NSH - PROJECT

CONTRACTOR: Kaizer Construction Co. Ltd.


Measurement Book :
Item No Description UOM NO Length Width Unit Wt QTY Remarks

Structural steel
OT BUILDING
EAST SIDE
EAST SIDE INSDE ISMB 250 Kg 1.00 26.05 37.3 971.665 971.665
SPLICE PLATE 16 MM Kg 1.00 0.4 0.16 125.6 8.038
SPLICE PLATE 16 MM Kg 1.00 0.4 0.11 125.6 5.526
SPLICE PLATE 12 MM Kg 2.00 0.3 0.2 94.2 11.304
ISA 75X75X6 Kg 6.00 0.2 6.8 8.160

EAST SIDE OUTSDE ISMB 250 OUTER Kg 1.00 26.05 37.3 971.665 971.665
EAST SIDE OUTSDE ISMB 250 INNER 1.00 24.80 37.3 925.040 925.040
SPLICE PLATE 16 MM Kg 4.00 0.4 0.16 125.6 32.154
SPLICE PLATE 12 MM Kg 8.00 0.3 0.2 94.2 45.216
ISA 75X75X6 Kg 4.00 0.2 6.8 5.440

NORTH SIDE
NORTH SIDE INSDE ISMB 250 Kg 1.00 49.55 37.3 1848.215 1848.215
SPLICE PLATE 16 MM Kg 6.00 0.4 0.16 125.6 48.230
SPLICE PLATE 16 MM Kg 6.00 0.4 0.11 125.6 33.158
SPLICE PLATE 12 MM Kg 6.00 0.3 0.2 94.2 33.912
ISA 75X75X6 Kg 12.00 0.2 6.8 16.320

NORTH SIDE OUTSDE ISMB 250 OUTER Kg 1.00 48.55 37.3 1810.915 1810.915
NORTH SIDE OUTSDE ISMB 250 INNER 1.00 47.05 37.3 1754.965 1754.965
SPLICE PLATE 16 MM Kg 4.00 0.4 0.16 125.6 32.154
SPLICE PLATE 12 MM Kg 8.00 0.3 0.2 94.2 45.216
ISA 75X75X6 Kg 4.00 0.2 6.8 5.440

WEST SIDE
WEST SIDE INSDE ISMB 250 Kg 1.00 24.13 37.3 900.049 900.049
SPLICE PLATE 16 MM Kg 1.00 0.4 0.16 125.6 8.038
SPLICE PLATE 16 MM Kg 1.00 0.4 0.11 125.6 5.526
SPLICE PLATE 12 MM Kg 2.00 0.3 0.2 94.2 11.304
ISA 75X75X6 Kg 8.00 0.2 6.8 10.880
WEST SIDE OUTSDE ISMB 250 OUTER Kg 1.00 26.05 37.3 971.665 971.665
WEST SIDE OUTSDE ISMB 250 INNER 1.00 24.80 37.3 925.040 925.040
SPLICE PLATE 16 MM Kg 4.00 0.4 0.16 125.6 32.154
SPLICE PLATE 12 MM Kg 8.00 0.3 0.2 94.2 45.216
ISA 75X75X6 Kg 4.00 0.2 6.8 5.440
SOUTH SIDE
SOUTH SIDE INSDE ISMB 250 Kg 1.00 15.00 37.3 559.500 559.500
SPLICE PLATE 16 MM Kg 1.00 0.4 0.16 125.6 8.038
SPLICE PLATE 16 MM Kg 1.00 0.4 0.11 125.6 5.526
SPLICE PLATE 12 MM Kg 2.00 0.3 0.2 94.2 11.304
ISA 75X75X6 Kg 4.00 0.2 6.8 5.440
WEST SIDE OUTSDE ISMB 250 OUTER Kg 1.00 9.625 37.3 359.013 359.013
WEST SIDE OUTSDE ISMB 250 INNER 1.00 8.875 37.3 331.037 331.037
SPLICE PLATE 16 MM Kg 4.00 0.4 0.16 125.6 32.154
SPLICE PLATE 12 MM Kg 8.00 0.3 0.2 94.2 45.216 12328.769
ISA 75X75X6 Kg 4.00 0.2 6.8 5.440

Total Kg 12890.71
Total MT 12.89
ISMB 250 PLATE 16 MM PLATE 12 MM ISA 75
12.329 0.257 0.248688 0.06256

NSH - PROJECT
CONTRACTOR: Kaizer Construction Co. Ltd.
Measurement Book :
Item No Description UOM Length Width Unit Wt QTY Remarks
NO

Structural steel
OT BUILDING
EAST SIDE
INSURT PLATE 16 MM Kg 5.00 0.55 0.275 125.6 94.985

NORTH SIDE
INSURT PLATE 16 MM Kg 11.00 0.55 0.275 125.6 208.967

WEST SIDE
INSURT PLATE 16 MM Kg 5.00 0.55 0.275 125.6 94.985
SOUTH SIDE
SOUTH SIDE INSDE ISMB 250 Kg 1.00 15.00 37.3 559.500
INSURTPLATE 16 MM Kg 4.00 0.55 0.275 125.6 75.988

Total Kg 1034.43
Total MT 1.03
NSH - PROJECT
CONTRACTOR: Kaizer Construction Co. Ltd.
Measurement Book :
Item No Description UOM Length Width Unit Wt QTY Remarks
NO

Structural steel
OT BUILDING
EAST SIDE
CHQ.PLATE 6 MM Kg 1.00 26.25 0.715 56.148 1053.828

NORTH SIDE
CHQ.PLATE 6 MM Kg 1.00 48.55 0.83 56.148 2262.568

WEST SIDE
CHQ.PLATE 6 MM Kg 1.00 26.25 0.715 56.148 1053.828

SOUTH SIDE
CHQ.PLATE 6 MM Kg 1.00 8.875 0.715 56.148 356.294

Total Kg 4726.52
Total MT 4.73
PACKAGE:NHS/HOWRAH/EXPANSION PROJECT/1394/21-22
Vendor:KAIZER CONSTRUCTION CO.LTD.
Project: EXPANSION OF NSH PROJECT
SHEET: JMR Summary

SL BRICK RCC BRICK BRICK BAT LOCKSET (NO


No. PART WORKS DISMANTLING DISMANTLING DISMANTLING
(Sqm) (Cum) (Cum) (Cum) 08mm 12mm
1 PART- A 23.84 17.61 10.21 6.65 - -
2 PART- B 51.62 14.58 33.59 3.87 - -
3 PART- C - 26.86 26.19 7.50 100.00 156.00
4 PART- D - 0.792 14.508 - - -
5 PART- E - - - - - 33.00

TOTAL 75.45 59.83 84.50 18.02 100.00 189.00


LOCKSET (NOS)

16mm 20mm 25mm


- - 3.00
2.00 75.00 114.00
16.00 47.00 1.00
5.00 2.00 -
- 11.00 4.00

23.00 135.00 122.00


PACKAGE:NHS/HOWRAH/EXPANSION PROJECT/1394/21-22
Vendor:KAIZER CONSTRUCTION CO.LTD.
Project: EXPANSION OF NSH PROJECT
SHEET: JMR for Part-A

Measurement Book : Brick work at Part-A


BOQ
Item Description UOM NO
No

7.20 BRICK WORKS


Brick Work at Part- A
Brick Work near Column C35 for Part-A Sqm 1
Brick Work near Column C36 (Both Side) for Part-A Sqm 2
Brick Work near Column C37 (Both Side) for Part-A Sqm 1
Sqm 1
Brick Work near Column C38 (Both Side) for Part-A Sqm 1
Sqm 1
Brick Work near Column C39 (Both Side) for Part-A Sqm 1
Sqm 1
Brick Work near Column C40 (Both Side) for Part-A Sqm 1
Sqm 1
Brick Work near Column C30 (Both Side) for Part-A Sqm 1
Sqm 1
Brick Work near Column C31 for Part-A Sqm 1
Brick Work near Column C58 (Both Side) for Part-A Sqm 1
Sqm 1
Brick Work near Column C55 (Both Side) for Part-A Sqm 1
Sqm 1
Brick Work near Column C54 (Both Side) for Part-A Sqm 1
Sqm 1
Brick Work near Column C53 (Both Side) for Part-A Sqm 1
Sqm 1
Brick Work near Column C47 (Both Side) for Part-A Sqm 1
Sqm 1
Brick Work near Column C41 for Part-A Sqm 1
OT Building 6th Floor Slab
South Side Bund Wall Sqm 1
For Cutout -1 Sqm 1
For Cutout -2 Sqm 1
For Cutout -3 Sqm 1
For Cutout -4 Sqm 1
For Cutout -5 Sqm 1
For Cutout -6 Sqm 1
For Shaft -01 Sqm 1
For Shaft -02 Sqm 1
For Shaft -03 Sqm 1
For Shaft -04 Sqm 1
TOTAL sqm
Measurement Book : RCC Dismantling Work
BOQ
Description UOM NO
Item No
9)a RCC DISMANTLING
RCC COLUMN DISMANTLING FOR OT BUILDING PART -A
1 C42,C43,C44,C45,C46 C48,C49,C50,C51,C52 cum 10.00
2 C36,C37,C39, cum 3.00
3 C54,C55,C56,C57,C58 cum 5.00
4 C35,C53,C28,C31 cum 4.00
5 C41,C47,C29,C30 cum 4.00
6 C40 cum 1.00
7 C38 cum 1.00
TOTAL cum

Measurement Book : Brick Dismantling Work


BOQ
Description UOM NO
Item No
9)b BRICK WORKS DISMANTLING
Brick Dismangtling Work at Part- A
Brick Dismantling Work near Column C35 for Part-A Cum 1
Cum 1
Brick Dismantling Work near Column C36 (Both Side) for Part-A Cum 2
Brick Dismantling Work near Column C37 (Both Side) for Part-A Cum 1
Cum 1
Brick Dismantling Work near Column C38 (Both Side) for Part-A Cum 1
Cum 1
Brick Dismantling Work near Column C39 for Part-A Cum 1
Brick Dismantling Work near Column C40 for Part-A Cum 1
Brick Dismantling Work near Column C41 for Part-A Cum 1
Brick Dismantling Work near Column C28 (Both Side) for Part-A Cum 1
Cum 1
Brick Dismantling Work near Column C29 for Part-A Cum 1
Brick Dismantling Work near Column C30 (Both Side) for Part-A Cum 1
Cum 1
Brick Dismantling Work near Column C31 for Part-A Cum 1
Brick Dismantling Work near Column C58 (Both Side) for Part-A Cum 1
Brick Dismantling Work near Column C57 for Part-A Cum 1
Brick Dismantling Work near Column C55 (Both Side) for Part-A Cum 1
Cum 1
Brick Dismantling Work near Column C54 (Both Side) for Part-A Cum 2
Brick Dismantling Work near Column C53 (Both Side) for Part-A Cum 1
Cum 1
Brick Dismantling Work near Column C47 (Both Side) for Part-A Cum 1
Cum 1
Part-A & Part-D expansion joint (C63 to C56) Cum 1
TOTAL cum
Measurement Book : Bricks bat Dismantling Work
BOQ
Description UOM NO
Item No
9)c Removing of Brick bat from terrace
DISMANTLNG FOR OT BUILDING ISMB TRENCH
Part-A OT Building (North Side) ISMB Trench PCC Dismantling from
Cum 1
C28 to C35
Part-A OT Building (West Side) ISMB Trench PCC Dismantling from
Cum 1
C53 to C35
Part-A OT Building (East Side) ISMB Trench PCC Dismantling from
1
C28 to C31
Part-A OT Building (South Side) ISMB Trench PCC Dismantling
Cum 1
From Column C31 to C57
Part-A OT Building (South Side) ISMB Trench PCC Dismantling
Cum 1
From Column C53 to C55
TOTAL cum

Measurement Book : LOCKSET 25mm


BOQ
Description UOM NO
Item No
4.1B a LOCKSET 25 MM DIA BAR
PART-A 5th floor nos
Column C45 nos 3.00
TOTAL Nos
Length Width Height QTY Remarks

0.5 1.05 0.53


0.7 1.05 1.47
0.7 1.05 0.74
1.3 1.05 1.37
0.4 1.05 0.42
1.2 1.05 1.26
0.2 1.05 0.21
0.87 1.05 0.91
0.70 1.05 0.74
0.66 1.05 0.69
0.4 1.05 0.42
0.8 1.05 0.84
0.7 1.05 0.74
0.95 1.05 1.00
0.25 1.05 0.26
0.8 1.05 0.84
0.3 1.05 0.32
0.3 1.05 0.32
1 1.05 1.05
1.2 1.05 1.26
0.6 0.5 0.30
1.2 1.05 1.26
0.5 1.05 0.53
0.7 1.05 0.74

20.55 0.075 1.54


6.54 0.075 0.49
5.36 0.075 0.40
6.364 0.075 0.48
4.53 0.075 0.34
8.54 0.075 0.64
6.24 0.075 0.47
4.1 0.075 0.31
4.38 0.075 0.33
4.34 0.075 0.33
4.46 0.075 0.33
23.84
Length Width Height QTY Remarks

0.8 0.8 1.15 7.360


0.7 0.6 1.15 1.449
0.7 0.6 1.15 2.415
0.6 0.6 1.15 1.656
0.8 0.6 1.15 2.208
0.7 0.6 3 1.260
0.7 0.6 3 1.260
17.61

Length Width Height QTY Remarks

1.7 0.3 1.05 0.536


1.7 0.3 1.05 0.536
0.7 0.3 1.05 0.441
0.7 0.3 1.05 0.221
1.3 0.3 1.05 0.410
0.4 0.3 1.05 0.126
1.2 0.3 1.05 0.378
2.00 0.3 1.05 0.630
1.7 0.3 1.05 0.536
2.1 0.3 1.05 0.662
1.5 0.3 1.05 0.473
1.6 0.3 1.05 0.504
1.4 0.3 1.05 0.441
0.4 0.3 1.05 0.126
0.8 0.3 1.05 0.252
1.6 0.3 1.05 0.504
1.2 0.3 1.05 0.378
1.6 0.3 1.05 0.504
0.8 0.3 1.05 0.252
0.3 0.3 1.05 0.095
0.3 0.3 1.05 0.189
1.2 0.3 1.05 0.378
0.6 0.3 0.5 0.090
1.2 0.3 1.05 0.378
0.5 0.3 1.05 0.158
3.225 0.3 1.05 1.016
10.21
Length Width Height QTY Remarks

42.55 0.40 0.15 2.553

20.05 0.40 0.15 1.203

20.05 0.40 0.15 1.203

14.125 0.40 0.15 0.848

14.125 0.40 0.15 0.848


6.65

TOTAL QTY Remarks

3.00
3.00
PACKAGE:NHS/HOWRAH/EXPANSION PROJECT/1394/21-22
Vendor:KAIZER CONSTRUCTION CO.LTD.
Project: EXPANSION OF NSH PROJECT
SHEET: JMR for Part-B

Measurement Book : Brick work at Part- B


BOQ
Item Description UOM NO
No

7.20 BRICK WORKS


Brick Work at Part B
Brick Work Between C116-C117 Sqm 1
Both Side of Column C116 Sqm 2
Brick Work Between C114-C115 Sqm 1
Sqm 1
Beside Column C103 Sqm 1
Beside Column C94 Sqm 1
Beside Side of Column C86 Sqm 1
Beside Side of Column C88 Sqm 1
LMR Room
Brick works North side Sqm 1
Brick works west side Sqm 1
Brick works south side Sqm 1

Part-B 6th Floor Slab Sqm


South Side Bund Wall Sqm 1
For Cutout -1 Sqm 1
For Cutout -2 Sqm 1
For Cutout -3 Sqm 1
For Cutout -4 Sqm 1
For Cutout -5 Sqm 1
For Cutout -6 Sqm 1
For Shaft -01 Sqm 1
For Shaft -02 Sqm 1
For Shaft -03 Sqm 1
For Shaft -04 Sqm 1

TOTAL sqm

Measurement Book : RCC Dismantling Work


BOQ
Item Description UOM NO
No
9)a RCC DISMANTLING
RCC COLUMN DISMANTLING FOR MAIN BUILDING PART-B
C95, C104,C105,C96,C97,C98 cum 6
C115,C87,C88,C89,C94,C103,C114 cum 7
C85,C86,C116,C90, cum 4
C83 cum 1
C99, cum 1
Coping Slab Dismantling Work at Between C86 & C87 cum 1
Coping Slab Dismantling Work at Between C87 & C88 cum 1
Coping Slab Dismantling Work at Between C88 & C89 cum 1
Column Dismantling for C106 cum 1
Column Dismantling for C107 cum 1
Column Dismantling for Tool Column Beside C107 cum 1
RCC Column Dismantling work at part-B LMR Room parapet wall porrtion
C117 & C118 cum 2
C134 cum 1
TOTAL cum

Measurement Book : Brick Dismantling Work


BOQ
Item Description UOM NO
No
9)b BRICK WORKS DISMANTLING
Brick Dismantling Work at Part B
Brick Dismantling Work near C117 Cum 1
Brick Dismantling Work near C116 Cum 1
Brick Dismantling Work between C116 & C115 (For Material Hoist) Cum 1
Brick Dismantling Work near C115 Cum 1
Brick Dismantling Work near C114 Cum 1
Brick Dismantling Work between C114 & C103 Cum 1
Brick Dismantling Work between C103 & C85 Cum 1
Brick Dismantling Work between C85 & C86 Cum 1
Brick Dismantling Work between C85 & C86 Cum 1
Brick Dismantling Work between C87 & C88 Cum 1
Brick Dismantling Work between C88 & C89 Cum 1
Brick Dismantling Wok at Part-B LMR Room Parapet wall Cum
LMR Room Parapet wall west side Cum 1
LMR Room Parapet wall North side Cum 1
LMR Room Parapet wall East side Cum 1
LMR Room Parapet wall South side Cum 1
TOTAL Cum

Measurement Book : Bricks bat Dismantling Work


BOQ
Item Description UOM NO
No
9)c Removing of Brick bat from terrace
FOR MAIN BUILDING PART -B ISMB TRENCH
Part-B Main Building (North Side) ISMB Trench PCC Dismantling
Cum 1
Workfrom C89 to C85
Part-B Main Building (West Side) ISMB Trench PCC Dismantling
Cum 1
Workfrom C85 to C114
Part-B Main Building (South Sidee) ISMB Trench Concrete Filling
Cum 1
From Column C114 to C117

TOTAL cum

Measurement Book : LOCKSET 16mm


BOQ
Description UOM NO
Item No
4.1B d LOCKSET 16 MM DIA BAR
PART-B 5th floor nos
Column C98 nos 2.00
TOTAL Nos

Measurement Book : LOCKSET 20mm


BOQ
Description UOM NO
Item No
4.1B e LOCKSET 20 MM DIA BAR
PART-B 5th floor
Column C98 nos 4.00
Column C116 nos 4.00
PART-B 5th floor roof slab Beam nos
Column C117 (Horizontal) nos 10.00
Column C106 (Horizontal) nos 20.00
Column C107 (Horizontal) nos 15.00
Column C107A (Horizontal) nos 10.00
Column C107 (Vertical) nos 7.00
Column C106 (Vertical) nos 5.00

TOTAL Nos

Measurement Book : LOCKSET 25mm


BOQ
Description UOM NO
Item No
4.1B a LOCKSET 25 MM DIA BAR
PART-B 5th floor
Column C99 nos 4.00
PART-B 5th floor roof slab Beam nos
Column C117 nos 20.00
Column C106 nos 40.00
Column C107 nos 30.00
Column C107A nos 20.00
TOTAL Nos
Length Width Height QTY Remarks

2.75 - 1.05 2.89


0.5 - 1.05 1.05
1.3 - 1.05 1.37
2 - 0.55 1.10
1.2 - 1.05 1.26
1.5 - 1.05 1.58
0.7 - 0.500 0.35
1.6 - 0.500 0.80

4.7 - 2.550 11.99


4.55 - 2.550 11.60
4.7 - 2.550 11.99

20.55 - 0.075 1.54


6.54 - 0.075 0.49
5.36 - 0.075 0.40
6.364 - 0.075 0.48
4.53 - 0.075 0.34
8.54 - 0.075 0.64
6.24 - 0.075 0.47
4.1 - 0.075 0.31
4.38 - 0.075 0.33
4.34 - 0.075 0.33
4.46 - 0.075 0.33

51.62

Length Width Height QTY Remarks

0.8 0.55 1.15 3.036


0.7 0.55 1.15 3.099
0.7 0.55 1.15 1.771
0.3 0.55 1.15 0.190
0.8 0.55 1.15 0.506
6.95 0.9 0.1 0.626
6.95 0.9 0.1 0.626
3 0.9 0.1 0.270
0.8 0.55 2.55 1.122
0.7 0.55 2.55 0.982
0.25 0.55 2.55 0.351

0.7 0.55 2.4 1.848


0.25 0.25 2.4 0.150
14.58

Length Width Height QTY Remarks

1.7 0.3 1.05 0.536


1.7 0.3 1.05 0.536
3.5 0.3 1.05 1.103
2.8 0.3 1.05 0.882
1.8 0.3 1.05 0.567
5.2 0.3 1.05 1.638
5.8 0.3 1.05 1.827
5.9 0.3 1.05 1.859
6.9 0.3 1.05 2.173
6.9 0.3 1.05 2.173
3 0.3 1.05 0.945

6.85 0.3 2.55 5.240


5.45 0.3 2.55 4.169
7.55 0.3 2.55 5.776
5.45 0.3 2.55 4.169
33.59

Length Width Height QTY Remarks

27.38 0.40 0.15 1.643


16.10 0.40 0.15 0.966

21.00 0.40 0.15 1.260

3.87

TOTAL QTY Remarks

0.00
2.00
2.00

TOTAL QTY Remarks

4.00
4.00

10.00
20.00
15.00
10.00
7.00
5.00

75.00

TOTAL QTY Remarks

4.00

20.00
40.00
30.00
20.00
114.00
PACKAGE:NHS/HOWRAH/EXPANSION PROJECT/1394/21-22
Vendor:KAIZER CONSTRUCTION CO.LTD.
Project: EXPANSION OF NSH PROJECT
SHEET: JMR for Part-C

Measurement Book : RCC Dismantling Work


BOQ
Item Description UOM NO
No
9)a RCC DISMANTLING
RCC COLUMN DISMANTLING FOR MAIN BUILDING PART-C
C92, C93, C23, C22, C21, C24, C113, C125 cum 8.00
C32,C33,C26,C25,C27,C102,C101,C110 cum 8.00
C91, C20, C124 cum 3.00
C100 cum 1.00
Rcc Column Dismantling at Part-C C18 cum 1.00
Rcc Beam Dismantling work at part-C Staircase-03 near C21 Column cum 1.00
Rcc Column Dismantling at Part-C C21 cum 1.00
Rcc Tool Column Dismantling Work at Part-C between C112 & C33 cum 1.00
Rcc Tool Column Dismantling Work at Part-C between C112 & C111 cum 1.00
Rcc Column Dismantling Work at Part-C for C112 cum 1.00
Rcc Column Dismantling Work at Part-C for C111 cum 1.00
Rcc Column Dismantling Work at Part-C for C122 cum 1.00
Rcc Column Dismantling Work at Part-C for C91 cum 1.00
Rcc Column Dismantling Work at Part-C for C100 cum 1.00
Rcc Column Dismantling Work at Part-C for C109 cum 1.00
Rcc Column Dismantling Work at Part-C for C120 cum 1.00
Rcc Column Dismantling Work at Part-C for C121 cum 1.00
Rcc Column Dismantling Work at Part-C for C133 cum 1.00
Rcc Tool Column Dismantling Work at Part-C between C123 & C124 cum 1.00
LMR Room Roof Slab cum 1.00
Less Tool Column area
Between C112 & C33 cum -1.00
Between C112 & C111 cum -1.00
Between C123 & C124 cum -1.00
Less Column C112 cum -1.00
Less Column C123 cum -1.00
Less Column C133 cum -1.00
North & South Side Beam area cum 2.00
East Side Beam area cum 1.00
West Side Beam area cum 1.00
RCC Column Dismantling work at part-C LMR Room Slab bottom to 1.4 mtr
For C112 cum 1.00
For C123 cum 1.00
For C133 cum 1.00
Tool Column between C112 & C33 cum 1.00
Tool Column between C112 & C111 cum 1.00
Tool Column between C123 & C124 cum 1.00
TOTAL cum
Measurement Book : Brick Dismantling Work
BOQ
Item Description UOM NO
No
9)b BRICK WORKS DISMANTLING
Brick Dismantling Wok at Part-C
Near Staircase-03 Mumty Room Parapet wall (Between Column C18 &
Cum 1
C19)
Brick Work Dismantling at Part-C for C21 Column near Staircase-03
Cum 1
(Existing wall Portion) both side
LMR Room Parapet Wall Portion
North side wall & South Side Wall Cum 2
East Side Wall & west Side Wall Cum 2
LMR Room Slab Bottom Wall
North side & South side wall Cum 2
East Side wall Cum 1
West Side Wall Cum 1
Brick wall dismantling at part -C beside column C-111 (both sides) Cum 2
Brick work Dismantling Work for R.O Plant part-C Structural staircase
Cum 1
fixing at west side
Brick Work Dismantling Work For near C122
West Side Wall Cum 1
North Side Wall Cum 1
TOTAL Cum

Measurement Book : Bricks bat Dismantling Work


BOQ
Item Description UOM NO
No
9)c Removing of Brick bat from terrace
LMR Room Roof Top Brick Bat dismantling Work at
cum 1
Part-C
Less Tool Column area
Between C112 & C33 cum -1
Between C112 & C111 cum -1
Between C123 & C124 cum -1
Less Column C112 cum -1
Less Column C123 cum -1
Less Column C133 cum -1

TOTAL Cum
Measurement Book : LOCKSET 08mm
BOQ
Description UOM NO
Item No
4.1B c LOCKSET 8 MM DIA BAR
Rebaring work for part-C Lift shaft-SW3
Horizontal Rebar for West Side Wall nos 54.00
nos 46.00
TOTAL Nos

Measurement Book : LOCKSET 12mm


BOQ
Description UOM NO
Item No
4.1B c LOCKSET 12 MM DIA BAR
PART-C 5th floor
Column C32 nos 6.00
Column C25 nos 5.00
Column C27 nos 2.00
Column C26 nos 8.00
Column C22 nos 6.00
Column C21 nos 1.00
Column C33 nos 4.00
Rebaring work for part-C Lift shaft-SW3
Vertical Rebar for South Side Wall nos 46.00
Vertical Rebar for East Side Wall nos 56.00
Vertical Rebar for North Side Wall nos 22.00

TOTAL Nos

Measurement Book : LOCKSET 16mm


BOQ
Description UOM NO
Item No
4.1B d LOCKSET 16 MM DIA BAR
PART-C 5th floor nos
Column C23 nos 1.00
Column C20 nos 2.00
Column C24 nos 2.00
Column C22 nos 8.00
Column C21 nos 3.00

TOTAL Nos

Measurement Book : LOCKSET 20mm


BOQ
Description UOM NO
Item No
4.1B e LOCKSET 20 MM DIA BAR
PART-C 5th floor
Column C101 nos 1.00
Column C124 nos 4.00
Column C32 nos 6.00
Column C25 nos 4.00
Column C27 nos 5.00
Column C26 nos 5.00
Column C93 nos 2.00
Column C33 nos 8.00
Column C24 nos 4.00
Column C125 nos 2.00
Column C92 nos 6.00
TOTAL Nos

Measurement Book : LOCKSET 25mm


BOQ
Description UOM NO
Item No
4.1B a LOCKSET 25 MM DIA BAR
PART-C 5th floor
Column C124 nos 1.00

TOTAL Nos
Length Width Height QTY Remarks

0.70 0.55 1.15 3.54


0.80 0.55 1.15 4.05
0.70 0.55 1.15 1.33
0.80 0.55 1.15 0.51
0.65 0.30 1.05 0.20
0.45 0.25 1.30 0.15

0.70 0.55 1.05 0.40


0.50 0.30 2.40 0.36
0.50 0.30 2.40 0.36
0.80 0.55 2.40 1.06
0.80 0.55 1.10 0.48
0.70 0.55 1.05 0.40
0.70 0.55 1.05 0.40
0.80 0.55 1.05 0.46
0.80 0.55 1.05 0.46
0.70 0.55 1.05 0.40
0.70 0.55 1.05 0.40
0.25 0.25 2.40 0.15
0.50 0.30 2.40 0.36
8.35 6.15 0.15 7.70

0.50 0.30 0.15 -0.02


0.50 0.30 0.15 -0.02
0.50 0.30 0.15 -0.02
0.80 0.55 0.15 -0.07
0.70 0.55 0.15 -0.06
0.25 0.25 0.15 -0.01
5.25 0.25 0.35 0.92
7.35 0.25 0.35 0.64
4.90 0.25 0.35 0.43

0.80 0.55 1.40 0.62


0.70 0.55 1.40 0.54
0.25 0.25 1.40 0.09
0.50 0.30 1.40 0.21
0.50 0.30 1.40 0.21
0.50 0.30 1.40 0.21
26.86
Length Width Height QTY Remarks

3.7 0.3 1.10 1.221

0.4 0.3 2.10 0.252

5.00 0.3 2.40 7.200


7.4 0.3 2.40 10.656

5.0 0.3 0.90 2.700


7.35 0.3 0.90 1.984
4.9 0.3 0.90 1.323
0.3 0.3 1.05 0.189
1.2 0.3 1.05 0.378

0.3 0.3 0.25 0.023


0.85 0.3 1.05 0.268
26.19

Length Width Height QTY Remarks

8.35 6.15 0.15 7.703

0.5 0.3 0.15 -0.023


0.5 0.3 0.15 -0.023
0.5 0.3 0.15 -0.023
0.8 0.55 0.15 -0.066
0.7 0.55 0.15 -0.058
0.25 0.25 0.15 -0.009

7.50
TOTAL QTY Remarks

54.00
46.00
100.00

TOTAL QTY Remarks

6.00
5.00
2.00
8.00
6.00
1.00
4.00

46.00
56.00
22.00

156.00

TOTAL QTY Remarks

0.00
1.00
2.00
2.00
8.00
3.00

16.00

TOTAL QTY Remarks


1.00
4.00
6.00
4.00
5.00
5.00
2.00
8.00
4.00
2.00
6.00
47.00

TOTAL QTY Remarks

1.00

1.00
PACKAGE:NHS/HOWRAH/EXPANSION PROJECT/1394/21-22
Vendor:KAIZER CONSTRUCTION CO.LTD.
Project: EXPANSION OF NSH PROJECT
SHEET: JMR for Part-D

Measurement Book : RCC Dismantling Work


BOQ
Item Description UOM NO
No
9)a RCC DISMANTLING
Part-D
Rcc Column Dismantling Work For C68 & C75 Cum 2

TOTAL Cum

Measurement Book : Brick Dismantling Work


BOQ
Item Description UOM NO
No
9)b BRICK WORKS DISMANTLING
Brick Dismantling Wok at Part-D Parapet wall
West Side wall Cum 1
North & South Side wall Cum 2
TOTAL Cum

Measurement Book : LOCKSET 16mm


BOQ
Description UOM NO
Item No
4.1B d LOCKSET 16 MM DIA BAR
PART-D 5th floor
Column C82 nos 4.00
Column C63 nos 1.00
TOTAL Nos

Measurement Book : LOCKSET 20mm


BOQ
Description UOM NO
Item No
4.1B e LOCKSET 20 MM DIA BAR
PART-D 5th floor
Column C82 nos 1.00
Column C63 nos 1.00
TOTAL Nos
Length Width Height QTY Remarks

0.55 0.3 2.4 0.792

0.792

Length Width Height QTY Remarks

4.35 0.3 2.40 3.132


7.9 0.3 2.40 11.376
14.508

TOTAL QTY Remarks

4.00
1.00
5.00

TOTAL QTY Remarks

1.00
1.00
2.00
PACKAGE:NHS/HOWRAH/EXPANSION PROJECT/1394/21-22
Vendor:KAIZER CONSTRUCTION CO.LTD.
Project: EXPANSION OF NSH PROJECT
SHEET: JMR for Part-E

Measurement Book : LOCKSET 12mm


BOQ
Description UOM NO TOTAL QTY
Item No
4.1B c LOCKSET 12 MM DIA BAR
Rebaring Work for Ramp (Level 4th to 5th FL)
For Slab area nos 33.00 33.00

TOTAL Nos 33.00

Measurement Book : LOCKSET 20mm


BOQ
Description UOM NO TOTAL QTY
Item No
4.1B e LOCKSET 20 MM DIA BAR
Rebaring Work for Ramp (Level 4th to 5th FL)
For B1 Beam nos 6.00 6.00
For B2 Beam nos 3.00 3.00
Column C128 For Part-E nos 2.00 2.00
TOTAL Nos 11.00

Measurement Book : LOCKSET 25mm


BOQ
Description UOM NO TOTAL QTY
Item No
4.1B a LOCKSET 25 MM DIA BAR
Column C128 For Part-E nos 4.00 4.00
TOTAL Nos 4.00
Remarks

Remarks

Remarks