Transition Path "System Conversion"

1. What tool provides guidance on replacing custom code developed for SAP ERP
with SAP S/4HANA functionality for the "System Conversion" transition path?
a. Software Update Manager with Database Migration Option
b. Simplification Item Check (SI-Check)
c. Software Provisioning Manager
d. SAP Code Inspector Agile Delivery Approach
2. What is the purpose of the Scrum Board?
a. To show the functional breakdown of the solution scope
b. To manage the resource load
c. To visualize team progress
d. To document the results of the Integration Test SAP Activate Elements
3. What does the Content element of SAP Activate provide? Note: There are 3
correct answers to this question.
a. Functional Specifications for WRICEF development
b. End-User guides
c. Business Processes Content
d. Migration Content
e. Integration Content
SAP Activate Overview
4. What is the purpose of the Solution Validation activity in the Explore phase?
Note: There are 3 correct answers to this question.
a. Educate project participants.
b. Log additional scope items.
c. Verify technical installation
d. Identify gaps.
e. Challenge changes to standard. Agile Delivery Approach
5. What is the objective of a Sprint Retrospective meeting?
a. Improve the Scrum process.
b. Define the stakeholder management approach.
c. Review and prioritize the Backlog.
d. Provide formal feedback to the Project Manager
Work streams Overview
6. What is the most granular level of the methodology you can view in the SAP
Roadmap Viewer?
a. Deliverables
b. Phase
c. Task
d. Scenario Agile Delivery Approach
7. When does the Scrum Team receive formal confirmation that the User Stories
are completed to the satisfaction of the Product Owner?
a. During the Sprint Retrospective
b. During the daily Scrum Meeting
c. During the sprint review
d. During the User Acceptance
Test Work Streams Overview
8. What tool would you use for managing project tasks and Solution
Documentation when implementing SAP S/4HANA Cloud?
a. SAP Roadmap Viewer
b. SAP Transformation Navigator
c. Implementation portal for SAP S/4HANA Cloud
d. SAP Support Marketplace Transition Path "New Implementation SAP S/4HANA Cloud"
9. How would you describe the Explore phase in the "New Implementation of SAP
S/4HANA Cloud" transition path?
a. Simplification and Custom Code Impact Analysis
b. Setup and enablement
c. Solution Validation and Delta Design
d. Fit-to-standard

Agile Project Planning


10. What information does the Project Team need before they can correctly estimate the
relative size of backlog User Stories?
a. Definition of Done
b. Overall project schedule
C. Test Strategy
d. Available project resources Transition Path "New Implementation SAP S/4HANA Cloud"
11. How does the provisioning of SAP S/4HANA Cloud differ from the setup of
SAP S/4HANA? Note: There are 2 correct answers to this question.
a. To start a Solution Validation workshop, a DEV system is available for SAP S/4HANA, while a
Starter system is required for Fit-to-standard for SAP S/4HANA Cloud.
b. There is a Preset phase for O-system, which is unique for SAP S/4HANA Cloud.
c. In SAP S/4HANA Cloud, decommissioning/shutdown of the Starter system is initiated
automatically after the P-system is requested through the Manage Your Solution app, whereas in
an SAP S/4HANA system, the DEV system persists.
d. SAP S/4HANA systems take less time to provision than SAP S/4HANA Cloud systems.
Workstreams Overview
12. Which tool can you use to collaborate with other SAP Activate Methodology
practitioners?
a. SAP Solution Manager
b. SAP Roadmap Viewer
C. SAP Jam
d. SAP Implementation Assistant

Agile Delivery Approach


13. What is the purpose of a Firm-up Sprint?
a. To revise the Release Plan and Sprint Plan
b. To demonstrate functionality from previous Sprints
c. To run an end-to-end Integration Test
d. To perform String test

Workstreams Overview
14. Which of the following are components of SAP Model Company? Note: There
are 3 correct answers to this question.
a. Preconfigured Solution
b. Business Process Content for SAP Solution Manager
c. Business-Driven Configuration Questionnaire
d. Quality Gate Checklist
e. Accelerators
Workstreams Overview
15. Which of the following tools are specific to the Data Management work
stream? Note: There are 3 correct answers to this question.
a. SAP Landscape Transformation
b. SAP Roadmap Viewer
c. SAP Data Services
d. SAP S/4HANA Migration Cockpit (for both SAP S/4HANA Cloud and SAP
S/4HANA editions)
e. SAP Solution Manager.
SAP Activate Elements
16. Which Value Chains does SAP Solution Manager7.2 deliver? Note: There are 3
correct answers to this question.
a. Detect-to-Correct
b. Request-to-Fulfill
c. Hire-to-Retire
d. Requirements-to-Deploy
e. Cash-to-Order SAP Activate Elements
17. Which end-to-end turn-key Application Lifecycle Management (ALM) solution
can support you in managing requirements and software development for large,
Agile projects?
a. Requirement Management
b. Change Request Management
c. Solution Manager Test Suite
d. Focused Build
Transition Path "New Implementation SAP S/4HANA
18. Which artifacts are created within Application Design and Configuration work
stream in the Explore phase of the "New Implementation of SAP
S/4HANA'transition path? Note: There are 3 correct answers to this question.
a. Delta Requirements List - Register
b. Roles and Authorizations Management Concept
c. Project Procedure - Mock-up Modeling
d. Detailed Design - Business Process
e. Organization Structure Specification

Agile Project Planning


19. Which new project roles are introduced with the SAP Activate
Methodology for the Agile delivery approach? Note: There are 2 correct
answers to this question.
a. Integration Lead
b. Scrum Master
c. Product Owner
d. Design Thinking Coach

Transition Path "New Implementation S/4HANA Cloud, Single Tenant Edition"


20. How often will an upgrade be performed on an SAP S/4HANA Cloud, Single
Tenant Edition environment?
a. One upgrade and two feature packs per year
b. Schedule is defined by Service Level Agreement for SAP HANA Enterprise Cloud and
SAP S/4HANA Cloud, Single Tenant Edition Services
c. Every year
d. Every quarter
Work streams Overview
21. Which collaboration features can SAP Jam users access in the SAP
Methodologies Jam group? Note: There are 2 correct answers to this question.
a. Comment on Key Deliverables
b. Update Key Deliverable wikis
C. Tweet questions
d. Ask questions

Agile Project Planning


22. Which activity helps the Project Team add User Stories to the Product
Backlog?
a. Planning the User Acceptance Test
b. Conducting the Solution Validation workshop
c. Assessing project risks
d. Preparing a project schedule
SAP Activate Elements
23. Where can you find Data Migration templates?
a. SAP Best Practices Explorer
b. SAP S/4HANA Migration Cockpit
c. SAP Cloud Appliance Library
d. SAP Roadmap Viewer
Transition Path "System Conversion
24. What tool is used to synchronize changes between SAP ERP and SAP
S/4HANA maintenance tracks?
a. SAP Code Vulnerability Analyzer
b. SAP Code Inspector
c. Business Process Change Analyzer
d. Retrofit
Transition Path "System Conversion"
25. What tool provides sizing estimations for the "System Conversion" transition
path?
a. SAP Readiness Check
b. SAP Transformation Navigator
c. SAP Best Practices Explorer What tool provides sizing estimations for the
"System Conversion" transition path
d. Scope and Effort Analyzer Transition Path "New Implementation S/4HANA Cloud, Single
Tenant Edition"
26. Which of the following will help you avoid modification of standard
functionality in SAP S/4HANA Cloud, Single Tenant Edit on? Note: There are 3
correct answers to this question.
a. Contract restrictions in SAP HANA Enterprise Cloud and SAP S/4HANA Cloud,
Single Tenant Edition
b. The 5 Golden Rules
c. SAP Code Inspector
d. A developer key
e. The Side-by-Side Extensibility Option (such as SAP Cloud Platform)

Transition Path "New Implementation S/4HANA Cloud, Single Tenant Edition"


27. Which statements are part of the 5 Golden Rules for SAP S/4HANA Cloud,
Single Tenant Edition? Note: There are 2 correct answers to this question.
a. Foster a cloud mindset and adherence to the Fit-to-Standard approach.
b. Document deviations from Golden Rules for transparency and future use in
upgrades.
c. Stick to the security standards of the customer organization.
d. Use SAP Solution Manager 7.2 with Focused Build
SAP Activate Overview

28. What is SAP Activate?


a. A bundle of ASAP SAP Launch, and Rapid Deployment Solutions
b. A Solution Adopt on Framework
c. Step-by-step instructions on how to move from SAP Best Practices to your
custom solution
d. A methodology for each of the deployment modes (cloud, on premise, hybrid)
Agile Delivery Approach
29. How do you set up Scrum teams? Note: There are 2 correct answers to
this question.
a. As a cross-functional team covering multiple functions, like configuration, data
loads, and testing
b. Based on group size, but a minimum of 12 people
c. Based on End-to-End Processes like Order-to-Cash
d. By type of work, like configuration Scrum, documentation Scrum, and testing Scrum.
SAP Activate Overview
30. What are some of the key characteristics of the implementation approach in
SAP Activate Methodology? Note: There are 3 correct answers to this question.
a. Based on Ready-to-use Content
b. Cloud Ready
c. On premise only
d. Fixed scope
e. Delta-based

Transition Path "New Implementation SAP S/4HANA


31. What is the term used for workshops, which are intended to set value targets,
validate SAP Standard functionality against customer requirements. And collect delta
requirements in the "New Implementation of SAP S/4HANA' transition path?
a. Solution Validation
b. Design Thinking
c. Delta Design
d. Fit-to-Standard
Transition Path "New Implementation SAP S/4HANA
32. Via which media does SAP provide Ready-to-run systems for SAP S/4HANA
deployments? Note: There are 2 correct answers to this question.
a. SAP Cloud Appliance Library
b. Blu-ray disks
c. SAP Solution Builder tool
d. SAP App Center Work Streams Overview
33. What Sprint types are part of the SAP Activate Methodology? Note: There are 3
correct answers to this question.
a Foundational
b. Build
c. Firm-up
d. Initial
e. Daily
Transition Path "New Implementation SAP S/4HANA
34. How would you describe the Realize phase in the New Implementation of SAP
S/4HANA" transit on path?
a. Configure and adjust custom code
b. Configure
c. Configuration copy
d. Configure and develop

SAP Activate Overview


35. What are two important approaches, based on the Control Center concept that
SAP proposes to use for streamlined implementation and operations within
Premium Engagements? Note: There are 2 correct answers to this question.
a. Build SAP Like a Factory
b. Always Connected
c. Intelligent Enterprise
d. Run SAP Like a Factory

SAP Activate Overview


36. What Solution Operations Framework can customers use to create a joint Business
and IT organization, that will secure transparency and efficiency of SAP
implementation, innovation, operation, and quality of business processes and
systems?
a. SAP Activate
b. Customer Center of Expertise
c. SAP Operations Control Center
d. Business Transformation Management Methodology

Transition Path "Selective Data Transition


37. Which of the following scenarios are enabled for the "Selective Data
Transition" transition path with the SAP Landscape Transformation tool? Note:
There are 3 correct answers to this question.
a. Security Migration
b. System Upgrade
c. Extract on of Business Units
d. System Consolidation
e Consolidation through online data replication
Transition Path "Selective Data Transition"
38. In which phase should you create a Data Migration Strategy (LO)
during a Selective Data Transition?
a. Deploy
b. Realize
c. Discover
d. Explore
Transition Path "New Implementation SAP S/4HANA Cloud
39. Which accelerators support the Fit-to-standard workshop in the Explore
phase? Note: There are 2 correct answers to this question.
a. Backlog template
b. Business-Driven Configuration Questionnaire
c. Test Strategy
d. Quality Gate Checklist

Agile Delivery Approach


40. According to the Definition of Done, which activity must be completed for
each Sprint?
a. End-user training must be delivered.
b. The solution must be built and configured in the development system (DEV).
c. Functionality must be released to the business.
d. Functionality must be tested in the quality system (OAS).
Transition Path "New Implementation S/4HANA Cloud, Single Tenant Edition"
41. Why is there NO Sandbox system in the "New Implementation of SAP
S/4HANA Cloud, Single Tenant Edition" transition path?
a. Because the Fit-to-Standard workshop is conducted using the O-system
b. Because the customer may use the SAP Model Company
c. Because SAP S/4HANA Cloud, Single Tenant Edition, contains predefined business
processes which should NOT be changed
d. Because the project team uses the DEV system to confirm solution fit and define delta
requirements

Workstreams Overview
42. What are some of the key topics covered in the Customer Team Enablement
workstream? Note: There are 3 correct answers to this question.
a. Solution Expertise
b. Project Management
c. Technical Expertise
d. Project Sourcing Approach
e. Planning skills
Workstreams Overview
43. What term is used for a Ready-to-run SAP S/4HANA system with pre-built
Solution Documentation, which supports End-to-End Processes for a specific
industry so that the Project Team can focus on differentiation and innovation?
a. Best Practice System
b. Fully Activated Appliance
c. SAP Cloud Appliance Library
d. SAP Model Company
SAP Activate Elements
44. Where can you find the Integration Content? Note: There are 3 correct
answers to this question.
a. Cloud Integration Automation Service
b. SAP Cloud Appliance library
c. SAP API Business Hub
d. SAP Solution Manager
e. SAP Best Practices Explorer
Workstreams Overview
45. In SAP Activate, what tool is used in the Agile Delivery Approach during
the Realize phase to make forecasts based on actual data?
a. Product Increment
b. Burn down Chart
c. Release Plan
d. Project Plan
SAP Activate Elements
46. Which of the following are benefits of using Ready-to-use Content? Note:
There are 2 correct answers to this question.
a. Predictable results
b. Run SAP Like a Factory
c. Minimized Total Cost of Ownership
d. Fast Time-to-Value
SAP Activate Elements
47. Which of the following are examples of Ready-to-run SAP S/4HANA systems?
Note: There are 2 correct answers to this question.
a. Fully Activated Appliance
b. SAP Best Practices Explorer
c. SAP Mission Control Center
d. SAP Model Company

Workstreams Overview
48. What is the order of art facts within the Technical Architecture and
infrastructure workstream in the Prepare phase?
a. Technical strategy -> Hardware specification from Hardware Vendor -> Parameters Hardware
Sizing calculation -> Hardware Sizing results.
b. Hardware specification from Hardware Vendor -> Parameters Hardware Sizing calculation ->
Hardware Sizing results -> Technical Strategy
c. Technical Strategy -> Parameters Hardware Sizing calculation -> Hardware Sizing results ->
Hardware Specification from Hardware Vendor.
d. Hardware specification from Hardware Vendor -> Technical Strategy -> Parameters
Hardware Sizing calculation -> Hardware Sizing results.
Workstreams Overview
49. In which phase do you create an ordered list of everything that is known to be
needed in the product"?
a. Explore
b. Prepare
c. Realize
d. Deploy
Agile Project Planning
50. Which estimation technique can be used in Agile Delivery Approach to size
the User Stories during Sprint Planning?
a. Product Owner's relative estimate of the effort that will be needed to implement the User
Story.
b. Detailed bottom-up effort estimate by the Scrum Master in Story Points basedon the User
Story complexity
c. Relative estimate in Ideal Person Days that reflects the best estimate provided by
the project team
d. Detailed bottom-up effort estimate that breaks each User Story up into hours or shorter tasks
Workstreams Overview
51. What does the Side-by-Side Extensibility Option mean?
a. Have two SAP S/4HANAinstances - one for standard code, and another for custom
developments
b. Context-aware SAP S/4HANA extensions, focused on tight integration
c. Transfer reporting to BW/4HANA
d. Extensibility based on the SAP Cloud Platform and published APIs
Transition Path "New Implementation SAP S/4HANA"
52. In the "New Implementation of SAP S/4HANA" transition path, which systems
are part of the project system landscape? Note: There are 2 correct answers to
this question.
a. DEV
b. P-system
c. Starter system
d. QAS Agile Delivery Approach
53. Which new role is introduced in the SAP Activate Methodology in a Full Scrum
Team?
a. Project Manager
b. Application Consultant
c. System Administrator
d. Product Owner Transition Path "System Conversion"
54. What is the best target deployment option of SAP S/4HANA for the “System
Conversion” transition path?
a. SAP C/4HANA
b. SAP S/4HANA Cloud
c. Hybrid of SAP S/4HANA Cloud and SAP S/4HANA
d. SAP S/4HANA
SAP Activate Elements

55. Ready-to-use Content in SAP Activate includes which of the following? Note:
There are 2 correct answers to this question.
a. Courses delivered by SAP Education
b. SAP Best Practices
c. Business models from leading companies in each industry sector
d. Project Accelerators
Agile Delivery Approach
56. What criterion does the Product Owner use to sequence the Product Backlog?
a. Relative effort
b. Complexity
c. Resource availability
d. Business priority

Workstreams Overview
57. In which phase will the customer develop a preliminary strategy for building a
target Operations and Support organizational model?
a. Prepare phase
b. Run phase
c. Explore phase
d. Discover phase

SAP Activate Overview


58. What is the primary purpose of the SAP Activate Methodology?
a. To manage solution documentation
b. To provide the sequence of actions in the project
c. To provide end-to-end Application Lifecycle Management
d. To enable access to the SAP ecosystem
Transition Path "New Implementation SAP S/4HANA Cloud
59. What is the difference between the "New Implementation of SAP S/4HANA
Cloud" and the "New Implementation of SAP S/4HANA" transit on paths? Note:
There are 2 correct answers to this question.
a. Different sets of work streams are used for these transition paths.
b. Upgrades of SAP S 4HANA Cloud are managed by SAP, and upgrades of SAP
S/4HANA are managed by the customer.
c. There are different roles in the Application Design and Configuration workstream.
d. SAP S/4HANA uses the implementation Guide (IMG) and the In-App Extensibility
Option for configuration and development and SAP S/4HANA Cloud uses SSCUls and
the Side-by-Side Extensibility Option. Workstreams Overview
60. Which artifacts are part of the Solution Adopt on work stream? Note:
There are 3 correct answers to this question.
a. Project Plan
b. Detailed Design - Business Process
c. Business Transformation Review (Point of View)
d. System Go live Announcement (order)
e. Project Business Case
Transition Path "Selective Data Transition"
61. In which phase should you first run the SAP Readiness Check for SAP S/4HANA
in a "Selective Data Transition" transit on path, in a System Consolidation scenario
that includes conversion from SAP ERP?
a. Discover
b. Prepare
c. Explore
d. Realize
Transition Path "New Implementation SAP S/4HANA Cloud"
62. What accelerator can help you document the Configuration Definition in the
Explore phase?
a. Data Definition
b. Change Request template
c. Backlog template
d. Test Strategy
Transition Path "New Implementation SAP S/4HANA Cloud"
63. Which of the following is part of the Explore phase in the "New Implementation
of SAP S/4HANA Cloud' transition path?
a. Setup and Enablement
b. Simplification and Custom Code Impact Analysis
c. Fit-to-standard
d. Solution Validation and Delta Design
Transition Path "New Implementation SAP S/4HANA Cloud"
64. Which of the following belong to the Application Design and Configuration
work stream for SAP S/4HANA Cloud in the Explore phase? Note: There are 2
correct answers to this question.
a. Kick-off workshop
b. Configuration definition
c. Fit-to-standard workshop
d. Integration prerequisites confirmation
Agile Delivery Approach
65. What is the key characteristic of the agile project approach?
a. Iterative build with frequent inspections
b. Formal and detailed documentation
c. Frequent Quality Gates
d. Frequent and detailed project scheduling
Agile Delivery Approach
66. How do you achieve frequent checkpoints with the End User in an Agile
Delivery Approach? Note: There are 2 correct answers to this question.
a. Solution Demo for Sprints
b. Demo the SAP Model Company
c. User Acceptance Test
d. Solution Review for Waves
SAP Activate Overview
67. What is the basis for approving work results (signing Act of Acceptance) on a
Project Phase level?
a. Agreed and met Acceptance Criteria within Quality Gate
b. Definition of Done for User Story
c. Definition of Ready for Sprint
d. Scrum of Scrums meeting decision
Agile Project Planning
68. What technique helps a Scrum Team to prioritize a large, flat Backlog?
a. Fit Gap analysis
b. Retrospective
c. User Story Mapping
d. Planning Poker
Transition Path "New Implementation SAP S/4HANA Cloud"
69. Which art facts in the Testing work stream are created within the Realize phase for
the New Implementation of SAP S/4HANA Cloud" transition path? Note:
There are 2 correct answers to this question.
a. Functional Test Scenarios
b. Functional Specifications
C. Reporting Functional Specifications
d. User Acceptance Test - Plan
Transition Path "System Conversion"
70. What is the difference between the "System Conversion and the "New
Implementation of SAP S/4HANA" transit on paths? Note: There are 2 correct
answers to this question.
a. There are different upgrade cycles.
b. In the Realize phase, custom code is adjusted rather than developed for System Conversion
c. SSCUIs are used in System Conversion for configuring SAP S/4HANA through the Manage
Your Solution app.
d. In the Realize phase, data is converted and NOT migrated for System Conversion
Agile Project Planning
71. What is Scrum of Scrums?
a. Mechanism for gathering and validating requirements
b. Frequent inspection of code and configuration prior to Quality Gates
c. Alternative to regular Scrum process for smaller teams
d. Integration meeting between the various project teams
Agile Project Planning
72. What are the responsibilities of the Product Owner in Release and Sprint
Planning? Note: There are 2 correct answers to this question.
a. Define objectives for each Release.
b. Analyze the functional and technical dependencies between User Stories.
c. Estimate the backlog User Stories.
d. Prioritize backlog User Stories by business priority
SAP Activate Overview
73. In which phase do you verify that the SAP Best Practices content meets the
customer's business needs, and then capture gaps?
a. Prepare
b. Deploy
c. Explore
d. Realize
Workstreams Overview
74. Which of the following are levels in the structure of an SAP Best Practices
Solution Package? Note: There are 2 correct answers to this question.
a. Scope Items
b. Building Blocks
c. Configuration Guides
d. Business Process Scenarios
SAP Activate Overview
75. Which of the following are part of the 10 SAP Quality Principles? Note: There
are 2 correct answers to this question.
a. Start scoping early.
b. Plan one phase at a time.
c. Use standard functionality optionally.
d. Achieve production readiness.
SAP Activate Elements
76. What is a Strategy Level (LO) artifact?
a. Project result that is developed solely by the partner
b. Preliminary strategy developed by the customer to approach the project in a specific work
stream
c. Approach document that is developed by a united Project Team (partner +customer)
d. Optional information that is NOT important for project activities
d. Optional information that is NOT important for project activities
Agile Delivery Approach
77. Who determines the tasks that are required to complete the committed
Backlog Items in a Sprint?
a. Scrum Master
b. Product Owner
c. Project Team
d. Project Manager
Agile Project Planning
78. Working in an Agile approach, what should your planning look like at the
beginning of the Realize phase?
a. Go-Live scope is fixed on the first of January the following year.
b. Timelines of the Sprint may differ due to the workload.
c. Project scope and planning are completed and final.
d. User Stories are in a Ready state for NO more than the first three Sprints
Workstreams Overview
79. Which of the following content best outlines the sequence of testing within
the Application Design and Configuration work stream in the Realize phase?
a. i. String test
ii. User Acceptance Test
iii. Integration Test
b. i. Data Migration
ii. String test
iii. User Acceptance Test
c. i. Integration Test
ii. User Acceptance Test
iii. String test
d. i. String test
ii. Integration Test
iii. User Acceptance Test
80. In which phase do you execute the User Acceptance Test?
a. Build and Test
b. Realize
c. Deploy
d. Final Preparation