-2 - FS L-2 -
Well No. P-04 Well No. P-05
1 Well Crub 3.250 3.250 STR/SPS/VIKRAMSHILA/08 18-Sep-23 89.00 Sep-2023 1 Well Crub 3.250 3.250 STR/SPS/VIKRAMSHILA/139 24-Nov-23 90.00 Nov-2023
2 L1 2.000 5.250 STR/SPS/VIKRAMSHILA/19 5-Oct-23 90.00 Oct-2023 2 L1 2.000 5.250 STR/SPS/VIKRAMSHILA/253 20-Dec-23 88.00 Dec-2023
3 L2 3.000 8.250 STR/SPS/VIKRAMSHILA/38 19-Oct-23 132.00 Oct-2023 3 L2 3.000 8.250 STR/SPS/VIKRAMSHILA/286 28-Dec-23 130.00 Dec-2023
4 L3 3.000 11.250 STR/SPS/VIKRAMSHILA/47 30-Oct-23 132.00 Oct-2023 4 L3 3.000 11.250 STR/SPS/VIKRAMSHILA/319 5-Jan-24 132.00 Jan-2024
5 L4 3.000 14.250 STR/SPS/VIKRAMSHILA/85 4-Nov-23 132.00 Nov-2023 5 L4 3.000 14.250 STR/SPS/VIKRAMSHILA/352 13-Jan-24 132.00 Jan-2024
6 L5 3.000 17.250 STR/SPS/VIKRAMSHILA/101 9-Nov-23 130.00 Nov-2023 6 L5 3.000 17.250 STR/SPS/VIKRAMSHILA/380 22-Jan-24 128.00 Jan-2024
7 L6 3.000 20.250 STR/SPS/VIKRAMSHILA/125 17-Nov-23 128.00 Nov-2023 7 L6 3.000 20.250 STR/SPS/VIKRAMSHILA/412 31-Jan-24 126.00 Jan-2024
8 L7 2.000 22.250 STR/SPS/VIKRAMSHILA/167 28-Nov-23 88.00 Nov-2023 8 L7 3.000 23.250 STR/SPS/VIKRAMSHILA/485 12-Feb-24 130.50 Feb-2024
9 L8 2.000 24.250 STR/SPS/VIKRAMSHILA/217 12-Dec-23 88.00 Dec-2023 9 L8 2.000 25.250 STR/SPS/VIKRAMSHILA/546 22-Feb-24 84.00 Feb-2024
10 L9 2.000 26.250 STR/SPS/VIKRAMSHILA/244 19-Dec-23 88.00 Dec-2023 10 L9 2.000 27.250 STR/SPS/VIKRAMSHILA/607 29-Feb-24 86.00 Feb-2024
11 L10 2.000 28.250 STR/SPS/VIKRAMSHILA/289 27-Dec-23 80.00 Dec-2023 11 L10 2.000 29.250 STR/SPS/VIKRAMSHILA/668 9-Mar-24 66.00 Mar-2024
12 L11 2.000 30.250 STR/SPS/VIKRAMSHILA/332 5-Jan-24 65.00 Jan-2024 12 L11 3.000 32.250 STR/SPS/VIKRAMSHILA/725 18-Mar-24 90.00 Mar-2024
13 L12 3.000 33.250 STR/SPS/VIKRAMSHILA/358 13-Jan-24 85.50 Jan-2024 13 L12 3.000 35.250 STR/SPS/VIKRAMSHILA/775 29-Mar-24 86.00 Mar-2024
14 L13 3.000 36.250 STR/SPS/VIKRAMSHILA/387 23-Jan-24 90.00 Jan-2024 14 L13 3.000 38.250 STR/SPS/VIKRAMSHILA/875 12-Apr-24 90.00 Apr-2024
15 L14 3.000 39.250 STR/SPS/VIKRAMSHILA/435 1-Feb-24 92.50 Feb-2024 15 L14 3.000 41.250 STR/SPS/VIKRAMSHILA/946 23-Apr-24 93.00 Apr-2024
16 L15 3.000 42.250 STR/SPS/VIKRAMSHILA/470 9-Feb-24 90.00 Feb-2024 16 L15 3.000 44.250 STR/SPS/VIKRAMSHILA/1015 7-May-24 92.00 May-2024
17 L16 3.000 45.250 STR/SPS/VIKRAMSHILA/543 21-Feb-24 92.00 Feb-2024 17 L16 3.000 47.250 STR/SPS/VIKRAMSHILA/1087 18-May-24 92.00 May-2024
18 L17 3.000 48.250 STR/SPS/VIKRAMSHILA/625 2-Mar-24 92.00 Mar-2024 18 L17 3.000 50.250 STR/SPS/VIKRAMSHILA/1298 21-Jun-24 94.50 Jun-2024
1 Well Crub 3.250 3.250 STR/SPS/VIKRAMSHILA/343 11-Jan-24 89.00 Jan-2024 1 Well Crub 3.250 3.250 STR/SPS/VIKRAMSHILA/719 17-Mar-24 90.00 Mar-2024
2 L1 2.000 5.250 STR/SPS/VIKRAMSHILA/377 20-Jan-24 87.50 Jan-2024 2 L1 2.000 5.250 STR/SPS/VIKRAMSHILA/784 30-Mar-24 85.00 Mar-2024
3 L2 3.000 8.250 STR/SPS/VIKRAMSHILA/399 25-Jan-24 130.50 Jan-2024 3 L2 3.000 8.250 STR/SPS/VIKRAMSHILA/824 5-Apr-24 132.50 Apr-2024
4 L3 3.000 11.250 STR/SPS/VIKRAMSHILA/421 31-Jan-24 126.00 Jan-2024 4 L3 3.000 11.250 STR/SPS/VIKRAMSHILA/887 13-Apr-24 132.00 Apr-2024
5 L4 3.000 14.250 STR/SPS/VIKRAMSHILA/461 7-Feb-24 132.00 Feb-2024 5 L4 3.000 14.250 STR/SPS/VIKRAMSHILA/937 20-Apr-24 132.00 Apr-2024
6 L5 3.000 17.250 STR/SPS/VIKRAMSHILA/512 15-Feb-24 130.00 Feb-2024 6 L5 3.000 17.250 STR/SPS/VIKRAMSHILA/988 30-Apr-24 132.00 Apr-2024
7 L6 3.000 20.250 STR/SPS/VIKRAMSHILA/552 22-Feb-24 132.00 Feb-2024 7 L6 3.000 20.250 STR/SPS/VIKRAMSHILA/1039 10-May-24 132.00 May-2024
8 L7 2.000 22.250 STR/SPS/VIKRAMSHILA/599 29-Feb-24 84.00 Feb-2024 8 L7 2.000 22.250 STR/SPS/VIKRAMSHILA/1093 17-May-24 84.00 May-2024
9 L8 2.000 24.250 STR/SPS/VIKRAMSHILA/631 4-Mar-24 66.00 Mar-2024 9 L8 2.000 24.250 STR/SPS/VIKRAMSHILA/1111 21-May-24 68.00 May-2024
10 L9 3.000 27.250 STR/SPS/VIKRAMSHILA/677 11-Mar-24 90.00 Mar-2024 10 L9 3.000 27.250 STR/SPS/VIKRAMSHILA/1165 30-May-24 94.00 May-2024
11 L10 3.000 30.250 STR/SPS/VIKRAMSHILA/722 17-Mar-24 90.00 Mar-2024 11 L10 3.000 30.250 STR/SPS/VIKRAMSHILA/1234 10-Jun-24 93.00 Jun-2024
12 L11 3.000 33.250 STR/SPS/VIKRAMSHILA/761 23-Mar-24 110.000 Mar-2024 12 L11 3.000 33.250 STR/SPS/VIKRAMSHILA/1262 15-Jun-24 94.000 Jun-2024
13 L12 3.000 36.250 STR/SPS/VIKRAMSHILA/827 5-Apr-24 92.00 Apr-2024 13 L12 3.000 36.250 STR/SPS/VIKRAMSHILA/1313 24-Jun-24 94.00 Jun-2024
FS L-1 - FS L-1 -
FS L-2 - FS L-2 -
Well No. P-09 Well No. P-11
Well Curb
1 Stage-1
1.200 1.200 STR/SPS/VIKRAMSHILA/427 1-Feb-24 15.00 Feb-2024 1 Stage-1 1.200 1.200 STR/SPS/VIKRAMSHILA/440 3-Feb-24 15.00 Feb-2024
Well Curb
2 Stage-2
1.000 2.200 STR/SPS/VIKRAMSHILA/482 10-Feb-24 30.00 Feb-2024 2 Stage-2 0.500 1.700 STR/SPS/VIKRAMSHILA/494 13-Feb-24 12.00 Feb-2024
Well Curb
3 Stage-3
1.050 3.250 STR/SPS/VIKRAMSHILA/537 22-Feb-24 45.00 Feb-2024 3 Stage-3 0.500 2.200 STR/SPS/VIKRAMSHILA/536 20-Feb-24 18.00 Feb-2024
4 L-1 Stage-1 0.900 4.150 STR/SPS/VIKRAMSHILA/645 6-Mar-24 40.00 Mar-2024 4 Stage-4 1.050 3.250 STR/SPS/VIKRAMSHILA/572 27-Feb-24 45.00 Feb-2024
5 L-1 Stage-2 1.000 5.150 STR/SPS/VIKRAMSHILA/752 22-Mar-24 42.00 Mar-2024 5 L-1 Stage-1 0.820 4.070 STR/SPS/VIKRAMSHILA/653 7-Mar-24 36.00 Mar-2024
6 L-1 Stage-2 0.650 5.800 STR/SPS/VIKRAMSHILA/752 23-Mar-24 30.00 Mar-2024 6 L-1 Stage-2 1.280 5.350 STR/SPS/VIKRAMSHILA/802 2-Apr-24 50.00 Apr-2024
7 L-2 2.050 7.850 STR/SPS/VIKRAMSHILA/789 31-Mar-24 90.00 Mar-2024 7 L-2 2.000 7.350 STR/SPS/VIKRAMSHILA/812 5-Apr-24 88.00 Apr-2024
8 L-3 3.000 10.850 STR/SPS/VIKRAMSHILA/804 3-Apr-24 120.00 Apr-2024 8 L-3 3.00 10.350 STR/SPS/VIKRAMSHILA/856 9-Apr-24 132.00 Apr-2024
9 L-4 Stage-1 2.100 12.950 STR/SPS/VIKRAMSHILA/834 6-Apr-24 90.00 Apr-2024 9 L-4 3.50 13.850 STR/SPS/VIKRAMSHILA/872 11-Apr-24 150.00 Apr-2024
10 L-4 Stage-2 1.900 14.850 STR/SPS/VIKRAMSHILA/854 8-Apr-24 78.00 Apr-2024 10 L-5 3.400 17.250 STR/SPS/VIKRAMSHILA/907 18-Apr-24 144.00 Apr-2024
11 L-5 2.40 17.250 STR/SPS/VIKRAMSHILA/878 12-Apr-24 97.00 Apr-2024 11 L-6 3.00 20.250 STR/SPS/VIKRAMSHILA/973 27-Apr-24 132.00 Apr-2024
12 L-6 3.00 20.250 STR/SPS/VIKRAMSHILA/943 23-Apr-24 132.00 Apr-2024 12 L-7 2.00 22.250 STR/SPS/VIKRAMSHILA/1012 7-May-24 86.00 May-2024
13 L-7 3.00 23.250 STR/SPS/VIKRAMSHILA/1027 8-May-24 132.00 May-2024 13 L-8 2.00 24.250 STR/SPS/VIKRAMSHILA/1060 13-May-24 67.50 May-2024
14 L-8 2.00 25.250 STR/SPS/VIKRAMSHILA/1075 16-May-24 88.00 May-2024 14 L-9 3.00 27.250 STR/SPS/VIKRAMSHILA/1135 24-May-24 90.00 May-2024
15 L-9 2.00 27.250 STR/SPS/VIKRAMSHILA/1141 25-May-24 85.00 May-2024 15 L-10 3.00 30.250 STR/SPS/VIKRAMSHILA/1198 5-Jun-24 95.00 Jun-2024
16 L-10 2.00 29.250 STR/SPS/VIKRAMSHILA/1174 31-May-24 71.00 May-2024 16 L-11 3.00 33.250 STR/SPS/VIKRAMSHILA/1243 11-Jun-24 92.00 Jun-2024
17 L-11 3.00 32.250 STR/SPS/VIKRAMSHILA/1228 9-Jun-24 93.00 Jun-2024 17 L-12 3.00 36.250 STR/SPS/VIKRAMSHILA/1292 20-Jun-24 92.00 Jun-2024
19 FS -
FS 0 FS -
Well No. P-15 Well No. P-16
1 Well Crub 3.250 3.250 STR/SPS/VIKRAMSHILA/313 3-Jan-24 91.50 Jan-2024 1 Well Crub 3.250 3.250 STR/SPS/VIKRAMSHILA/295 28-Dec-23 89.00 Dec-2023
2 L1 2.000 5.250 STR/SPS/VIKRAMSHILA/370 19-Jan-24 90.00 Jan-2024 2 L1 2.125 5.375 STR/SPS/VIKRAMSHILA/346 12-Jan-24 96.00 Jan-2024
3 L2 0.818 6.068 STR/SPS/VIKRAMSHILA/418 31-Jan-24 36.00 Jan-2024 3 L2 2.875 8.250 STR/SPS/VIKRAMSHILA/402 27-Jan-24 126.00 Jan-2024
4 L2 2.182 8.250 STR/SPS/VIKRAMSHILA/439 2-Feb-24 96.00 Feb-2024 4 L3 3.000 11.250 STR/SPS/VIKRAMSHILA/446 5-Feb-24 132.00 Feb-2024
5 L3 3.000 11.250 STR/SPS/VIKRAMSHILA/473 11-Feb-24 131.00 Feb-2024 5 L4 3.000 14.250 STR/SPS/VIKRAMSHILA/500 15-Feb-24 132.00 Feb-2024
6 L4 3.000 14.250 STR/SPS/VIKRAMSHILA/558 23-Feb-24 132.00 Feb-2024 6 L5 3.000 17.250 STR/SPS/VIKRAMSHILA/571 26-Feb-24 130.50 Feb-2024
7 L5 3.000 17.250 STR/SPS/VIKRAMSHILA/616 2-Mar-24 132.00 Mar-2024 7 L6 3.000 20.250 STR/SPS/VIKRAMSHILA/637 4-Mar-24 131.00 Mar-2024
8 L6 3.000 20.250 STR/SPS/VIKRAMSHILA/711 15-Mar-24 132.00 Mar-2024 8 L7 3.000 23.250 STR/SPS/VIKRAMSHILA/687 13-Mar-24 131.00 Mar-2024
9 L7 2.000 22.250 STR/SPS/VIKRAMSHILA/901 15-Apr-24 85.50 Apr-2024 9 L8 2.000 25.250 STR/SPS/VIKRAMSHILA/758 23-Mar-24 88.00 Mar-2024
10 L8 2.000 24.250 STR/SPS/VIKRAMSHILA/964 26-Apr-24 68.00 Apr-2024 10 L9 2.000 27.250 STR/SPS/VIKRAMSHILA/843 7-Apr-24 84.00 Apr-2024
11 L9 3.000 27.250 STR/SPS/VIKRAMSHILA/1126 24-May-24 92.00 May-2024 11 L10 2.000 29.250 STR/SPS/VIKRAMSHILA/997 1-May-24 66.00 May-2024
12 L10 2.000 29.250 STR/SPS/VIKRAMSHILA/1156 28-May-24 62.000 May-2024 12 L11 3.000 32.250 STR/SPS/VIKRAMSHILA/1063 13-May-24 91.50 May-2024
13 L11 3.000 32.250 STR/SPS/VIKRAMSHILA/1304 23-Jun-24 95.00 Jun-2024 13 L12 3.000 35.250 STR/SPS/VIKRAMSHILA/1180 1-Jun-24 94.00 Jun-2024
FS L-1 - FS L-1 -
FS L-2 - FS L-2 -
Total Progress This Balance
Up to
S.N. Well No. Unit Project Upto Last month as on
6/1/2024
Date
Scope Month progress date
0.000
NEW VIKRAMSHILA SETU PROJECT (
6/10/2024
6/11/2024
6/12/2024
6/2/2024
6/3/2024
6/4/2024
6/5/2024
6/6/2024
6/7/2024
6/8/2024
6/9/2024
3.000
3.220
0.000 0.000 3.000 3.220 0.000 0.000 0.000 0.000 0.000 0.000 0.000
SETU PROJECT (BHAGALPUR END)
6/14/2024
6/15/2024
6/16/2024
6/17/2024
6/18/2024
6/19/2024
6/20/2024
6/21/2024
6/22/2024
6/23/2024
5.500
7.897
2.124
4.500
6.000
6.000 4.500 0.000 0.000 2.124 0.000 0.000 0.000 5.500 0.000 7.897
6/24/2024
0.000
6/25/2024
0.000
6/26/2024
0.000
6/27/2024
0.000
6/28/2024
0.000
6/29/2024
0.000
6/30/2024
0.000
REMARKS
NEW VIKRAMSHILA SETU PROJECT (N
Daily concrete production detail
Upto 24th June, 2024
Quantity
DATE LOCATION STRUCTURE Grade
(Cum)
9/1/2023 Naugachia End M-15 1
Naugachia End M-25 4
Bhagalpur End M-25 2
Bhagalpur End M-30 4
9/2/2023 Naugachia End M-15 1
Naugachia End M-25 3.5
Bhagalpur End M-25 1
9/5/2023 Naugachia End M-25 3.25
Bhagalpur End M-15 12
9/6/2023 Naugachia End M-25 5.25
Bhagalpur End M-15 12
9/7/2023 Naugachia End M-25 7.75
9/9/2023 Naugachia End Block Casting M-25 8.5
Naugachia End Gantry Raft (PCC) M-15 4.00
Bhagalpur End Cement Godown M-15 18.25
9/10/2023 Naugachia End Gantry track M-15 5
Naugachia End Block Casting M-25 7.25
Bhagalpur End Cement Godown M-15 8
9/11/2023 Naugachia End Beam M-25 2.25
Naugachia End Block Casting M-25 8.25
Bhagalpur End Misc. M-15 1.5
9/12/2023 Naugachia End Car parking pcc M-15 11
Naugachia End Misc. M-15 6
Naugachia End Block Casting M-25 8.25
Naugachia End Gantry Raft M-30 14.5
Bhagalpur End RCC work M-25 1.5
9/13/2023 Naugachia End Gantry Raft M-30 11.75
Naugachia End Block Casting M-25 8.25
9/14/2023 Naugachia End Gantry Raft (PCC) M-15 7
Naugachia End Block Casting M-25 8.25
Naugachia End Gantry Raft M-30 15
Bhagalpur End Pcc office garden M-15 2
Bhagalpur End Weigh bridge M-25 3.5
9/15/2023 Naugachia End Block Casting M-25 8.25
Naugachia End At p-2 Gantry track M-30 8.25
Bhagalpur End Staff Resident M-15 2
9/16/2023 Naugachia End Gantry Raft (PCC) M-15 5
Naugachia End Block Casting M-25 8.25
Naugachia End Gantry Raft M-30 16
9/18/2023 Naugachia End Well Curb (P-04) M-35 89.05
Naugachia End M-25 8.25
9/19/2023 Naugachia End Labour Room M-15 6
Naugachia End Caisson Bed M-15 10
Naugachia End Pcc M-15 4.5
Naugachia End Pcc M-15 1.25
Naugachia End Gantry M-30 17
Naugachia End Block Casting M-25 8.25
9/20/2023 Naugachia End Misc. M-15 3.5
9/21/2023 Naugachia End Well Curb (P-02) M-35 91
12/28/2023
Naugachia End Casting Yard (RCC) M-35 10.5
12/28/2023
Naugachia End Labour Shed (RCC) M-15 7.5
23889.250
Quantity
Grade
(Cum)
M-15 1246.450
M-25 770.300
M-30 216.500
M-35 3770.800
M-45 17885.200
Total 23889.250
TU PROJECT (NAUGACHIA END)
ete production details.
24th June, 2024
19 19 19 19 19 19
18 06/04/24 18 Well Cap Well Cap 18 23/03/24 18 18 18
55.200
9 19/03/24 9 9 13/12/23 9 9 16/12/23 9 9 31/12/24 9 9 19/12/23 9 9 29/02/24 9
51.250
51.250
55.200
51.700
51.700
50.250
8 06/03/24 8 8 10/12/23 8 48.250 8 08/12/23 8 8 18/01/24 8 8 12/12/23 8 8 22/02/24 8
48.250
7 26/02/24 7 7 24/11/23 7 7 22/11/23 7 7 10/01/24 7 7 28/11/23 7 7 12/02/24 7
10/3/2023
11/29/2023 9/21/2023 11/3/2023 9/18/2023 11/24/2023
Sinking done
Concrete done
In Progress
Page 94
New Four Lane Vikramshila Setu, Naugachia End A1 to P16 07/10/2024
19 19 19 19
Well Cap Well Cap 18 18 Well Cap Well Cap 18 18
17 17 17 17 17 17 17 17 17 17 17 17
16 16/06/24 16 16 16 16 16 16 16 16 16 16 16
15 21/05/24 15 15 15 15 15 15 15 15 15 15 15
14 29/04/24 14 14 14 14 14 14 14 14 14 14 19/06/24 14
###
###
###
13 18/04/24 13 13 13 13 13 13 13 13 13 13 06/06/24 13
55.200
55.200
9 11/03/24 9 9 30/05/24 9 9 25/05/24 9 9 24/05/24 9 9 24/05/24 9 9 07/04/24 9
51.700
51.700
51.200
51.700
8 04/03/24 8 8 21/05/24 8 8 16/05/24 8 8 13/05/24 8 8 26/04/24 8 8 23/03/24 8
36.250
36.250
6 22/02/24 6 6 10/05/24 6 6 23/04/24 6 6 27/04/24 6 6 15/03/24 6 6 04/03/24 6
41.250
35.250
32.250
5 15/02/24 5 5 30/04/24 5 5 12/04/24 5 5 18/04/24 5 5 02/03/24 5 5 26/02/24 5