Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

SHOP KIT

BOBBLE DIAMOND BLANKET BRN0502-036387M | March 18, 2024

JUMBO

7 CRAFT I SKILL LEVEL: EASY

ABBREVIATIONS
Approx = Approximately St(s) = Stitches
Rep = Repeat

MEASUREMENTS loop from working yarn up through


Approx 45 x 55" [114.5 x 139.5 cm]. twisted loop. Rep from * to end of
row. 61 sts.
GAUGE 2nd row: Working from left to right
5.5 sts = 4" [10 cm] in pattern. with yarn held in back, twist first
loop once to left. Pull next loop
INSTRUCTIONS from working yarn up through
Note: All rows are worked with twisted loop. *With yarn held in
right side facing. Do not turn work. front, pull next loop from working
yarn towards back through next st.
See chart on page 3. With yarn held in back, twist next
Count 61 loops for foundation row loop once to left. Pull next loop
noting yarn end is at left and yarn from working yarn up through
ball is at right. Place all loops of twisted loop. Rep from * to end of
MATERIALS
foundation row pointing upward row.
Bernat® Alize® Blanket-EZ™ (6.4 oz/180 g; 18 yds/16 m) for ease of working. 3rd row: Working from right to left,
Candy Pink (37025) 7 balls or 120 yds/110 m work from * as given for 2nd row.
1st row: Working from right to left 4th row: Rep 2nd row.
with yarn held in back, twist first 5th row: Working from right to left
loop once to left. Pull 62nd loop with yarn held in back, twist first
from working yarn up through loop once to left. Pull next loop
twisted loop. *With yarn held in from working yarn up through
front, pull next loop from working twisted loop. (With yarn held in
yarn towards back through next front, pull next loop from working
stitch. With yarn held in back, twist yarn towards back through next st.
next loop once to left. Pull next

For accessibility support, please contact customer care at 1-888-368-8401 or access@yarnspirations.com. BOBBLE DIAMOND BLANKET 1 of 3
BOBBLE DIAMOND BLANKET BRN0502-036387M | March 18, 2024

With yarn held in back, twist next from yarn up from behind through front, pull next loop from working twisted loop. (With yarn held in
loop once to left. Pull next loop next st (2 sts increased). Working yarn towards back through front, pull next loop from working
from working yarn up through from left to right, pull next loop next st. With yarn held in back, yarn towards back through next st.
twisted loop) twice. Pull next loop from behind up through 3 sts just twist next loop once to left. Pull With yarn held in back, twist next
from working yarn up from behind worked. Working from right to left, next loop from working yarn up loop once to left. Pull next loop
through next st. *Pull next loop pull next loop from yarn up from through twisted loop) twice. (Pull from working yarn up through
from working yarn up from behind behind through each of same next loop from working yarn up twisted loop) twice. (Pull next
through next st. Rep from * across 3 sts just worked. Stack center st from behind through next stitch) loop from working yarn up from
to end of row. Do not turn. Rep of 2 sts on top of st to the left. Pull 5 times. Bobble in next st. [(Pull behind through next st) 3 times.
from * to last 5 sts. Twist next loop right-most of these 3 sts up from next loop from working yarn up Bobble in next st. [(Pull next loop
once to left. Pull next loop from behind through 2 stacked st - 2 sts from behind through next stitch) from working yarn up from behind
working yarn up through twisted decreased and Bobble complete. 3 times. Bobble in next st. (Pull next through next st) 7 times. Bobble
loop. (With yarn held in front, [(Pull next loop from working yarn loop from working yarn up from in next st. (Pull next loop from
pull next loop from working yarn up from behind through next st) behind through next st) 7 times. working yarn up from behind
towards back through next st. With 11 times. Bobble in next st] 3 times. Bobble in next st] 3 times. (Pull next through next st) 3 times. Bobble
yarn held in back, twist next loop (Pull next loop from working yarn loop from working yarn up from in next st] 3 times. (Pull next loop
once to left. Pull next loop from up from behind through next st) behind through next st) 3 times. from working yarn up from behind
working yarn up through twisted 7 times. Twist next loop once to Bobble in next st. (Pull next loop through next st) 7 times. Bobble
loop) twice. left. Pull next loop from working from working yarn up from behind in next st. (Pull next loop from
6th row: Working from left to right yarn up through twisted loop. (With through next st) 5 times. Twist next working yarn up from behind
with yarn held in back, twist first yarn held in front, pull next loop loop once to left. Pull next loop through next st) 3 times. Twist
loop once to left. Pull next loop from working yarn towards back from working yarn up through next loop once to left. Pull next
from working yarn up through through next st. With yarn held in twisted loop. (With yarn held in loop from working yarn up through
twisted loop. (With yarn held in back, twist next loop once to left. front, pull next loop from working twisted loop. (With yarn held in
front, pull next loop from working Pull next loop from working yarn yarn towards back through next st. front, pull next loop from working
yarn towards back through next st. up through twisted loop) twice. With yarn held in back, twist next yarn towards back through next st.
With yarn held in back, twist next 7th and alternating rows: Rep 5th loop once to left. Pull next loop With yarn held in back, twist next
loop once to left. Pull next loop row. from working yarn up through loop once to left. Pull next loop
from working yarn up through 8th row: Working from left to right twisted loop) twice. from working yarn up through
twisted loop) twice. (Pull next loop with yarn held in back, twist first 10th row: Working from left to twisted loop) twice.
from working yarn up from behind loop once to left. Pull next loop right with yarn held in back, twist 12th row: Working from left to
through next st) 7 times. Make from working yarn up through first loop once to left. Pull next loop right with yarn held in back, twist
Bobble as follows: Pull next 3 loops twisted loop. (With yarn held in from working yarn up through first loop once to left. Pull next

For accessibility support, please contact customer care at 1-888-368-8401 or access@yarnspirations.com. BOBBLE DIAMOND BLANKET 2 of 3
BOBBLE DIAMOND BLANKET BRN0502-036387M | March 18, 2024

loop from working yarn up through from working yarn up through 59


twisted loop. (With yarn held in twisted loop. *With yarn held in 57
front, pull next loop from working front, pull next loop from working 55
53
yarn towards back through next st. yarn towards back through next st.
51
With yarn held in back, twist next With yarn held in back, twist next 49
loop once to left. Pull next loop loop once to left. Pull next loop from 47
from working yarn up through working yarn up through twisted 45
43
twisted loop) twice. Pull next loop loop. Rep from * to end of row.
41
from working yarn up from behind 57th row: Working from right to 39
through next st. Bobble in next st. left with yarn held in back, twist 37
[(Pull next loop from working yarn first loop once to left. Pull next loop 35
up from behind through next st) from working yarn up through 33
31
11 times. Bobble in next st] 4 times. twisted loop. *With yarn held in 29
Pull next loop from working yarn up front, pull next loop from working 27
from behind through next st. Twist yarn towards back through next st. 25
next loop once to left. Pull next With yarn held in back, twist next 23
21
loop from working yarn up through loop once to left. Pull next loop from 19
twisted loop. (With yarn held in working yarn up through twisted 17
front, pull next loop from working loop. Rep from * to end of row. 15
yarn towards back through next st. 58th and 59th rows: Rep last 2 rows 13
11
With yarn held in back, twist next once more.
9
loop once to left. Pull next loop from 7
working yarn up through twisted Bind off row: Working in same 5
loop) twice. direction as last row, pull 2nd st 3
14th row: Rep 10th row. through first st. Pull 3rd st through 1
Start here
16th row: Rep 8th row. 2nd st. Pull 4th st through 3rd st. Key
18th row: Rep 10th row. Continue in this manner to end of = Knit
19th to 54th rows: Rep 5th to 18th row. Cut last loop to create a yarn = Purl
rows 3 times more. ‘tail’. Tie to secure and weave in ends. = Twisted knit
55th row: Rep 5th row. = Bobble
56th row: Working from left to
right with yarn held in back, twist
first loop once to left. Pull next loop

For accessibility support, please contact customer care at 1-888-368-8401 or access@yarnspirations.com. BOBBLE DIAMOND BLANKET 3 of 3

You might also like