PT.

ENERGY METAL INDONESIA


OPERATIONAL COST BREAKDOWN
PSI PT. KACCI PURNAMA INDAH
Name Ardiansya Karim,Akbar J,Rahmat dan wahyu
Departement : PT. ENERGY METAL INDONESIA (Nickel Ore Trading)
Divisi/Bagian : Quality Control
No. DESCRIPTION VOLUME UNIT UNIT PRICE (IDR) TOTAL PRICE (IDR) REMARKS
1 Meals (Quality Qontrol tim) 4 Days 600,000 2,400,000 4 Person, each Person @Rp. 150,000 Per Day
2 Hotel/Wisma 2 Days 400,000 800,000 1 Sampler 1 Driver 400,000/Room
3 Pembelian BBM 2 Days 1,000,000 2,000,000 Pembelian BBM
4 Contingency Cost 1 2,000,000 2,000,000 This is intended if there is urgen condition during site visit.however if it was not used, then this cost must be returned to the office
GRAND TOTAL 7,200,000

Kendari, 25 Mai 2024


Prepared By, Approved By,

Rahmat Junyoun Lee


PT. ENERGY METAL INDONESIA
PT. EMI'S QC PSI
Prepared by : Quality Tim
Company : PT. Energy Metal Indonesia
Dept. : Nickel Ore Trading
Trip Schedule : 27Mai 2024 Sampai 30 Mai 2024

Time
Day Date Duration Activities
Start Finish
(Hr/Min)
Senin 27-May-24 6:00 15:00 9hrs, 00min Road Trip Kendari PT.KPI
Selasa 28-May-24 8:00 17:00 9hrs, 00min PSI PT. KPI
Rabu 29-May-24 8:00 17:00 9hrs, 00min PSI PT. KPI
Kamis 30-May-24 8:00 17:00 9hrs, 00min Road trip AKP - Kendari

Kendari,25 Mei 2024


Prepared by, Approved By,

Rahmat Junyoun Lee


MI'S QC PSI

PIC QC Remarks

Ardi,Akbar,Rahmat dan Wahyu Road Trip Kendari PT.KPI


Ardi,Akbar,Rahmat dan Wahyu PSI PT. KPI
Ardi,Akbar,Rahmat dan Wahyu PSI PT. KPI
Ardi,Akbar,Rahmat dan Wahyu Road trip AKP - Kendari