PETRONAS CARIGALI SDN BHD Page 1 of 4

Daily Drilling Report


Well Name: ANGSI-D2 Date: 10/06/2009 Report: 21 DFS: 20.67 DOL: 78.50
Event Name: ORIG DRILLING Start: 21/05/2009 End: 10/06/2009

Rig Name: T-10 TMD: 4,243.0 (m) TVD: 1,768.7 (m) Progress:

Rig Super: NG K N / GALIH Rot. Hours: AV ROP: Hole Size: 12.250 (in)

Wellsite Eng: Last Casing: 9.625 (in) Shoe TMD: 4,237.0 (m) Shoe TVD: 1,764.1 (m)

Daily Cost: 1,081,334 Cum Cost: 6,032,140

Operations Summary

From - To Hours Code Sub Code Phase Description of Operations


00:00 - 05:00 5.00 CAS OPRN D12 CONT RIH 9 5/8" CASING, L-80, 47 PPF, VAM TOP CONNECTION CASING FROM
3520 M TO 4219 M. FILL CSG EVERY JOINT RIH. RUN TOTAL 337 JNTS & ONE PUP
JNT.

05:00 - 06:00 1.00 CAS OPRN D12 M/U 9 5/8" MANDREL CSG HANGER C/W RUNNING TOOL & LANDING JNT. LAND
CSG HANGER. F/S AT 4237 M, F/C AT 4211 M. PIP TAG AT 3848.2 M.

06:00 - 08:30 2.50 CAS OPRN D12 M/U CMT HEAD & CMT LINE. CIRC 1.2 CASING VOL. 1220 BBL, 500 GPM, 1200 PSI.

08:30 - 09:30 1.00 CAS OPRN D12 PUMP 630 BBL KCL-PHPA MUD (10.5 PPG) AHEAD.

09:30 - 11:30 2.00 CAS OPRN D12 BJ PUMP 10 BBLS MCS-A SPACER. PRESS TEST CMT LINE TO 4000 PSI. PUMP
ANOTHER 10 BBLS MCS-A SPACER. RIG PUMP 80 BBL MCS-O. DROP BTM WIPER
PLUG. BJ MIX AND PUMP 84 BBL MIX WATER WITH 634 SXS "G" CMT TO YIELD
138 BBL OF 15.8 PPG SLY @ AVG 5.0 BPM, 680 PSI (0.35 GPS BJ-XL + 0.05 GPS
FP-9LS + 0.05 GPS R-21LS + 0.5 GPS BA-58LS + 4.29 GPS S/WATER, SLY YIELD
1.22 ft³/SXS) BJ FLUSH CMT LINE CLEAN. DROP TOP WIPER PLUG. BJ PUMP 10
BBLS MIX WATER SPACER.

11:30 - 13:30 2.00 CAS OPRN D12 RIG PUMP DISPLACE CMT WITH 1001.7 BBL OF 11.0 PPG SBM AT 500 GPM, 1000
PSI, REDUCE PUMP RATE TO 260 GPM, 400 PSI FOR LAST 30 BBL OF
DISPLACEMENT. HAD FULL RETURN THRU' OUT CMT JOB. HAD 170 BBL
KCL-PHPA MUD RETURN. BUMP PLUG & PRESS TEST CASING TO 3000 PSI/10
MIN. PUMP EFFICIENCY 95.5%. BLEED BACK 15 BBL. FLOAT EQT HOLDING.CIP AT
1300 HRS.

13:30 - 16:00 2.50 CAS OPRN D12 L/D CMT HEAD, LANDING JNT C/W RUNNING TOOL & TESCO CDS. R/U HAWK
JAW.

16:00 - 17:30 1.50 WHB OPRN D12 M/U CAMERON WASH TOOL. WASH 9 5/8" CSG HANGER/WELL HEAD & BOP
STACK CLEAN WITH S/WATER. 600 GPM, 550 PSI. 20 RPM.

17:30 - 19:00 1.50 WHB OPRN D12 M/U PACK-OFF RUNNING TOOL C/W PACK-OFF ASSY. SET SAME INSIDE UPPER
CSG HEAD. CLOSE HYDRILL. PRESS TEST PACK-OFF ASSY TO 1500 PSI/10 MIN -
OK. L/D RUNNING TOOL.

19:00 - 21:30 2.50 NDB OPRN D12 N/D 13 5/8" BOP & RISERS. L/D TRANSITION SPACER SPOOL.

21:30 - 00:00 2.50 WHB OPRN D12 N/U TUBING HEAD SPOOL. (13-5/8" x 11" - 5000 PSI). PRESS TEST HANGER NECK
SEAL, CASING HANGER SEAL & RING GASKET TO 5000 PSI/10 MIN-OK

Current Status: N/U 13-3/8" BOP

24hr Summary: CEMENTING 9 5/8" CASING. INSTALL PACK OFF ASSY. N/D BOP. N/U THS.

24hr Forecast: BOP TEST. RUN BIT & SCRAPPER

Printed: 11/06/2009 6:19:01 AM


PETRONAS CARIGALI SDN BHD Page 2 of 4

DAILY DRILLING REPORT


Well Name: ANGSI-D2 Date: 10/06/2009 Report: 21 DFS: 20.67 DOL: 78.50
Event Name: ORIG DRILLING Start: 21/05/2009 End: 10/06/2009

Operations Summary

From - To Hours Code Sub Code Phase Description of Operations


21:30 - 00:00 2.50 WHB OPRN D12 ---------------------------------------
11TH JUNE 2009

00:00-00:45:
N/U ADAPTER SPOOL & 13 5/8" RISER

00:45-03:45:
INSTALL GUMBO BOX AT FLOW LINE.

03:45-06:00:
N/U 13-5/8" BOP.

NOTE:
- TOTAL HAZARD CARDS REPORTED = 18 (6 - SAFE, 12 - UNSAFE CONDITIONS)
TIOMAN DRILLING = 13 , 3RD PARTY SERVICES = 5

Printed: 11/06/2009 6:19:01 AM


PETRONAS CARIGALI SDN BHD Page 3 of 4

Daily Drilling Report


Well Name: ANGSI-D2 Date: 10/06/2009 Report: 21 DFS: 20.67 DOL: 78.50
Event Name: ORIG DRILLING Start: 21/05/2009 End: 10/06/2009

Bit Data Mud Check


Bit No. Type 1: SBM 2: SBM
Run Time/Loc 20:00 / IN 04:00 / IN Ca+ (mg/L)
Size TMD (m) 4,243.0 4,243.0 K+ (mg/L)
Manu. Temp (°F) 125 125 Polymer (ppb)
Type Density (ppg) 11.05 11.05 CaCl2 (%)
Serial No. ECD (ppg) NaCl (%)
TFA Viscosity (s/qt) 87 86 Sand (%) 0.5 0.5
TMD In PV (cp) 34 34 Tot. Solids 18.2 18.2
TMD Out YP (lb/100ft²) 25 25 % Oil 61.5 61.5
Cum. TMD GELS (lb/100ft²) 15 / 26 / 36 15 / 26 / 36 % H2O 20.3 20.3
Cum. Hours API WL (cc/30min Oil/H2O 75 / 25 75 / 25
WOB (Min) HTHP WL (cc/30min 4.8 4.8 HGSolid (ppb)
WOB (Max) API FC (/32") LGSolid (ppb)
RPM (Min) MBT (ppb) ES (mV) 503 502
RPM (Max) Lime (ppb) 3.1 3.1 Oil Ret (%)
Cond (IODL) pH
Cond (BGOR) Pm (mL) OprtaCarb 20.00 20.00
Jets 1/2/3 Pf/Mf (mL / mL) Slicken 10.00 10.00
Jets 4/5/6 Comment1: 2:
BHA Description:
Item Jts Length Item Jts Length

Pump Data Pipe Data Mud Volume


Pump Min ID Hole Vol (bbl) 1,054.0
Liner DC OD Pit 1 100.0
Stroke DC Pit 2 450.0
EFF HWDP OD Pit 3 190.0
Press Pit 4 594.0
SPM HWDP Total Mud Vol (bbl) 2,388.0
Output
BHA Vol Built Day (bbl)
Velocities Vol Built Cum 1,186.0
Drill Pipe (ft/min) DP OD Vol Lost Surf Day (bbl) 199.0
Drill Collar (ft/min) Vol Lost Surf Cum 1,533.0
Riser (ft/min) String Rot Vol Lost Hole Day (bbl)
Lag Time (min) Weight Vol Lost Hole Tot
Pick-Up Vol Dumped Day (bbl)
Slow Pump Weight
Pump Press Slack Off
Mud Cost
Pump Press Weight Daily 3,464
Pump Press Cumulative 465,843

Shaker Mesh Size HRS Centrifuge Hydroclone Type HRS


# DE-1000 DE-1000
VSM300 RPM 2,900 2,900
VSM300 Process Outp. (gpm) 50.00 50.00
VSM300 Overflow Outp.(gpm) 43.80 44.60
VSM300 Overflow Dens.(ppg) 10.0 10.1
Hours 12.00 12.00
Op Code
Gas Readings
Conn Avg/Max (ppm)
LOT/FIT Formation Data Bkgr Avg/Max (ppm)
(ppg) (ppg)
EMW MAASP (psi) Max Mud Wt Formation Name Top (m) Trip Avg/Max (ppm)
5.9 0.10 H2S (ppm)
Printed: 11/06/2009 6:19:01 AM
PETRONAS CARIGALI SDN BHD Page 4 of 4

Daily Drilling Report


Well Name: ANGSI-D2 Date: 10/06/2009 Report: 21 DFS: 20.67 DOL: 78.50
Event Name: ORIG DRILLING Start: 21/05/2009 End: 10/06/2009

Support Craft
Type Number Remarks
SETIA UNGGUL ENROUTE TO KSB.
GULF FLEET 63 STAND BY AT T-10

Bulks Sarapar(Base Oil) Diesel Water, Drilling Water, Potable "G" Cement "B" Cement Barite Sacks
Unit BBLS BBLS BBLS BBLS SXS CU FT SXS
On Hand 1,127 3,587 11,132 2,996 3,970 1,316 6,133
Used 98 65 335 733
Received 478
Returned
Adjusted

Weather 23:59 Personnel


Rig Heave (m) 0.3 PCSB 5
Rig Pitch (°) 0.2 RAMUNIA 8
Rig Roll (°) 0.2 SCHL TCP 4
Wave Height (m) 0.5 TIOMAN 28
Wave Direct 180 OMPI DRILLING 46
Wave Period OMPI CATERING 17
Swell Height (m) 0.5 BJ OIL 2
Swell Direct SCOMI 4
Wind Speed (Knts) 10 ILO 2
Wind Direct 202 SCHL WIRELINE 3
Temp Maximum (°F) 78 CAMERON 2
Temp Minimum (°F) 78 TESCO 3
Visibility (nM) 7 Barom (psi) 14.79 Other: 13
Weather CLOUDY Total: 137
Anchoring
Rig Heading 49 VDL (Klb) 14,396 Riser Tension (kip) Riser Angle/Dir
Anchor 1 2 3 4 5 6 7 8 9 10 11 12
Tensions 49.5 56.1 44.9 30.6 39.2 21.1 48.8 42.7
Safety Drills Last Fire Drill 06/06/2009 Last Rig Inspection
Last BOP Test (P) 29/05/2009 Last Evacuation Drill Days Without LTA (Total) 303
Last BOP Test (F) 29/05/2009 Last Rig Check Loss Control Incident
Last BOP Drill 21/05/2009 Last Safety Meeting 08/06/2009 Incident Report Sent Y/N

Survey Data
MD Incl. Azimuth TVD N/S (-) E/W (-) Section DLS BUR

Printed: 11/06/2009 6:19:01 AM