Professional Documents
Culture Documents
PROJ2_ACTUAL CIVIL WORKS
PROJ2_ACTUAL CIVIL WORKS
PROJ2_ACTUAL CIVIL WORKS
WORKS
TABLE OF
CONTENTS
03 MASONRY/CONCRETE PAINTING
SPECIALIZATION
LIST OF MATERIALS
PROCEDURE
LESSON
04 WOOD/PLYWOOD PAINTING
SPECIALIZATION
LIST OF MATERIALS
PROCEDURE
LESSON
05 STEEL PAINTING
SPECIALIZATION
LIST OF MATERIALS
PROCEDURE
LESSON
06 CHB LAYING
SPECIALIZATION
LIST OF MATERIALS
PROCEDURE
LESSON
07 TILEWORKS
SPECIALIZATION
LIST OF MATERIALS
PROCEDURE
LESSON
08 MASONRY PLASTERING
SPECIALIZATION
LIST OF MATERIALS
PROCEDURE
LESSON
MASONRY/
CONCRETE
PAINTING
SPECIALIZATION LIST OF
MATERIALS
Surface Preparation: Haji and Johnrey are
adept at preparing concrete surfaces for
painting. This includes cleaning, repairing BOSTIK SKIM COAT
cracks and imperfections, and ensuring VOSHTECH SANDING PAPER
the surface is smooth and free of debris. BOYSEN FLAT LATEX WHITE
They also applied primers or sealers as
BOYSEN PERMACOAT
needed to enhance paint adhesion.
Epoxy Coatings: Epoxy coatings were
used by the painters to create a high-
gloss, durable, and chemical-resistant LESSON
surface. Concrete painting involves several essential steps,
Color Matching and Customization: They including skim coating, sanding, priming, painting, and
have the knowledge and skills to mix and various other crucial aspects. Here's what I've learned:
Skim Coating: Skim coating is the initial step in
match colors to achieve specific design
concrete painting. It's a process of applying a thin
requirements or to create custom color
layer of a cementitious or polymer-modified
schemes tailored to the client's material to create a smooth and uniform surface.
preferences. This layer fills in imperfections, such as pits and
The workers have 15 years of experience. small cracks, and prepares the concrete for
painting. This is layered 3 to 4 times.
Sanding: After the skim coating has dried, sanding is
PROCEDURE required. This step involves using sandpaper or a
sander to further smooth the surface, removing any
uneven areas or rough spots left behind by the skim
1. Mix skim coat and let it dry. coat. Proper sanding is crucial for a flawless final
Repeat process 3 to 4 coats. result.
Priming: Primer is a critical component of the
2. Sand the surface after
concrete painting process. It helps the paint adhere
drying using a sanding better and provides a uniform base for the topcoat.
paper. Select a primer suitable for concrete surfaces, and
apply it evenly, allowing it to dry thoroughly before
3. Prime using a primer painting.
(material used was flat latex Paint Application: When painting, ensure that the
paint is applied evenly, using a roller, brush, or
in white)
sprayer as appropriate for the project. Multiple
4. Gloss can now be applied coats may be necessary, with adequate drying time
once the surface is dry. between each coat.
05
CHB
LAYING
SPECIALIZATION LIST OF
MATERIALS
Engr. Bryan explained the whole process
of CHB laying.
The foreman is Rodelio with 6 years of LOAD-BEARING CHB
experience in masonry before he started SAND/GRAVEL
being a foreman. CEMENT
Mortar Mixing: Sir Rodelio is
knowledgeable about mortar mixing.
They prepare the mortar mixture, which LESSON
typically consists of cement, sand, and
One of the first things I noticed was the
sometimes additives, to achieve the right
meticulous planning that goes into CHB
consistency and strength for CHB
laying. The masons began by carefully
construction.
measuring and marking the layout for the
Mortar Application: Applying mortar
walls. They used string lines, levels, and
effectively is crucial to ensure that CHBs
other tools to ensure that the walls were
bond securely and evenly. Sir Rodelio is
properly aligned and plumb.
adept at spreading mortar on the block's
Proper Mortar Mixing: The masons mixed
surface to create a strong and durable
mortar using the right proportions of
connection.
cement and sand to achieve the desired
CHB Placement: Engr. Bryan is an expert
consistency. They used water sparingly to
at handling concrete hollow blocks. They
avoid making the mortar too runny. This is
understand the correct orientation and
crucial for strong and stable wall
positioning of the blocks, ensuring that
construction.
the hollow cores are aligned and that
Techniques for Mortar Application: I
there are no voids in the wall. Proper
observed how the masons applied mortar
placement ensures structural stability.
evenly on both the CHBs and the surface
Finishing and Plastering: Sir Rodelio is
they were being laid on.
also an expert in finishing whether it
CHB Handling: The masons handled the
finishes on a rough or smooth surface.
CHBs with precision. They placed the
blocks gently, making sure they were level
PROCEDURE and aligned with the layout marks.
Quality Control: The masons regularly
1. Clean the location checked their work for accuracy and
2. Mortar bead will be placed quality. They used levels and measuring
between 2.5 to 5 cm. tools to ensure that the walls were plumb
3. Elantic is placed to ensure and level, and they made adjustments as
needed.
the alignment.
I gained a better understanding of the
4. Corner block is first applied. attention to detail, planning, and
5. Concrete beam will be craftsmanship that goes into CHB laying. It's
placed after 4 layers. clear that masons play a crucial role in the
6. Coat with mortar depending construction process, ensuring that the
structural and aesthetic aspects of a building
on the finish.
are of the highest quality.
06
TILEWORKS
SPECIALIZATION
Jorson and Reynaldo are skilled tile
installers with 7 years of experience in the LIST OF
field. MATERIALS
Surface Preparation: They are skilled in
preparing surfaces for tiling. This includes
cleaning the surface, ensuring it is level TILES
and free from debris, and addressing any CEMENT
structural issues or imperfections that GROUT
could affect the tile installation.
PLYWOOD
Tile Selection: Tile setters are
knowledgeable about the various types of
tiles available and can advise clients on
the best choices for specific applications.
They consider factors such as material,
size, texture, and design to match the LESSON
client's preferences and project
requirements. One of the lessons I learned
Adhesive and Grout Application: They is the reason why tiles
understand the importance of using the
sometimes go up is because
right adhesives and grouts for different
tiles were not installed
tile types and substrates.. Grout is applied
to fill the spaces between tiles, providing properly or cement was not
stability and a finished appearance. enough inside. This can also
happen when earthquakes
occur.
0.5 centimeters is the
PROCEDURE standard spacing in tiles.
When buying tiles, it is
1. Mix cement and water. Mix
important to make sure that
until it thickens and become
tiles do not have any
a paste.
damages so that it can be
2. Apply the mixture to the
applied properly.
plywood and tiles. Put the
It is important to clean up
tile to the plywood and pat it
the workspace to make the
down. Make sure to clean up
process go smoothly.
the excess.
The materials used in tiling
3. Mix grout and water until it
include adhesive and grout
becomes a paste.
and the most important
4. Apply the grout in the
material needed.
corners of the tiles.
Tilework needs skills, time
and planning to successfully
do.
07
MASONRY
PLASTERING
SPECIALIZATION LIST OF
The worker is 42 years old and has 28 MATERIALS
years of experience started with
plastering. TROWEL
Surface Preparation: He is an expert in
KNIFE
preparing masonry surfaces before plaster
application. They ensure the surface is
FLOAT
clean, free of dust, debris, and any loose HAMMER
material. This step is crucial for proper THREAD
adhesion and a smooth finish.. CEMENT
Mixing and Application: They are skilled at
mixing plaster to achieve the right
consistency for application. They LESSON
understand the proper water-to-plaster
ratio and work to prevent air bubbles or
One of the lessons I learned
lumps. They apply plaster evenly, using
is the materials used for
trowels and float tools to create a smooth
and consistent surface. plastering and its
Smooth Finish: Achieving a smooth and importance to make sure
uniform finish is essential for masonry that everything is aligned
plastering. They have a keen eye for
and smooth.
detail, ensuring that there are no
I also learned the technique
imperfections or blemishes in the plaster
surface. to make plastering faster and
easier demonstrated by the
mason in the video.
There are problems that can
PROCEDURE also arise in plastering like
when the wall is not good
1. Mix cement and water.
and aligned it needs more
2. Start plastering the walls.
plaster.