Professional Documents
Culture Documents
Fitup Report C2-1 to C2-11
Fitup Report C2-1 to C2-11
:
PCSG/WOSPL/KS/FT/001
Western Outdoor Structures Date:
Pvt Limited
Project: Tensile Structure for Palmyra Cricket Drawing no.-C2-1
Stadium Project
Size as per drawing Size as per Measurement Remarks
Sr. No. Item No1 Item No 2 QTY.
Thickness Length Width Thickness Length Width
mm /mm /mm mm mm Dia/mm
Pvt Limited
Project: Tensile Structure for Palmyra Cricket Drawing no.-C2-2
Stadium Project
Size as per drawing Size as per Measurement Remarks
Sr. No. Item No1 Item No 2 QTY.
Thickness Length Width Thickness Length Width
mm /mm /mm mm mm Dia/mm