Vendor Development Status of 2X25KV AC items as on dated 05.04.24

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 13

File No.

RDSO-TI0LKO(PSI)/22/2020-O/o PED/TI/RDSO-Part(1)

भारत सरकार - रेल मंत्रालय Telephone: 2465763 (O).


42805(Off.)
अनुसंिान अचभकल्प और मानक संगठन मानक
Fax : 91-0522-2465763
नगर, लखनऊ- 226 011 E-mail:edtiohe@rdso.railnet.gov.in

संख्या: RDSO-TI0LKO(PSI)/22/2020-O/o PED/TI/RDSO-Part (1) दिनांक: As signed.

सचिव चवद्युत,
रे लवे बोर्ड, रे ल भवन
नई दिल्ली - 110001
{ध्यानाकर्डण: Shri R. K. Jain, PED/EE (Dev.)}

चवर्य: Status of Vendor Development of 2X25kV AC Traction items.


संिभड: Railway Board letter No. 2022/Elect(Dev)/170/5 dated 22.08.2022

In reference to above, please find enclosed herewith the one page status as Annexure-A
and detailed status as Annexure-B, of vendor development of 2X25kV AC traction items
controlled by RDSO for your kind information and perusal, please.

इसे सक्षम प्राचिकारी के अनुमोिन से जारी दकया जाता है।

(चजतेन्द्र कु मार)
चनिेशक/क.सं.-3
कृ ते महाचनिेशक/ (क.सं.)

संलग्नक: ऊपरोक्त अनुसार.


File No.RDSO-TI0LKO(PSI)/22/2020-O/o PED/TI/RDSO-Part(1)
Status of sources for 2X25kV Items
Annexure-A
Progress (30 March – 05 April) of Vendors Development of RDSO Controlled 2x25 kV Items
As on 05.04.2024
No of Vendors Stage wise Progress Status Final
(This Stage wise Progress is of Conditional Developmental Approval
Vendors) Under
SN Item Name Stage Inspection
Develop- CCA Design Process
Approved completed Approved
mental Tank Core Winding
Tap
Changer
60/84/100 MVA,
1 132/2X55 KV Scott Nil 01 + 08* 08 07 01 01 01 01 00
Connected Transformer
2 60/84/100 MVA,
220/2X55 KV Scott Nil 07* 07 07 01 01 01 01 00
Connected Transformer
3 38/53/63MVA,
132/2X27.5KV Dual LV Nil 02+06* 06 05 02 02 02 02 00
Winding Transformer
4 38/53/63MVA,
220/2X27.5KV Dual LV Nil 06* 06 06 02 02 02 01 00
Winding Transformer
5 8 MVA, 55/27.5KV Auto
Nil 02+05* 05 04 02 01 01 NA 00
Transformer
6 12.3 MVA, 55/27.5KV
Nil 03+05* 05 03 00 00 00 NA 00
Auto Transformer
7 16.5 MVA, 55/27.5KV
Nil 03+05* 05 04 01 01 01 NA 00
Auto Transformer
8 SCADA 03 01* Approval Process Completed
9 Control &Relay Panel 02 01+02* 02 00 Not Applicable 00
10 25 KV DP VCB 02 04* 04 01 Not Applicable 00
11 25 KV DP VI 02 04* 04 01 Not Applicable 00
12 107 Sq.mm Ag-Cu Prototype of Nine firms approved. WR, WCR and ER nominated for the field trial. #
Contact Wire
13 Current Carrying ‘A’ Vendors are under development through EOI. ##
Dropper
* Conditional Developmental Vendor subject to approval of Prototype.
# 1. The prototype of nine firms i.e. M/s APAR, M/s KEC, M/s Shashi Cables, M/s JK Cables, M/s Santoshi Hyvolt , M/s
Ajanma Industries, M/s BMI Cables, M/s GSJ Alloys and M/s Victor Cables has been completed and approved and field
trial to be conducted.
2. RDSO has nominated WR, WCR, and ER for the field trial of Cu-Ag contact wire vide letter no RDSO-
TI0LKO(OHE)/24/2020 dated 10.01.2023.
• West Central Railways: WCR has issued PO to M/s JK cable,M/s Santoshi Hyvol & M/s Ajanma Industries, the material
received on 11.12.2023. The same has been installed on 28.01.2024 in Kota division.
• Eastern Railways: PO has been placed by ER on dated 19.01.2024 to M/s APAR & M/s Ajanma Industries. The material
has not received yet.
• Western Railway: PO has been issued on dated 24.10.2023 to M/s JK cables, M/s KMG Pvt. Ltd. & M/s
Ajanma Industries. Material from JK cable has been received on dated 17.02.2024. The material from other
two firms has not received yet.
3. Vide letter no. RDSO-TI0LKO (OHE)/24/2020 dated 01.01.2024, RDSO has also nominated NWR for the usage of 107
mm² Silver Bearing Grooved Copper Contact Wire on a trial basis in the main line of the first phase of Dedicated Test
Track Project only.
## CCA/STR Verification of M/s APAR for the current carrying flexible dropper has been completed successfully and
approved on 29.09.2023. The firm has offered prototype and partial testing completed; the fatigue test of 10 sqmm
current carrying flexible dropper start from 16.01.2024 and completed on 26.02.2024, Fatigue test of 25 sqmm current
carrying flexible dropper is in progress.

Highlights of the week

1. Stage Inspection of Transformer Tank, Core & Winding of M/s Kanohar maker 16.5MVA, 55/27.5kV
Autotransformer has been conducted.
File No.RDSO-TI0LKO(PSI)/22/2020-O/o PED/TI/RDSO-Part(1)
Annexure-B
Status of RDSO approved vendors for all RDSO items of 2X25kV AT system
As on 05.04.2024
SN Item Name Approved Developmental Vendors Status PDC** Date of
Vendors monthly
No. of Name of Drawing Name of Vendor Annual Per month meetings held
supply
vendors Vendor Approved on capacity capacity
with vendors
1. 60/84/100MVA, 0 NIL 14.07.22 1. M/s Meiden T&D (India) Limited.* 12 1 Firm to offer prototype. ----
132kV/2X55kV,
Scott Connected 23.07.22 2. M/s Toshiba Transmission And 80 6-7 Firm to offer prototype.
----
Traction Power Distribution Systems India Pvt. Ltd.*
Transformer Comple 3. M/s Hitachi Energy India Limited 90 7-8 Firm has been approved as a developmental
Compl
ted vendor on 14.03.2024 after successful type
Required eted 22.06.2022,
testing. 28.07.2022,
Quantity: 32 no.
4. M/s Kanohar Electricals Limited* 50 4 Type testing has been conducted. Final report 24.08.2022,
April,
WR- 10 No. 11.07.23 of Short Circuit testing, which is issued by 26.09.2022,
2024
WCR-16 No. CPRI/Bengaluru is to be submitted by the firm. 20.10.2022,
ECR-06 No. 01.04.24 5. M/s CG Power And Industrial 48 4 06.12.2022
Firm to offer prototype. ---- 11.01.2023,
Solutions Ltd.*
25.04.23 6. M/s Bharat Heavy Electricals Ltd.* 50 4 Firm to offer prototype. 23.02.2023,
---- 11.04.2023
---- 7. M/s Siemens Limited* 24 2 Revised Design Documents has been submitted &
by firm on 18.01.2024. Observed shortcoming 10.08.2023
have been communicated to the firm on ----
04.02.2024. Compliance has been submitted by
firm on 22.03.2024. Under scrutiny.
21.02.24 8. M/s TMC Transformers India* 26 2
Firm to offer prototype. ----
Private Limited
---- 9. M/s Shree Abirami Engineering 36 3 Design Documents has been submitted by firm
----
Works, Chennai* on 20.03.2024. Under scrutiny.
* Conditional Developmental Vendor subject to approval of Prototype.
**The PDCs have been mentioned for those firms only, of which all the stage inspections have been conducted.
File No.RDSO-TI0LKO(PSI)/22/2020-O/o PED/TI/RDSO-Part(1)

SN Item Name Approved Developmental Vendors * Status PDC** Date of


Vendors monthly
No. of Name of Drawing Annual Per meetings held
vendors Vendor Approved on
Name of Vendor capacity month
with vendors
supply
capacity

2. 60/84/100MVA, 0 NIL 07.07.22 1. M/s Meiden T&D (India) Limited 12 1 Firm to offer prototype. ----
220kV/2X55kV,
22.06.2022,
Scott Connected 19.07.22 2. M/s Toshiba Transmission And 80 6-7 Firm to offer prototype. ----
28.07.2022,
Traction Power Distribution Systems India Pvt. Ltd
24.08.2022,
Transformer 09.09.22 3. M/s Hitachi Energy India Limited 90 7-8 Firm to offer prototype. ---- 26.09.2022,
20.10.2022,
Required 13.10.22 4. M/s CG Power And Industrial 48 4 Firm to offer prototype. ----
06.12.2022
Quantity: 02 No. Solutions Limited
11.01.2023,
01.03.23 5. M/s Kanohar Electricals Limited 50 4 Stage inspection of Core & Winding, Tank and 23.02.2023,
WR- 02 No. OCTC has been conducted on 03.11.2023,
July, 11.04.2023
11.12.2023 and 10.03.2024 respectively. Firm to &
2024
submit the Internal test report of the 10.08.2023
Transformer.
30.10.23 6. M/s Bharat Heavy Electricals Ltd. 50 4 Firm to offer prototype. ----

15.01.24 7. M/s Siemens Limited 24 2 Firm to offer prototype. ----


* Conditional Developmental Vendor subject to approval of Prototype.
**The PDCs have been mentioned for those firms only, of which all the stage inspections have been conducted.
File No.RDSO-TI0LKO(PSI)/22/2020-O/o PED/TI/RDSO-Part(1)

SN Item Name Approved Developmental vendors Status PDC** Date of


Vendors monthly
No. of Name of Drawing Annual Per month meetings held
Name of Vendor supply
vendors Vendor Approved on capacity capacity
with vendors

3. 38/53/63MVA, 0 NIL Complet 1. M/s Meiden T&D (India) Limited 80 6-7 Firm has been approved as a
Complet
132kV/2X27.5kV ed developmental vendor on 23.02.2024 after
ed
Single Phase Dual successful type testing.
LV Winding 10.07.22 2. M/s Toshiba Transmission And 80 6-7 Firm to offer prototype.
----
Traction Power Distribution Systems India Pvt. Ltd*
Transformer Complet 3. M/s Hitachi Energy India Limited 120 10 Firm has been approved as a 22.06.2022,
ed developmental vendor on 29.01.2024 after Complet 28.07.2022,
Required successful type testing. ed 24.08.2022,
Quantity: 60 no. 26.09.2022,
12.10.22 4. M/s CG Power And Industrial* 48 4 Pre Short Circuit Testing has been completed 20.10.2022,
NCR-42 No. 06.12.2022
Solutions Limited on 22 & 23.02.2024. Short circuit testing has
ECR-09 No April, 11.01.2023,
ER- 09 No. been conducted from 20 to 22.03.2024 at
2024 23.02.2023,
CPRI/Bengaluru. Further testing to be
11.04.2023
offered by the firm.
&
21.12.22 5. M/s Kanohar Electricals Limited* 50 4 Firm to offer prototype. ---- 10.08.2023
25.01.23 6. M/s Vishvas Power Engineering 12 1 Pre Short Circuit Testing has been completed
Services Pvt. Ltd. * on 08.03.2024 to 10.03.2024. Short circuit
April,
testing has been conducted from 26 to
2024
28.03.2024 at CPRI/Bengaluru. Further
testing to be offered by the firm.
25.04.23 7. M/s Bharat Heavy Electricals Ltd. * 50 4 Firm to offer prototype. ----
22.03.24 8. M/s TMC Transformers India 40 3 Firm to offer prototype.
---
Private Limited*
* Conditional Developmental Vendor subject to approval of Prototype.
**The PDCs have been mentioned for those firms only, of which all the stage inspections have been conducted.
File No.RDSO-TI0LKO(PSI)/22/2020-O/o PED/TI/RDSO-Part(1)

SN Item Name Approved Drawing Developmental vendors* Status PDC** Date of


Vendors Approved monthly
No. of Name on Name of Vendor Annual Per
meetings
vendors of capacity month
Vendor supply held with
capacity
vendors
4. 38/53/63MVA, 0 NIL 14.07.22 1. M/s Meiden T&D (India) Limited 80 6-7 Firm to offer prototype. ----
220/2X27.5kV, 10.07.22 2. M/s Toshiba Transmission And 80 6-7 Firm to offer prototype.
Single Phase Dual Distribution Systems India Pvt. ----
LV Winding Ltd 22.06.2022,
Traction Power 09.09.22 3. M/s Hitachi Energy India Limited 120 10 Stage Inspection of Transformer Tank, Core 28.07.2022,
Transformer & Winding and OCTC have been completed July, 24.08.2022,
on 23.06.2023, 28.06.2023 and 09.03.2024 2024 26.09.2022,
Required respectively. Firm to submit the Internal 20.10.2022,
Quantity: 15 No. test report of the Transformer. 06.12.2022
23.09.22 11.01.2023,
4. M/s CG Power And Industrial 48 4 Stage Inspection of Transformer Tank,
NCR-03 No. 23.02.2023,
Solutions Limited CORE & Winding has been completed on 29 11.04.2023
NR-06 No
ER- 06 No. & 30.06.23. Type test reports of OCTC have &
----
been submitted by firm on 09.03.2024 and 10.08.2023
observed shortcomings on same has been
communicated to the firm on 02.04.2024.
Reply awaited.
10.07.23 5. M/s Kanohar Electricals Limited 50 4 Firm to offer prototype. ----
30.10.23. 6. M/s Bharat Heavy Electricals Ltd. 50 4 Firm to offer prototype.
----
* Conditional Developmental Vendor subject to approval of Prototype.
**The PDCs have been mentioned for those firms only, of which all the stage inspections have been conducted.
File No.RDSO-TI0LKO(PSI)/22/2020-O/o PED/TI/RDSO-Part(1)

SN Item Name Approved Developmental vendors Status PDC** Date of


Vendors monthly
No. of Name of Drawing Name of Vendor Annual Per month meetings held
vendors vendors Approved on capacity supply
capacity with vendors
5. 8 MVA, 0 NIL Complet 1. M/s Vishvas Power Engineering 120 10 Firm has been approved as a developmental vendor
Compl
55/27.5 kV ed Services Pvt. Ltd. on 20.10.2022 after successful type testing.
eted
Auto
22.06.2022,
Transformer 12.07.22 2. M/s Meiden T&D (India) Limited* 240 20 Firm to offer prototype. ---- 28.07.2022,
24.08.2022,
Required 19.07.22 3. M/s Toshiba Transmission And 150 12 Stage inspection of Transformer tank has been 26.09.2022,
Quantity: 150 Distribution Systems India Pvt. completed on 14.10.2023. Stage inspection of Core ---- 20.10.2022,
No. Ltd* & Winding to be offered by the firm. 06.12.2022
11.01.2023,
WR-40 No. 02.02.23 4. M/s CG Power And Industrial 220 + 18+ Firm to offer prototype.
145 ---- 23.02.2023,
WCR-80 No Solutions Ltd.* 12 11.04.2023
ECR- 30 No. Complet 5. M/s TMC Transformer 216 18 Firm has been approved as a developmental vendor &
Compl
ed on 13.09.2023 after successful type testing. 10.08.2023
eted
06.11.23 6. M/s Kanohar Electricals Limited* 300 25 Internal Test Report (ITR) has been submitted by June,
firm on 13.03.2024. Under Scrutiny. 2024
---- 7. M/s Technical Associates Limited* 250 20 Design Documents have been submitted by the firm
----
on 27.12.2023. Under Scrutiny.

* Conditional Developmental Vendor subject to approval of Prototype.


**The PDCs have been mentioned for those firms only, of which all the stage inspections have been conducted.
File No.RDSO-TI0LKO(PSI)/22/2020-O/o PED/TI/RDSO-Part(1)
SN Item Name Approved Developmental vendors PDC** Date of
Vendors monthly
No. of Name Drawing Name of Vendor Annual
capacity
Per month
supply
Status meetings held
vendors of Approved
vendors
capacity
with vendors
on
6. 12.3 MVA, 0 NIL Complet 1. M/s Vishvas Power Engineering 90 7-8 Firm has been approved as a developmental vendor Compl
55/27.5 kV, ed Services Pvt.Ltd. on 02.03.2024 after successful type testing. eted
Auto
transformer 12.07.22 2. M/s Meiden T&D (India) Limited* 240 20 Firm to offer prototype. ----

Required 21.07.22 3. M/s Toshiba Transmission And 75 6 22.06.2022,


Firm to offer prototype.
Quantity: ---- 28.07.2022,
Distribution Systems India Pvt.
44No. 24.08.2022,
Ltd*
26.09.2022,
Complet 4. M/s High Volt Electricals Private 120 10 Firm has been approved as a developmental vendor Compl
WR-32 No. 20.10.2022,
ed Limited on 23.10.2023 after successful type testing. eted 06.12.2022
ECR-12 No.
23.12.22 5. M/s CG Power And Industrial 220 18+ Firm to offer prototype. 11.01.2023,
----
Solutions Ltd.* +90 8 23.02.2023,
Complet 6. M/s TMC Transformer 110 9 Firm has been approved as a developmental vendor 11.04.2023
Compl &
ed on 27.09.2023 after successful type testing.
eted 10.08.2023
---- 7. M/s Kanohar Electricals Limited* 200 16 After approval of design documents on 02.01.2023,
Stage inspection of the Transformer Tank, Core &
Winding were conducted on 02.05.2023. However, ----
firm has changed the design and submitted revised
documents on 06.03.2024. Under scrutiny.
---- 8. M/s Technical Associates Limited* 200 16 Design Documents have been submitted by the firm
----
on 27.12.2023. Under Scrutiny.
* Conditional Developmental Vendor subject to approval of Prototype.
**The PDCs have been mentioned for those firms only, of which all the stage inspections have been conducted.
File No.RDSO-TI0LKO(PSI)/22/2020-O/o PED/TI/RDSO-Part(1)
SN Item Name Approved Developmental vendors Status PDC** Date of
Vendors monthly
No. of Name of Drawing Name of Vendor Annual Per month meetings held
vendors vendors Approved on capacity supply
with vendors
capacity
7. 16.5 MVA, 0 NIL Complet 1. M/s Vishvas Power Engineering 72 6 Firm has been approved as a developmental vendor Compl
55/27.5 kV ed Services Pvt. Ltd. on 20.10.2022 after type testing. eted
Auto 10.07.22 2. M/s Meiden T&D (India) 240 20 Firm to offer prototype.
Transformer Limited* ----
21.07.22 3. M/s Toshiba Transmission and 75 6 Firm to offer prototype.
Required
Distribution Systems India Pvt. ----
Quantity: 22.06.2022,
204 No. Ltd*
28.07.2022,
28.09.22 4. M/s High Volt Electricals Private 120 10 Prototype of the firm has failed twice in the short 24.08.2022,
NCR-122 No Limited* circuit testing at CPRI/Bhopal. Revised design 26.09.2022,
NR-17 No. documents of the firm have been approved on 20.10.2022,
June,
ECR-26 No 23.01.2024. Further, stage inspection of core & 06.12.2022
ER- 39 No. 2024
winding has been conducted on 14.02.2024. Internal 11.01.2023,
Test Report (ITR) has been submitted by firm on 23.02.2023,
11.03.2024. Under Scrutiny. 11.04.2023
Complet 5. M/s CG Power And Industrial 220 18 + Firm has been approved as a developmental vendor &
+ Compl 10.08.2023
ed Solutions Limited 6* on 09.01.2024 after successful type testing.
70* eted
Complet 6. M/s TMC Transformer 96 8 Firm has been approved as a developmental vendor Compl
ed on 27.09.2023 after successful type testing. eted
06.11.23 7. M/s Kanohar Electricals Limited* 200 16 Stage inspection of Transformer Tank, Core &
Winding has conducted on 03.04.2024. Firm to ----
submit the Internal Test Report (ITR) of item.
---- 8. M/s Technical Associates Limited* 150 12 Design Documents have been submitted by the firm
----
on 27.12.2023. Under Scrutiny.
* Conditional Developmental Vendor subject to approval of Prototype.
**The PDCs have been mentioned for those firms only, of which all the stage inspections have been conducted.
File No.RDSO-TI0LKO(PSI)/22/2020-O/o PED/TI/RDSO-Part(1)
Item Name Approved Vendors Developmental vendors Status
SN
No. of Name of Vendor No. of Name of Annual Per month
vendors Vendors capacity supply
Vendor
capacity
Supervisory 1. M/s Synergy System &
Control and Solutions.
Data (Annual Capacity: 58 No.)
Acquisition Prototype Test of all three approved vendors Approved.
System 2. M/s Ashida Electronics
M/s SCOPE T&M
Private Limited. (Annual M/s SCOPE - Observed Shortcomings in the submitted revised
8. 03 01 Pvt. Limited* 20 1-2
Capacity: 30No.) design documents on 26.09.2023, have been communicated to
the firm on 07.12.2023. A revised design documents have been
3. M/s V-Bro Tech India Pvt. submitted by firm on 19.02.2024. Under Scrutiny.
limited
(Annual Capacity: 03 No.)

9. Control & 02 1. M/s Aluminium Industries 03 1. M/s GK Power 120 10


relay panel Ltd. Expertise Pvt. The firm has been approved as a developmental vendor after
including Per month supply Capacity: 20 Ltd. successful type testing.
relays for No.
2X25kV 2. M/s Concord 1000 83 Revised design Documents have been submitted by the firm on
System 2. M/s Ashida Electronics Control 21.10.2023. Observed shortcomings have been communicated
Private Limited. Systems to the firm on 14.12.2023. Revised design documents have
Per month supply Capacity: 8 No. Private Ltd.* been submitted by firm on 13.03.2024. Under scrutiny.
3. M/s Hitachi 780 65 Design & Drawings has been submitted by firm on 24.04.2023.
Energy India Observed shortcomings were communicated to the firm on
Limited* 20.07.23. As per firm request, extension up to 14.10.2023 has
been accorded for submission of revised documents. Further,
firm has not submitted the documents nor applied for
extension.

* Conditional Developmental Vendor subject to approval of Prototype.


File No.RDSO-TI0LKO(PSI)/22/2020-O/o PED/TI/RDSO-Part(1)
Item Name Approved Vendors Developmental vendors Status
SN

No. of Name of Vendor No. of Name of Annual Per month


vendors Vendors capacity supply
Vendor
capacity

10. 25 kV 02 1. M/s Aluminium Industries 05 1. M/s 600 50 Design documents of the firm have been approved for
Double Pole Ltd. (with Spring-Spring Megawin prototype unit on 06.12.2023. Internal Test Report (ITR) has
Vacuum operating mechanism) Switchgear been approved and in house type testing has been conducted
Circuit Per month supply Capacity: 250 Private from 23.01.2024 to 27.02.2024. Further, third party type tests
Breaker No. limited* are to be conducted.
2. M/s System 400 33 Observed Shortcomings in the submitted revised design
2. M/s Vans Electricals Control* documents, have been communicated to the firm on
Per month supply Capacity: 37 22.02.2024. Compliance of same has been submitted by firm
No. on 08.03.2024. Under Scrutiny.
3. M/s BHEL* 200 16 Revised design Documents have been submitted by the firm on
16.02.2024. Under Scrutiny.
4. M/s 600 50 Design documents have been submitted by firm on 20.02.2024.
Siemens* Observed Shortcomings on same have been communicated to
the firm on 15.03.2024. Firm has submitted the compliance of
same on 04.04.2024. Under scrutiny.
11. 25 kV 02 1. M/s Aluminium Industries 05 1. M/s 600 50 Design documents of the firm have been approved for
Double Pole Ltd. (with Spring-Spring Megawin prototype unit on 06.12.2023. Internal Test Report (ITR) has
Vacuum operating mechanism) Switchgear been approved and in house type testing has been conducted
Interrupter Per month supply Capacity: 250 Private from 23.01.2024 to 27.02.2024. Further, third party type tests
No. limited* are to be conducted.
2. M/s System 400 33 Observed Shortcomings in the submitted revised design
2. M/s Vans Electricals Control* documents, have been communicated to the firm on
Per month supply Capacity: 37 23.02.2024. Compliance of same has been submitted by firm
No. on 08.03.2024. Under Scrutiny.
3. M/s BHEL* 200 16 Revised design Documents have been submitted by the firm on
16.02.2024. Under Scrutiny.
4. M/s 600 50 Design documents have been submitted by firm on 20.02.2024.
Siemens* Observed Shortcomings on same have been communicated to
the firm on 15.03.2024. Firm has submitted the compliance of
same on 04.04.2024. Under scrutiny.
* Conditional Developmental Vendor subject to approval of Prototype.
File No.RDSO-TI0LKO(PSI)/22/2020-O/o PED/TI/RDSO-Part(1)

SN Item Name Approved Vendors Developmental Status


vendors
No. of Name of No. of Name of
vendors Vendor Vendor Vendor
12. 107 sq.mm Silver 0 NIL 0 NIL • 14 firms have submitted their response against EOI. 13 firms namely M/s KEC, M/s APAR, M/s
Bearing Grooved VTL, M/s GSJ Alloys, M/s Shashi Cables, M/s Stellar Cables, M/s Victor Cables, M/s Gupta Powers
Copper Contact wire Pvt Ltd, M/s Santoshi Hyvolt, M/s J K Cable, M/s Ajanma Industries ,M/s BMI Cables & M/s KMG
Mumbai have been included in select panel for development of item and firms had been advised
to offer prototype testing.
Out of 13 firms, Proto type test of 9 firms namely M/s KEC, M/s APAR, M/s GSJ Alloys, M/s Shashi
Cables, M/s Victor Cables, M/s Santoshi Hyvolt, M/s J K Cable, M/s Ajanma Industries & M/s BMI
Cables has been carried out sucessfully.
• Eastern Railway, & West Central Railway has been nominated for field trial vide RDSO letter
dated 10.01.2023. P.O has been placed by WR on 24.10.2023.
• West Central Railways: WCR has issued PO to M/s JK cable,M/s Santoshi Hyvol & M/s Ajanma
Industries, the material received on 11.12.2023. The same has been installed on 28.01.2024 in
kota division.
• Eastern Railways: PO has been placed by ER on dated 19.01.2024 to M/s APAR & M/s Ajanma
Industries. The material has not received yet.
• Western Railway: PO has been issued on dated 24.10.2023 to M/s JK cables, M/s KMG Pvt Ltd &
M/s Ajanma Industries. Material from JK cable received on dated 17.02.2024. The material from
other two firm not received yet.
• M/s KMG Wires has submitted the response to EOI on 12.12.2023. The same has been short
listed in select panel. Further, vide letter dated 11.01.2024 firm has been advised to submit ITR,
QAP & compliance of STR. Firm has submitted compliance vide firm’s letter dated 13.01.2023,
shortcoming/deficiencies has been advised vide this office letter dated 29.01.2024. Firm has
submitted reply on 05.02.204. CCA has been conducted on 12 & 13.03.2024 the same has been
approved. The proto type test has been carried out from 21.03.2024 to 23.03.2024, it is under
approval.
• Vide letter no. RDSO-TI0LKO (OHE)/24/2020 dated 01.01.2024; RDSO has also nominated NWR
for usage of 107 mm² Silver Bearing Grooved Copper Contact Wire on trial basis in main line of
first phase of Dedicated Test Track Project only..
File No.RDSO-TI0LKO(PSI)/22/2020-O/o PED/TI/RDSO-Part(1)

SN Item Name Approved Vendors Developmental Status


vendors
No. of Name of No. of Name of
vendors Vendor Vendor Vendor
13. Current Carrying 0 NIL 0 NIL • CCA/STR Verification of M/s APAR has been completed successfully and approved on
Dropper (“A” 29.09.2023. The firm has offered prototype and partial testing completed; the fatigue test of 10
Dropper) sqmm current carrying flexible dropper start from 16.01.2024 and completed on 26.02.2024,
Fatigue test of 25 sqmm current carrying flexible dropper is to be carried out.
• M/s KEC has submitted QAP, Invoice and test report on dated 02.01.2024, the
shortcomings/deficiencies have been advised to the firm vide this office letter dated 15.01.2024.
Firm has submitted reply on 06.02.2024. shortcoming advised to firm vide this office letter dated
19.03.2024.reply is awaited
• M/s J.K. Cable has submitted response to EOI dated 01.12.2022 and is included in select panel-
Facing problem to get Raw material.
• M/s Shashi Cable has submitted response to EOI on 24.12.2022 and is included in select panel-
Facing problem to get Raw material.
• M/s Ajanma industry has submitted EOI response on dated 24.01.2023 and is include in select
Panal- Firm has assured to submit compliances and ITR at the earliest.
• M/s Santoshi Hyvolt Electrical Pvt. Ltd has submitted EOI on dated 23.01.2023 and is include in
Select Panel -Firm has assured to submit compliances and ITR at the earliest.