Andre Marihot Jonatan Sihombing_f1e221007

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

UJIAN AKHIR SEMESTER SDTL 2024

UNIVERSITAS JAMBI

Nama : Andre Marihot Jonatan Sihombing

Nim : F1E221007

Ruang : R-001

Format 1 : Gambar rencana lokasi


Format 2 : Rencana Anggaran Biaya
No Uraian Sat. Vol. Harga Jumlah
1 TM 2 18 1.500 – 2.500 Kg Rp.10.000.000 Rp.180.000.000
2 TM 3 9 1000 – 2000 Kg Rp.10.000.000 Rp.27.000.000
3 TM 6 1 2000 – 3500 Kg Rp.12.000.000 Rp.12.000.000
4 TM 10 1 1000-3000 Kg Rp.8.000.000 Rp.8.000.000
5 TM 4 2 1000 – 2000 Kg Rp.12.000.000 Rp.24. 000.000
6 TM 5 1 1000 – 2000 Kg Rp. 10.000.000 Rp. 10.000.000
7 TR 1 18 800 – 1500 Kg Rp.6.000.000 Rp.108.000.000
8 TR 2 10 2200- 2800 Kg Rp.7.000.000 Rp.70.000.000
9 TR 3 1 2500 – 4000 Kg Rp.12.000.000 Rp.12.000.000
10 HGW 3 1500 – 2500 Kg Rp.12.000.000 Rp.60.000.000
11 GW 3 1000 – 2000 Kg Rp. 6.000.000 Rp.48.000.000
12 GID 1 20.000 kg Rp.1.000.000.000 Rp.1.000.000.000
TOTAL Rp.1.552.000.000

Format 3 : Harga Satuan Material

No Material Sat. Vol. Harga. Jumlah


1 TM 2 18
2 Crossarm UNP 1x18 150-160 283.000 5.094.000
10x2000 mm kg
3 Klamp beugal tiang 1x18 500 gr 50.000 900.000
beton bulat
4 Mur baut & ring 4x18 91 gr 21.000 378.000
5/8”x70mm
5 Steel plat 2x18 24 kg 125.000 2.250.000
6 Mur baut spring 2x18 100 gr 10.000 180.000
washer
5/8”x148mm
7 Arm tie brace 3x18 6,8 kg 150.000 2.700.000
50.50x1270 mm
8 Isolator tumpu 3x18 5-10 kg 200.000 3.600.000
9 Preformed top ties- 3/8x18 700 gr 25.000 450.000
bending wire
10 Klem beugel 50x6 2x18 450 gr 50.000 900.000
mm
Total 16.452.000
No Material Sat. Vol. Harga. Jumlah
1 TM 3 9 Pcs
2 Double Bolt & Nut 9 x1 Set 4,00 27.500,00 247.500,00
M.16 x 350 +
Washer
3 Double Arm Tie 9 x 1Pcs 1,00 56.000,00 504.000,00
Band
4 Performed double 9 Pcs 3,00 6.500,00 58.000,00
side 150/70/35 mm²
5 Alluminium Bending 9 Pcs 6,00 22.000,00 198.000,00
wire
6 Insulator Tumpu 20 3 × 9 Pcs 6,00 230.000,00 2.070.000,00
KV
7 Double arm Bolt & 2 × 9 Pcs 3,00 27.500,00 247.500,00
Nut M.16x350 +
Washer
8 Arm Tie Type 810 9 Pcs 4,00 59.000,00 531.000,00
9 Cross arm type 2000 1 x 9 Pcs 2,00 287.151,00 2.584.359,00
UNP 10
Total 6.440.359,00
No Material Sat. Vol. Harga. Jumlah
1 TM 4 2
2 Bolt & Nut M. 16 X 2 x 1 Pcs 4,00 18.000,00 23.280,00
50 + Washer
3 Double arm tie band 2 x 1 Set 1,00 56.000,00 74.600,00
4 Arm tie type 810 2 Pcs 4,00 236.000,00 310.400,00
5 Double arm Bolt & 2 x 2 Pcs 3,00 82.500,00 94.800,00
Nut M. 16 x 350 +
Washer
6 Insulator Tarik 20 KV 3 x 2 Pcs 3,00 1.020.000,00 1.053.000,00
7 Cross arm type 2000 2 x 2 Pcs 2,00 574.302,00 629.342,00
UNP 10
8 TOTAL 2.185.557,00
No Material Sat. Vol. Harga. Jumlah
1 TM 5 1
2 Bolt & Nut M. 16 x 1x1 Pcs 4,00 Rp. 18.000,00 Rp. 23.280,00
50 + Washer
3 Line tap connector / 1x1 Pcs 3,00 Rp. 82.500,00 Rp. 101.100,00
non tension joints
4 Preformed top tie 1x1 Pcs 1,00 Rp.8.500,00 Rp. 11.600,00
150/70/35
5 All Binding wire 1x1 Pcs 2,00 Rp. 44.000,00 Rp. 50.200,00
6 Double Bolt & Nut 1x1 Pcs 3,00 Rp.82.500,00 Rp. 94.800,00
M. 16 x 350 +
Washer
7 Double Arm tie 1x1 Set 1,00 Rp. 48.500,00 Rp.67.100,00
band
8 Arm Tie Type 810 1x1 Set 4,00 Rp.236.000,00 Rp. 310.400,00
9 Isolator Tumpu 20 3x1 Pcs 1,00 Rp. 230.000,00 Rp. 690.000,00
KV
10 Isolator Tarik 20 KV 2x1 Pcs 6,00 Rp.2.040.000,00 Rp. 4.080.000,00
11 Cross arm type 2000 3 x1 Pcs 2,00 Rp.574.302,00 Rp. 1.722.302,00
UNP 10
TOTAL Rp. 7.150.782,00
No Material Sat. Vol. Harga. Jumlah
1 TM 6 1
2 Strain Insulator Long 3/6 x 6 3kg 160.000 5.760.000
Rod /Disc
3 Cross arm UNP 10- 3x6 150-160gr 283.000 5.094.000
2000
4 Arm tie LNP 8 2x6 12-16kg 40.000 480.000
5 Bolt nuts double 4x6 900gr 50.000 1.200.000
arming bolt
6 Cross arm clevis 3x6 1-2kg 60.000 1.080.000
7 Bolt nuts m 16x120 3x6 900gr 18.500 333.000
8 Strain clamp + clevis 6x6 1 kg 183.000 6.588.000
eye
Total 20.535.000
No Material Sat. Vol. Harga. Jumlah
1 TM 10 1
2 Angkur/Baut 1x1 50-100gr 51.000 51.000
Jangkar
3 Bracket/ 1x1 250gr 175.000 175.000
sambungan
4 Penopang Lateral/ 1x1 10-30 kg 204.000 204.000
Diagonal
5 Isolator Post 5x1 3kg 200.000 1.000.000
6 Penangkap petir 1x1 4,8kg 4.200.000 4.200.000
7 Hgw 1x1 1-10kg 12.000.000 12.000.000
Total 17.630.000
No Material Sat. Vol. Harga. Jumlah
1 TR 1 18 200gr
2 Suspension Clamp 1x18 200gr 75.000 5.250.000
Bracket
3 Stainless steel strip 2x18 24kg 78.000 10.920.000
75cm
4 Stoping buckle 2x18 100gr 65.000 9.100.000
5 Plastick strap 3x18 7kg 22.000 4.620.000
Total 29.890.000
No Material Sat. Vol. Harga. Jumlah
1 TR 3 1
2 Tension Bracket 1x1 200gr 15.000 60.000
3 Strain Clamp 2x1 1kg 230.000 1.840.000
4 Stainless Steel strip 2x1 24kg 108.000 864.000
0.75 meter
5 Stopping buckle 2x1 100gr 65.000 520.000
6 Plastic strap 3x1 7kg 22.000 264.000
7 PVC 2” 50 cm 3x1 100cm 26.000 52.000
8 Link 3x1 1 Set 15.000 15.000
9 Protektip Plastic 4x1 8gr 22.000 240.000
Strap 0.5 meter
TOTAL 3.855.000,00
No Material Sat. Vol. 15.000 Jumlah
1 TR 2 10 200gr
2 Tension Bracket 1x10 200gr 15.000 150.000
3 Strain clamp 2x10 1kg 230.000 2.300.000
4 Stainless steel strip 2x10 24kg 108.000 1.080.000
0.75 meter
5 Stopping buckle 2x10 100gr 65.000 650.000
6 Plastic strap 3x10 7kg 22.000 220.000
7 Protectip plastic 4x10 8 gr 15.000 150.000
strap 0.5 meter
Total 4.550.000
No Material Sat. Vol. Harga. Jumlah
1 GW 3
2 GW (GUY WIRE) 1x3 15,00 195.000,00 585.000,00
Mtr
3 Patok Schoor UNP 8 1 x 3 Set 1,00 113.000,00 339.000,00
Rod Stay
4 Isolator Belimbing 1 Bh 1,00 60.000,00 60.000,00
5 Timble 1 Bh 2,00 11.000,00 11.000,00
6 Preformed 1 Bh 4,00 26.000,00 26.000,00
termination
7 Spanschroef/Turn 1 Bh 1,00 51.500,00 51.500,00
Buckle
8 Bridle for heavy guy 1 Bh 1,00 6.000,00 6.000,00
9 Double Arm Band Bh 1,00 48.500,00 67.100,00
TOTAL 1.145.000,00
No Material Sat. Vol. Harga. Jumlah
1 HGW 3 1-10kg
2 Kawat baja galvanis 1x3 26 kg 450.00 1.800.000
3 Anchor 1x3 1-2kg 91.150 364.600
4 Strain Insulator 1x3 3kg 150.000 600.000
5 Turnbuckle 1x3 1.44 kg 70.000 280.000
6 Dead and clamp 2x3 10 kg 19.000 152.000
7 Guy timble 2x3 200 gr 15.000 120.000
Total 3.316.600
No Material Sat. Vol. Harga. Jumlah
1 GID 1 20.000kg
2 Trafo distribusi 1x1 12.000 kg 500.000.000 500.000.000
3 Perlengkapan 1x1 2000 kg 100.000.000 100.000.000
hubungan bagi
4 Penangkap petir 1x1 200 kg 10.000.000 10.000.000
5 VCB 1x1 200 kg 50.000.000 50.000.000
6 FUSE 1x1 50 kg 10.000.000 10.000.000
7 GROUNDING 1x1 50 kg 10.000.000 10.000.000
8 Sistem control 1x1 50 kg 100.000.000 100.000.000
SCADA
Total 780.000.000

You might also like