GRADE DATE DATE AGE OF

CUBE SLUMP
SL NO. LOCATION OF OF OF CUBE
ID (mm)
CONCRETE CASTING TESTING (DAYS)

1 DGF-1 Chiller foundation & OT Building M25 04.05.22 11.05.22 7 130


DGF-2 Column Starter C46, C50, C51, C52 M25 04.05.22 11.05.22 7 130
DGF-3 M25 04.05.22 11.05.22 7 130
DGF-4 M25 04.05.22 01.06.22 28 130
DGF-5 M25 04.05.22 01.06.22 28 130
DGF-6 M25 04.05.22 01.06.22 28 130
2 5C-1 OT Building Part -A 5th FL column M25 13.05.22 20.05.22 7 120
5C-2 C42 to C46, C47 to C52, C54, C39 & M25 13.05.22 20.05.22 7 120
C53 -1st Lift (level + 4th FL top to
5C-3 +2.4 mtr) M25 13.05.22 20.05.22 7 120
5C-4 M25 13.05.22 20.05.22 7 120
5C-5 M25 13.05.22 20.05.22 7 120
5C-6 M25 13.05.22 20.05.22 7 130
5C-7 M25 13.05.22 20.05.22 7 130
5C-8 M25 13.05.22 20.05.22 7 130
5C-9 M25 13.05.22 20.05.22 7 130
5C-10 M25 13.05.22 10.06.22 28 130
5C-11 M25 13.05.22 10.06.22 28 130
5C-12 M25 13.05.22 10.06.22 28 145
5C-13 M25 13.05.22 10.06.22 28 145
5C-14 M25 13.05.22 10.06.22 28 145
5C-15 M25 13.05.22 10.06.22 28 145
5C-16 M25 13.05.22 10.06.22 28 145
5C-17 M25 13.05.22 10.06.22 28 145
5C-18 M25 13.05.22 10.06.22 28 145
3 5C-01 OT Building Part -A 5th FL column M25 17.05.22 24.05.22 7 140
5C-02 C42 to C46, C47 to C52, C54, C39 & M25 17.05.22 24.05.22 7 140
C53 -2nd Lift (level + 2.4mtr to +3.8
5C-03 mtr) & C35 to C37 & C55-1st Lift M25 17.05.22 24.05.22 7 140
5C-04 (level + 4th FL top to +2.4 mtr) M25 17.05.22 24.05.22 7 140
5C-05 M25 17.05.22 24.05.22 7 140
5C-06 M25 17.05.22 24.05.22 7 140
5C-07 M25 17.05.22 24.05.22 7 135
5C-08 M25 17.05.22 24.05.22 7 135
5C-09 M25 17.05.22 24.05.22 7 135
5C-10 M25 17.05.22 14.06.22 28 135
5C-11 M25 17.05.22 14.06.22 28 135
5C-12 M25 17.05.22 14.06.22 28 135
5C-13 M25 17.05.22 14.06.22 28 145
5C-14 M25 17.05.22 14.06.22 28 145
5C-15 M25 17.05.22 14.06.22 28 145
5C-16 M25 17.05.22 14.06.22 28 145
5C-17 M25 17.05.22 14.06.22 28 145
5C-18 M25 17.05.22 14.06.22 28 145
4 5C-1 Part-B 5th FL Column C95, C104, M25 25.05.2022 01.06.2022 7 130
C105, C96-1st Lift (level + 4th FL top
to +2.4 mtr) & Part-A 5th FL Column
C56, 58, C30, C29- 1st Lift (level +
4th FL top to +2.4 mtr) & C35, C55,
C47, C36, C37 2nd lift ( (level +
2.4mtr to +3.8 mtr) casting &
4 Part-B 5th FL Column C95, C104,
5C-2 C105, C96-1st Lift (level + 4th FL top M25 25.05.2022 01.06.2022 7 130
to +2.4 mtr) & Part-A 5th FL Column
5C-3 C56, 58, C30, C29- 1st Lift (level + M25 25.05.2022 01.06.2022 7 130
5C-4 4th FL top to +2.4 mtr) & C35, C55, M25 25.05.2022 01.06.2022 7 130
5C-5 C47, C36, C37 2nd lift ( (level + M25 25.05.2022 01.06.2022 7 130
2.4mtr to +3.8 mtr) casting & M25 25.05.2022 01.06.2022 7 130
5C-6
Radiotherapy Room Pit & Cable
5C-7 Trench Casting. M25 25.05.2022 22.06.2022 28 125
5C-8 M25 25.05.2022 22.06.2022 28 125
5C-9 M25 25.05.2022 22.06.2022 28 125
5C-10 M25 25.05.2022 22.06.2022 28 125
5C-11 M25 25.05.2022 22.06.2022 28 125
5C-12 M25 25.05.2022 22.06.2022 28 125
5 RTR-1 Roof Top of Radiotherapy Room M25 25.05.2022 01.06.2022 7 120
RTR-2 M25 25.05.2022 01.06.2022 7 120
RTR-3 M25 25.05.2022 01.06.2022 7 120
RTR-4 M25 25.05.2022 22.06.2022 28 120
RTR-5 M25 25.05.2022 22.06.2022 28 120
RTR-6 M25 25.05.2022 22.06.2022 28 120
AVG.
CUBE COMPRESSIVE
FAILURE COMPRESSIVE SIGN OF SIGN OF
WEIGHT STRENGTH REMARKS
LOAD(KN) STRENGTH KCCL CLIENT
(kg) (N/mm2)
(N/mm2)
8.592 490 21.78
8.53 500 22.22 21.93
8.465 490 21.78
8.501 700 31.11
8.502 610 27.11 30.22
8.548 730 32.44
8.873 590 26.22
8139 710 31.56 30.37
8579 750 33.33
8476 820 36.44
8595 740 32.89 30.37
8704 490 21.78
8536 390 17.33
8650 790 35.11 25.63
8432 550 24.44
8637 999.4 44.42
8264 966.8 42.97 46.56
8340 1176.8 52.30
8541 1191.3 52.95
8333 1215.5 54.02 53.68
8431 1216.8 54.08
48.40 From
46.70 47.57 JADAVPUR
47.60 UNIVERSITY
8855 410 18.22
8719 460 20.44 18.96
8662 410 18.22
8698 490 21.78
8805 490 21.78 20.89
8475 430 19.11
8758 480 21.33
8836 460 20.44 19.85
8592 400 17.78
8829 874.5 38.87
8771 723 32.13 37.10
8550 906.7 40.30
8740 694 30.84
8638 870.2 38.68 37.06
8721 937.5 41.67
8741 1021.6 45.40
8883 1003.9 44.62 43.95
8781 941.2 41.83
8230 480 21.33
20.44
8418 440 19.56 20.44
8515 460 20.44
8625 627.1 27.87
8523 677.2 30.10 29.44
8618 682.6 30.34
8750 1012.2 44.99
8830 820.6 36.47 41.48
8322 967.2 42.99
8462 880 39.11
8397 830 36.89 38.07 From T-RMC
8516 860 38.22
8524 512.6 22.78
8397 540.3 24.01 24.17
8502 578.9 25.73
8812 1155.5 51.36
8520 1128.4 50.15 50.10
8583 1097.7 48.79