Professional Documents
Culture Documents
A BLOCK Ramp reinforcement details
A BLOCK Ramp reinforcement details
SEC SEC
H I H I H I H I
A' A' A' A'
TO PODIUM-1
6.4
CRS
2.35
CRS
0.69
450MM WIDTH X450MM DEPTH RAMP DRAIN
Beam @ 1st slab level INTERIOR DESIGNERS PVT. LTD
RBR4
2 C10
2 2 C10
2 2 C10
2 2 C10
2 ASLAM ARCHITECTS AND
INTERIOR DESIGNERS PVT. LTD
4 FILLING
4 4 4 DRIVEWAY
@ +562.20M LVL
MSB-1,KSCMF BUILDING,
MEZANINE FLOOR ,
3RD FLOOR
THE MAJESTIC, MUNICIPAL
RC3 150THK
RC3 DRIVEWAY150THK
@ +562.20M LVL NO.8,CUNNINGHAM ROAD, NO.08-2, 277/A
4.55
150THK BANGALORE - 560 052. ROAD NO.02 BANJARA HILLS
RB1
RB1
RS1 RS1
PH : 080-22253532, 40900726. HYDERABAD 500034
RAMP COMING DN RAMP GOING UP TELEFAX : 080 - 41485362 PHONE : 040-48589555
FROM PODIUM-2 TO PODIUM-2
10Tor@150c/c
RB4
RB4
Beam @ 2nd slab level
3 RB3 3 3 RB3 3 3 3 3 3 website : www.aslamarchitects.com
C3 C3 C3 C3
10Tor@150c/c
6.40
RB2
DEVELOPMENT LENGTH OF BARS FOR Fe-550 GRADE
(Bot.)
RB2
RB2
RB2
150THK 150THK
10Tor@230c/c IN TENSION IN COMPRESSION
RS1 RS1
5.14
5.14
7 4a
(Top)
150THK
C3 RS2
(Bot.)
C3 C3 C3 DIA M-20 M-25 M-30 M-35 M-40 DIA M-20 M-25 M-30 M-35 M-40
(Top)
8 mm 500 450 415 370 330 8 mm 400 360 335 300 265
PODIUM - 2 @ +565.70M LVL 10 mm 625 560 520 460 410 10 mm 500 450 415 370 330
RB3 RB3 RB3
26.4
26.7
RB4
RB4
RB4
RB5
RB5
RB5
12 mm 750 670 625 550 495 12 mm 600 535 500 440 330
6.40
16 mm 1000 890 835 735 660 16 mm 800 715 670 590 530
3.01
150THK 150THK 150THK
5.48
5.48
20 mm 1250 1115 1040 920 825 20mm 1000 900 835 735 660
RS1 RS1 RS1
4.62
28.70
25 mm 1560 1395 1300 1150 1025 25mm 1250 1115 1040 920 820
9 9 9 9 9 9 9 9 32 mm 1995 1785 1670 1470 1315 32mm 1595 1430 1335 1175 1050
31.94
RC3 RC3 RC3 RC3
RB3 RB3 RB3 RB3 1. GRADE OF CONCRETE MIX SHALL BE AS FOLLOWS :
8 8 8 8 8 8 8 8 COLUMNS M - 40, M-60
C1 C1 C1 C1 FOOTINGS M - 30.
150THK 150THK 150THK 150THK SLAB & BEAMS- M - 25.
26.48
2. REINFORCEMENT SHALL BE HIGH STRENGTH.
RB6
RB6
RB6
RB6
RS1 RS1 RS1 RS1
RB1
RB1
RB1
RB1
28.1
DEFORMED BARS OF GRADE Fe-550
4.29
4.29
4.29
CONFIRMING TO IS : 1786 - 1985.
12mm to 25mmtor Fe-500
Below 12mmtor Fe-415
RB3 RB3 RB3 RB3 3. CLEAR COVER TO REINFORCEMENT AS FOLLOWS :
9 9 9 9 9 9 9 9 FOOTINGS : 50mm
10Tor@150c/c
21.49
10 C1 10 10 C1 10 10 C1 10 10 C1 10 COLUMNS : 40mm
(Bot.)
3.77
3.77
150THK 150THK 150THK 150THK
SLABS : 15mm
RS1 RS1 RS1 RS1
10Tor@230c/c 4. LAP LENGTH OF BARS FOR TENSION & COMPRESSION AS FOLLOWS : REFER TABLE ABOVE
(Bot.)
RB5
RB4
RB5
RB4
RB5
RB4
RB5
RB4
5. LAPS SHALL BE STAGGERED
RB3
6. LAPPING AT COLUMN BEAM JUNCTIONS SHALL BE AVOIDED
Beam @ 1st slab level Beam @ 2nd slab level 150THK
RB3 7. WORK SHALL BE IN ACCORDANCE WITH IS : 456 -2000
RS1 8. WHERE CEMENT CONSUMPTION IS GREATER THAN 100 BAGS CUBES TEST ARE TO BE DONE
3.36
3.36
3.36
THERE SHALL BE ONE SET OF 3 CUBES PER EVERY 20 Cu. M. OF CEMENT CONCRETE OR
6.40 PART OF THERE OF USED AT SITE AND SHALL BE TESTED ON 7th. / 28th. DAY
0.76
RB8
12 10a 10a 12 12 10a 450MM WIDTH X450MM DEPTH RAMP DRAIN
10a 12 12 10a 450MM WIDTH X450MM DEPTH RAMP DRAIN
10a 12 12 10a 450MM WIDTH X450MM DEPTH RAMP DRAIN
10a 12 9. AT JUNCTION OF TWO ELEMENTS OF DIFFERENT CONCRETE MIXES THE COMMON CONCRETE
SHALL BE DONE WITH RICHER MIX
RC3 RC3 RC3 RC3 RC3 RC3 RC3 RC3 10. CONCRETE SHALL BE MACHINE MIXED AND VIBRATED
2.63
2.18
11. MAXIMUM WATER CEMENT RATIO USED SHALL BE LIMITED TO 0.50 FOR SLAB, BEAMS, COLUMNS.
Beam @ 3rd slab level
12.CHIPPING OF ANY STRUCTURAL CONCRETE ELEMENTS SHALL NOT BE DONE ANY CIRCUMSTANCES
UNLESS WITH THE SPECIAL PERMISSION OF CONSULTANTS
13.ALL COVER SHALL BE ENSURED BY PRECAST COVER BLOCKS MADE UP C.M. 1 : 1
6.4 14.DONOT SCALE THE DRAWING FOLLOW WRITTEN DIMENSIONS ONLY
RAMP GOING DN RAMP COMING UP 15.ANY DISCRIPANCY SHALL BE BROUGHT TO THE NOTICE OF THE CONSULTANTS
TO CELLAR-1 FROM CELLAR-1
RAMP GOING DN RAMP COMING UP CLIENT :
PODIUM - 1 @ +562.40M LVL TO PODIUM-1 FROM PODIUM-1
AR HOMES
PODIUM - 2 @ +565.70M LVL PROJECT :
STRUCTURAL ENGINEERS.
ARCHITECTS:- 4th. FLOOR ,ANASUYA COMM. COMPLEX
Liberty Circle Himayathnagar Hyd.
(:55613497 , 23224772. 07
ZAKI AHMED
CONSULTING ENGINEER