Professional Documents
Culture Documents
Drawing-Set-1-G-6-Project-f178qs
Drawing-Set-1-G-6-Project-f178qs
Drawing-Set-1-G-6-Project-f178qs
84'-3"
9'-11" 2'-5"2'-5" 12'-9" 10'-3" 8'-9" 10'-3" 12'-9" 2'-5"2'-5" 9'-11"
4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6"
4'-6" 4'-3.5" 4'-3.5" 4'-6"
4'-6" 5'-9" 5'-9" 4'-6"
5'-3"
5'-3"
4'-6"
4'-6"
4'-6"
4'-6"
4'-6"
A
4'-6"
4'-6"
5'-9"
5'-9"
5'-9"
5'
5'
10'-3"
14'-3"
14'-0.2"
4'-9"
4'-6"
4'-6"
5'
5'
B
5'-9"
5'-9"
11'-3"
5'-9"
2'
2'
C
4'-6"
4'-6"
5'-3"
5'-3"
3'-9"
4'-6"
4'-6"
1'-9.2"
D 4'-6" 5'-9"
4'-6" 4'-6" 4'-6" 4'-6"
5'-9" 4'-6"
8'-11.3"
9"
12'-4" 12'-4"
4'-5.7" 4'-6.3"
4'-5.7" 4'-6.3"
4'-6"
4'-6"
4.5" 1' 1'
3'-6"
3'-6"
45'-11"
E
7'
7'
4.5"
3'-6"
3'-6"
4.5"
4'-6"
4'-6"
6'-5.5"
4.5"
4'-6" 4'-6"
F 4'-6" 5'-9" 3'-9" 2'-5" 2'-5" 3'-9" 3'-9" 2'-5" 2'-5" 3'-9" 5'-9" 4'-6"
4'-6"
4'-6"
4'-3"
3'-9"
5'-3"
5'-3"
4.5"
4'-6"
4'-6"
G
B
2'
H 4.5"
7' 7'
5'-9"
5'-9"
4.5"
5'-2.4"
4'-6"
4'-6"
5'
5'
1
11'-9.6"
11'-9.6"
5'-0.6"
5'-9"
5'-9"
4.5"
4'-6"
4'-6"
5'
5'
4.5"
J
4'-6"
4'-6"
4'-6"
4'-6"
4.5"
4.5"
4.5"
5'-3"
5'-3"
3'-6" 3'-6" 3'-6" 3'-6"
4'-6" 5'-9" 5'-9" 4'-6"
4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6"
²
1 2 34 5 6 7 8 9 10 11 12
83'-3"
9'-11" 2'-5"2'-5" 12'-9" 10'-3" 7'-9" 10'-3" 12'-9" 2'-5"2'-5" 9'-11"
A
10'-3"
13'-11"
B
C
2'
D
10'-8.5"
45'-11"
E
10'-8.5"
F
2'
G
5'-2.4"
12'-3"
H
5'-0.6"
1
1'-4.1"
11.5"
1'-5.9"
brick work starts from lintel 8'-0.4" 8'-0.4" projected chajja at 7' ht
4'-6.3"
4'-6.3"
3'-6.2"
Utility Utility 2'
2' 14'10"X3'6"
W1 7'-4.4" 6'-6.3" 10'-0.5" 10'-0.5" 6'-6.3" 7'-4.4" W1
W1
6" 5.8" KW
D3
W1 W1 W1 W1
D3
KW
6"W1
3'-6.1" 3'-6.2" 12'-0.6" 3'-6.1"
6'-0.3"
6'-0.3"
c. b.
9'-8.1"
9'-0.5"
9'-0.5"
9'-7.9"
1'-9.1" Bed Room Bed Room 1'-9.1"
12'-8.6"
12'-8.6"
14'-8.7"
D3 D3
12'-0.6" Storage Storage
11'-8.6"
8'0"x5'0"
D2 8'-4.4" 7'-4.4" D2
3'-7.2"
Balcony
Balcony
3'3" Wide Passage 3'3" Wide Passage
10'-8.5"
2'-10.1"
2'-10.1"
W2 D2 D2 W2
6'-6.8" 6'-6.8"
7'-0.4"
7'-0.4"
8'-1.9" 7'-0.4" 7'-0.4"
6'-0.3" 6'-0.3"
D4 D4
D4 D4
D3 D3
1'-9.1" LIVING Drawing Drawing LIVING 1'-9.1"
9'-0.4"
9'-0.5"
8'-9.4"
2'-3.1" Bed Room Bed Room
8'-5.4"
Toilet 16'6"X10'0" Toilet
10'0"X12'0" 4'0"X6'9" Toilet 16'6"X10'0" Toilet 4'0"X6'9" 10'0"X12'0"
5'-0.3"
5'-0.3"
4'-0.2" 6'0"X7'4" 16'-6.8" 6'0"X7'4" 4'-0.2"
c. b.
D1 2 3 D1
7'-2" V 5'-4.3" 16'-6.8" 5'-4.3" 8'-8.4"
V
LOBBY
1'-9.1"
DUCT DUCT
10'-0.5" V 5'-2.3" 16'-6.8" 16'-6.8" 7'-2"
V
5'-0.3"
5'-0.3"
D1 1 4 D1
4'-0.2" 4'-0.2"
c. b.
Toilet
8'-11.8"
9'-0.5"
6'0"X7'4" Drawing
10'-0.5"
Toilet
9'-8.3"
Toilet
4'0"X6'9" LIVING Toilet Bed Room
Bed Room 16'6"X10'0" LIVING 4'0"X6'9"
6'0"X7'4" 10'0"X12'0"
10'0"X12'0" Drawing 1'-9.1"
9'-11.4" 1'-1.5"
12'
16'6"X10'0" D3
7'-0.4"
D4 D4
D4
6'-0.3" 10'-5.9" 7'-0.4" 6'-0.3" D4
6'-6.8" 6'-6.8"
11'-4.5"
W2
4'0"X12'0"
4'0"X12'0"
UP
Balcony
D2 D2 W2
Balcony
3'3"12'-11.2"
Wide Passage 3'3" Wide Passage
6'-11.7"
D2 D2
Storage
Storage
12'-8.6"
12'-0.6"
12'-0.6"
12'-8.6"
D3 Bed Room D3
Kitchen/dinning
9'-7.9"
9'-0.5"
Bed Room BED ROOM BED ROOM 12'0"X10'0"
Kitchen/dinning 14'11"X10'4.5" 1'-9.1"
10'0"X12'0" 10'0"X12'0"
7'
12'0"X10'0"
14'11"X10'4.5"
3'-6.6"
6'-0.3"
5'-8.7"
11.8"
c. b.
12' 1'-0.9" 1'-0.9" 12'-0.6"
6" 5.8" D3
5.8" 6"
W1 7'-4.4" 10'-3" W1 9'-6" W1 9'-4.6"
W1 W1 7'-4.4" W1 1'-5.1"
2'
W1 KW Utility 8'-0.4" Utility KW W1
2'
14'10"X3'6" Balcony Balcony 14'10"X3'6"
1'-5.9"
1'-5.9"
projected chajja at 7' ht
10'0"X4'6" 10'0"X4'6" projected chajja at 7' ht
brick work starts from lintel brick work starts from lintel
D1= 3'6"X7'0" W1= 5'0"X4'0" KW= 3'0"X3'6"
D2= 3'0"X7'0" W2= 2'0"X4'0" V= 1'6"X 2'6"
BLOCK -B
D3= 2'6"X7'0" W3= 4'0"X4'0"
1 2 34 5 6 7 8 9 10 11 12
9'-11" 2'-5" 2'-5" 12'-9" 10'-3" 8'-9" 10'-3" 12'-9" 2'-5" 2'-5" 9'-11"
RAILING RAILING
1'-4" 8'-8"
BRICK WORK 3' ht 1'-4"
8'-8" 6'-6" 6'-6"
1'
1'
6'
4'-6"
6'
4'-6"
1'-9" 1'-9"
3'-6"
3'-6"
1' 1'
A c.b.
5' 5'
c.b.
5'-5.1"
5'-9"
4'
4'
5"
10'-3"
10'-3"
4' 4'
4'-6"
4'-6"
B
9"
9"
2'
RAILING
2'
3'-3"
C
2'
RAILING
6'-11"
6'-11"
D 5" 2'-3"
6'-11.5"
6'-11.5"
2'-3"1'-9" 1'-9"
c.b. c.b.
7'-2" 5'-6.5" 5'-6.5" 7'-2"
1'-4"1'-4"
1'-4"1'-4"
5'-1" 5'-1"
3'-4"
E c.b.
9"
9'-2" 4' 10'-7.5" 2' 27'-3" 10'-7.5" 9'-2"
9"
c.b.
5'-2.8"
6'-5.5"
6'-5.5"
16'-5" 16'-5"
1'-4"
1'-9" 4' 4' 1'-9"
9'-11.5"
9'-11.5"
2'-3" 5'-2" 5'-2"
8"
11'-11.5"
11'-11.5"
11'-11.5"
11'-11.5"
F 2'-3"
9'-11"
9'-11"
6'-11"
4'-3"
6'-11"
4'-3"
10'-3" 10'-3"
6'-2" 6'-2"
G RAILING
2'
2'
2'
2'
H
9"
9"
9'-6" 9'-6"
11'-7" 14'-5" 14'-5" 11'-7"
4'-6"
4'-6"
11'-6"
4'
11'-6"
4'
10'-3"
10'-3"
1
9'-6"
9'-6"
9'-6"
9'-6"
5'-9"
5'-9"
c.b. c.b.
4'
4'
5' 5" 5' 1'-6"
J
1'-6"
1' 7'-11" 7'-11" 1'
3'-6"
6'
4'-6"
1'-9"
4'-6"
6' 6' 1'-9"
1'5"
2'-3"
8'-8"
4"
13'-1" 1'-6" 1' 4 8
'- .9" 1'-9
6'-6" 1'-6"
6' 1' 1'
9'-11" 2'-5" 2'-5" 12'-9" 10'-3" 10'-3" 12'-9" 2'-5" 2'-5" 9'-11"
5'
5"
4'
SLAB DETAILS:-
3'
SHORTER BAR LONGER BAR X
√
S.NO. SLAB TH. OF TYPE OF MAIN EXTRA TOP DISTRIBUTION MAIN EXTRA TOP DISTRIBUTION
NO. SLAB SPAN BAR AT ENDS BAR BAR AT ENDS BAR √ √
X √
√ √
√ √
√ √
√ √
X √
1'-4"
1'-6"
6"
3'-10" 10" 10"
4'-6" 4'-4"
6"
10'
4'-8"
4'-8"
4'-6"
4'-7"
10"
7'-6"
1'
S.NO. SLAB TH. OF TYPE OF MAIN DISTRIBUTION
NO. SLAB SPAN BAR BAR
4.5"
BLOCK -B
1'
SIDE ELEVATION
6'
4'
4'
5'-6"
1" THK GROOVE IN
PLASTER
1'
2'
10'
1'-6"
PLASTER
1'
2'
10'
6"
1'-6" 3'-6"
1'
PLASTER
2'
10'
1'-6" 3'-6"
1'
PLASTER
6"
1'-6"
10'
1'-6" 3'-6"
1'-6"
1" THK GROOVE IN
1'-6"
1'
PLASTER
6"
8'-6"
1'-6" 3'-6"
1" THK GROOVE IN
1'
PLASTER
2'
3'
4'
3'-6"
1" THK GROOVE IN
3'
1'
PLASTER
10'
BLOCK -B -1,2,3
8'0"x10'0"
water tank
LOBBY DUCT
D1 1 4 D1
c. b.
c. b.
Toilet Toilet
Bed Room Toilet Toilet Bed Room
4'0"X6'9" LIVING LIVING 4'0"X6'9"
10'0"X12'0" 6'0"X7'4" 6'0"X7'4" 10'0"X12'0"
Drawing Drawing
D3 16'6"X10'0" 16'6"X10'0" D3
D4 D4
D4 D4
4'0"X12'0"
4'0"X12'0"
W2 D2 UP D2 W2
Balcony
Balcony
3'3" Wide Passage 3'3" Wide Passage
D2 D2
Storage Storage
c. b.
6" 5.8" 5.8" 6"
1'-5.1" W1 KW
D3
W1 W1 W1 W1
D3
KW W1 1'-5.1"
W1 W1
2' Utility
Balcony Balcony
Utility 2'
14'10"X3'6" 14'10"X3'6"
1'-5.9"
1'-5.9"
projected chajja at 7' ht 10'0"X4'6" 10'0"X4'6" projected chajja at 7' ht
brick work starts from lintel brick work starts from lintel
14'6"
5'
5'
5'
SIDE VIEW FRONT VIEW
NOTE:- AS PER STAIR DESIGN
2'-3"
Ld
B1 B1
B1 B1
B1 B1
MIDDLE BOTT CUT
BOT. BAR BAR AT 23L
B1 B1 B1 B1
1'-9"
3'
B1
B1 B1
B1
SLAB DETAILS:-
B1 B1 SHORTER BAR LONGER BAR
S.NO. SLAB TH. OF TYPE OF MAIN EXTRA TOP DISTRIBUTION MAIN EXTRA TOP DISTRIBUTION
NO. SLAB SPAN BAR AT ENDS BAR BAR AT ENDS BAR
N #8@8"C/C #8@8"C/C
RB1
SLAB BEAM DETAILS:-
S.NO. BEAM SIZE TOP. BAR EXTRA TOP MID SPAN MAIN BAR STIRRUPS
(axb) TO 0.3xL AT
BOTT. STRT. BOTT. CUT AT UPTO L/4 AT MID SPAN
SUPPORTS
BAR MIDDLE 2/3*L
B1 B1
#8@12"C/C #8@12"C/C
B1 B1 B1 B1 B1 8"X12" 2#10 1#12 2#10 1#12
RB1 8"X12" 2#10+ 2#10 -
4.5"TH . 4.5"TH . 2#12 #8@12"C/C #8@12"C/C
RB1 RB1 B2 8"X12" -
#8@8"C/C
#8@8"C/C
2#10 1#12 2#10 2#10 #8@12"C/C #8@12"C/C
1"
4'-02
#8@8"C/C #8@8"C/C
RB1 4"TH . RB1 4"TH . RB1 -
B3 8"X12" 2#10 2#10 #8@12"C/C #8@12"C/C
B4 4"X12" 2#12 2#12 1#12 #8@12"C/C #8@12"C/C
B4 B4 B4 B4
B5 8"X12" 2#10 2#10 2#10 2#10 #8@12"C/C #8@12"C/C
CB 8"X4.5" 2#12 3#12 #8@12"C/C #8@12"C/C
FIRST FLOOR SLAB (5 bhk)