PENGADAAN DAN PEMASANGAN PIPA GAS JIIPE MANYAR - GRESIK

CLEANING BEFORE HYDROSTATIC TEST REPORT


Project : Pengadaan dan pemasangan pipa gas jiipe Manyar - Gresik Report No :IAE-PIJ-HDR-CL-01

Employer : PT Inti Alasindo Energy Date : 04 Juni 2024


Work Executor : PT Panca Indah Jayamahe Location : Manyar-Gresik
Sub Work Executor : '- Weather : Cerah

Pigging Direction from : Kp 0+000 (KIM IV) to Kp 4+076 (KEK JIIPE)

Test Section : Compressor/ Pump :


Test Point : Manufacturer : KAESER
Pipe Diameter : 12 " Model : M350
Wall Thickness : 10,3 mm Maximum Pressure : 8,6 Bar
Length : 4.100 m Output : '- Ltr/min
Volume : 299,15 m3 Location : Manyar -Gresik

Equipment Manufacturer Model Serial No. Range Calibration Due


Foam Pig local - - - -

Air Kompresor KAESER M 350 - 0-8.6 BAR -

Run No. Pig Type Start End Pig-Speed Average Pressure (Psi)
(Mtr/mnt) Velocity Quantity of Debris (Kg)
Date Time Date Time Min. Max.
(Mtr/mnt)
1 Foam pig 04-06-24 10:10 04-06-24 10:42 128,12 - 100 102
2 Foam pig 04-06-24 10.15 04-06-24 10.42 128,12 - 100 102

Remark :

PT.Panca Indah Jayamahe PT .INTI ALASINDO ENERGY