Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

NATIONAL OILWELL DRILLING & WORKOVER COMPANY.

Daily Drilling Report # 21

NWD Rig # U-124 Well, Name: Type Object. Company: Waha Oil Com.
B 195 I - 59
Date Days Moving Days Since Spud Total Days Roll Days Out of Pay Roll
19/08/2022 7 7 0
Proposed T.D R.O.P 1.Depth 2. Total 3.Rotary R.P.M 4.Flow Rate G.P.M
6189’ 60 ’3350 90 625
5.Pump # 1 6. Pump # 2 7.Pump 8.Total Pressure 9. Deviation Survey.
LINER = 7 '' LINER= 7 '' Combined 1500 ½ DEG @ 1880’
SPM = 60 SPM = 60 120 spm
10.Hole size 11. Csg size 12. Csg Shoe 13. Mud Weight. PPG Tool Pusher
12 ¼ ” 13 3/8 ” 1890’ 9 Fouad Alzoubi
14. Slow Pump Rate @ Company Man.
Pump one SPM psi Pump two SPM psi Jamal Yekhlif
SPM psi SPM psi
Drilling Line Last Cut. Crown O-Matic Ton Miles NWD Personnel Others Personnel Owner
New drilling Line ‘’ok’’ 350 45 16
Visitor Days since Last Accident Blow Out Preventer
339 Reaction: Trip Drill Second = 72 sec.
BHA =
Present Operation CONT. DRLG 12 ¼ '' HOLE TO CSG POINT
FROM TO Hrs Time Distribution ( Operation )
CONT. DRLG 12 1/4" HOLE F/ 2150', TO 2688', GOT PARTIAL LOSS W/ 87% RTNS, AVG ROP WC =
5:00 16:00 11 49 FPH & WOC = 58 FPH, LAST SAMPLE SHOWED, 100 % LIME STONE @ 2630', SWEEP HOLE
INTERMITTENTLY W/15 BBLS OF HIGH VIS -PILL.
PUMP 30 BBL'S OF HI-VIS AND CONT. DRLG 12 1/4'' HOLE F/2688' T/3350' W/ FULL MUD RTNS,
16:00 5:00 13 AVG ROP WC = 51 FPH & WOC = 61 FPH, LAST SAMPLE SHOWED, 100 % LIMESTONE @ 3290',
SWEEP HOLE INTERMITTENTLY W/15 BBLS OF HIGH VIS -PILL.

TOTAL 24
Field Brake Received Requirements
Equipment Drilling Line. Sand Line. Repair Time/Hrs
Rented Rig Move.= No of Loads = 1 3/8’’ 5/8’’

FORKLIFT 2 Oxygen Acetylenes No. Vehicle Condition


TRUCK Full 16 Full 11 4 Fair
1 Empty 7 Empty 5 Cumm -Time
RENTAL CRAN Rig Diesel (barrel) Camp Diesel ( barrel)
0 135 20

You might also like