AppendixA

Typ!.ca I Piping
Dellverables

The following list is intended to be an all-encompassing list. However,


the typical piping project will not normally require every document listed
here. It will be the piping engineering lead and the actual needs of the proj-
ect that determine which are actually required.
Note: The term specification is used here for certain documents. These
do not always need to be specifications. They could be prepared and issued
as technical notes or some other format. The important thing is to make
sure all parties understand and agree to the order of priority. The order of
priority may be as follows:

9 Shall do--Specifications are "shall do" documents. A piping fabrica-


tion isometric is a shall do document defining specific work to a shop
fabricator.
9 Should do--Technical notes may be considered a "should do" document.
Some codes are written to be should do documents. (If you have this con-
dition, then you should do thus; if you have that condition, then you
should... )

Piping material engineering


Specifications
Piping line class material
Piping specialty item and data sheets
Piping pressure testing

248
Typical Piping Detiverables 249

Piping system internal cleaning (standard)


Piping system internal cleaning (high purity)
Positive material identification, traceability, and certification
Piping painting
Pipe commodity and safety marking
Galvanizing
Piping insulation (hot, cold, and acoustical)
Coatings and wrapping of underground piping
Welding~general systems
Welding~hygienic systems
Piping system NDE (nondestructive examination)
Nonmetallic lined piping systems
Data sheets
Specialty item data sheets
Drawings (vendor)
Specialty item (vendor catalog or certified drawings)
Lists
Piping line list (originate and maintain)
Piping specialty item list (originate and maintain)
Piping commodity catalog (originate and maintain)
Calculations
Maximum allowable flange ratings
Pipe wall calculations
Data files
Relational database (3D geometry for electronic modeling)

Piping design
Specifications
Plant layout and piping design
Electronic design model (3D-PDS)
Field survey/close range photogrammetry
Piping tie-ins
Shop fabrication and handling
Field fabrication and installation
Heat tracing (piping, equipment, and instruments)
Drawings
Piping standards
Plot plan(s)
Pipeline transposition
250 Piping Engineering Leadershipfor Process Plant Projects

Piping layout studies and vessel orientations


Plant equipment location control plan (equipment general
arrangement plan)
3D plant design model index
Piping drawing index
Piping plan drawings
Piping isometrics
Revamp demolition drawings
Tie-in location index
Tie-in isometrics
Heat tracing manifold index
Heat tracing plans
Heat tracing details
Heat tracing isometrics
Piping stress sketches
Piping material sketches
Lists
Interference reports
Piping isometric index
Tie-in list
Calculations
Deadweight loads for structures
Data files
Electronic drawings
Final electronic database

Piping material control


Specifications
Commodity purchase specifications (pipe, fittings, flanges, etc.)
Field receiving geographic color code
Drawings
None
Lists
Piping material summary (preliminary, intermediate, and final)
Shortage and overage reports
Calculations
Piping material cost estimations
Data files
Material history (item and source)
Typical Piping Deliverables 251

Pipe stress engineering


Specifications
Piping flexibility design criteria
Preengineered and engineered piping support elements
Metallic expansion joints
Elastomer expansion joints
Pipe restraints and shock arrestors
Data sheets
Engineered spring supports
Engineered expansion joints
Drawings
Preengineered pipe support elements
Lists
Piping flexibility analysis log
Calculation data files
Piping flexibility analysis