NOTES

OPERATIONAL LRT
TELECOM MANHOLE 1- Datum of 0.00 Equal to +2.80 on QND ( Qatar National Datum )
PIN 69040240
1 2- Maximum depth of excavation for shoring piles within RPZ is -9.950m QND
QR-300 3- Proposed works has no influence on QR assets. However, all safety guidelines
Z A B C E F G D H I to be strictly followed.
4- Any document that is not part of the submittal to RKH will not be covered
through this permit and the associated works will be treated as violation.
E 229372.684 5- Drilling or boring is STRICTLY prohibited within critical zone.
T N 405447.140 A 6- From the edge of elevated QR structures, 10m distance must be considered as
U
INTERFACE LINE E 229315.184 FH Crane free zone where no crane movement/erection or boom reach or material
handling by crane is allowed.
7- Approved QR PTW should be always kept at the site.
E 229311.932 E 229318.468
S N 405443.000
N 405444.476
N 405444.917 8- Dewatering Aassesment Report to be submitted at the PTW stage to confirm
NO impact on the Qatar Rail tunnel before construction commence.
E 229309.065 6199 6300 6375 11350
N 405441.175 KEY PLAN
R JRC 12
42
DOWN TO BASEMENT 01
SHORING SYSTEM

E 229306.740 E 229374.987

Q N 405438.559
N 405438.176 Qatar Integrated Railways Project
B Governmental Interfaces & Permits Department
E 229305.082 GARBAGE STORE
39 m²

P N 405435.477
D AINAGE 7
MANHOLE
N
E 229304.179
O N 405432.095 OPEN TO ABOVE

FUEL TANK
7 16 m²
REV DESCRIPTION DATE
RAIL PROTECTION 00 DC1 2022-10-17
GENERAOTPEONRTO ABOVE
6
ZONE LIMIT ROOM
E 229304.082 29 m² E 229377.040

N N 405428.597 N 405428.384
C
6
E 229304.450
N 405426.631
M LV ROOM
59 m²

5 OPEN TO ABOVE 5 REVISIONS

E 229305.948 E 229378.635
N 405419.323
L TX ROOM
1
QR-300
N 405418.512
D QR-Code MUNICIPALITY STAMP
HV CABLE
36 m²
LAYOUT

8349
11824
-4.60
Maximum depth for all works
-4.20 - There is no work Within Critical zone

4 FH MV ROOM
4 - Out of Critical Zone is -11750 mm QND(95)

75 m²

3475
Important Conditions (operational Rail)
3 E 229307.237 3 1- The building Permit from the Municipality
does not PERMIT to proceed with WORKS. PTW

2275
N 405411.427
from Qatar Rail must be approved before any
K

1200
1693 works in the site.
2 2 2- The following works are NOT allowed and
require separate approval from Qatar Rail:
F.F LOBBY F.F LOBBY E 229379.891
LIFT LOBBY · Drilling Geotechnical investigation/ boreholes
7 m² 7 m²
14 m² N 405408.591 / wells
375 PUMP ROOM
28 m²
E · Drilling for earthing rods / Pits (earth boring).
ENQUIRY No. : Application No :

488 STAIR-2 · Any unapproved Dewatering works. CONSULTANT REG. No : GRADE: CONSULTANT REG. No : GRADE:

1.872 21 · Any unapproved shoring works, anchors, soil

8600
CORRIDOR CONSULTANT STAMP & SIGNATURE : CONSULTANT STAMP & SIGNATURE :
m² nailing, Piling, Diaphragm etc.
DN FF TANK1 18 m²
· Installation/replacement of unapproved
POTABLE

E229311.184 BREAK TANK


17 m²
WATER

E 229308.195 UP utilities, drainage, soak always, tanks, etc.


N 405403.485 N405399.730 36 m² O FICE STORE
T.O.P = 1.970
E 229380.747 · Any unapproved tree planting, landscaping.
J FF TANK2
F-F PUMP ROOM 10 m²
N 405398.628 F 3- Any drilling work including but not limited to
UNDER-GRO ND SETBACK

39 m² (soak away, earthing pits/ rods, soil investigation,


19 m² dewatering well, Piles, shoring) within Rail critical
1 1 Zone is NOT ALLOWED.
4- Any works NOT clearly mentioned on the TECHNICAL MANAGER: TECHNICAL MANAGER:
reviewed .drawings is NOT PERMITED
E229309.370 Ground Floor Limit
SEWER

E 229308.820 5- It is the consultant and the contractor full


FOUL

N405394.710 REGISTIRATION No.: REGISTIRATION No.:


N 405395.509
I=2.00 responsibility to make sure that no any works will
I Ø 0.15M be installed below the mentioned maximum DESIGNER AOR

PLOT BOUNDARY
depth.
ETS I
6- The design, construction and operation of the ENGINEERING

9900
94 m²
permitted works shall be perform strictly in CONSULTANCY

accordance with the technical specifications and


BACCA SABIHAT
COOLING
DISTRICT

E229312.942 safety measures required by the following ENGINEERING CONSULTANCY


ARCHITECTURAL - STRUCTURAL - ELECTROMECHANICAL
N405391.787 documents: PROJECT MANAGEMENT
P.O BOX 37229 DOHA - QATAR
T.O.P=2.56 TM-201-SR05 TM-217-G01 TEL-44322498 FAX-44321235
Email: sabihatengineering@gmail.com

TM-219-G01 TM-220-G01
BALL VALVE

OPEN TO ABOVE TM-224-G01 TM-216-G01


CLIENT/DEVELOPER
D
063

LEGEND AL JADAWL REAL ESTATE


PLOT BOUNDARY E 229381.180
CHILLED WATER SUPPLY PIPE (S) ELECTRICAL CABLE
HOUSE CONNECTION CONNECTED WITH END CAP N 405389.383
CHILLED WATER RETURN PIPE (R)
POSITION OF ELECTRICAL HV SUPPLY INTAKE AS KNOWN TO DATE
G This drawing reviewed by Qatar Rail Technical
PROJECT
BALL VALVE Interface Department at design stage.

E 229309.064
ROAD CROSSING FOULSEWER HOUSE CONNECTION WITH
END CAP ( 150mm, 200mm, 250mm VC PIPE)
STRAIGHT JOINT
This drawing needs to be read in conjunction with all
Qatar Rail guidance documents , manuals and
ECQ-D24-OFFICE BUILDING
H N 405389.693 conditions of the mentioned below approval form

69040240 LOCATION: ENERGY CITY-DOHA-QATAR PIN NO. :69040240


PIN
MME-online application N-2022-000 5692
SHEET TITLE
QR.Approval Form Ref.
Permit to work (PTW) Ref.
UTILITY LAYOUT .

Project No. Discipline Date Scale Stage Size


UTILITY LAYOUT . ARCH
2022-10-17
Drawn
1 : 150
Checked
DC1
Approved
A1
1 1 : 150 ECQ-D24-2201
Drawing No.
SA MU KN
Revision
QR-101 00