Height of furthest point above and the point of interest along the river, H = 37.758 m
= 1.464 hour
Duration of Rainfall = 87.867 minute
As per EPC Agreement Document; Construction of New BG Railway Line Project from Murkongselek station in the
state of Assam (Ch: 0.780 Km) to proposed Pasighat station in the state of Arunachal
Pradesh (Ch: 27.062 Km) including Electrical (General), Signal and Telecommunication works on
Engineering, Procurement & Construction (EPC) Mode, JUNE 2022 (PDF Page No. 172) :
Runoff Coefficient, C = 0.415 (R*F)0.2 (R in cm)
= 0.875
K = (tc hr ratio/1 hr ratio) = 1.189 (As per Cl. 2.3 of RBF 16)
R50 (1 hr) = ( R50(for 24 hr) * 1 hr ratio ) (As per Cl. 3.1 of RBF 16)
= 177.600 mm
R50 (tc hr) = (K * R50 (1 hr)) (As per Cl. 3.1 of RBF 16)
= 211.200 mm
Intensity of Rainfall for 50 years, lasting for t c hours durations, I50 = (R50 (tc hr)/tc)
(As per Cl. 3.1 of RBF 16)
I50 = 144.21794844 mm/hr
Design Flood Discharge, Q50 = ( 0.278*C*I50*A ) (As per Cl. 2.1 of RBF 16)
Add 30% extra for catchment area upto 500 KM 2 as per (As per Cl. 310 of IR Bridge Manual)
Number of Span = 1
Slope Diagram
Wetted Perimeter, P = (B' + 2*d) m Example Calculation from : Bridge Planning including Hydraulogical Investigation, Published by IRICEN, Pune (Nov, 2019) , Page No. 76)
= 23.213 m
Hydraulic Radius, R = ( Aapprox/P ) m Example Calculation from : Bridge Planning including Hydraulogical Investigation, Published by IRICEN, Pune (Nov, 2019) , Page No. 76)
= 1.937 m
Actual Velocity of flow, Vactual = (1/n)*R2/3*S1/2 (in m/sec) (By Manning's Formula)
= 1.51 m/sec Example Calculation from : Bridge Planning including Hydraulogical Investigation, Published by IRICEN, Pune (Nov, 2019) , Page No. 76)
m
Effective Width of Waterway, B' = 18.300
m
River bed level = 126.242
Wetted Perimeter, P = (B' + 2*d) m Example Calculation from : Bridge Planning including Hydraulogical Investigation, Published by IRICEN, Pune (Nov, 2019) , Page No. 76)
= 29.156
Hydraulic Radius, R = ( A/P ) m Example Calculation from : Bridge Planning including Hydraulogical Investigation, Published by IRICEN, Pune (Nov, 2019) , Page No. 76)
= 3.407 m
Actual Velocity of flow, Vactual = (1/n)*R2/3*S1/2 (in m/sec) (By Manning's Formula)
= 2.194 m/sec
Adopted Discharge = Maximum Value of discharge in between RBF-16 and Area Velocity
= 217.947 m3/Sec
Silt Factor, Ksf = 0.69 (As per Geotechnical Investigation Report submitted by Consultant)
WIDTH OF
DIFFERENCE WETTED
BED DEPTH OF CROSS- AREA(m
s. no. width HFL BETWEEN PERIME
LEVEL(m) WATER (m) SECTION 2)
BED LEVEL TER (m)
(m)
1 0 131.896 131.896 0 0 0
2 0 131.896 131.21 0.69 0 -0.69 0 0.686
3 8.44 131.896 126.82 5.08 8.44 -4.39 24.32 9.513
4 11.31 131.896 126.94 4.96 2.87 0.12 14.40 2.873
5 18.37 131.896 131.06 0.84 7.06 4.12 20.45 8.174
6 18.37 131.896 131.896 0.00 0 0.836 0.00 0.836
7 0 0 0 0 0 0.00 0 0
59.16 22.08
R = A/P
= 2.679 m
S = 0.00285
N = 0.055
1/
VELOCITY
= n*R^(2/3)*S^
(V)
0.5
= 1.872 m/sec
DISCHARGE
= AXV
(Q)
= 110.76 m3/sec
S = 0.00285
N = 0.055
1/
VELOCITY
= n*R^(2/3)*S^
(V)
0.5
= 1.979 m/sec
DISCHARGE
= AXV
(Q)
= 186.85 m3/sec
V 2.0981333755
Target discharge Q 186.96003007 3.0070412E-05
Qfoundation 243.048039092
Height of furthest point above and the point of interest along the river, H = 21.265 m
= 2.297 hour
Duration of Rainfall = 137.836 minute
As per EPC Agreement Document; Construction of New BG Railway Line Project from Murkongselek station in the
state of Assam (Ch: 0.780 Km) to proposed Pasighat station in the state of Arunachal
Pradesh (Ch: 27.062 Km) including Electrical (General), Signal and Telecommunication works on
Engineering, Procurement & Construction (EPC) Mode, JUNE 2022 (PDF Page No. 172) :
Runoff Coefficient, C = 0.415 (R*F)0.2 (R in cm)
= 0.875
K = (tc hr ratio/1 hr ratio) = 1.405 (As per Cl. 2.3 of RBF 16)
R50 (1 hr) = ( R50(for 24 hr) * 1 hr ratio ) (As per Cl. 3.1 of RBF 16)
= 177.600 mm
R50 (tc hr) = (K * R50 (1 hr)) (As per Cl. 3.1 of RBF 16)
= 249.600 mm
Intensity of Rainfall for 50 years, lasting for t c hours durations, I50 = (R50 (tc hr)/tc)
(As per Cl. 3.1 of RBF 16)
I50 = 108.65121165 mm/hr
Design Flood Discharge, Q50 = ( 0.278*C*I50*A ) (As per Cl. 2.1 of RBF 16)
Add 30% extra for catchment area upto 500 KM 2 as per (As per Cl. 310 of IR Bridge Manual)
Number of Span = 1
Slope Diagram
Wetted Perimeter, P = (B' + 2*d) m Example Calculation from : Bridge Planning including Hydraulogical Investigation, Published by IRICEN, Pune (Nov, 2019) , Page No. 76)
= 23.271 m
Hydraulic Radius, R = ( Aapprox/P ) m Example Calculation from : Bridge Planning including Hydraulogical Investigation, Published by IRICEN, Pune (Nov, 2019) , Page No. 76)
= 1.955 m
Actual Velocity of flow, Vactual = (1/n)*R2/3*S1/2 (in m/sec) (By Manning's Formula)
= 1.51 m/sec Example Calculation from : Bridge Planning including Hydraulogical Investigation, Published by IRICEN, Pune (Nov, 2019) , Page No. 76)
m
Effective Width of Waterway, B' = 18.300
m
River bed level = 126.242
Wetted Perimeter, P = (B' + 2*d) m Example Calculation from : Bridge Planning including Hydraulogical Investigation, Published by IRICEN, Pune (Nov, 2019) , Page No. 76)
= 29.156
Hydraulic Radius, R = ( A/P ) m Example Calculation from : Bridge Planning including Hydraulogical Investigation, Published by IRICEN, Pune (Nov, 2019) , Page No. 76)
= 3.407 m
Actual Velocity of flow, Vactual = (1/n)*R2/3*S1/2 (in m/sec) (By Manning's Formula)
= 2.194 m/sec
Adopted Discharge = Maximum Value of discharge in between RBF-16 and Area Velocity
= 217.947 m3/Sec
Silt Factor, Ksf = 0.85 (As per Geotechnical Investigation Report submitted by Consultant)
WIDTH OF
DIFFERENCE WETTED
BED DEPTH OF CROSS- AREA(m
s. no. width HFL BETWEEN PERIME
LEVEL(m) WATER (m) SECTION 2)
BED LEVEL TER (m)
(m)
1 0 131.896 131.896 0 0 0
2 0 131.896 131.21 0.69 0 -0.69 0 0.686
3 8.44 131.896 126.82 5.08 8.44 -4.39 24.32 9.513
4 11.31 131.896 126.94 4.96 2.87 0.12 14.40 2.873
5 18.37 131.896 131.06 0.84 7.06 4.12 20.45 8.174
6 18.37 131.896 131.896 0.00 0 0.836 0.00 0.836
7 0 0 0 0 0 0.00 0 0
59.16 22.08
R = A/P
= 2.679 m
S = 0.00285
N = 0.033
1/
VELOCITY
= n*R^(2/3)*S^
(V)
0.5
= 3.120 m/sec
DISCHARGE
= AXV
(Q)
= 184.60 m3/sec
S = 0.00285
N = 0.055
1/
VELOCITY
= n*R^(2/3)*S^
(V)
0.5
= 1.979 m/sec
DISCHARGE
= AXV
(Q)
= 186.85 m3/sec
V 1.77527059561
Target discharge Q 110.126892101 -0.0001078989
Qfoundation 143.164959731
Height of furthest point above and the point of interest along the river, H = 21.265 m (167.00m-145.735m)
= 2.297 hour
Duration of Rainfall = 137.836 minute
As per EPC Agreement Document; Construction of New BG Railway Line Project from Murkongselek station in the state of Assam (Ch: 0.780
Km) to proposed Pasighat station in the state of Arunachal
Pradesh (Ch: 27.062 Km) including Electrical (General), Signal and Telecommunication works on
Engineering, Procurement & Construction (EPC) Mode, JUNE 2022 (PDF Page No. 172) :
Runoff Coefficient, C = 0.415 (R*F)0.2 (R in cm)
= 0.875
K = (tc hr ratio/1 hr ratio) = 1.405 (As per Cl. 2.3 of RBF 16)
R100 (1 hr) = ( R50(for 24 hr) * 1 hr ratio ) (As per Cl. 3.1 of RBF 16)
= 177.600 mm
R100 (tc hr) = (K * R50 (1 hr)) (As per Cl. 3.1 of RBF 16)
= 249.600 mm
Intensity of Rainfall for 50 years, lasting for tc hours durations, I50 = (R50 (tc hr)/tc)
(As per Cl. 3.1 of RBF 16)
I50 = 108.65121165 mm/hr
Design Flood Discharge, Q50 = ( 0.278*C*I50*A ) (As per Cl. 2.1 of RBF 16)
DIFFERE
difference
NCE WETTED
DEPTH OF WIDTH OF AREA(
s. no. width HFL BED LEVEL(m) BETWEE PERIMET
WATER (m) CROSS- m2)
N BED ER (m)
SECTION (m)
LEVEL
1 0 148.158 148.158 0 0 0
2 0 148.158 146.304 1.85 0 -1.85 0 1.854
3 1.07 148.158 146.002 2.16 1.07 -0.30 2.15 1.112
4 4.97 148.158 145.323 2.83 3.9 -0.68 9.73 3.959
5 9.42 148.158 147.142 1.02 4.45 1.82 8.57 4.807
6 9.42 148.158 148.158 0.00 0 1.02 0.00 1.016
7 0 0 0 0 0 0.00 0 0
20.45 12.75
R = A/P
= 1.604 m
S = 0.00526
N = 0.055
DIFFERE
WETTED
DEPTH OF WIDTH OF X- NCE B/W AREA(
s. no. width HFL BED LEVEL(m) PERIMET
WATER (m) SECTION (m) BED m2)
ER (m)
LEVEL
1 0 147.5 147.5 0 0 0
2 0 147.5 146.9 0.60 0 -0.60 0 0.6
3 2.75 147.5 145.773 1.73 2.75 -1.13 3.20 2.972
4 7.97 147.5 145.12 2.38 5.22 -0.65 10.72 5.261
5 18.25 147.5 146.654 0.85 10.28 1.53 16.58 10.394
6 18.25 147.5 147.5 0.00 0.00 0.85 0.00 0.846
7 0 0 0 0.00 0 0 0.00 0.000
8 0 0 0 0.00 0 0 0.00 0.000
9 0 0 0 0 0 0 0 0
30.50 20.07
R = A/P
= 1.520 m
S = 0.00526
N = 0.055
DISCHARGE
= AXV
(Q)
= 53.16 m3/sec
Design Flood Discharge, Q = 110.127 m3/sec Max (RBF-16, Upstream & Bridge Location discharge)
(1x6.1+9.15+2x6.1
Type of Span Provided = m PSC SLAB
)
C/C of Abutment = 31.5725 m (As per GAD)
Number of Span = 4
Observed HFL = 147.5 m
Vertical clearance required for Q10 = 776 mm
Slope, S = 0.00526 Target discharge Q 110.127
Mannings rugosity co-efficient, n = 0.055 s 0.00526
Total width of water way, B = 31.5725 m n 0.055
width of abutment wall = 0.8425 m B' 24.17
width of pier 1.065,
= m
1107.5,1107.5 d 2.253156
Effective width of water way, B' 31.5725-(1.1075+1.1075+1.065) x 2 -
= m
0.8425 A 54.45877
= 24.17 m P 28.67631
For calculation of depth by Goal seek R 1.899086
Q = AxV
1 B'd 2/3
V 2.022211
110.127 = (B' x d) x x x S1/2
n B'+2d Target discharge Q 110.1271 0.0001391
Depth of flow, d = 2.253 m
Hydraulic radius, R = A/P (B' x d)/(B'+2d) 1.899 m Qfoundation 143.1653
Cross section area of River, A = (B' x d) = 54.46 m2
Actual velocity of flow, V = 1/n*R^(2/3)*S^(1/2) = 2.022 m
Silt Factor, Ksf = 0.85 Silt factor for Abutment (As per Geotechnical Investigation Report submitted by Consultant)
Silt Factor, Ksf = 0.82 Silt factor for Pier (As per Geotechnical Investigation Report submitted by Consultant)