Professional Documents
Culture Documents
11F Performance Monitoring Coaching Journal Performance Period PCMJ Rev00 022819 (3)
11F Performance Monitoring Coaching Journal Performance Period PCMJ Rev00 022819 (3)
SESSION
DATE/ TIME OUTPUT/s REALITY OPTIONS WRAP-UP
NO.
Assisted the MFM in the formulation of There is only one red zone within the
100%
one (1) CFPP. municipality of Maigo, LDN.
Assisted the MFM in the conduct of an
There is only one red zone within the
intense inspection survey for one(1) 100%
municipality of Maigo, LDN.
targeted barangay.
Assisted the MFM in the conduct of
There is only one red zone within the
intensive fire drills and simulation of one 100%
municipality of Maigo, LDN.
(1) barangay this semester.
Assisted the MFM in the establishment There is only one red zone within the
100%
of one (1) CFAG for targeted barangay. municipality of Maigo, LDN.
Conducted by:
Coachee Coach
Signature: Signature:
SESSION
DATE/ TIME OUTPUT/s REALITY OPTIONS WRAP-UP
NO.
Recommended the I.O. for the conduct 100% of the total number of the
of Fire Safety Inspection of 4 buildings buildings covered by the Fire Code
60%
and establishments covered by the Fire for the whole year of 2023 were
Code. already inspected.
Conducted by:
Coachee Coach
Signature: Signature:
Name: FO3 Opal Jade R Cuarteron Name: SFO1 Jason Marlowe M Luna
Designation: OIC, FSES Designation: Deputy, Municipal Fire Marshal
Date: 31 December 2023 Date: 31 December 2023
SESSION
DATE/ TIME OUTPUT/s REALITY OPTIONS WRAP-UP
NO.
Conducted by:
Coachee Coach
Signature: Signature:
Name: FO3 Opal Jade R Cuarteron Name: SFO1 Jason Marlowe M Luna
Designation: OIC, FSES Designation: Deputy Fire Marshal
Date: 16 February 2024 Date: 16 February 2024