Professional Documents
Culture Documents
1MC08-BBV_MSD-MN-SPE-N001-101700
1MC08-BBV_MSD-MN-SPE-N001-101700
1MC13
I. Gibb A. Hocke
S. Srinivasan Claude
C04 S. Moore 27/04/2023 For HS2 Acceptance
Jacquot-
A.G.Nunez Preaux
Without prejudice to the express terms and conditions of the Contract, this document is issued for the party which commissioned it and for specific purposes connected with the captioned
project only. Subject to the conditions of the Contract, the Employer may provide this document to third parties for the purpose of the project.
The issuing Consultant expressly excludes tortious liability for third parties, the issuance of this document to third party/ies and reliance on it shall not create any contractual nor tortious
obligation between the third party/ies and the Consultant. The Consultant accepts no responsibility for the consequences of this document being relied upon by any other party than the
Employer or other party/ies the Employer issued the document to in accordance with the Contract or any party/ies to whom the Consultant has provided a collateral warranty under the
contract, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to the Consultant by other parties.
Any person using or relying on the document for such other purpose agrees, and will by such use or reliance be taken to confirm his agreement to indemnify the issuing Consultant for all
loss or damage resulting therefrom. the issuing Consultant accepts no responsibility or liability for this document to any party other than the Employer, the person by whom it was
commissioned or the beneficiary of any collateral warranty provided by the Consultant.
© Copyright Controller HMSO 2017. This material is published for High Speed Two (HS2) Limited with the permission of the Controller of Her Majesty’s Stationery Office".
"The authors of this report are employed by Balfour Beatty Vinci JV. The work reported herein was carried out under a deed placed on 01/08/2017 by High Speed Two (HS2) Limited and
should not be relied upon as authoritative by any third party.
This report shall not be copied or reproduced in whole or in part except with the express consent of High Speed Two (HS2) Limited.
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
Review Required
Team Yes/No Name Position Date
Quality
Health & Safety
Environment &
Sustainability
Other teams if required
Revision History
Previous Reviewed Approved
Author Date Approved Reason for Review
Revision By By
S4 – For Stage
P01 J. Bull I. Gibb M. Shepard 08/12/2020
Approval
M. Shepard
C01 J. Bull I. Gibb 09/02/2021 For HS2 Acceptance
S Manson
J. Bull To address CAT3
P02 I. Gibb A. Hocke 27/08/2021
S. Srinivasan checker comments
Added new mixes and
comments from BBV
P03 S. Srinivasan I. Gibb A. Hocke 14/10/2021
and CATIII Checkers
incorporated.
A. Hocke
C02 S. Srinivasan I. Gibb 25/10/2021 For HS2 Acceptance.
C Matta
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 2 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
I. Gibb A. Hocke
S. Srinivasan Claude
C04 S. Moore 27/04/2023 For HS2 Acceptance
Jacquot-
A.G.Nunez Preaux
Revision Summary
Paragraph Modified Details of Modification
Updated test frequency for large pours.
Updated default limiting values for control of early age thermal
cracking and DEF; added reference to BBV’s hot weather concrete
works
Added new SCL mixes Mix 17 and Mix 30, precast segment mix for
Bromford tunnel - Mix 32; Pre-production testing requirement for
SCL in Appendix 1/5
Added Mix 13H and 13J in Appendix 17/1
Appendix 1/5, Appendix
Updated Appendix 17/3 item 1 – Reference trial panels
17/1, Appendix 17/3 and
Updated Appendix 17/5 - Coating for buried parts of concrete
Appendix 17/6
elements
Updated Appendix 17/6 item 7 – Maximum vent spacing
Updated cube sampling frequency in Appendix 1/5 for structural
concrete to incorporate cube testing relaxation as supported by
Departure N1-145
Updated manual consistence testing frequency in Appendix 1/5 to
incorporate the use of a digital monitoring system as supported by
Departure N1-145
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 3 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
Contents
SCOPE 5
REFERENCE DOCUMENTS 6
1.1 Contract 6
1.2 Standards 6
1.3 Associated BBV Procedures 7
1.4 The BBV Way 7
ABBREVIATIONS 8
APPENDIX 1/5: TESTING DETAILS 9
APPENDIX 17/1: SCHEDULE FOR THE SPECIFICATION OF DESIGNED CONCRETE 16
APPENDIX 17/3: CONCRETE SURFACE FINISHES 25
APPENDIX 17/4: CONCRETE - GENERAL 27
APPENDIX 17/5: BURIED CONCRETE 29
APPENDIX 17/6: GROUTING AND DUCT SYSTEMS FOR POST-TENSIONED TENDONS 30
APPENDIX 17/7: PRECAST CONCRETE ELEMENTS 31
APPENDIX 17/9: COVER TO REINFORCEMENT 32
APPENDIX 17/10: DIGITAL CONCRETE MONITORING SYSTEM 33
APPENDIX 26/1: ANCILLIARY CONCRETE 35
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 4 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
SCOPE
This document provides the project specific appendices for HS2 and is to be read in conjunction with:
HS2 SPECIFICATION FOR CIVIL ENGINEERING WORKS
The Appendices in this document apply across all structures. Site specific information can be found
in the asset specific annex.
The requirements of this document and associated asset specific annexes are based on the
requirements set out in the Durability Assessment Report (DAR) - Document no.: 1MC08-BBV_MSD-
MN-REP-N000-100001.
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 5 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
REFERENCE DOCUMENTS
1.1 Contract
1.2 Standards
BS 8500-1 Concrete. Complementary British Standard to BS EN 206. Method of specifying and
guidance for the specifier
BS 8500-2 Concrete. Complementary British Standard to BS EN 206. Specification for constituent
materials and concrete
BS EN 206 Concrete. Specification, performance, production and conformity.
BS EN 934-2 Admixtures for concrete, mortar and grout. Concrete admixtures. Definitions,
requirements, conformity, marking and labelling
BS EN 1008 Mixing water for concrete. Specification for sampling, testing and assessing the
suitability of water, including water recovered from processes in the concrete industry, as mixing
water for concrete.
BS EN 12620 Aggregates for concrete
BS EN 12794 Precast concrete products. Foundation piles.
BS EN 13369 Common rules for precast concrete products.
BS EN 13670 Execution of concrete structures.
BS EN 14487-1 Sprayed concrete. Definitions, specifications and conformity
BS EN 14488-1 Testing sprayed concrete. Sampling fresh and hardened concrete
BS EN 14561 Test method for metallic fibre concrete. Measuring the flexural tensile strength (limit
of proportionality (LOP), residual)
BS EN 14844 Precast concrete products. Box culverts.
BS EN 15050 Precast concrete products. Bridge elements.
BS EN 15258 Precast concrete products. Retaining wall elements.
BS EN 12843 Precast concrete products. Masts and poles.
ISO 9001: 2015 Quality Management System
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 6 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
The BBV Way is the Balfour Beatty VINCI Integrated Management System for the project. It contains
the processes that we will use to manage the project – it is held in the following location:
The BBV Way
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 7 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
ABBREVIATIONS
BTS British Tunnelling Specification
BBV Balfour Beatty VINCI
CCA Crushed concrete aggregate
CMC Controlled Modulus Columns
DAR Durability assessment report
FA Fly Ash
FP Fire protection (Plastic Fibre reinforced concrete)
GGBS Ground Granulated Blastfurnace Slag
GY Concrete suitable for ground containing Gypsum Veins
HS2 High Speed Two Limited, also referred to as “HS2” or “EMPLOYER”
Institution of Civil Engineers Specification for Piling and Embedded Retaining
ICE3
Walls, Third Edition.
LH Low Heat concrete mix
MWCC Main Works Civils Contracts
N Normal
U Underwater
PC Precast
Progressive cantilever construction method with temporary cable stays – for
PCMS
precast segmental box girder deck construction
PPF Polypropylene Fibre
SCC Self-Compacting Concrete
SCL Sprayed Concrete Lining
SF Steel fibres
Slip Slipformed
SP Sprayed
SRA Shrinkage Reducing Admixture
ΔT Temperature difference between the mid-point of a section and the surface
Tp The peak temperature achieved at the centre of a concrete section
PP Polypropylene
HDPE High-Density Polyethylene
ETA European Technical Assessment
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 8 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 9 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 10 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 11 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 12 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 13 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
fr1K/fLk >0.4
fr3k/fr1k >0.5
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 14 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 15 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
Typical application (check asset specific annex for actual D-Walls, Piling, CMC D-Walls, Piling, CMC
applications) (For congested rebar applications)
Nominal Cover to Reinforcement (mm) See Appendix 17/9 Refer drawings Refer drawings
DC-class (where appropriate) DC1, DC2, DC3, DC4, DC4+APM DC1, DC2, DC3, DC4, DC4+APM
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 16 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
Requirement Schedule
Designed Concrete Ref /Refer to drawings for location in the Works C35/45 LH C35/45 LH GY C35/45 FP
Typical application (check asset specific annex for actual applications) Below ground As 11 but As 11 but
structures exposed to exposed to fire
gypsum strata
Nominal Cover to Reinforcement (mm) See Appendix 17/9 Refer drawings Refer drawings Refer drawings
DC-class (where appropriate) DC1, DC2, DC3, DC1, DC2, DC3, DC1, DC2, DC3,
DC4 DC4, DC4+APM1 DC4
Requirements to Control Early Thermal Cracking and DEF For mean ambient temperature > 0°C the default value for max peak
Tp is Peak Temperature at the centre of a concrete section temperature shall be 75°C (except where ggbs content <40% then Tp ≤
70°C) and max differential temp (ΔT) shall be 60°C unless alternative values
ΔT Temperature difference between-Tp and the surface
are required in the asset specific annex. Also refer to 1MC08-BBV-QY-PRO-
N000-000014 -BBV’s Hot weather working procedure and 1MC08-BBV-QY-
PRO-N000-000002 – BBV’s cold weather onsite working procedure.
Durability Testing and enhancements No requirements No requirements No requirements No requirements
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 17 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
Requirement Schedule
Designed Concrete Ref / Location in the Works C35/45 LH GY SRA C35/45 LH 10 C35/45 LH GY 10 C35/45 N
Required Source/Special Type of Aggregate Free from lignite/pyrite Free from Free from Free from
MS18, FI35 lignite/pyrite lignite/pyrite lignite/pyrite
MS18, FI35 MS18, FI35 MS18, FI35
Maximum Cement Content kg/m³ 550 550 550 550
Required Admixture Shrinkage reducing As required As required As required
admixture Control 40 or
Air Entrainment Required equivalent
No No No No
Fibre required None None None None
Minimum or Maximum Temperature of Fresh Concrete °C Min 5°C Min 5°C Min 5°C Min 5°C
Max 35°C Max 35°C Max 35°C Max 30°C
Sampling and Testing (refer to Appendix 1/5) Appendix 1/5 Appendix 1/5 Appendix 1/5 Appendix 1/5
Requirements to Control Early Thermal Cracking and DEF For mean ambient temperature > 0°C the default value for max peak temperature shall be
Tp is Peak Temperature at the centre of a concrete section 75°C (except where ggbs content <40% then Tp ≤ 70°C) and max differential temp (ΔT)
shall be 60°C unless alternative values are required in the asset specific annex. Also refer to
ΔT Temperature difference between-Tp and the surface
1MC08-BBV-QY-PRO-N000-000014 -BBV’s Hot weather working procedure and 1MC08-
BBV-QY-PRO-N000-000002 – BBV’s cold weather onsite working procedure
Durability Testing & Enhancements Shrinkage ≤300 microstrain No requirements No requirements No requirements
at 28 days for prism size
75mmx75mmx280mm at
20°C and 55% RH.
Tests at other RH will have
different compliance
criteria (contact DJV).
Test duration up to 6
months.
Reduction in shrinkage to
11A mix >40%
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 18 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
Requirement Schedule
Designed Concrete Ref / Location in the Works C35/45 N 10 C35/45 SCC C50/60 SCC C35/45 SCC C56/70 SCC C70/85 SCC
(FP)
BBV mix reference 11L/11M 12 12A 12B 12C 12D
Intended Working Years of Structure 120 120 120 120 120 120
Typical application (check asset specific annex As 11J but Applications Applications Bromford Bridge bearing Bridge bearing
for actual applications) congested requiring SCC requiring SCC Tunnel plinth plinth
rebar Letterbox
Nominal Cover to Reinforcement (mm) See Refer drawings Refer drawings Refer drawings Refer drawings Refer drawings Refer drawings
Appendix 17/9
DC-class (where appropriate) DC1, DC2, DC3 DC1, DC2, DC3 DC1, DC2, DC3 DC1, DC2, DC3 DC1, DC2, DC3 DC1, DC2, DC3
Compressive Strength Class of Concrete C35/45 C35/45 C50/60 C35/45 C56/70 C70/85
Additional strength requirements None None None None None None
Minimum Cement Content (kg/m³) 380 380 380 380 380 380
Maximum Free Water/Cement Ratio 0.40 0.40 0.40 0.40 0.40 0.40
Required Group or Type and Class of Cement or IIIA+SR IIIA+SR IIIA+SR IIIA+SR IIIA+SR IIIA+SR
Combination
Maximum Aggregate Size, mm 10 10 10 10 10 10
Chloride Content Class Cl 0.2 Cl 0.2 Cl 0.2 Cl 0.2 Cl 0.2 Cl 0.2
Concrete compressive strength compliance age 28 28 28 28 28 28
(days)
For Heavyweight Concrete, the Target Density N/A N/A N/A N/A N/A N/A
Typical Consistence Class [actual to be specified S4/S3 SF2 SF2 SF2 SF2 SF2
by the contractor]
GGBS content 40-55% 40-55% 40-55% 40-55% 40-55% 40-55%
Required Source/Special Type of Aggregate Free from Free from Free from Free from Free from Free from
lignite/pyrite lignite/pyrite lignite/pyrite lignite/pyrite lignite/pyrite lignite/pyrite
MS18, FI35 MS18, FI35 MS18, FI35 MS18, FI35 MS18, FI35 MS18, FI35
Maximum Cement Content kg/m³ 550 550 550 550 550 550
Required Admixture As required As required As required As required As required As required
Air Entrainment Required No No No No No No
Fibre required None None None PPF None None
Minimum or Maximum Temperature of Fresh Min 5°C Min 5°C Min 5°C Min 5°C Min 5°C Min 5°C
Concrete °C Max 30°C Max 30°C Max 30°C Max 30°C Max 30°C Max 30°C
Sampling and Testing (refer to Appendix 1/5) Appendix 1/5 Appendix 1/5 Appendix 1/5 Appendix 1/5 Appendix 1/5 Appendix 1/5
Requirements to Control Early Thermal For mean ambient temperature > 0°C the default value for max peak temperature shall be 75°C (except
Cracking and DEF where ggbs content <40% then Tp ≤ 70°C) and max differential temp (ΔT) shall be 60°C unless
Tp is Peak Temperature at the centre of a alternative values are required in the asset specific annex. Also refer to 1MC08-BBV-QY-PRO-N000-
concrete section 000014 -BBV’s Hot weather working procedure and 1MC08-BBV-QY-PRO-N000-000002 – BBV’s cold
weather onsite working procedure
ΔT Temperature difference between-Tp and the
surface
Durability Testing & Enhancements No No No Fire testing No No requirements
requirements requirements requirements required requirements
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 19 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
Requirement Schedule
Designed Concrete Ref / Location in C50/60 PC N C40/50 LH C40/50 LH FP C40/50 N C40/50 LH C40/50 N
the Works
BBV mix reference 13A 13/13C 13B 13G/13D 13H 13J/13F
Intended Working Years of Structure 120 120 120 120 120 120
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 20 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
Requirement Schedule
Designed Concrete Ref C40/50 LH U C50/60 PC 10 C50/60 PC C50/60 PC FP C50/60 N 10 C50/60 LH
BBV mix reference 13U 14 15/15B 15A 15C/15D 15E/15F
Intended Working Years of Structure 120 120 120 120 120 120
Typical application (check asset Underwater Parapets Bridge Beams Precast segments (LIW As 15 but Piers, in-situ
specific annex for actual applications)
concrete tunnel) congested stitch
applications rebar
Nominal Cover to Reinforcement (mm) Refer drawings Refer drawings Refer drawings Refer drawings Refer drawings Refer drawings
See Appendix 17/9
DC-class (where appropriate) DC1, DC2, DC3 DC1, DC2, DC3 DC1, DC2, DC3 DC1, DC2, DC3 + 1 APM or DC1, DC2, DC3 DC1, DC2, DC3,
& DC4 DC4, DC4+APM DC4
Compressive Strength Class of C40/50 C50/60 C50/60 C50/60 C50/60 C50/60
Concrete
Additional strength requirements None None None Residual strength to BS None None
EN 14651
fr1K =3.5MPa
fr3k = 2.8 MPa
Characteristic split tensile
strength ≥ 4.4 MPa
Minimum Cement Content (kg/m³) 360 380 380 400 380 360
Maximum Free Water/Cement Ratio 0.45 0.35 0.40 0.40 0.40 0.45
Required Group or Type and Class of IIIB+SR IIIA+SR IIIA+SR IIIA+SR IIIA+SR IIIB+SR
Cement or Combination
Maximum Aggregate Size, mm 20 10 20 20 10 20
Chloride Content Class Cl 0.2 Cl 0.2 Cl 0.1 Cl 0.2 Cl 0.1 Cl 0.2
Concrete compressive strength 56 28 28 28 28 56
compliance age (days)
For Heavyweight Concrete, the Target N/A N/A N/A N/A N/A N/A
Density
Typical Consistence Class [actual to be S4 S4 S4/S3 S1 S4/S3 S4/S3
specified by the contractor]
GGBS content ≥70% 40-55% 40-55% 40-55% 40-55% ≥70%
Required Source/Special Type of Free from Free from Free from Free from lignite/pyrite Free from Free from
Aggregate lignite/pyrite lignite/pyrite lignite/pyrite MS18, FI35 lignite/pyrite lignite/pyrite
MS18, FI35 MS18, FI35 MS18, FI35 MS18, FI35 MS18, FI35
Maximum Cement Content kg/m³ 550 550 550 550 550 550
Required Admixture Anti-washout As required As required As required As required As required
admixture
Air Entrainment Required No No No No No No
Fibre required None None None PPF + SF None None
Minimum or Maximum Temperature Min 5°C Min 5°C Min 5°C Min 5°C Min 5°C Min 5°C
of Fresh Concrete °C Max 35°C Max 30°C Max 30°C Max 30°C Max 30°C Max 35°C
Sampling and Testing (refer to Appendix Appendix 1/5 Appendix 1/5 Appendix 1/5 Appendix 1/5 and SCEW Appendix 1/5 Appendix 1/5
1/5) 4020 Tables 1 & 3.
Requirements to Control Early Thermal For mean ambient temperature > 0°C the default value for max peak temperature shall be 75°C (except where ggbs
Cracking and DEF; Tp is Peak content <40% then Tp ≤ 70°C) and max differential temp (ΔT) shall be 60°C unless alternative values are required in
Temperature at the centre of a the asset specific annex. Also refer to 1MC08-BBV-QY-PRO-N000-000014 -BBV’s Hot weather working procedure and
concrete section; ΔT Temperature 1MC08-BBV-QY-PRO-N000-000002 – BBV’s cold weather onsite working procedure
difference between-Tp and the surface
Max 6°C rise in any 15min period of
accelerated heat curing
Durability Testing & Enhancements No Rigid steel Rigid steel Segments to be pre- Rigid steel No
requirement formwork and formwork and carbonated to BRE SD1 formwork and requirements
intense compaction intense Fire testing to the intense
56 day Chloride compaction EUREKA curve compaction
migration coeff.≤ 2 Rigid steel formwork and
x 10-12 m2/s intense compaction
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 21 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
Requirement Schedule
Designed Concrete Ref / Location in the Works C50/60 LH 10 C40/50 Slip C40/50 Slip LH C40/50 SP (FP) C16/20 LH
Typical application (check asset specific annex for actual As 15E but First stage, First stage, Sprayed concrete – Female pile
applications) congested walkways walkways Primary lining for cross
rebar passages
Nominal Cover to Reinforcement (mm) See Appendix 17/9 Refer drawings Refer drawings Refer drawings Refer drawings N/A
DC-class (where appropriate) DC1, DC2, DC3, DC1, DC2 DC1, DC2 DC1, DC2, DC3, DC4 DC1, DC2, DC3,
DC4 DC4
Compressive Strength Class of Concrete C50/60 C40/50 C40/50 C40/50 C16/20
Additional strength requirements: Cube strength None None None See Appendix 1/5 Cl Min 2.5MPa at 3
1707 – Sprayed days,
concrete Max 25MPa at 7
days
Min 20MPa at 90
days
Minimum Cement Content (kg/m³) 360 340 340 400 (min CEM I content 300
360)
Sampling and Testing (refer to Appendix 1/5) Appendix 1/5 Appendix 1/5 Appendix 1/5 Appendix 1/5 Appendix 1/5
Requirements to Control Early Thermal Cracking and DEF For mean ambient temperature > 0°C the default value for max peak temperature shall be 75°C
Tp is Peak Temperature at the centre of a concrete section (except where ggbs content <40% then Tp ≤ 70°C) and max differential temp (ΔT) shall be 60°C
unless alternative values are required in the asset specific annex. Also refer to 1MC08-BBV-QY-
ΔT Temperature difference between-Tp and the surface
PRO-N000-000014 -BBV’s Hot weather working procedure and 1MC08-BBV-QY-PRO-N000-
000002 – BBV’s cold weather onsite working procedure.
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 22 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
Requirement Schedule
Designed Concrete Ref / Location in the Works C12/15 LH C28/35 N C50/60 PC C50/60 PC 10 C50/60 SF (FP)
Limestone Limestone
BBV mix reference 22A 24 27 27A 30
Intended Working Years of Structure 120 120 120 120 120
Typical application (check asset specific annex for Female pile Slip Guide wall Precast As 27 but Secondary lining and
actual applications) segmental congested rebar door structures for
viaduct cross passages, LIW
segments internal and external
collars
Nominal Cover to Reinforcement (mm) See N/A Refer drawings Refer drawings Refer drawings Refer drawings
Appendix 17/9
DC-class (where appropriate) DC1, DC2, DC3, DC4 N/A N/A N/A DC1, DC2, DC3, DC4
Durability Testing & Enhancements No requirements No Rigid steel Rigid steel Fire testing to the
requirements formwork and formwork and EUREKA curve
intense intense
compaction compaction
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 23 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
Requirement Schedule
Typical application (check asset specific annex for actual Precast segments (Bromford In-situ deck As 33 but congested
applications) Tunnel) rebar
Nominal Cover to Reinforcement (mm) See Appendix 17/9 Refer drawings Refer drawings Refer drawings
DC-class (where appropriate) DC1, DC2 DC1, DC2, DC3, DC4 DC1, DC2, DC3, DC4
DC3 + 1 APM or DC4, DC4+APM
Compressive Strength Class of Concrete C50/60 C45/55 C45/55
Additional strength requirements: Cylinder strength Split tensile strength ≥ 3.2 MPa None None
Sampling and Testing (refer to Appendix 1/5) Appendix 1/5 and SCEW 4020 Appendix 1/5 Appendix 1/5
Tables 1 & 3.
Requirements to Control Early Thermal Cracking and DEF For mean ambient temperature > 0°C the default value for max peak temperature
Tp is Peak Temperature at the centre of a concrete section shall be 75°C (except where ggbs content <40% then Tp ≤ 70°C) and max differential
temp (ΔT) shall be 60°C unless alternative values are required in the asset specific
ΔT Temperature difference between-Tp and the surface
annex. Also refer to 1MC08-BBV-QY-PRO-N000-000014 -BBV’s Hot weather working
procedure and 1MC08-BBV-QY-PRO-N000-000002 – BBV’s cold weather onsite
working procedure
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 24 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
A
D
Exposed (but not B C
Visible to public
visible to public Buried / Textured
in close
Element in close covered (CDP)
proximity4
proximity4)
Retaining Walls/ Wing Walls F2 F1 F3/F43 F3 (F4)1
Piers F2 F1 F3/F43 F3 (F4)1
Columns F2 F1 F3/F43 F3 (F4)1
Piles N/A N/A N/A N/A
Pile Caps F2 F1 F3/F43 F3 (F4)1
Shallow Foundations F2 F1 F3/F43 F3 (F4)1
Abutments F2 F1 F3/F43 F3 (F4)1
Bearing Shelves F2 F1 F3/F43 F3 (F4)1
(upstands and plinths)
Precast Beams F3 except: N/A N/A F3 except:
end flaps F4 end flaps F4
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 25 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
A
D
Exposed (but not B C
Visible to public
visible to public Buried / Textured
in close
Element in close covered (CDP)
proximity4
proximity4)
Precast Box culverts UTXs and F2 F1 F3/F43 F2
associated wingwalls
Diaphragms F2 F1 F3/F43 F4 except:
F3 external face
on side elevation
of deck
Bridge Deck (elements to be N/A U4/U5 N/A N/A
waterproofed) equivalent
Bridge Deck (other elements, not F2 F1 N/A F3
waterproofed inc side elevations
and soffit)
Parapet External face F3
(see CDE drawings) Internal face F4
Other faces F2
Acoustic Barrier External face F3
(see CDE drawings) Internal face F4
Other faces F2
Robust Kerbs F2 N/A N/A N/A
Sprayed concrete unformed unformed unformed N/A
1 : F3 (F4) means formed finish should be either F3 where reasonably practicable and F4 where not reasonably practical or
where a patterned finish is required
2: F3 (F2) means F3 where reasonably practicable but specification of F2 finish accepted for precast boxes and UAN
components is acceptable when cast with steel shutters as they generally achieve F3 finishes.
3: F3/F4 for CDP designation means F3 finish on plane surfaces and F4 on areas with a defined pattern where fully
coordinated with the geometry and surface finish of the concrete.
4: For definition of close proximity refer to asset specific general notes drawings
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 26 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 27 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 28 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 29 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 30 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 31 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
Strength class XC3 & XC4 Any DC or XC2 XC1, all XF XD1 XD3 & XD2
C28/35 45mm 25mm 20mm 50mm 60mm
C35/45 35mm 25mm 20mm 40mm 50mm
C40/50 30mm 25mm 20mm 35mm 50mm
C50/60 30mm 25mm 20mm 30mm 50mm
Note: Where durability enhancement measures e.g. Drcm values and/or rigid steel formwork with intense vibration are
specified in 17/1 then lower minimum covers may be permitted.
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 32 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
Stage 1
BBV Metric List
All loads to be sampled for consistence and temperature
Correlation
(site testing) at specified frequency for 1000 results per
Acceptance / Rejection
mix type per plant
Cube Strength
If compliant with all three metrics, then PASS
If non compliant with any above metric, return to
Stage 1
FAIL
BBV Metric List
PASS
Notes
Stage 2 No proposed reduction to sampling of ancillary
Site testing frequency relaxed to cube sampling mixes as the testing frequency has already
frequency (BBV structural 1 test / 24 m3) for 500 results been agreed at 1 / 75 m3.
per mix type per plant During stage 2, technician is in attendance
during all of pour, overseeing site compliance
and understanding of VERIFI acceptance. If any
loads visually identified by technician as not
FAIL matching VERIFI reading, manual test to be
BBV Metric List
done.
If site team reports concrete arriving visually
PASS above specification, a technician will be
dispatched to site to confirm. If this is found to
Stage 3 be the case, revert to stage 1.
Structural concrete site testing and cube sampling When a new mix is to supplied by a plant
frequency relaxed by 50% (BBV structural 1 test / 50 m3) (subject to approval), this mix will be individually
for minimum 500 results per mix type per plant calibrated as per stage 1 (all loads tested).
When the calibration is completed, the mix will
then join the stage at which the mix type / plant
is operating at.
Calibration and maintainance regime as per
FAIL schedule at Appendix. Truck taken out of
BBV Metric List
circulation if issues identified until compliant.
PASS
Stage 4
Structural concrete site testing and cube sampling
frequency relaxed by 50% (BBV structural 1 test / 100
m3) for minimum 500 results per mix type per plant
FAIL
BBV Metric List
PASS
Stage 5
Structural concrete site testing and cube sampling
frequency relaxed by 50% (BBV structural 1 test / 200
m3) per mix type per plant
Ongoing
Review against stage acceptance checklist regularly FAIL
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 33 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
Result
Category Metric Metric Reasoning
/ Data
Although correlation coefficient is not necessarily the
VERIFI correlation
Clear correlation
differences in outcome as below can be considered
line?
more critical, the correlation provides a good indicator of
performance.
The variability of 30mm (between VERIFI and manual
Are 95% of results
test) is derived from reproducibility value for slump test
within ±30mm?
as per BS EN 12350-2: 2019.
No. loads rejected: Are the suppliers correctly utilising VERIFI to optimise
satisfactory?
Acceptance /
No. loads accepted: their batching process and deliver the efficiencies
rejection
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 34 of 35
Document Title: Specification for Civil Engineering Works –
HS2 Project Specific Appendices
Document Number: 1MC08-BBV_MSD-MN-SPE-N001-101700
Revision: C04
Handling Instructions: Produced by BBV for project use only
No Fines Concrete N/A 19 Void fill compacted N/A Portland cement CEM I to BS
by hand only. EN 197-1
20 mm Max aggregate size
complying with BS EN 12620
The ratio of aggregate to
cement shall be 8:1 by
volume or 10:1 by mass
Notes
1. ST mixes will not be used on the contract. The equivalent Designated mix will be supplied
1MC08_09-IBBV-QY-TEM-N000-000007 Procedure & Management Plan Template Rev P08 Date of Rev 06/04/2020 Page 35 of 35