Section I - 【Ship Situation at Time of Grounding】 Date / Time of incident - - Time: ST ( UT) Ship's position: - N / S - E / W Ships heading (Steering console): Center repeater: Intended course: Speed: Section II - 【Weather and Sea Conditions】 Wind direction / Force: / Weather: Tidal stream: Tide: Ebb / Flood Visibility: Swell: Section III - 【Immediate Response of OOW】 1. Stop M/E Time: 2. Report to Master Time: 3. Sound emergency alarm signal Time: 4. Inform C/E and D/Eng. Time: 5. Inform D/Eng. to change over to high sea suctions □ 6. Stop steering gear motor □ 7. Marking of course recorder / telegraph logger □ 8. Mark ship’s position on chart / ECDIS □ 9. Switch on deck lights (If applicable) □ 10. Appropriate light / shapes / sound signals exhibited & sounded □ 11. Activate automatic W/T & fire door closing (If applicable) □ 12. AIS status updated □ Section IV - 【Emergency Station】 1. Order emergency station Time: 2. Designate staging area: Section V - 【Roll Call and Check Communication】 Team Time Present / Listed Missing Crew Injured Crew (Name) (Name) Command Team / On-scene Leader / Mobile Team No.1 / Mobile Team No.2 / Back-up Team / Engine Room Team / LNG Team / Section VI - 【Grasping Situation and Checks for】
Is there a possibility of Oil spill Y/N Fire Y/N
1. : Cargo spill Y/N Flooding Y/N 2. Hull damage and its extent (When taking photographs, beware of explosion) Y/N 3. Sound all tanks and bilges, engine room bilge, void spaces and cofferdams. □ 4. Abnormality, damage of M/E, shaft and other machinery Y/N SMS Manual (Rev: 2022-11-01) <S-111004-07CHK> Grounding Checklist Page 2 of 2 5. Abnormality in sea suction Y/N 6. Damage to stern tube seal Y/N 7. Cargo damage and its extent Y/N 8. All watertight and fire doors closed □ 9. Readiness of ballast pump □ Section VII - 【Investigation】 1. Record depth diagram inc. trim and heel (Continuous check) S-111004-07 □ CHK 2. Check location of deep water in relation to ship for refloating □ 3. Check nature of seabed and surrounding areas □ 4. Time & height of high & low water □ 5. Time, direction & speed of current □ 6. Check possibility to refloat at next H.W. □ 7. Considerations of adjusting ballast □ 8. Considerations of using anchor □ 9. Pros and cons of using M/E and rudder □ 10. Stability condition before grounding □ Section VIII - 【Reporting to Applicable Parties】 1. Transmit appropriate DSC alert / message Time: 2. Report to company’s 24 hours emergency contact number Time: 3. Discuss with company possibility of refloating under own power Time: 4. Report to VTIS / MRCC / local coastguard (As applicable) Time: Section IX - 【Judgment of whether Salvage is Required】 1. Salvage required? -> Make request for salvage in consultation with company Y/N Section X - 【Other Preparation (As applicable)】 1. Prepare lifeboat(s) / ready stretchers and first-aid kits Time: Section XI - 【Hazardous Cargo Monitoring – Applicable vessels】 1. Monitor hazardous gases by gas detector □ 2. Monitor cargo tank pressure □ Section XII - 【Various Arrangement (If applicable)】 □ Damage survey (Hull) □ Damage survey (Cargo) □ Classification survey □ Notification to P&I Rep. Section XIII -【Preparation of Records and Documents】 1. Save S-VDR / VDR data □ 2. Prepare appropriate report as per company advise □ 3. Entries in log book as applicable □ 4. ECDIS records saved □