GCC – General Construction Company

RISK ASSESSMENT

Description of Activity: CLADDING Project:


Date: 10.10 AM LIKELIHOOD RISK RATING
Time: 04-NOV-2017 RISK RATING
3 2 1 SEVERITY
3 9 6 3 3 Major Injury/ Pollution/ Damage

SEVERITY
New
2 6 4 2 2 Minor / Pollution/ Damage/ Loss
Revised
1 3 2 1 1 Injury / low Damage / Loss
Participants: LIKELY HOOD
Project Manager 6 & 9 = High Risk 3 Likely
3 & 4 = Medium Risk 2 Possible
Project Engineer 1 & 2 = Low Risk 1 Never / Very Unlikely
Site Engineer Risk Rating = S X L = R

High Risk = Immediate action required, activities should be modified/ re-planning, be subjected to EHS re-assessment.
Work In Charge
Medium Risk = Monitoring Controls are required. Management responsibility must be specified or modify the activities.
EHS Team
Low Risk = identify hazards and implement controls. Manage by routine process. i.e. inspections/ observation.

Plant, Tools & Equipment required: Chemical / Industrial Gas:


Hilti Drill, Electric drill, Battery drill, hammer, cradle Rock wool.
Work Environment / Human: Work Location/ Place:
Heat stress, working under sun light in summer Work at height, working with cradle
Source of Fire (ignition source/fuel): PPE:
Packaging materials & rock wool Hard hat, Gloves, safety shoes, Protective clothing, Safety harness, life line.
Prepared By: Name : Signature: Eng. Subeesh TS, EHS Engineer Approved By: Name : Signature: Eng. Ahmed El Maghrabi, QEHS Manager

GCC Controlled Form /QEHS Dept./ Risk Assessment Rev.001_00102017 Page 1 of 4


GCC – General Construction Company
RISK ASSESSMENT
Risk Risk Level
Significant People at risk
S. Level Action to be Taken to Reduce After
Responsibility
Activity Element potential Legal
No
Hazards Associated Risk
risks
L S R L S R
1. Working with 1.Work at Fatalities, 3 3 9 1.Ensure competent workers. 1 2 2 Code of Work in charge;
Cradle height. Major & 2.Competent & certified cradle construction Site Engineer ,
minor operator. safety practice Foreman, EHS
injuries, 3.Ensure all tools & equipment 8-11-4 Officer
property taken in to cradle are secured.
damage due 4.Provide proper head protection
to fall of for cradle.
material & 5.Cover the cradle by mesh to
man avoid falling objects.
6.Implement Permit to work
system.
7.Do not operate cradle on high
wind.
8.Information, instruction,
training & supervision.
9.Ensure adequate PPE.
(Safety harness), Use hard hat
with chin strip.
DM TG 05
2.Electricity 1.Electric 2 3 6 1.Electrical installation by 1 2 2 Code of
construction
shock competent person.
safety practice
Electric burn. 2.Pre- check all the electrical Chapter 16
installation before work.
3.Information, instruction, Code of
training & supervision. construction
2. 1.Fatalities, 4.Use of adequate PPE. safety practice
Fixing of runner, 1.Fall of Major & 3 3 9 1.Competent cladding workers. 1 2 2 8-11-4 Work in charge;
rockwhool & materials. minor 2.Ensure all tools & equipment Site Engineer ,
cladding. injuries. taken in to cradle are secured. Foreman, EHS
3.Safe handling of materials. Officer

GCC Controlled Form /QEHS Dept./ Risk Assessment Rev.001_00102017 Page 2 of 4


GCC – General Construction Company
RISK ASSESSMENT
Risk Risk Level
Significant People at risk
S. Level Action to be Taken to Reduce After
Responsibility
Activity Element potential Legal
No
Hazards Associated Risk
risks
L S R L S R
4.Implement permit to work
system.
5.Ensure no loose objects on the
cradle.
6.Dont operate the cradle during
high wind.
7.Information. instruction,
training & supervision. Code of
8.Use of adequate PPE. construction
safety practice
1.Work 1.Use of manual handling 7.4
7.4.1
2.Manual related 2 2 4 techniques. 1 2 2
DM TG
Handling. upper limb 2.Information, instruction, 13,12,8,11
disorder. training & supervision.
2.Musculo 3. Job rotation.
skeletal DM TG 03
disorders. Code of
construction
3. Working 1.Dehydratio 1.Provide shelter area for safety practice
outside under 1.Extreme n workers as much as possible. 3.4, 3.5, 3.15 Work in charge;
sunlight in temperature a.Tiredness 2.Drink water & hydrate. DM TG 03 Site Engineer ,
summer (2% fluid 3.Adequate welfare facilities. Foreman, EHS
loss) 4.Mid day rest time during Officer
b.Headache summer season.
& confusion 5.information, instruction,
(4% fluid training for Extreme temperature
loss) and its risk.
c.Muscle 6.PPE
cramps(5%
fluid loss)

GCC Controlled Form /QEHS Dept./ Risk Assessment Rev.001_00102017 Page 3 of 4


GCC – General Construction Company
RISK ASSESSMENT
Risk Risk Level
Significant People at risk
S. Level Action to be Taken to Reduce After
Responsibility
Activity Element potential Legal
No
Hazards Associated Risk
risks
L S R L S R
d.Nausea &
vomiting (6%
fluid loss)
e.Heat
stroke. (8%
fluid loss)

2 Rock wool Fire 1.Fire. 2 3 6 1.Proper storage of materials. 1 2 2 DM Code of Store keeper.
storage & 2.Property 2.Ensure proper fire fighting construction Work in charge
packing damage. equipment’s are available. safety practice.
materilals 3.Smoke & 3.Information, instruction, Trakhees
Regulations
related training & supervision.
health issues

GCC Controlled Form /QEHS Dept./ Risk Assessment Rev.001_00102017 Page 4 of 4