PUTRAJAYA – KLIA HIGHWAY PROJECT (MEX 2)

1.0 CHRONOLOGY OF THE EVENT


The incident took place at Bridge 12 deck slab area. At that time, all workers form H&S Advance
Construction PLT & staff already at site to perform their daily activity. There are a few operation team
from Bridgex (BBSB) and Maju Holding (MHSB) doing routine inspection on site.

Suddenly En. Mohd Saufi, their site supervisor smelled burnt and spotted fire near to their bending
machine located at deck slab. Due to the emergency, an evacuation procedures were triggered. The
chronologies of the event as per below:

DATE OF EMERGENCY
: 29th October 2019 (Tuesday) STARTING TIME : 11:05 am
DRILL
DEPARTMENT/
: Bridgex Sdn Bhd (H&S)
SECTION/ PROJECT COMPLETION TIME : 11:55 am
(Section 1 Bridge 12 - Cyberjaya)
AND LOCATION
TYPE OF EMERGENCY : Emergency fire drill exercise &
DURATION : 50 minutes
DRILL & SCENARIO training use of fire extinguisher

Weather Conditions : Clear

1.0 CHRONOLOGY OF THE EVENT

NO. TIME CHRONOLOGY OF THE EVENT


1 Fire triggered.
En. Mohd Saufi spotted the fire and shouted ‘fire’ 3 times to alert everyone at the
location.
11:04 am
2 En. Nik Hazri (Bridgex Site Supervisor) who also at the incident scene immediately
instructed all workers and staff to stop work and abandon the work area and
gathered at the assembly point.

En. Nik Hazri contacted En. Muhammad Nizam (Bridgex Site Safety Supervisor) to
reported about the incident.
3 11:05 am At the same time En. Mohd Saufi together with En. Farouk Omar (Kepala)
immediately extinguish fire using ABC type fire extinguisher which located nearby
the bar cutting machine.

4 11:07 am Fire completely extinguished.


5 11:10 am All staff and site workers reach assembly area.

En. Nik Hazri start head count to ensure all personnel safely evacuated. He also
6 11:11 am
asked all personnel to report to him if there is any injuries during evacuation.

En. Nik Hazri reported to En. Muhammad Nizam and inform all workers and staffs
7 11:13 am
are safely evacuated from the work area and evacuation completed.

En. Muhammad Nizam inform MHSB Safety and announced the Fire Evacuation
8 11:14 am
Drill is ended.

Emergency evacuation procedure briefed to all staff by BBSB HSE Officer , En.
8 11:15 am
Mohd Idham followed by fire safety briefing.

Fire Drill Report – MEX2 Project at Section 1 Site Page 1 of 3


PUTRAJAYA – KLIA HIGHWAY PROJECT (MEX 2)

9 11:30 am Firefighting training and demonstration. All personnel is participated.

10 11.55 am Firefighting training and demonstration ended and group photo session with all staff.

2.0 FIRE DRILL REPORT& EVALUATION

Number of
participants and 16 persons (Bridgex Staff, Maju Staff & H&S).
participation rate

• All the workers immediately stop their work activity after fire incident triggered and
instructed by En. Nik Hazri.
• All workers evacuate from workplace using both main access without panic.
• All staff is aware the location of assembly area.
Area of Excellent
• All workers gathered at designated assembly point and follow instructions from Site
Identified
supervisor & Bridgex Safety personnel.
• Good & clear communication between witness of fire with Site Supervisor and team.
• Good housekeeping and no access were obstructing during fire drill exercise.
• No injuries to any staff during the drill.

Required Remedial
N/a
Action

Recommendation for
N/a
improvement

Prepared by: Validate by:

Signature Signature
Name Muhammad Nizam B Zoladzni Name Lau Jie Ci
Designation Site Safety Supervisor Designation Senior Engineer
Date 09/11/2019 Date 09/11/2019

Approved by: Acknowledge by:

Signature Signature
Name Mohd Idham B Ibrahim Name Norhisnan B Norhashimi
Designation Health & Safety Officer Designation Health & Safety Manager
Date 09/11/2019 Date

3.0 FIRE DRILL EXERCISE EQUIPMENTS


 Barricade tape
Fire Drill Report – MEX2 Project at Section 1 Site Page 2 of 3
PUTRAJAYA – KLIA HIGHWAY PROJECT (MEX 2)

 Fire extinguisher (ABC type)


 Camera
 Loud hailer
 Stopwatch
 Phone
 Half drum, paper, petrol & lighter

4.0 FIRE DRILL EXCERCISE MEMBERS INVOLVED


 En. Mohd Saufi (Witness of incident)
 En. Nik Hariz (Trigger alarm, acknowledge to management for the incident, call BOMBA/
ambulans if required)
 En. Nik Hariz (Head count, inform to MHSB representative)
 En. Safwan (First aider)
 En. Anwar (Time keeper, Observer)
 En. Hisnan (Observer)
 En. Mohd Idham (Observer)
 En. Norhisham, Mr. Lee Man Hong (Observer)

5.0 PHOTOS DURING EMERGENCY DRILL