MIEL Ref: YL202201-91887-ICE-A089

Check Certificates for Temporary Works


(Clause F7 of the additional conditions of contract)

Contract No. YL/2022/01


Site Formation and Infrastructure Works for Yuen Long South First Phase Development -
Contract 3

Description of Temporary Works:


Design of pilling plarform across existing nullah

The relevant Design Check Certificate is YL202201-91887-ICE-089.


The following document(s) are included in this temporary works design submission:

Reference No. Rev. Title

TW-D-0.23 SK1 0 Pilling Platform Across Existing Nullah

I/We+ certify that the Temporary Works described above have been constructed in accordance with the
design which was certified for and on behalf of the Contractor on 16/5/2024 and by the checking engineer
on 16/5/2024.

Date: Signed: *

for and on behalf of: China Road and Bridge Corporation


(the Contractor)

Date: 14/6/2024 Signed:


Name: LEE Kin-wah
On behalf of: Meinhardt Infrastructure and
Environmental Ltd.
(The Independent Checking Engineer)


Delete as appropriate.

Person signing shall be duly authorised by the Contractor.