Professional Documents
Culture Documents
221107_olhao_deck for Demolishing (1)
221107_olhao_deck for Demolishing (1)
1 of 18
Location
868.54
335.00 50.00 270.88 35.00 98.00 79.66
36.50
65.00 90.00
84.69
dice
20.00
131.00 132.99 91.71
Tv. do Ju
30.00 86.99 65.00 117.99
rua Alm. Reis
278.00
120.00
élévation AA'
426.80
72.30
197.92
ground floor
29,78 m2 68.00
193.01
131.50
71.00
107.00
55.50 529.76
176.00
46.82 145.00
83.00
93.00
10.00 470.76
177.35 10.00
erdade
949.98
ib
rua da L
139.00
19.17
November 7th 2022 P. 3 of 18
rua Alm. Reis, 76 - 8700-567 Olhao
PLANS November 7th 2022
First floor
First floor
Layout
32.26
175.48 185.52 314.38 194.36
87.16
85.00
udice
160.36 158.49
10.55
119.99 100.00
rua Alm. Reis
Tv. do J
9.51
93.00 120.00295.01
149.19
174.30
351.85
196.07
91.91 144.76
98.94 9.68
187.27 33.00
215.83 647.67 988.51
iber dade
rua da L
November 7th 2022
rua Alm. Reis, 76 - 8700-567 Olhao P. 4 of 18
PLANS November 7th 2022
Staircase
Staircase / Elevation AA'
Élévation AA’
89.00
15.00
293.00
272.00
168.00
Demolishing
It will have to be confirmed by a structural engineer before any demolishing acts.
- Walls, flooring and integrated furnitures (represented in red) will be demolished after structural stu-
dies to be sure it would not damage the building.
- False ceiling will have to be removed at the ground and first floor.
- Windows (represented in red on the layout) will be removed and replaced with a wooden panel
during the works.
- Paint and tiiles on the walls, flooring and ceiling would be removed before the begining of the
construction works.
November 7th 2022 P. 6 of 18
rua Alm. Reis, 76 - 8700-567 Olhao
PLANS November 7th 2022
Ground floor / Demolishing
GroundLayout
floor / Demolishing
868.54
335.00 50.00 270.88 35.00 98.00 79.66
36.50
65.00 90.00
84.69
udice
20.00
131.00 269.98 35.00 97.99 91.71
30.00
rua Alm. Reis
Tv. do J
278.00
120.00
élévation BB'
426.80
72.30
197.92
ground floor
29,78 m2 68.00
131.50
71.00
55.50 529.76
176.00
46.82 145.00
373.35
470.76
dade
949.98
iber
rua da L
139.00
19.17
November 7th 2022 P. 7 of 18
rua Alm. Reis, 76 - 8700-567 Olhao
PLANS November 7th 2022
First floor / Demolishiing
First floor / Demolishing
Layout
32.26
175.48 185.52 314.38 194.36
87.16
85.00
dice
158.49
202.50
Tv. do Ju
229.50
rua Alm. Reis
120.00295.01
149.19
567.53 196.07
144.76
187.27
ib erdade
rua da L
November 7th 2022 P. 8 of 18
rua Alm. Reis, 76 - 8700-567 Olhao
PLANS November 7th 2022
Staircase / Demolishing
Staircase
Élévation BB’ / Elevation BB'
95.00
293.00
273.00
178.00
The demolishing of the wall between this space and the other will also apppear in this space.
November 7th 2022 P. 10 of 18
Demolishing / Terrace
It will have to be confirmed by a structural engineer before any demolishing acts.
November 7th 2022 P. 16 of 18
Demolishing / Terrace
It will have to be confirmed by a structural engineer before any demolishing acts.
Flooring on the terrace will have to be flatten will the pergolas will be removed.
November 7th 2022 P. 17 of 18
Demolishing / Terrace
It will have to be confirmed by a structural engineer before any demolishing acts.
November 7th 2022 P. 18 of 18
Demolishing / Facade
It will have to be confirmed by a structural engineer before any demolishing acts.