Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Project:Obras Complementarias para el Incremento de

Producción de 105 MBD a 165 MBD de Crudo


Extrapesado en las Instalaciones de PETROLERA
SINOVENSA en Planta Mezcla JOSE, MORICHAL Y
MPE-3, Frente 1: Obras Complementarias PMJ-
MORICHAL

Client: PSSA
厂商文件评阅清单(VDI) Proj. No.:50831
至To: ANGEL GARCIA 自From: GUSTAVO PACHECO
电话Tel: 电话Tel:
电子邮件E-mail: agarcia.hqcec@gmail.com 电子邮件E-mail: gpacheco@generaldetectors.com
接收单位签字: 接收日期: 发送单位签字:
RECEIVED BY(SIGNATURE): DATE: SIGNED BY(SIGNATURE):
发送日期:
VDO NO: 50831-PO-025_0A-VDI-0003T DATE: 30-07-2018 Sheet 1 OF 1

Please return the copy of transmittal with signature confirming your receipt of the document.

ADDITIONAL REMARKS BY RECIPIENT ADDITIONAL REMARKS BY VENDOR

Rev0 considering all the modifications of the comment


broadcast of the RevB

发布用途: FI for information 评阅等级: 1 Revise and resubmit


ISSUE PURPOSE: FR for review COMMENTS STATUS: 2 To be issued as final provided comments are incorporated
FA for approval 3 No comment - final issue
4 For information only (internal use)
序号 供应商文件编号 供应商文件名称 版次 页数 发布用途 前一版评阅等级
Item Doc. Code Doc. Description Rev. Pages Issue Pre. Comments
TEST PROTOCOL
1 PDD-I-1202-20-2611-P001 ACCEPTANCE IN FACTORY
A 7 FA

ANEXO al PDD-I-1202-20-2611- VERIFICATION OF RESULTS 0003-FDP-


2 21001
A 1 FA
P001
ANEXO al PDD-I-1202-20-2611- VERIFICATION OF RESULTS 0001-FDP-
3 2101
A 1 FA
P001
ANEXO al PDD-I-1202-20-2611- VERIFICATION OF RESULTS 0001-FDP-
4 2102
A 1 FA
P001
ANEXO al PDD-I-1202-20-2611- VERIFICATION OF RESULTS 0001-FDP-
5 2103
A 1 FA
P001
ANEXO al PDD-I-1202-20-2611- VERIFICATION OF RESULTS 0001-FDP-
6 2104
A 1 FA
P001

You might also like