Professional Documents
Culture Documents
JAD-EXT-ADT-102 SCRAP YARD LAYOUT-JAD-EXT-ADT-102
JAD-EXT-ADT-102 SCRAP YARD LAYOUT-JAD-EXT-ADT-102
KEY PLAN
7660
PLOT LIMIT
RING
MAIN
599-997
FIGH
TING
EMPTY DRUMS CAR
T
500
500
35.70 M2 1310 1426
8405
0 GENERAL NOTES
1. ALL WORKS ARE TO BE CARRIED OUT IN
4160
ACCORDANCE WITH THE RELEVANT CODES OF
3220 PRACTICE AND ALSO TO MEET THE LOCAL
11130
6280
AUTHORITY REQUIREMENTS.
STO 300 2. DIMENSIONS ARE NOT TO BE SCALED FROM THIS
DRAWING.
RA
GE 3. DIMENSIONS ARE IN MILLIMETER, UNLESS NOTED
SH OTHERWISE.
E D 4. THE CONTRACTOR IS TO VERIFY ALL DIMENSION
FLOOR MARKING 430 300
300
3135 ON SITE BEFORE EXECUTING THE SITE.
5. ANY DISCREPANCIES, EITHER BETWEEN WRITTEN
03 8870 DIMENSIONS AND SITE DIMENSIONS OR BETWEEN
THIS DRAWING AND OTHER CONTRACT DOCUMENTS OR
STO SUPPLIER'S DRAWINGS SHOULD BE BROUGHT TO
1000 RA THE IMMEDIATE ATTENTION OF THE ENGINEER
500
EMPTY DRUMS GE BEFORE EXECUTING THE WORKS.
SH
8885
ED
BATTERY STORAGE
6. IN CASE OF ANY AMBIGUITIES & CONTRADICTIONS
4160
CONTRACTOR SHALL ISSUE HIS FINDINGS IN THE FORM
OF (RFIs) TO THE ENGINEER FOR CLARIFICATION.
7. THIS DRAWING IS TO BE READ IN CONJUNCTION
BATTERY STORAGE WITH THE RELEVANT STRUCTURAL, MECHANICAL AND
ELECTRICAL DRAWINGS AND SPECIFICATIONS.
04
42.77 M2
04
3275
500
275
9000
300
250
657
5000
3825
FIRE FIGHTING CART 04 5
30
TYER STORAGE
169
TYRE STORAGE
3570
124.40 M2
33150
500
495
METAL SCRAP 02
500
588
0
BIN-1 300
120
0 BIN-2 0 MAR. 2024 CONTRACT DOCUMENTS O.H
0 DEC. 2023 TENDER O.H
0 JULY 2023 FINAL DESIGN O.H
INTERLOCK AND FENCE BIN-3 0
No.
JUNE 2023
Date
CONCEPT DESIGN
Description
O.H
Chk'd By
8275 R E V I S I O N
BIN-4
METAL SCRAP PROJECT:
0
120
CASS/BUF/1121
62 M2 BIN-5
IMPROVEMENT OF BUS DEPOTS AND
PASSENGERS BUS STATION
LOCATION:
12BIN-6
00
17265
13460
BIN-8 CLIENT:
BIN-9
75
140
BIN-10
DESIGN CONSULTANT:
BIN-11
ENGINEERING CONSULTANTS
P.O BOX 11676 DUBAI.UAE.
Phone: 04-3555859/ 04-3555949
Fax: 04-3597440/ 04-3555405
e-mail: alturath@emirates.net.ae
DRAWING TITLE: