020_Method Statement - Road Marking
020_Method Statement - Road Marking
PROJECT NO : 57/2023
REVISION CONTROL
Doc. No: BGC-MS-020 Rev 00 Page 1 of 11 Method Statement for Road Marking
1.0 PURPOSE
2.0 SCOPE
3.0 REFERENCES
7.0 SAFETY
8.0 PROCEDURE
Doc. No: BGC-MS-020 Rev 00 Page 2 of 11 Method Statement for Road Marking
2.0 SCOPE
The scope of this procedure covers the methods and procedures to be followed for road marking for
project: 2023/57 Improvement of Al Khor St., Umm Al Quwain.
3.0 REFERENCES
4.1 ABBREVIATIONS
4.2 DEFINITIONS
Doc. No: BGC-MS-020 Rev 00 Page 4 of 11 Method Statement for Road Marking
He shall be overall responsible for safe execution of the complete activity including, but not limited to:
a) Organizing tools and equipment required to the work site.
b) Assigning work crew.
c) Sequence of activities to be carried out for the work as per this work procedure.
d) Stage Inspection & Surveillance.
e) Ensure all safety Regulations are followed as applicable.
f) Contract specific requirements for excavations, if any specified shall be identified and the requirements of
such specification shall prevail in addition to the non-conflicting requirements of this procedure.
g) Ensure & study the approved drawings & statements before starting the activity.
h) Communicate all HSE requirements to the entire working crew and ensure that they understand.
i) Thoroughly familiar with all MODES/RAY contract and general HSE requirements and understand it to
maintain a healthy and safe environment for employees and contract staff.
5.4 NOC Officer
Doc. No: BGC-MS-020 Rev 00 Page 5 of 11 Method Statement for Road Marking
5.6 Surveyor
Doc. No: BGC-MS-020 Rev 00 Page 6 of 11 Method Statement for Road Marking
a) Ensure all P & M Equipment being used for the activity are in good working condition.
b) Ensure P & M Operators are qualified & authorized to operate the relevant equipment.
c) Ensure the work area shall be barricaded.
d) The toolbox talk shall be carried out before starting the work.
e) Ensure all necessary PPEs are worn by workers involved in the work.
f) Work shall be carried out in the daytime and if authorized, night work is permitted.
g) All sub-contractor men, material, machinery details to be collected and checked against insurance.
h) No work shall be allowed if temperature is more than 50 degree Celsius / high wind / more than 80%
humidity / inclement weather due to rain, lighting storm, fog or dark condition.
Doc. No: BGC-MS-020 Rev 00 Page 8 of 11 Method Statement for Road Marking
7.0 SAFETY
a) Prior to the commencement of any activities, the workforce will receive an induction talk on the
Project site safety requirements. This induction talk will include both activity safety issues, as well as
general safety requirements.
b) Where possible hazards may arise from filling activities, the necessary safety measures will be taken to
prevent accident or injury at all times. This may include barriers, warning tape/ net, signage,
watchman, and proper lighting.
Where work upon existing services may be required, the necessary work permits and safety
equipment should be obtained prior to the activity commencement.
Safety Officer will enforce that Personal Protective Equipment be worn by site personnel at all
times during construction activities.
Provisions of adequate cool drinking water, shade, and salt water tablets will be in place.
Plant & Equipment will be provided back-up alarms, lights, and all other applicable safety
Devices.
Safety Hazards and Precautions for excavation collapse and fall into excavation pit.
8.0 PROCEDURE
Prior to start the road lining work, the Surveyor must locate and make all the center lines, width and
length for all types of white and yellow on road.
Prepare the surfaces by removing effervescence, chalk, dust, dirt, grease, oil and release agent. Ensure
the roughening of the surface with fine emery paper to remove glaze.
The Surveyor will locate and mark all main outlines, spots, coordinates for every type of road markings
and signs. These outlines will be clearly marked using tapes or chalk.
Carefully mix and prepare paint materials in accordance with the manufacture direction. Use suitable
thinner approved by paint manufacturer and only recommended limits.
All yellow line 200mm and dotted line 150mm shall be marked using road marking machine. All
markings with different shapes and areas shall be done manually. Use masking tape or any other
precautionary measure. Apply additional coats as required.
Doc. No: BGC-MS-020 Rev 00 Page 9 of 11 Method Statement for Road Marking
Doc. No: BGC-MS-020 Rev 00 Page 10 of 11 Method Statement for Road Marking