November 7th 2022 P.

1 of 18

Location

rua Alm. Reis, 76 - 8700-567 Olhao


November 7th 2022 P. 2 of 18
rua Alm. Reis, 76 - 8700-567 Olhao
PLANS November 7th 2022
Ground floor
GroundLayout
floor

868.54
335.00 50.00 270.88 35.00 98.00 79.66

36.50
65.00 90.00
84.69

dice
20.00
131.00 132.99 91.71

Tv. do Ju
30.00 86.99 65.00 117.99
rua Alm. Reis

278.00
120.00
élévation AA'

426.80
72.30
197.92
ground floor
29,78 m2 68.00

193.01
131.50
71.00

107.00

55.50 529.76
176.00

46.82 145.00
83.00
93.00
10.00 470.76
177.35 10.00

erdade
949.98
ib
rua da L
139.00
19.17
November 7th 2022 P. 3 of 18
rua Alm. Reis, 76 - 8700-567 Olhao
PLANS November 7th 2022
First floor
First floor
Layout

32.26
175.48 185.52 314.38 194.36

87.16
85.00

udice
160.36 158.49

10.55
119.99 100.00
rua Alm. Reis

Tv. do J
9.51
93.00 120.00295.01

terrace 101.00 first floor


101.00
469.51 16,61 m2 14,95 m2
87.85
157.32

149.19
174.30

351.85
196.07
91.91 144.76
98.94 9.68
187.27 33.00
215.83 647.67 988.51

iber dade
rua da L
November 7th 2022
rua Alm. Reis, 76 - 8700-567 Olhao P. 4 of 18
PLANS November 7th 2022
Staircase
Staircase / Elevation AA'
Élévation AA’

89.00

15.00

293.00
272.00

168.00

117.00 65.00 251.00 91.00


November 7th 2022 P. 5 of 18

Demolishing
It will have to be confirmed by a structural engineer before any demolishing acts.

- Walls, flooring and integrated furnitures (represented in red) will be demolished after structural stu-
dies to be sure it would not damage the building.

- False ceiling will have to be removed at the ground and first floor.

- Windows (represented in red on the layout) will be removed and replaced with a wooden panel
during the works.

- Paint and tiiles on the walls, flooring and ceiling would be removed before the begining of the
construction works.
November 7th 2022 P. 6 of 18
rua Alm. Reis, 76 - 8700-567 Olhao
PLANS November 7th 2022
Ground floor / Demolishing
GroundLayout
floor / Demolishing

868.54
335.00 50.00 270.88 35.00 98.00 79.66

36.50
65.00 90.00
84.69

udice
20.00
131.00 269.98 35.00 97.99 91.71
30.00
rua Alm. Reis

Tv. do J
278.00
120.00
élévation BB'

426.80
72.30
197.92
ground floor
29,78 m2 68.00

131.50
71.00

55.50 529.76
176.00

46.82 145.00

373.35
470.76

dade
949.98
iber
rua da L
139.00
19.17
November 7th 2022 P. 7 of 18
rua Alm. Reis, 76 - 8700-567 Olhao
PLANS November 7th 2022
First floor / Demolishiing
First floor / Demolishing
Layout

32.26
175.48 185.52 314.38 194.36

87.16
85.00

dice
158.49
202.50

Tv. do Ju
229.50
rua Alm. Reis

120.00295.01

terrace 101.00 first floor


469.51 16,61 m2 14,95 m2
87.85

149.19

567.53 196.07
144.76

187.27

215.83 647.67 988.51

ib erdade
rua da L
November 7th 2022 P. 8 of 18
rua Alm. Reis, 76 - 8700-567 Olhao
PLANS November 7th 2022
Staircase / Demolishing
Staircase
Élévation BB’ / Elevation BB'

The wall would be aligned to the


begining of the 5th stair step. We
might need to add a beam to
maintain the structure above.

95.00

293.00
273.00

178.00

277.00 58.00 98.00 91.00

The wall under the stairs between


the actual main room and the
bathroom will be removed.
November 7th 2022 P. 9 of 18

Demolishing / Ground floor


It will have to be confirmed by a structural engineer before any demolishing acts.

The demolishing of the wall between this space and the other will also apppear in this space.
November 7th 2022 P. 10 of 18

Demolishing / Ground floor


It will have to be confirmed by a structural engineer before any demolishing acts.
November 7th 2022 P. 11 of 18

Demolishing / Ground floor / Staircase


It will have to be confirmed by a structural engineer before any demolishing acts.

Furnitures inside the actual bathroom will have to be removed.


November 7th 2022 P. 12 of 18

Demolishing / First floor


It will have to be confirmed by a structural engineer before any demolishing acts.
November 7th 2022 P. 13 of 18

Demolishing / First floor


It will have to be confirmed by a structural engineer before any demolishing acts.
November 7th 2022 P. 14 of 18

Demolishing / First floor


It will have to be confirmed by a structural engineer before any demolishing acts.
November 7th 2022 P. 15 of 18

Demolishing / Terrace
It will have to be confirmed by a structural engineer before any demolishing acts.
November 7th 2022 P. 16 of 18

Demolishing / Terrace
It will have to be confirmed by a structural engineer before any demolishing acts.

Flooring on the terrace will have to be flatten will the pergolas will be removed.
November 7th 2022 P. 17 of 18

Demolishing / Terrace
It will have to be confirmed by a structural engineer before any demolishing acts.
November 7th 2022 P. 18 of 18

Demolishing / Facade
It will have to be confirmed by a structural engineer before any demolishing acts.