hole cleaning

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 57

Computer

Computer Modeling
Modeling of
of Wellbore
Wellbore
Cleanup
Cleanup Operations
Operations
Presented at SPE-GCS Northside Group Luncheon Meeting

Gefei Liu
Pegasus Ventures, Inc.
September 10, 2002
Presentation
Presentation Contents
Contents
u Technical Background

u Mud displacement Software

u Case studies and Field Validation

u Software Demonstration
Benefits
Benefits from
from Cleaning
Cleaning of
of Wellbore:
Wellbore:
u Increased productivity and mud recovery
u Reduced rig time
u Reduced filtration time and expense
u Maintain integrity of the completion fluid
u Fewer mechanical failures of downhole equipment
u Reduce corrosion pitting
Wellbore
Wellbore Clean
Clean up
up Solutions:
Solutions:
u Chemical:
u Solvents
u Wetting agents
u Demulsifies, etc

u Mechanical cleaning:
u Brush tools
u Casing scrapers
u Brush/scraper combo
u Circulating tools
u Downhole Debris Filter
Mechanical
Mechanical Wellbore
Wellbore Cleaning
Cleaning Tools:
Tools:

u Brush tools
u Casing scrapers
u Brush/scraper combo
u Circulating tools
u Downhole debris filter
EZI-CHANGE TM 6
Self Centralizing Casing Brush 2
1
3
10

7 9
4
4

3
5
1 5

3
6 2

4 4
8

TOOL PART INFORMATION


1 - MILD STEEL STABILIZER SLEEVES
5 4 2 - CAPHEAD SCREWS
3 - SPRING WASHERS
10 4 - BRUSH PAD
5 - COIL SRINGS (BOW SPRINGS IN SMALLER TOOLS)
6 - FISHING NECK
7 - CENTRE RING
3
2 8 - API STANDARD THREADS (4 ½”IF & 3 ½” F & 2 3 8 ” REG)
9 - MAIN BODY
10 - STUB ACME THREAD
C EZI-FLOW INTERNATIONAL LTD
Mechanical
Mechanical Wellbore
Wellbore Cleaning
Cleaning Tools:
Tools:

u Brush tools
u Casing scrapers
u Brush/scraper combo
u Circulating tools
u Downhole Debris Filter
Mechanical
Mechanical Wellbore
Wellbore Cleaning
Cleaning Tools:
Tools:

u Brush tools
u Casing scrapers
u Brush/scraper combo
u Circulating tools
u Downhole Debris Filter
Mechanical
Mechanical Wellbore
Wellbore Cleaning
Cleaning Tools:
Tools:

u Brush tools
u Casing scrapers
u Brush/scraper combo
u Circulating tools
u Downhole Debris Filter
Mechanical
Mechanical Wellbore
Wellbore Cleaning
Cleaning Tools:
Tools:

u Brush tools
u Casing scrapers
u Brush/scraper combo
u Circulating tools
u Downhole Debris Filter
Hydraulics
Hydraulics modeling
modeling -- Rheological
Rheological Models
Models
Flow
Flow Patterns
Patterns
Plug flow:
flow

•Fluid moves as a single, undisturbed solid body

•Occurs at very low flow rates


Flow
Flow Patterns
Patterns
Laminar flow:
flow

•Laminar layer of the fluid is displayed.

•Each laminar layer moves in parallel direction.


Flow
Flow Patterns
Patterns
Turbulent flow:
flow

•Small eddies are formed.

•Velocity profile: flat in the middle, steep near the walls


Flow
Flow Patterns
Patterns
Change of flow type:
0 V
1 2 3 4 5

1. Plug flow
2. Core thickness decreases with increasing V
3. Laminar flow
4. Transition zone
5. Turbulent flow
Concerns
Concerns in
in aa Mud
Mud Displacement
Displacement Job
Job

u Mud displacement dynamics


u Flow rate design
u Tools such as circ. sub and its impact
u ECDs @ TD and weak zones
u Annular pressure profile during displacement
u Pump pressure / HP requirements
u Free-falling / back-filling calculation
Pressures
Pressures during
during aa Displacement
Displacement Job
Job
Pump P = Σ (Hydrostatic) Ann
- Σ (Hydrostatic) Pipe
+ Σ (Frictional) Ann
+ Σ (Frictional) Pipe

BH P = Σ (Hydrostatic) Ann
+ Σ (Frictional) Ann

Pay
Zone
U-Tubing:
U-Tubing: Free-fall
Free-fall –– Pump
Pump Pressure
Pressure
When Pump P < = 0, i.e.

Σ (Hydrostatic) Ann
- Σ (Hydrostatic) Pipe
+ Σ (Frictional) Ann
+ Σ (Frictional) Pipe < = 0

i.e. Heavy fluids inside pipe


Increased flow rate so that
Pay
Zone
Pump P = 0
U-Tubing:
U-Tubing: Free-fall
Free-fall –– Flow
Flow Rate
Rate
When flow rate > pump rate,

•A gap is developed in upper pipe.

•Well goes on “vacuum”.

•Free-fall starts.

Pay
•Flow rate changes constantly.
Zone
U-Tubing:
U-Tubing: Back
Back fill
fill –– Pump
Pump Pressure
Pressure
During U-tubing, when
Pump P > 0, i.e.

Σ (Hydrostatic) Ann
- Σ (Hydrostatic) Pipe
+ Σ (Frictional) Ann
+ Σ (Frictional) Pipe > 0

i.e. Heavy fluids enters annulus


Pay Decreased flow rate so that
Zone

Pump P = 0
Wellbore
Wellbore Integrity
Integrity during
during Displacement
Displacement
Pressure Profile

Frac gradient

at t = t1

at t = t2

Pay Pore gradient


Zone

Depth
Hazards
Hazards of
of U-Tubing
U-Tubing
u Loss of control on flow rate

u Difficulty in predicting of dynamic pressure profile

u Flow rate below the desired minimum rate

u Slow down of slurry reduces displace efficiency

u Formation breakdown

u Pipe collapse
Presentation
Presentation Contents
Contents
u Technical Background

u Mud displacement Software

u Case studies and Field Validation

u Software Demonstration
Benefits
Benefits of
of Computer
Computer Software
Software
u See the effects of design parameters beforehand
u Identify potential problems
u Optimize pump rates for displacement efficiency
u Predict flow dynamics including “free-fall”
u Predict circulating pressures during the job
u Engineering tool in planning or doing post-
analysis.
u Visualize the mud displacement process.
Main
Main Features
Features
u Flow dynamics during displacement for 3D wells
u Forward or reverse circulation

Drilling fluid
Spacer

Chemical wash
Scavenger

Brine completion fld


Main
Main Features
Features –– Con’t
Con’t
u Mud rehology: Bingham plastic or power law
u Flow pattern

uRequired flow rate


for turbulence for
fluids at different
geometry
Main
Main Features
Features –– Con’t
Con’t
u Circulation sub options
Main
Main Features
Features –– Con’t
Con’t
u Multiple zones of interest for ECD monitoring
u Oil field, SI and customized units
Main
Main Features
Features –– Con’t
Con’t
u Automatically export results into MS Word.
Presentation
Presentation Contents
Contents
u Technical Background

u Mud displacement Software

u Case studies and Field Validation

u Software Demonstration
Case
Case Study:
Study: –– Wellbore
Wellbore Clean
Clean Up
Up

Location: Gulf of Mexico


Fluid in place: 16.0 ppg WBM
Geometry: 9 5/8" casing, 7" liner & 2 5/8" DP
Max. deviation: 49 deg.
Cir. method: Long Way
Displacement system: Three pill System, unbalanced
Comparison of pump press. prediction and measurement

5000

Wellbore Displacement & Clean Up


4500 Location: Gulf of Mexico
Fluid in place: 16.0 ppg WBM
Geometry: 9 5/8" casing, 7" liner & 2 5/8" DP
4000 Max. Deviation: 49 deg.
Cir. Method: Long Way
Displacement System: Threepill System,
3500 unbalanced
PUMP PRESSURE, psi

3000

2500

2000

1500

1000
Actual
Clean up Model
500

0
0 50 100 150 200 250 300 350 400 450
VOLUME, bbl
Conclusions
Conclusions
u An engineering design simulator has been developed to
describe the flow dynamics of mud displacement.

u Optimize pump rates foe maximum displacement


efficiency by design the highest allowable pump rates,
without breaking down the formation.

u Predict ECDs and pressure profiles at any time.

u Forward and reverse flow, free-fall / back-fill, circ. sub.

u Calculates minimum pump rates for turbulence


Conclusions
Conclusions –– Con’t
Con’t
u Computer model helps engineers to identify
problem and optimize mud displacing
operations.

u Visualize the mud displacing, flow pattern and


resulting pressure profile during the job

uA unique software in the market, it is an


advanced engineering tool as well as a sales
tool.
Acknowledgements
Acknowledgements
We thank the following companies providing the slides to us
for this presentation:

u Baker Hughes INTEQ


u BJ Services
u Deep South Chemical
u Global Completion
u Tetra Technologies
u Well-Flow International
u ……

You might also like