Apron 1 118.00 0.45 0.4021.24
Septic Tank 2 3.05 2.10 2.4431.26
Sock Pit 2 0.91 0.91 1.20 1.99
54.48 278.20 ₹ 15,157.40
A 10.1 Providing 100mm thick soiling with approved quality of stone including carraige, watering, ramming, consolidation,
aggregate 20 mm nominal size).
A 10.1 1:4 (1 cement : 4 coarse sand) Sqm
Apron 1 118.00 0.45 53.10
Septic Tank 2 3.05 2.10 12.81
Sock Pit 2 0.91 0.91 1.66
67.57 377.31 ₹ 25,493.40
2 A4.1.8 Providing and laying in position cement concrete of specified grade
excluding the cost of centering and shuttering
A4.1.9 1:4:8 (1 Cement : 4 fine sand :
8 stone aggregate 40 mm) Cum
Apron 1 24.00 0.45 0.10 1.08
Septic Tank 2 3.05 2.10 0.10 1.28
Sock Pit 2 0.91 0.91 0.10 0.17
2.53 10198.00 ₹ 25,766.47
3 A5.1.3 Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies,
shelves, chajjas, lintels, bands. plain window sills, staircases and spiral stair cases upto floor five level excluding the
cost of centring, shuttering, finishing and reinforcement with 1:2:4 (1 cement: 2 coarse sand: 4 graded stone
aggregate 20 mm nominal size).
Cum
Septic Tank Slab 2 2 1.51 2.10 0.10 1.27 13,455.10 ₹ 17,066.45
4 A5.6 Centering and shuttering
including strutting, propping
etc. and removal of form for: Sqm
Septic Tank Slab side 2 4 1.51
0.10 1.21
2 4 2.00
0.10 1.60
TOTAL 2.81 502.90 ₹ 1,412.14
5 A5.18. Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all Hot
4 rolled deformed bars (Tor)
Septic Tank Slab Kg
10 mm dia bars @ 100mm c/c
2 1 19 1.51 0.616 35.35
2 1 14 2.10 0.616 36.22
71.57 92.30 ₹ 6,605.62
6 A6.1 Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in
A6.1.4 Cement mortar 1:4 (1 cement :
4 coarse sand) Cum
Apron 2 24.00 0.15 0.25 1.80
Septic Tank 2 2 3.05 0.25 1.99 6.07
2 2 2.13 0.25 1.99 4.24
2 1 2.13 0.12 1.69 0.86
Total 12.97 12841.50 ₹ 166,581.58
7 A13.7 12 mm Cement Plaster of mix:
A13.7. 1:3 (1 cement : 3 fine sand) Sqm
1
7
A21.73 450mm long towel rail with total elgnth of 495mm, 78mm wide and effective hight of 88mm, weighin not less thatn
.1 170gms
28 A Finishing walls with Deluxe Multi surface paint system "Uni-Glosss" of M/s nowcem India Ltd., or equivalent
13.50 for interiors using Priming as per manufactures specifications
29 A Two or more coats applied @ 1.25 ltr/ 10 Sqm. Over and including one coat of special primer C-W applied @
13.50. 0.75 ltr / 10 Sqm
1
Sqm 3289.00 179.02 ₹ 588,796.78
30 A9.1 Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and
fixed Wood
A9.1.1 Teak in position:
Cum
D1 6 1 1.21 0.100 0.100 0.073
D1 6 2 2.03 0.100 0.100 0.244
TOTAL 0.32 63124.60 ₹ 19,960.00
31 A 9.7 Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows
including
A Teak Wood ISI marked black enamelled M.S butt hinges with necessary screws excluding, panelling which will
9.7.1 Cum
D1 1 6 2.03 2.13 25.94
D2 1 2 0.00 2.13 0.00
D3 1 2 0.00 2.13 0.00
TOTAL 25.94 1681.40 ₹ 43,621.23
32 A8.44 Providing 40x5 mm iron hold Each 8 8 135.62 ₹ 1,084.96
A8.65 fast
Providing and fixing bright
33 A8.65. finished brass butt
100x85x5.5mm hinges
(heavy type) Each 8 8 275.6 ₹ 2,204.80
3A8.67 with necessary screws etc.
Providing
complete and fixing bright
finished brass tower bolts
(barrel type) with necessary
screws etc. complete