AUTHORITY STAMP

KEY PLAN

350 210 210 210 210 210 210 210 210 210 210 210 210 210 210 210 210 210 210 350

B
350

MECHABICAL REPAIR TRENCH no- 1


2000
1300

A A
350

B
GENERAL NOTES
GRATING FOR DRAIN CERAMIC TILE CERAMIC TILE ROAD MARKING 1. ALL WORKS ARE TO BE CARRIED OUT IN
300X300 300X300 ACCORDANCE WITH THE RELEVANT CODES OF
PRACTICE AND ALSO TO MEET THE LOCAL
AUTHORITY REQUIREMENTS.
2. DIMENSIONS ARE NOT TO BE SCALED FROM THIS
DRAWING.
3. DIMENSIONS ARE IN MILLIMETER, UNLESS NOTED
OTHERWISE.
4. THE CONTRACTOR IS TO VERIFY ALL DIMENSION
ON SITE BEFORE EXECUTING THE SITE.
5. ANY DISCREPANCIES, EITHER BETWEEN WRITTEN
DIMENSIONS AND SITE DIMENSIONS OR BETWEEN
THIS DRAWING AND OTHER CONTRACT DOCUMENTS OR
SUPPLIER'S DRAWINGS SHOULD BE BROUGHT TO
THE IMMEDIATE ATTENTION OF THE ENGINEER
BEFORE EXECUTING THE WORKS.
6. IN CASE OF ANY AMBIGUITIES & CONTRADICTIONS
CONTRACTOR SHALL ISSUE HIS FINDINGS IN THE FORM
OF (RFIs) TO THE ENGINEER FOR CLARIFICATION.
7. THIS DRAWING IS TO BE READ IN CONJUNCTION
WITH THE RELEVANT STRUCTURAL, MECHANICAL AND
ELECTRICAL DRAWINGS AND SPECIFICATIONS.

8. TYPICAL DETAILS APPLICABLE TO ALL EXISTING PITS

FFL. +31.30

250 330

1600
1070
SFL. +32.90

FOOT LINE OF REPLACE ALL WALLS AND REINFORCEMENT CONCRETE RECESS WALL
ANTI-SLIP FLOOR TILES WITH NEW SERVICE TRENCH WITH STEPS LIGHT
CERAMIC TILES 300X300

0 MAR. 2024 CONTRACT DOCUMENTS O.H


0 DEC. 2023 TENDER O.H
0 JULY 2023 FINAL DESIGN O.H
0 JUNE 2023 CONCEPT DESIGN O.H
No. Date Description Chk'd By
R E V I S I O N
FFL. +31.30 PROJECT:

CASS/BUF/1121
IMPROVEMENT OF BUS DEPOTS AND
PASSENGERS BUS STATION

LOCATION:

Ø 20mm PIPES (2 NOS.)

LIGHT FIXTURE
PLOT NO.: DISTRICT:

CLIENT:

SFL. +32.90

DESIGN CONSULTANT:

REINFORCEMENT CONCRETE SERVICE TRENCH WITH STEPS


ENGINEERING CONSULTANTS
P.O BOX 11676 DUBAI.UAE.
Phone: 04-3555859/ 04-3555949
Fax: 04-3597440/ 04-3555405
e-mail: alturath@emirates.net.ae

DRAWING TITLE:

JEBEL ALI BUS DEPOT


TYPICAL DETAILS
PIT LAYOUT
SECTION BB 3 DATE: DRAWN: CHECKED: APPROVED:
1:20 JUNE 2023 TEC MJ O.H
PROJECT NO. SCALE: DRAWING NO.: REV.

1341 NTS JAD-TYP-ADT-102 0