10-05-2024 Block Mechanical Altaf 54 Ring Ring Lifting 9/5/2024 9/5/2024

3,4 Winding Zinser pulkey of 22:55 23:10


72XL ring rail
tape got
displaced
and

10-05-2024 Block Electrical N 41 Ring Ring Zinser "FU MUW 9/5/2024 9/5/2024
3,4 o Winding 72XL Warning 22:10 22:45
m temperatur
a e" Alarm.
n
Inverter got
h
10-05-2024 Block Mechanical I 14 Back Finish "Sliver 10/5/2024 10/5/2024
1,2 k Process er deviation" 0:5 0:16
r Drawi alarm.
a ng Wrapping
m was
62.57.Recti

10-05-2024 Block Mechanical I 15 Back Finish "Sliver 10/5/2024 10/5/2024


1,2 k Process er deviation" 2:5 2:20
r Drawi alarm.
a ng Wrapping
m was
70.22.Recti

10-05-2024 Block Mechanical I 17 Back Finish "Sliver 10/5/2024 10/5/2024


1,2 k Process er deviation" 3:30 3:44
r Drawi alarm.
a ng Wrapping
m was
70.11.Recti

10-05-2024 Block Electrical N 22 Back Simplex "Speed 10/5/2024 10/5/2024


3,4 o Process difference 5:5 5:30
m too high"
a alarm.
n Alarm got
reset

10-05-2024 Block Mechanical I 24 Back Simplex Abnormal 9/5/2024 10/5/2024


3,4 k Process sound 23:30 0:1
r observed.
a On
m investigatio
n bearing

10-05-2024 Block Mechanical I 31 Back Inter Steel roller 9/5/2024 9/5/2024


3,4 k Process Drawing velt was 22:30 23:0
r damaged
a and
m
changed.R
ectifie
10-05-2024 Block Electrical t 7 Back Lap "Lap 10/5/2024 10/5/2024
3,4 a Process Former monitoring 0:30 1:30
y drafting
y system 2"
a alarm.
b Electric

10-05-2024 Block Electrical t CLU Back Blow Motor got 10/5/2024 10/5/2024
3,4 a Process Room tripped.Trip 4:15 4:35
y Block-4 ping was
y clear.Rectif
a ied
b

10-05-2024 Block Mechanical S 3 Ring Ring Traveller 10/5/2024 10/5/2024


1,2 a Winding Zinser change. 8:45 9:20
j 72XL
i
d
10-05-2024 Block Mechanical S 12 Ring Ring Traveller 10/5/2024 10/5/2024
1,2 a Winding Zinser change. 10:45 11:20
j 72XL
i
d
10-05-2024 Block Mechanical S 9 Ring Ring Traveller 10/5/2024 10/5/2024
1,2 a Winding Zinser change. 9:20 9:50
j 72XL
i
d
10-05-2024 Block Mechanical Sajid 29 Ring Ring Traveller 10/5/2024 10/5/2024
1,2 Winding Zinser change. 10:0 10:35
72XL
10-05-2024 Block Mechanical Sajid 32 Ring Ring Traveller 10/5/2024 10/5/2024
3,4 Winding Zinser change. 11:50 12:20
72XL
10-05-2024 Block Mechanical Sajid 34 Ring Ring Traveller 10/5/2024 10/5/2024
3,4 Winding Zinser change. 11:15 11:45
72XL
10-05-2024 Block Mechanical Sajid 57 Ring Ring Count 10/5/2024 10/5/2024
3,4 Winding Zinser change. 6:0 7:0
72XL
10-05-2024 Block Mechanical Sajid 56 Ring Ring Count 10/5/2024 10/5/2024
3,4 Winding Zinser change. 6:30 8:20
72XL
10-05-2024 Block Electrical Usman 4 Ring Ring Zinser "FU spindle 10/5/2024 10/5/2024
1,2 Winding 72XL warning 8:30 8:55
temperatur
e" alarm,

Electrical
10-05-2024 Block Mechanical Zulifqar 1 Ring Ring Overhaulin 10/5/2024 10/5/2024
1,2 Winding Zinser g. 8:30 12:30
72XL
10-05-2024 Block QCD Dilshad 17 Back Finish "Sliver 10/5/2024 10/5/2024
1,2 Process er deviation" 8:30 8:45
Drawi alarm,
ng Wrapping
64.30.
Rectifie

10-05-2024 Block Electrical Tayyab 15 Back Simpl Bobbin 10/5/2024 10/5/2024


1,2 Process ex exchanger 8:0 9:30
was
problemati
c. Electrical

perso
10-05-2024 Block Mechanical altaf,jillani 32 Ring Ring Zinser Stopped 10/5/2024 10/5/2024
3,4 Winding 72XL because 20:0 20:40
WD40+
Zero guage
setting was

done.
10-05-2024 Block Mechanical iftkhar 31 Ring Ring Stopped 10/5/2024 10/5/2024
3,4 Winding Zinser because 15:28 15:45
72XL WD40
sapry was
done.
10-05-2024 Block Mechanical iftkhar 33 Ring Ring Stopped 10/5/2024 10/5/2024
3,4 Winding Zinser because 15:0 15:15
72XL WD40 was
done.
10-05-2024 Block Mechanical iftkhar 35 Ring Ring Stopped 10/5/2024 10/5/2024
3,4 Winding Zinser because 16:26 16:37
72XL WD40 was
done.
10-05-2024 Block Electrical sajad 44 Ring Ring Stopped 10/5/2024 10/5/2024
3,4 Winding Zinser due to "WF 14:50 15:30
72XL not on
sensore"
alarm,
electric

10-05-2024 Block Mechanical iftkhar 53 Ring Ring Traveller 10/5/2024 10/5/2024


3,4 Winding Zinser change + 14:49 15:45
72XL suction fan
moter belt
1280 was
10-05-2024 Block Mechanical safdar 59 Ring Ring Conveyor 10/5/2024 10/5/2024
3,4 Winding Zinser belt was 16:58 17:14
72XL not
completed.
10-05-2024 Block Mechanical zulfiqar+aw 19 Ring Ring Stopped 10/5/2024 10/5/2024
1,2 ais Winding Zinser due to "WF 14:20 15:30
72XL not on
sensor final
sppining ti
10-05-2024 Block Mechanical akhtar 1 Ring Ring Zero guage 10/5/2024 10/5/2024
1,2 Winding Zinser setting was 14:32 14:55
72XL done.

10-05-2024 Block Mechanical akhtar 2 Ring Ring Zero guage 10/5/2024 10/5/2024
1,2 Winding Zinser setting was 15:25 15:40
72XL done.

10-05-2024 Block Mechanical akhtar 3 Ring Ring Zero guage 10/5/2024 10/5/2024
1,2 Winding Zinser setting was 14:49 15:15
72XL done.

10-05-2024 Block Mechanical akhtar 4 Ring Ring Zero guage 10/5/2024 10/5/2024
1,2 Winding Zinser setting was 15:44 16:0
72XL done.

10-05-2024 Block QCD asif 19 Back Finish Stopped 10/5/2024 10/5/2024


3,4 Process er due to 19:25 19:40
Drawi "Sliver
ng deviation-"
alarm,
wrapping

10-05-2024 Block QCD asif 22 Back Finish Stopped 10/5/2024 10/5/2024


3,4 Process er due to 21:10 21:25
Drawi "Sliver
ng deviation-"
alarm,
wrapping

10-05-2024 Block QCD asif 25 Back Finish Stopped 10/5/2024 10/5/2024


3,4 Process er due to 21:20 21:35
Drawi "Sliver
ng deviation-"
alarm,
wrapping

10-05-2024 Block Electrical azeem 20 Back Finish Stopped 10/5/2024 10/5/2024


3,4 Process er due to 14:30 15:0
Drawi "Speed of
ng regulation
drive"
alarm,

10-05-2024 Block Electrical sajad 21 Back Finish Stopped 10/5/2024 10/5/2024


3,4 Process er due to 18:0 19:0
Drawi "Rotery
ng can plate
drive"
alarm, can

10-05-2024 Block Mechanical Farooq 53 Back Car Stopped 10/5/2024 10/5/2024


3,4 Process d because 17:30 18:0
flat belt
was
changed.
11-05-2024 Block Mechanical Altaf 31 Ring Ring Ballon 10/5/2024 10/5/2024
3,4 Winding Zinser control 23:10 23:35
72XL bracket
was
damaged
and
changed

11-05-2024 Block Mechanical Altaf 14 Ring Ring Zinser Belt of 11/5/2024 11/5/2024
3,4 Winding 72XL suction 1:49 3:10
pressure
motor was
damaged
and

cha
11-05-2024 Block Mechanical Altaf 53 Ring Ring Zinser Belt of 11/5/2024 11/5/2024
3,4 Winding 72XL suction 1:50 3:10
pressure
motor was
damaged
and

cha
11-05-2024 Block Mechanical Altaf 57 Ring Ring Spindle 11/5/2024 11/5/2024
3,4 Winding Zinser lock was 3:40 4:15
72XL loosed and
tightened

11-05-2024 Block Mechanical Gulzar RPF Back FDP Card Stopped 10/5/2024 10/5/2024
1,2 Process due to RPF 3:55 4:25
of line no 3
was
chocked
due

11-05-2024 Block QCD Naeem 33 Back Finish Stopped 10/5/2024 10/5/2024


3,4 Process er due to 10:30 10:45
Drawi alarm "
ng sliver
deivation"
wrapping

11-05-2024 Block Electrical Tayab 32 Back Comber Stopped 10/5/2024 10/5/2024


3,4 Process due to 1:30 2:0
alarm " lap
motor
overlod
"machine

11-05-2024 Block Mechanical Shoiab 7 Back Lap Stopped 10/5/2024 10/5/2024


3,4 Process Former due to 0:0 0:30
alarm
"Tube
spreator
target

positio
11-05-2024 Block Mechanical Sajid 33 Ring Ring Traveler 11/5/2024 11/5/2024
3,4 Winding Zinser change 10:30 11:0
72XL
11-05-2024 Block Mechanical Sajid 40 Ring Ring Traveler 11/5/2024 11/5/2024
3,4 Winding Zinser change 11:6 11:40
72XL
11-05-2024 Block Mechanical Sajid 35 Ring Ring Traveler 11/5/2024 11/5/2024
3,4 Winding Zinser change 12:11 12:40
72XL
11-05-2024 Block Mechanical Sajid 31 Ring Ring Overhaulin 11/5/2024 11/5/2024
3,4 Winding Zinser g + count 8:50 14:0
72XL change
11-05-2024 Block Mechanical Iftikhar 55 Ring Ring Balloon 11/5/2024 11/5/2024
3,4 Winding Zinser control ring 8:0 8:20
72XL bracket
was
replaced

11-05-2024 Block Mechanical z 59 Ring Ring Flexi drive 11/5/2024 11/5/2024


3,4 u Winding Zinser pin was 8:39 10:19
li 72XL replaced
f
q
a
r
11-05-2024 Block Mechanical A 15 Ring Ring Suction 11/5/2024 11/5/2024
3,4 li Winding Zinser flap 12:29 12:55
r 72XL cylinder
a was
z replaced
a

11-05-2024 Block Mechanical i 35 Ring Ring Stopped 11/5/2024 11/5/2024


3,4 f Winding Zinser because 8:5 8:35
t 72XL ring rail
i lifting tape
k was
h damaged
a
r

11-05-2024 Block Mechanical khalil 5 Back Simplex overhaulin 11/5/2024 11/5/2024


1,2 Process g 8:30 14:0
11-05-2024 Block Mechanical A 10 Back Finish "Sliver 11/5/2024 11/5/2024
1,2 r Process er deviation" 9:15 9:31
b Drawi alarm,
a ng wrapping
b was
61.27gr.

11-05-2024 Block Mechanical Z 31 Ring Ring Overhaulin 11/5/2024 11/5/2024


1,2 u Winding Zinser g 14:0 16:45
lf 72XL
i
q
u
r
11-05-2024 Block Mechanical Sajjid 54 Ring Ring Traveller 11/5/2024 11/5/2024
1,2 Winding Zinser change 14:0 14:35
72XL
11-05-2024 Block Mechanical S 60 Ring Ring Bobbin 11/5/2024 11/5/2024
1,2 a Winding Zinser conveyour 16:25 16:45
f 72XL wasn't
d completed(
a bps belt got
r cho

11-05-2024 Block Mechanical Sajjid 10 Ring Ring Traveller 11/5/2024 11/5/2024


1,2 Winding Zinser change 15:35 16:10
72XL
11-05-2024 Block Mechanical Sajjid 20 Ring Ring Traveller 11/5/2024 11/5/2024
1,2 Winding Zinser change 15:0 15:30
72XL
11-05-2024 Block Mechanical Sajjid 22 Ring Ring Traveller 11/5/2024 11/5/2024
1,2 Winding Zinser change 14:25 15:0
72XL
11-05-2024 Block Mechanical A 14 Ring Ring Stopped 11/5/2024 11/5/2024
1,2 li Winding Zinser due to 15:30 16:10
R 72XL deflection
a pulley got
z heated
a up,rep

11-05-2024 Block Mechanical S 8 Ring Ring Stopped 11/5/2024 11/5/2024


1,2 a Winding Zinser against 21:0 21:25
q 72XL "timeout
i pressure
b gripper"
alarm,M

11-05-2024 Block Mechanical Ikram 36 Back Inter Stopped 11/5/2024 11/5/2024


3,4 Process Drawing due to 14:0 15:0
drafting
zone
pressure
pipe got le

11-05-2024 Block QCD Asif 29 Back Finish Stopped 11/5/2024 11/5/2024


3,4 Process er due to 14:30 14:55
Drawi "maximum
ng draft
exceeded"
alarm,can

11-05-2024 Block Electrical Waqar 3 Back Card Stopped 11/5/2024 11/5/2024


1,2 Process due to 17:0 17:30
system
error
alarm,elect
rical perso

11-05-2024 Block Mechanical Ikram 5 Back Simplex Overhaulin 11/5/2024 11/5/2024


1,2 Process g 14:0 17:0
11-05-2024 Block Electrical Sajjad CLU Back Blow Cotton line 11/5/2024 11/5/2024
3,4 Process Room # 8was 15:0 16:30
Block-4 stopped
due to
"motor
protectio
12-05-2024 Block Electrical Tayab 5 Back Simplex Stopped 11/5/2024 11/5/2024
1,2 Process due to 0:20 0:40
alarm"
Bobbin rail
encoder
was not

12-05-2024 Block Electrical Tayab 10 Back Simplex Stopped 11/5/2024 11/5/2024


1,2 Process due to 1:5 1:35
alarm"
Bobbin rail
encoder
was not

12-05-2024 Block Mechanical Gulzar 14 Back Card Stopped 11/5/2024 11/5/2024


1,2 Process due 23:5 23:30
to"T.con
alarm "foil
paper was
found

.
12-05-2024 Block Mechanical Gulzar RPF Back FDP Card Stopped 11/5/2024 11/5/2024
3,4 Process due to"RPF 5:0 5:20
nozzle was
chocked"

rectified
12-05-2024 Block Electrical Tayab 23 Back Pre Stopped 11/5/2024 11/5/2024
3,4 Process Drawing due to 1:0 2:0
alarm"Sucti
on
pressure
monitoring"

12-05-2024 Block Electrical Tayab 24 Back Pre Stopped 11/5/2024 11/5/2024


3,4 Process Drawing due to 1:0 2:0
alarm"Sucti
on
pressure
monitoring"

12-05-2024 Block Mechanical Shoiab West Back FDP Stopped 11/5/2024 11/5/2024
3,4 Process Drawing due to FDP 3:40 4:20
drawing
was tripped
panel.

It w
12-05-2024 Block Mechanical Shoiab 33 Back Finish "Sliver 12/5/2024 12/5/2024
3,4 Process er count 4:0 4:25
Drawi monitoring"
ng alarm.
Wrapping
was 70.33
12-05-2024 Block Mechanical Shoiab 23 Back Finish "Sliver 11/5/2024 11/5/2024
3,4 Process er deviation"al 23:35 23:45
Drawi arm.
ng Wrapping
was 61.24
Rectif

12-05-2024 Block Mechanical Shoiab 26 Back Finish "Sliver 11/5/2024 11/5/2024


3,4 Process er deviation"al 22:35 22:50
Drawi arm.
ng Wrapping
was 62.05
Rectif

12-05-2024 Block Mechanical Shoiab 27 Back Finish "Sliver 12/5/2024 12/5/2024


3,4 Process er deviation"al 1:20 1:40
Drawi arm.
ng Wrapping
was
70.26.Recti
f

12-05-2024 Block Mechanical Shoiab 29 Back Finish "Maximum 12/5/2024 12/5/2024


3,4 Process er draft 5:0 5:20
Drawi exceeded"
ng alarm.
Wrapping
was 70.90.
12-05-2024 Block Mechanical Shoiab 32 Back Finish "Sliver 11/5/2024 11/5/2024
3,4 Process er deviation"al 23:5 23:20
Drawi arm.
ng Wrapping
was
61.27.Recti
f

12-05-2024 Block Mechanical Ali Raza 8 Ring Ring Stopped 12/5/2024 12/5/2024
1,2 Winding Zinser due to 15:0 15:15
72XL "timeout
pressure
gripper"
alarm,Re

12-05-2024 Block Mechanical Javed 2 Ring Ring Overhaulin 12/5/2024 12/5/2024


1,2 Winding Zinser g 14:0 16:30
72XL
12-05-2024 Block Mechanical Sajjid 58 Ring Ring Traveller 12/5/2024 12/5/2024
3,4 Winding Zinser change 15:15 15:50
72XL
12-05-2024 Block Mechanical Awais 58 Ring Ring Zinser Stopped 12/5/2024 12/5/2024
3,4 Winding 72XL due to 18:35 18:55
bobbin
conveyour
wasn't
completed(
c
12-05-2024 Block Mechanical Ashraf 59 Ring Ring Needle 12/5/2024 12/5/2024
3,4 Winding Zinser bearing 14:10 14:25
72XL was
replaced
12-05-2024 Block Mechanical Sajjid 60 Ring Ring Traveller 12/5/2024 12/5/2024
3,4 Winding Zinser change 14:0 14:40
72XL
12-05-2024 Block Mechanical Shabir/ 15 Back Finish Stopped 12/5/2024 12/5/2024
1,2 sajjid Process er due to 15:0 19:0
Drawi "draft
ng devation "
alarm,wrap
ping

wa
12-05-2024 Block Mechanical Ikram 8 Back Finish Stopped 12/5/2024 12/5/2024
1,2 Process er due to front 17:50 18:30
Drawi roller
ng belt(2286)
was
damage,

12-05-2024 Block Mechanical I 13 Back Simplex Stopped 12/5/2024 12/5/2024


1,2 k Process due to 15:50 17:0
r bobbin
a wheel
m bearing
was
replaced
a

12-05-2024 Block Electrical FBOA Back Blow Stopped 12/5/2024 12/5/2024


3,4 a Process Room due to 20:45 21:0
r Block-4 "cover belt"
o alarm,elect
o rical perso
q

12-05-2024 Block Mechanical F 54 Back Card Stopped 12/5/2024 12/5/2024


3,4 a Process due to top 17:0 18:30
r set pin got
o damage,re
o placed
q

12-05-2024 Block Mechanical I 26 Back Comber Stopped 12/5/2024 12/5/2024


3,4 k Process due to 18:15 19:0
r "compress
a ed air
m
monitoring"
alarm,p
12-05-2024 Block Mechanical I 21 Back Simplex Overhaulin 12/5/2024 12/5/2024
3,4 k Process g 14:0 17:0
r
a
m
12-05-2024 Block Electrical W29 Back Simplex Stopped 12/5/2024 12/5/2024
3,4 a Process due to 17:30 17:46
q bobbin rail
a encoder
r alarm,Recti
fied
12-05-2024 Block Mechanical i 29 Back Lap Stopped 12/5/2024 12/5/2024
3,4 k Process Former due to 17:0 17:30
r "tube
a seperator
m target
postion not

13-05-2024 Block Mechanical Altaf 55 Ring Ring Steel roller 13/5/2024 13/5/2024
3,4 Winding Zinser bearing 4:30 4:49
72XL was
changed
13-05-2024 Block Electrical N 11 Back Simplex Stopped 13/5/2024 13/5/2024
1,2 o Process due to 5:15 5:30
m alarm "
a Bobbin
n encoder
not ready"

m
13-05-2024 Block Mechanical S 31 Back Break Delivery 13/5/2024 13/5/2024
3,4 h Process er roller belt 0:0 0:30
o Drawi was
i ng damaged
a and
b replaced

13-05-2024 Block Mechanical G


TST-5 Back Blow Room Stopped 13/5/2024 13/5/2024
3,4 u Process Block-4 due alarm" 4:30 5:10
l Lighting
z image
a bright F1"
r

clean
13-05-2024 Block Mechanical GRPF Back FDP RPF was 13/5/2024 13/5/2024
3,4 u Process Blow choked 4:20 5:20
l Room twice due
z to material
a was
r cleared a

13-05-2024 Block Mechanical G 14 Back Card Stopped 12/5/2024 12/5/2024


1,2 u Process due to 22:0 22:30
l "T.con
z alarm.foil
a paper was
r found .

13-05-2024 Block QCD N 16 Back Finish Stopped 13/5/2024 13/5/2024


1,2 a Process er due to 3:35 3:45
e Drawi alarm"
e ng sliver
m deivation"
wrapping w

13-05-2024 Block Mechanical Z 33 Ring Ring Over 13/5/2024 13/5/2024


3,4 u Winding Zinser haulling 8:45 13:15
lf 72XL
q
a
r
13-05-2024 Block Mechanical Sajid 47 Ring Ring Traveller 13/5/2024 13/5/2024
3,4 Winding Zinser change 11:6 11:40
72XL
13-05-2024 Block Mechanical Sajid 59 Ring Ring Traveller 13/5/2024 13/5/2024
3,4 Winding Zinser change 10:25 11:0
72XL
13-05-2024 Block Mechanical Sajid 41 Ring Ring Traveller 13/5/2024 13/5/2024
3,4 Winding Zinser change 11:40 12:15
72XL
13-05-2024 Block Mechanical Sajid 38 Ring Ring Traveller 13/5/2024 13/5/2024
3,4 Winding Zinser change 12:15 12:50
72XL
13-05-2024 Block Mechanical A 19 Ring Ring Zero guage 13/5/2024 13/5/2024
1,2 li Winding Zinser + crown 11:0 11:34
R 72XL cleaning
a
z
a

13-05-2024 Block Electrical U 24 Ring Ring Fu Spindle 13/5/2024 13/5/2024


1,2 s Winding Zinser Warning 9:45 10:0
m 72XL temperatur
a e
n
13-05-2024 Block Mechanical Amir 27 Back Finish Sliver 13/5/2024 13/5/2024
3,4 Process er count 10:50 11:30
Drawi alarm.
ng wrapping
was done
(69.90).

13-05-2024 Block Mechanical M 5 Back Card T.Con 13/5/2024 13/5/2024


1,2 o Process alarm. 6:30 6:55
h found
s nothing.
i
n
13-05-2024 Block Mechanical M 37 Back Card T.Con 13/5/2024 13/5/2024
1,2 o Process alarm. 10:50 11:20
h found
s nothing.
i
n
13-05-2024 Block Mechanical Abid 6 Back Simplex Over 13/5/2024 13/5/2024
1,2 Process Hauling 8:30 14:0
13-05-2024 Block Mechanical S 15 Back Finish Stopped in 13/5/2024 13/5/2024
1,2 h Process er night shift 6:0 10:0
a Drawi due to fake
b ng alarms of
b slive
ir

13-05-2024 Block QCD K 15 Back Finish Stopped 13/5/2024 13/5/2024


1,2 a Process er due to " 12:5 12:30
s Drawi Sliver
h ng deviation
if (-) " alarm.
(64

IFL
Daily Stoppages Report
Date Block Rectified Dep Rectified Person McNo Area Sub Area
Reason
13-05-2024 Block Stop Time
Mechanical AkhtarStart Time
32 Ring Ring Bush of 13/5/2024 13/5/2024
3,4 Winding Zinser ring rail 16:15 16:30
72XL bracket
was
changed
13-05-2024 Block Mechanical Dastageer 58 Ring Ring Spindle 13/5/2024 13/5/2024
3,4 Winding Zinser belt tension 17:30 17:45
72XL was
increased

13-05-2024 Block Mechanical Dastageer 59 Ring Ring Spindle 13/5/2024 13/5/2024


3,4 Winding Zinser belt tension 16:45 16:56
72XL was
increased

13-05-2024 Block Mechanical Dastageer 60 Ring Ring Spindle 13/5/2024 13/5/2024


3,4 Winding Zinser belt tension 16:40 16:55
72XL was
increased

13-05-2024 Block Mechanical Dastageer 57 Ring Ring Spindle 13/5/2024 13/5/2024


3,4 Winding Zinser belt tension 16:55 17:5
72XL was
increased

13-05-2024 Block Mechanical Dastageer 52 Ring Ring Spindle 13/5/2024 13/5/2024


3,4 Winding Zinser belt tension 17:0 17:11
72XL was
increased

13-05-2024 Block Mechanical Dastageer 49 Ring Ring Spindle 13/5/2024 13/5/2024


3,4 Winding Zinser belt tension 17:5 17:25
72XL was
increased

13-05-2024 Block Mechanical Dastageer 50 Ring Ring Spindle 13/5/2024 13/5/2024


3,4 Winding Zinser belt tension 17:20 17:35
72XL was
increased

13-05-2024 Block Mechanical Ali raza 16 Ring Ring Steel roller 13/5/2024 13/5/2024
1,2 Winding Zinser bearing 17:15 17:25
72XL was
changed
13-05-2024 Block Mechanical zulfiqar 3 Ring Ring Over 13/5/2024 13/5/2024
1,2 Winding Zinser Hauling 14:0 16:10
72XL
13-05-2024 Block Mechanical Sajjid 18 Ring Ring Traveller 13/5/2024 13/5/2024
1,2 Winding Zinser changed 14:10 14:31
72XL
13-05-2024 Block Mechanical Sajjid 24 Ring Ring Traveller 13/5/2024 13/5/2024
1,2 Winding Zinser changed 14:35 15:10
72XL
13-05-2024 Block Mechanical Sajjid 14 Ring Ring Traveller 13/5/2024 13/5/2024
1,2 Winding Zinser changed 15:11 15:50
72XL
13-05-2024 Block Mechanical Usman 17 Back Finish "Sliver 13/5/2024 13/5/2024
1,2 Process er deviation"al 19:10 19:20
Drawi arm.
ng Wrapping
was
36.11.Recti
f

13-05-2024 Block Mechanical Usman 18 Back Finish "Sliver 13/5/2024 13/5/2024


1,2 Process er deviation"al 15:0 15:45
Drawi arm twice.
ng Wrapping
was 64.60

13-05-2024 Block Mechanical Usman 14 Back Finish KZS6 Card 13/5/2024 13/5/2024
1,2 Process er was 14:40 15:30
Drawi interchang
ng ed from
MC 15
and found
fa
14-05-2024 Block Mechanical Saqib 30 Ring Ring Stopped 14/5/2024 14/5/2024
1,2 Winding Zinser due to 0:45 2:30
72XL lifting
pulley
bearing
was
damage,R

14-05-2024 Block QCD Naeem 23 Back Finish Stopped 13/5/2024 13/5/2024


3,4 Process er due 22:10 22:25
Drawi to"Maximu
ng m
draft
exceeded"

alarm,wrap
p
14-05-2024 Block QCD Naeem 9 Back Finish Stopped 14/5/2024 14/5/2024
1,2 Process er due to 3:25 3:35
Drawi "Maximum
ng draft
exceeded"
alarm,can

14-05-2024 Block QCD Naeem 13 Back Finish Stopped 14/5/2024 14/5/2024


1,2 Process er due to 1:50 2:5
Drawi "Maximum
ng draft
exceeded"
alarm,can

14-05-2024 Block QCD Naeem 15 Back Finish Stopped 14/5/2024 14/5/2024


1,2 Process er due to "CV 1:15 1:30
Drawi value
ng monitoring"
wrapping
was
14-05-2024 Block QCD Naeem 17 Back Finish Stopped 14/5/2024 14/5/2024
1,2 Process er due to 4:55 5:10
Drawi sliver
ng devation
alarm,can
was

place
14-05-2024 Block Mechanical Farooq 13 Back Card Stopped 14/5/2024 14/5/2024
1,2 Process against"T- 4:0 4:30
CON"
alarm,foip
paper was
found

14-05-2024 Block Mechanical Farooq LDF Back FDP Card Card line # 13/5/2024 13/5/2024
1,2 Process 3 was 23:0 23:20
stopped
due to LDF
got
choked,cl

14-05-2024 Block QCD Naeem 26 Back Finish Stopped 14/5/2024 14/5/2024


3,4 Process er against 5:30 5:45
Drawi sliver
ng deavtion,ca
n was
placed in

14-05-2024 Block Mechanical Saif 45 Ring Ring Traveller 14/5/2024 14/5/2024


3,4 Winding Zinser change 9:30 10:0
72XL
14-05-2024 Block Mechanical Saif 49 Ring Ring Traveller 14/5/2024 14/5/2024
3,4 Winding Zinser change 10:25 11:6
72XL
14-05-2024 Block Mechanical Saif 50 Ring Ring Traveller 14/5/2024 14/5/2024
3,4 Winding Zinser change 11:0 11:30
72XL
14-05-2024 Block Mechanical Saif 36 Ring Ring Traveller 14/5/2024 14/5/2024
3,4 Winding Zinser change 11:20 11:50
72XL
14-05-2024 Block Mechanical Saif 37 Ring Ring Traveller 14/5/2024 14/5/2024
3,4 Winding Zinser change 11:50 12:20
72XL
14-05-2024 Block Mechanical Z 34 Ring Ring Over 14/5/2024 14/5/2024
3,4 u Winding Zinser hauling 8:30 13:15
lf 72XL
q
a
r
14-05-2024 Block Mechanical A 10 Ring Ring Stopped 14/5/2024 14/5/2024
1,2 li Winding Zinser due to " 9:25 10:0
R 72XL ADB:
a warning
z suction
a pressure to
14-05-2024 Block QCD Asif 3 Back Finish Stopped 14/5/2024 14/5/2024
1,2 Process er due to " 7:30 7:45
Drawi Maximum
ng draft
exceded"al
arm.Recti

14-05-2024 Block Mechanical Khalil 22 Back Simplex Over 14/5/2024 14/5/2024


3,4 Process hauling 8:30 14:0
14-05-2024 Block Electrical T 8 Back Lap Stopped 14/5/2024 14/5/2024
3,4 a Process Former due to " 13:0 14:0
y Left side
y plate not
a close"
b alarm.

14-05-2024 Block Mechanical z 4 Ring Ring Over 14/5/2024 14/5/2024


1,2 u Winding Zinser hauling 14:0 16:25
lf 72XL
i
q
a
r
14-05-2024 Block Mechanical sajid 25 Ring Ring traveller 14/5/2024 14/5/2024
1,2 Winding Zinser change 14:0 14:30
72XL
14-05-2024 Block Mechanical sajid 2 Ring Ring traveller 14/5/2024 14/5/2024
1,2 Winding Zinser change 14:33 15:5
72XL
14-05-2024 Block Mechanical sajid 1 Ring Ring traveller 14/5/2024 14/5/2024
1,2 Winding Zinser change 15:4 15:45
72XL
14-05-2024 Block Mechanical s 30 Ring Ring Stopped 14/5/2024 14/5/2024
1,2 a Winding Zinser because 16:40 16:59
f 72XL stoppage
d in auto
a cone.
r
14-05-2024 Block QCD A 18 Back Finish Stopped 14/5/2024 14/5/2024
1,2 r Process er due to " 18:22 18:35
b Drawi Sliver
a ng deviation-"
b alarm,
alarm w

14-05-2024 Block Electrical n BOA Back Blow Blendomat 14/5/2024 14/5/2024


1,2 o Process Room e#3 was 19:25 19:40
u Block-3 stopped
m due to
a "Motor
n protection

14-05-2024 Block Mechanical g 46 Back Card Doubble 14/5/2024 14/5/2024


3,4 u Process timing belt 20:30 21:10
l 1270
z changed.
a
r
14-05-2024 Block Mechanical u 8 Back Lap Stopped 14/5/2024 14/5/2024
3,4 s Process Former due to "Left 21:0 21:35
m side plate
a not closed"
n alarm,

14-05-2024 Block QCD A 26 Back Finish Stopped 14/5/2024 14/5/2024


3,4 r Process er due to " 19:10 19:20
b Drawi Sliver
a ng deviation-"
b alarm,
alarm w

14-05-2024 Block QCD A 30 Back Finish Stopped 14/5/2024 14/5/2024


3,4 r Process er due to " 14:0 14:11
b Drawi Sliver
a ng deviation-"
b alarm,
alarm w

14-05-2024 Block QCD A 32 Back Finish Stopped 14/5/2024 14/5/2024


3,4 r Process er due to " 15:45 15:55
b Drawi Sliver
a ng deviation-"
b alarm,
alarm w

14-05-2024 Block Mechanical g 36 Back Card Stopped 14/5/2024 14/5/2024


1,2 u Process due to 20:0 20:55
l "TCon"
z alarm(twice
a ), a foil
r paper w

14-05-2024 Block Mechanical g 16 Back Card Stopped 14/5/2024 14/5/2024


1,2 u Process due to 19:45 20:11
l "TCon"
z alarm, a foil
a paper was
r foun

14-05-2024 Block Mechanical u 13 Back Inter Steel roller 14/5/2024 14/5/2024


1,2 s Process Drawing belt 21:0 21:30
m replaced.
a
n
15-05-2024 Block Mechanical S 3 Ring Ring Stopped 15/5/2024 15/5/2024
1,2 a Winding Zinser due to 0:45 1:50
q 72XL deflection
i pulley got
b heated
up,rep

15-05-2024 Block Mechanical S 17 Ring Ring Front roller 14/5/2024 14/5/2024


1,2 a Winding Zinser bearing 23:30 23:40
q 72XL was
i replaced
b
15-05-2024 Block QCD N 15 Back Finish Stopped 14/5/2024 14/5/2024
1,2 a Process er due to 22:55 23:15
e Drawi "Sliver
e ng count"
m alarm,wrap
ping was

d
15-05-2024 Block QCD N 21 Back Finish Stopped 15/5/2024 15/5/2024
3,4 a Process er due to 2:35 2:50
e Drawi "sliver
e ng devation"
m alarm,can
was

pla
15-05-2024 Block QCD S 20 Back Break Stopped 14/5/2024 14/5/2024
3,4 h Process er due to 22:30 23:0
o Drawi delivery
a ng roller belt
i 615 was
b damage

15-05-2024 Block Electrical S 29 Back Simplex Stopped 15/5/2024 15/5/2024


3,4 h Process due to 4:20 4:55
a drafting
fi system
q hardware
u
e
malfunctio
15-05-2024 Block Mechanical F 80 Back Card Stopped 14/5/2024 15/5/2024
3,4 a Process due 22:0 0:0
r to"Thick
o spot"
o alarm,Mec
q hanica
person

15-05-2024 Block Mechanical F CLC-3 Back Blow Stopped 15/5/2024 15/5/2024


3,4 a Process Room agaisnt 2:40 3:30
r Block-4 feed
o monitoring
o alarm,timin
q g belt

15-05-2024 Block Mechanical Sajid 15 Ring Ring Traveller 15/5/2024 15/5/2024


1,2 Winding Zinser change 12:25 13:0
72XL
15-05-2024 Block Mechanical Sajid 26 Ring Ring Traveller 15/5/2024 15/5/2024
1,2 Winding Zinser change 11:50 12:25
72XL
15-05-2024 Block Mechanical Sajid 16 Ring Ring Count 15/5/2024 15/5/2024
1,2 Winding Zinser change+ 6:0 7:30
72XL process
change
15-05-2024 Block Mechanical Sajid 44 Ring Ring Traveller 15/5/2024 15/5/2024
3,4 Winding Zinser change 9:25 10:0
72XL
15-05-2024 Block Mechanical Sajid 51 Ring Ring Traveller 15/5/2024 15/5/2024
3,4 Winding Zinser change 10:20 10:49
72XL
15-05-2024 Block Mechanical Sajid 56 Ring Ring Traveller 15/5/2024 15/5/2024
3,4 Winding Zinser change 10:50 11:20
72XL
15-05-2024 Block Mechanical Sajid 57 Ring Ring Traveller 15/5/2024 15/5/2024
3,4 Winding Zinser change 11:20 11:50
72XL
15-05-2024 Block Mechanical Z 35 Ring Ring Over 15/5/2024 15/5/2024
3,4 u Winding Zinser haulling 8:30 13:15
lf 72XL
q
a
r
15-05-2024 Block Mechanical Q 30 Ring Ring Zinser Stopped 15/5/2024 15/5/2024
1,2 a Winding 72XL due to 10:25 13:0
i winding
s because
e storage
r belt was

ch
15-05-2024 Block Mechanical Abid 7 Back Simplex Under 15/5/2024 15/5/2024
1,2 Process OverHaulin 8:30 14:1
g
15-05-2024 Block Electrical Khalil 8 Back Lap "Left side 15/5/2024 15/5/2024
3,4 Process Former plate not 6:0 11:0
closed"
alarm. On
checking
bo

15-05-2024 Block Mechanical A 38 Ring Ring pressure 15/5/2024 15/5/2024


3,4 ft Winding Zinser pipe was 17:40 17:55
a 72XL damaged
k and
h replaced
a
r

15-05-2024 Block Mechanical Z 5 Ring Ring Overhaulin 15/5/2024 15/5/2024


1,2 u Winding Zinser g 14:0 16:30
lf 72XL
q
a
r
15-05-2024 Block Mechanical S 3 Ring Ring traveler 15/5/2024 15/5/2024
1,2 a Winding Zinser changed 14:1 14:32
jj 72XL
a
d
15-05-2024 Block Mechanical S 13 Ring Ring traveler 15/5/2024 15/5/2024
1,2 a Winding Zinser changed 14:33 15:2
jj 72XL
a
d
15-05-2024 Block QCD R 34 Back Finish Stopped 15/5/2024 15/5/2024
3,4 o Process er due to 15:0 15:29
b Drawi alarm"slive
a ng r count
b monetoring
"wrapp
15-05-2024 Block QCD R 29 Back Finish Stopped 15/5/2024 15/5/2024
3,4 o Process er due to 20:30 21:0
b Drawi alarm"slive
a ng r
b deivation"w
rapping 70.

15-05-2024 Block Electrical N 21 Back Simplex Stopped 15/5/2024 15/5/2024


3,4 o Process due to 18:55 19:30
m alarm"drafti
a ng system
n
hardware
malf
15-05-2024 Block Mechanical G Blow Back Blow Room card line no 15/5/2024 15/5/2024
3,4 u Room Process Block-4 7 was 20:15 20:45
l stopped
z due to PTC
a fan alarm,
r m

Line-3
15-05-2024 Block Mechanical R 45 Ring Ring Stopped 15/5/2024 15/5/2024
3,4 a Winding Zinser due to 21:30 21:51
m 72XL stoppage
z in winding
a
n

16-05-2024 Block Mechanical R 45 Ring Ring Zinser Stopped 16/5/2024 16/5/2024


3,4 a Winding 72XL due to 0:10 1:0
m bobbin
d conveyour
a wasn't
n

completed(
w
16-05-2024 Block QCD N 3 Back Finish Stooped 15/5/2024 16/5/2024
1,2 a Process er due to 23:45 0:0
e Drawi "Sliver
e ng devation -"
m alarm,wrap
ping

16-05-2024 Block QCD N 1 Back Finish Stooped 16/5/2024 16/5/2024


1,2 a Process er due to 0:51 1:11
e Drawi "maximum
e ng draft
m exceeded"
alarm,wrap

16-05-2024 Block Mechanical S 13 Back Comber Stooped 16/5/2024 16/5/2024


1,2 h Process due to 1:0 1:30
o pressure
a pipe got
i leaked,joint
b was
16-05-2024 Block Mechanical F LDF Back FDP Card Card line # 15/5/2024 16/5/2024
1,2 a Process 2 was 23:30 0:0
r stopped
o due to LDF
o got
q choked,cl

16-05-2024 Block Mechanical S 27 Back Comber Stopped 16/5/2024 16/5/2024


3,4 h Process against 3:45 4:15
o "Compress
a ed air
i
b
monitoring"
alarm,
16-05-2024 Block Electrical S 34 Back Comber Stopped 15/5/2024 15/5/2024
3,4 h Process against 23:10 23:40
a "Lap motor
fi amplifier
q position
u faul
e
16-05-2024 Block QCD n 28 Back Finish "Sliver 16/5/2024 16/5/2024
3,4 a Process er devation" 3:10 3:25
e Drawi alarm,wrap
e ng ping was
m done &
can wa
16-05-2024 Block Electrical S LDF Back FDP Card Carding 15/5/2024 16/5/2024
3,4 h Process line # 8 22:0 0:0
a was
fi stopped
q against
u "Motor
e
breake
16-05-2024 Block Mechanical Sajid 4 Ring Ring Traveller 16/5/2024 16/5/2024
1,2 Winding Zinser change 10:50 11:25
72XL
16-05-2024 Block Mechanical Sajid 5 Ring Ring Traveller 16/5/2024 16/5/2024
1,2 Winding Zinser change 11:25 12:0
72XL
16-05-2024 Block Mechanical Sajid 27 Ring Ring Traveller 16/5/2024 16/5/2024
1,2 Winding Zinser change 10:25 10:55
72XL
16-05-2024 Block Mechanical Sajid 17 Ring Ring Count 16/5/2024 16/5/2024
1,2 Winding Zinser change+pr 6:0 8:45
72XL ocess
change
16-05-2024 Block Mechanical Sajid 39 Ring Ring Traveller 16/5/2024 16/5/2024
3,4 Winding Zinser change 12:0 12:30
72XL
16-05-2024 Block Mechanical Z 36 Ring Ring Over 16/5/2024 16/5/2024
3,4 u Winding Zinser haulling 8:30 13:0
lf 72XL
q
a
r
IFL
Daily Stoppages Report
Date Block Rectified Dep Rectified Person McNo Area Sub Area
Reason
16-05-2024 Block Stop Time
Mechanical Q Start Time
45 Ring Ring Stopped 16/5/2024 16/5/2024
3,4 a Winding Zinser due to 10:20 23:30
i 72XL winding
s because
e feed belt
r was
chang

16-05-2024 Block Mechanical A 29 Ring Ring Zinser "Advanced 16/5/2024 16/5/2024


1,2 s Winding 72XL suction 7:30 7:55
g pressure
e monitoring"
r alarm.
Suct
16-05-2024 Block Mechanical S 19 Back Break "Can 16/5/2024 16/5/2024
3,4 h Process er changed" 11:0 12:15
a Drawi Alarm.
b ng Sensor
b was
ir adjusted

16-05-2024 Block Electrical S 17 Back Simplex "Doffing 16/5/2024 16/5/2024


3,4 a Process slide 6:20 6:40
jj encoder
a not
d ready"Alar
m. Alarm
was

16-05-2024 Block Electrical T 20 Back Simplex "Doffing 16/5/2024 16/5/2024


3,4 a Process bar 8:55 9:15
n encoder
v not
i ready"Alar
r m. Alarm
was re

16-05-2024 Block Mechanical S 17 Back Finish "Sliver 16/5/2024 16/5/2024


1,2 h Process er deviation"A 10:20 10:40
a Drawi larm twice.
b ng Wrapping
b was 62.10
ir

16-05-2024 Block Mechanical Sajid 52 Ring Ring Traveler 16/5/2024 16/5/2024


3,4 Winding Zinser change 14:0 14:35
72XL
16-05-2024 Block Mechanical Sajid 43 Ring Ring Traveler 16/5/2024 16/5/2024
3,4 Winding Zinser change 14:35 15:5
72XL
16-05-2024 Block Mechanical A 19 Ring Ring Stopped 16/5/2024 16/5/2024
1,2 li Winding Zinser because 16:50 17:20
R 72XL conveyor
a belt joint
z was made
a
16-05-2024 Block Mechanical z 6 Ring Ring Overhaulin 16/5/2024 16/5/2024
1,2 u Winding Zinser g 14:0 16:30
lf 72XL
q
a
r
16-05-2024 Block QCD R 15 Back Finish Stopped 16/5/2024 16/5/2024
1,2 o Process er due to 17:16 17:41
b Drawi alarm"slive
a ng r deivation
b "Wrapping
wa

16-05-2024 Block QCD R 11 Back Finish Stopped 16/5/2024 16/5/2024


1,2 o Process er due to 18:0 18:20
b Drawi alarm"slive
a ng r count
b monetoring
" .rec

16-05-2024 Block QCD R 28 Back Finish Stopped 16/5/2024 16/5/2024


3,4 o Process er due to 18:47 19:0
b Drawi alarm"
a ng sliver
b deivation"
wrapping w

16-05-2024 Block QCD R 26 Back Finish Stopped 16/5/2024 16/5/2024


3,4 o Process er due to 20:36 21:0
b Drawi alarm"
a ng sliver
b deivation"
wrapping w

16-05-2024 Block Electrical N 77 Back Card Stopped 16/5/2024 16/5/2024


3,4 o Process due to 20:20 21:0
m alarm"
a motor
n protuction
switch has

17-05-2024 Block Electrical S 38 Ring Ring Zinser Stopped 17/5/2024 17/5/2024


3,4 h Winding 72XL due to 3:45 4:0
a "Right
fi emergency
q stopped rib
u
e
cord"
17-05-2024 Block Mechanical F 5 Back Card Stopped 17/5/2024 17/5/2024
1,2 a Process due to "T- 1:30 2:0
r CON"
o alarm,foil
o paper was
q recove

17-05-2024 Block QCD N 27 Back Finish Stopped 17/5/2024 17/5/2024


3,4 a Process er due to 1:20 1:35
e Drawi "Sliver
e ng deavtion"
m alarm,wrap
ping
wa
17-05-2024 Block QCD N 23 Back Finish Stopped 17/5/2024 17/5/2024
3,4 a Process er due to 2:50 3:5
e Drawi "Sliver
e ng deavtion"
m alarm,wrap
ping

wa
17-05-2024 Block QCD N 19 Back Finish Stopped 17/5/2024 17/5/2024
3,4 a Process er due to 4:6 4:20
e Drawi "Sliver
e ng deavtion"
m alarm,wrap
ping

wa
17-05-2024 Block QCD N 21 Back Finish Stopped 17/5/2024 17/5/2024
3,4 a Process er agaisnt 4:25 4:40
e Drawi "Thick
e ng spot"
m alarm,wrap
ping was

do
17-05-2024 Block QCD S 16 Back Finish Stopped 17/5/2024 17/5/2024
1,2 a Process er due to " 12:30 12:45
f Drawi Sliver
d ng daviation"
a alarm.Wra
r pping

17-05-2024 Block Mechanical Sajid 28 Ring Ring Traveller 17/5/2024 17/5/2024


1,2 Winding Zinser change 11:15 11:45
72XL
17-05-2024 Block Mechanical Sajid 30 Ring Ring Traveller 17/5/2024 17/5/2024
1,2 Winding Zinser change 10:35 11:5
72XL
17-05-2024 Block Mechanical Sajid 60 Ring Ring Traveller 17/5/2024 17/5/2024
3,4 Winding Zinser change 9:5 9:40
72XL
17-05-2024 Block Mechanical S 32 Ring Ring Traveller 17/5/2024 17/5/2024
3,4 a Winding Zinser change 11:50 12:20
j 72XL
i
d
17-05-2024 Block Mechanical A 53 Ring Ring Stopped 17/5/2024 17/5/2024
3,4 s Winding Zinser due to " 10:10 10:30
h 72XL Suction fan
r pressure
a leak". Recti
f

17-05-2024 Block Electrical A 60 Ring Ring Zinser Stopped 17/5/2024 17/5/2024


3,4 w Winding 72XL due to " FU 11:15 11:30
a spindle
i warning
s
temprature
". R
17-05-2024 Block Electrical A 2 Ring Ring Zinser Stopped 17/5/2024 17/5/2024
1,2 w Winding 72XL due to " 9:30 10:0
a Unit
i bracket
s motor was
change".
17-05-2024 Block Mechanical A 13 Ring Ring Stopped 17/5/2024 17/5/2024
1,2 k Winding Zinser due to " 11:45 12:0
h 72XL Control
t bracket
a was
r change".

17-05-2024 Block Mechanical Q 39 Ring Ring Stopped 17/5/2024 17/5/2024


3,4 a Winding Zinser due to 14:10 14:55
s 72XL alarm"FU
a doffing bar
r bus
malfunctio

17-05-2024 Block Mechanical Q 45 Ring Ring Stopped 17/5/2024 17/5/2024


3,4 a Winding Zinser due to 15:25 15:40
s 72XL spindle belt
a tension
r adjustment
was

17-05-2024 Block Mechanical Q 46 Ring Ring Stopped 17/5/2024 17/5/2024


3,4 a Winding Zinser due to 15:40 15:55
s 72XL spindle belt
a tension
r adjustment
was

17-05-2024 Block Mechanical Q 44 Ring Ring Stopped 17/5/2024 17/5/2024


3,4 a Winding Zinser due to 16:0 16:15
s 72XL spindle belt
a tension
r adjustment
was

17-05-2024 Block Mechanical Z 30 Ring Ring stopped 17/5/2024 17/5/2024


3,4 u Winding Zinser due to front 15:45 17:10
lf 72XL steel roller
q coupling
a was rep
r

17-05-2024 Block QCD K 25 Back Finish stopped 17/5/2024 17/5/2024


3,4 a Process er due to 16:50 17:0
s Drawi alarm"
h ng maximum
if draft
axceded

wrappi
17-05-2024 Block QCD K 29 Back Finish stopped 17/5/2024 17/5/2024
3,4 a Process er due to 17:34 17:46
s Drawi alarm"Slive
h ng r deivation
if " wrapping
w

17-05-2024 Block QCD K 13 Back Finish stopped 17/5/2024 17/5/2024


1,2 a Process er due to 21:0 21:20
s Drawi alarm"Slive
h ng r deivation
if " wrapping
w

17-05-2024 Block Electrical Noman 8 Back Simplex stopped 17/5/2024 17/5/2024


1,2 Process due to 17:0 17:30
Bobbin
exchanger
sensor
cable
was r

18-05-2024 Block Mechanical Saqib 30 Ring Ring Front roller 18/5/2024 18/5/2024
1,2 Winding Zinser bearing 0:0 0:10
72XL was
replaced!
18-05-2024 Block QCD Naeem 18 Back Finish Stopped 18/5/2024 18/5/2024
1,2 Process er due to 3:30 3:45
Drawi "sliver
ng devation - "
alarm,wrap
ping

18-05-2024 Block Mechanical Farooq 13 Back Card Stopped 18/5/2024 18/5/2024


1,2 Process due to "T- 0:0 0:30
CON"
alarm,nothi
ng was
found.Rec
18-05-2024 Block QCD Naeem 19 Back Finish Stopped 17/5/2024 17/5/2024
3,4 Process er due to 22:16 22:25
Drawi "sliver
ng devation"
alarm,wrap
ping

wa
18-05-2024 Block QCD Naeem 21 Back Finish Stopped 18/5/2024 18/5/2024
3,4 Process er due to 2:5 2:20
Drawi "sliver
ng devation"
alarm,wrap
ping

wa
18-05-2024 Block QCD Naeem 21 Back Finish Stopped 18/5/2024 18/5/2024
3,4 Process er due to 3:30 3:45
Drawi "sliver
ng devation"
alarm,wrap
ping

wa
18-05-2024 Block QCD Naeem 25 Back Finish Stopped 17/5/2024 18/5/2024
3,4 Process er due to 22:0 22:16
Drawi "maximum
ng draft
exceeded"
alarm,can

18-05-2024 Block Mechanical Shoaib 34 Back Inter Stopped 17/5/2024 17/5/2024


3,4 Process Drawing against 23:0 23:30
suction
pressure
monitoring
alarm,

18-05-2024 Block Mechanical Shoaib 26 Back Pre Delivery 18/5/2024 18/5/2024


3,4 Process Drawing belt(1940) 4:15 4:45
got
damage,R
eplaced!
18-05-2024 Block Mechanical Sajid 29 Ring Ring Traveller 18/5/2024 18/5/2024
1,2 Winding Zinser change 12:10 12:45
72XL
18-05-2024 Block Mechanical Sajid 59 Ring Ring Traveller 18/5/2024 18/5/2024
3,4 Winding Zinser change 9:30 10:10
72XL
18-05-2024 Block Mechanical Sajid 35 Ring Ring Traveller 18/5/2024 18/5/2024
3,4 Winding Zinser change 10:30 11:0
72XL
18-05-2024 Block Mechanical Sajid 33 Ring Ring Traveller 18/5/2024 18/5/2024
3,4 Winding Zinser change 11:0 11:30
72XL
18-05-2024 Block Mechanical Sajid 31 Ring Ring Traveller 18/5/2024 18/5/2024
3,4 Winding Zinser change 11:30 12:0
72XL
18-05-2024 Block Mechanical Sajid 41 Ring Ring Count 18/5/2024 18/5/2024
3,4 Winding Zinser change 6:30 7:10
72XL
18-05-2024 Block Mechanical Sajid 42 Ring Ring Count 18/5/2024 18/5/2024
3,4 Winding Zinser change 6:0 6:40
72XL
18-05-2024 Block Mechanical Zulfqar 37 Ring Ring Over 18/5/2024 18/5/2024
3,4 Winding Zinser Haulling 8:30 13:0
72XL
18-05-2024 Block Mechanical Ali raza 1 Ring Ring Front roller 18/5/2024 18/5/2024
1,2 Winding Zinser bearing 11:15 11:40
72XL was
changed.
18-05-2024 Block Mechanical Zulfqar 3 Ring Ring Wf not on 18/5/2024 18/5/2024
1,2 Winding Zinser senser 8:40 9:20
72XL
18-05-2024 Block Mechanical Akhter 30 Ring Ring Gauge of 18/5/2024 18/5/2024
1,2 Winding Zinser pressure 11:0 12:25
72XL arm has
done.
18-05-2024 Block QCD Dilshad 8 Back Finish Sliver 18/5/2024 18/5/2024
1,2 Process er Deviation 8:21 8:40
Drawi alarm!
ng wrapping
was 70.10
grains.

18-05-2024 Block QCD Asif 11 Back Finish Sliver 18/5/2024 18/5/2024


1,2 Process er Deviation 12:20 12:40
Drawi alarm!
ng wrapping
was 70.40
grains.

18-05-2024 Block QCD Asif 17 Back Finish Maximum 18/5/2024 18/5/2024


1,2 Process er draft 10:30 10:50
Drawi exceeded.
ng Wrapping
was 70.6
grains.

18-05-2024 Block Mechanical Abid 8 Back Simpl Overhaulin 18/5/2024 18/5/2024


1,2 Process ex g. 8:30 14:0
18-05-2024 Block Mechanical Zulfqar 7 Ring Ring Overhaulin 18/5/2024 18/5/2024
1,2 Winding Zinser g 14:0 16:20
72XL
18-05-2024 Block Mechanical S 20 Ring Ring traveler 18/5/2024 18/5/2024
1,2 a Winding Zinser changed 14:0 14:30
jj 72XL
a
d
18-05-2024 Block Electrical N 4 Back Simplex Stopped 18/5/2024 18/5/2024
1,2 o Process due to 20:0 20:45
m alarm"Time
a out doffing
n bar
movemen
18-05-2024 Block Electrical N 16 Back Simplex Stopped 18/5/2024 18/5/2024
3,4 o Process due to 20:50 21:20
m alarm"Doffi
a ng bar
n encoder
not read
18-05-2024 Block Electrical N 7 Back Card Under 18/5/2024 18/5/2024
1,2 o Process rectifacti 21:30 22:0
m on
a
n
18-05-2024 Block Electrical N 7 Back Card Stopped 18/5/2024 18/5/2024
1,2 o Process due to 21:30 22:0
m alarm" fall
a head
n drive"under
rectif
19-05-2024 Block Mechanical S 19 Back Pre Stopped 19/5/2024 19/5/2024
1,2 h Process Drawing due to 0:35 1:5
o "Suction
a pressure
i monotoring
b " alarm

19-05-2024 Block QCD N 26 Back Finish Stopped 19/5/2024 19/5/2024


1,2 a Process er due to 1:0 1:25
e Drawi "Sliver
e ng devation"
m alarm,wrap
ping

wa
19-05-2024 Block QCD N 23 Back Finish Stopped 19/5/2024 19/5/2024
1,2 a Process er due to 4:15 4:30
e Drawi "Sliver
e ng devation"
m alarm,wrap
ping

wa
19-05-2024 Block QCD N 22 Back Finish Stopped 18/5/2024 18/5/2024
1,2 a Process er due to 21:40 22:20
e Drawi "Sliver
e ng devation"
m alarm,wrap
ping

wa
19-05-2024 Block QCD N 26 Back Finish Stopped 19/5/2024 19/5/2024
1,2 a Process er due to 3:55 4:10
e Drawi "Maximum
e ng draft
m exceeded"
alarm,can

19-05-2024 Block QCD N 1 Back Finish Stopped 19/5/2024 19/5/2024


1,2 a Process er due to 1:20 1:30
e Drawi "Maximum
e ng draft
m exceeded"
alarm,can

19-05-2024 Block Mechanical F 3 Back Card Stopped 19/5/2024 19/5/2024


1,2 a Process against"T- 4:30 5:0
r CON"
o alarm,clea
o ning was
q done(foi

19-05-2024 Block Mechanical F 5 Back Card Stopped 19/5/2024 19/5/2024


1,2 a Process against"T- 4:30 5:0
r CON"
o alarm,clea
o ning was
q done(foi
19-05-2024 Block Mechanical F 36 Back Card DFK 19/5/2024 19/5/2024
1,2 a Process opening 0:0 0:30
r roller belt
o was
o replaced.
q

19-05-2024 Block QCD N 23 Back Finish "Sliver 19/5/2024 19/5/2024


3,4 a Process er devation" 5:10 5:30
e Drawi alarm,wrap
e ng ping was
m
done(61.06
)c
19-05-2024 Block Mechanical sajid 11 Ring Ring Traveller 19/5/2024 19/5/2024
1,2 Winding Zinser change 12:0 12:35
72XL
19-05-2024 Block Mechanical sajid 7 Ring Ring Traveller 19/5/2024 19/5/2024
1,2 Winding Zinser change 11:30 12:0
72XL
19-05-2024 Block Mechanical sajid 22 Ring Ring Traveller 19/5/2024 19/5/2024
1,2 Winding Zinser change 10:31 11:0
72XL
19-05-2024 Block Mechanical sajid 55 Ring Ring Traveller 19/5/2024 19/5/2024
3,4 Winding Zinser change 7:45 8:15
72XL
19-05-2024 Block Mechanical Sajid 44 Ring Ring Count was 19/5/2024 19/5/2024
3,4 Winding Zinser changed. 6:5 6:45
72XL
19-05-2024 Block Mechanical J 38 Ring Ring Over 19/5/2024 19/5/2024
3,4 a Winding Zinser hauling. 8:40 12:45
v 72XL
e
e
d

19-05-2024 Block Mechanical If 43 Ring Ring Stopped 19/5/2024 19/5/2024


3,4 t Winding Zinser because 12:29 13:0
k 72XL spindle belt
h tension
a was done.
r

19-05-2024 Block Mechanical If 40 Ring Ring Stopped 19/5/2024 19/5/2024


3,4 t Winding Zinser because 12:15 12:30
k 72XL spindle belt
h tension
a was done.
r

19-05-2024 Block QCD A 7 Back Finish Stopped 19/5/2024 19/5/2024


1,2 b Process er due to 9:20 9:39
d Drawi "Sliver
u ng deviation-"
ll alarm,
a wrapping
h
19-05-2024 Block QCD A 16 Back Finish Stopped 19/5/2024 19/5/2024
1,2 b Process er due to 7:0 7:35
d Drawi "Sliver
u ng deviation-"
ll alarm,
a wrapping
h
19-05-2024 Block Electrical t 9 Back Simplex Stopped 19/5/2024 19/5/2024
1,2 a Process due to 10:0 10:50
n "Doffing
v bar
e encoder
e not ready"
r ala

19-05-2024 Block Mechanical Sajid 43 Ring Ring Count 19/5/2024 19/5/2024


3,4 Winding Zinser changed. 6:0 7:0
72XL
19-05-2024 Block Mechanical Abid 24 Back Simplex Overhaulin 19/5/2024 19/5/2024
3,4 Process g 8:30 14:0
19-05-2024 Block Electrical Tanveer 27 Back Simplex Suction 19/5/2024 19/5/2024
3,4 Process drive motor 11:0 11:40
changed.

19-05-2024 Block QCD Asif 33 Back Finish Sliver 19/5/2024 19/5/2024


3,4 Process er deviation 10:30 10:45
Drawi alarm.
ng wrapping
was 70.78
grain.

19-05-2024 Block QCD Asif 22 Back Finish Sliver 19/5/2024 19/5/2024


3,4 Process er deviation 12:55 13:10
Drawi alarm.
ng wrapping
was 62
grain.

19-05-2024 Block Mechanical Ashrif 56 Ring Ring Stopped 19/5/2024 19/5/2024


3,4 Winding Zinser due to 14:0 14:40
72XL alarm"WF
not on
sensor "
sensor is

19-05-2024 Block Mechanical Qasar 58 Ring Ring Zinser Stopped 19/5/2024 19/5/2024
3,4 Winding 72XL due to 17:10 17:30
alarm"boffi
ng bar not
sewiveled
"ri
19-05-2024 Block Electrical Noman 37 Ring Ring Zinser Stopped 19/5/2024 19/5/2024
3,4 Winding 72XL due to 20:50 21:15
alarm"FU
MUW
warning
temperatur
e"fi
19-05-2024 Block Mechanical Sajid 1 Ring Ring Traveler 19/5/2024 19/5/2024
1,2 Winding Zinser changed 14:0 14:35
72XL
19-05-2024 Block Mechanical Sajid 6 Ring Ring Traveler 19/5/2024 19/5/2024
1,2 Winding Zinser changed 15:5 15:40
72XL
19-05-2024 Block Mechanical Sajid 19 Ring Ring Traveler 19/5/2024 19/5/2024
1,2 Winding Zinser changed 14:35 15:5
72XL
19-05-2024 Block Mechanical Akther 17 Ring Ring Stopped 19/5/2024 19/5/2024
1,2 Winding Zinser due to 14:25 14:45
72XL alarm "
incorrect
swiveled
position

19-05-2024 Block Mechanical Zulfqar 8 Ring Ring Zinser Overhaulin 19/5/2024 19/5/2024
1,2 Winding 72XL g 14:0 16:30

19-05-2024 Block Electrical Noman 7 Ring Ring Stopped 19/5/2024 19/5/2024


1,2 Winding Zinser due to 19:10 20:0
72XL alarm "
Doffing bar
postion not
rea

19-05-2024 Block QCD Robab 30 Back Finish Stopped 19/5/2024 19/5/2024


3,4 Process er due to 21:0 21:15
Drawi alarm
ng "Maximum
draft
exceeded

not r
19-05-2024 Block Electrical Noman 63 Back Card Stopped 19/5/2024 19/5/2024
3,4 Process due to 16:20 17:0
alarm "
Fixed piont
sensor T
moved"
19-05-2024 Block QCD Robab 7 Back Finish Stopped 19/5/2024 19/5/2024
1,2 Process er due to 19:43 20:0
Drawi alarm "
ng Sliver
deivation"
wrapping

19-05-2024 Block QCD Robab 12 Back Finish Stopped 19/5/2024 19/5/2024


1,2 Process er due to 18:52 19:11
Drawi alarm "
ng Sliver
deivation"
wrapping

19-05-2024 Block QCD Robab 16 Back Finish Stopped 19/5/2024 19/5/2024


1,2 Process er due to 16:50 17:0
Drawi alarm "
ng Sliver
deivation"
wrapping
19-05-2024 Block Mechanical Usman 7 Back Inter Steel roller 19/5/2024 19/5/2024
1,2 Process Drawing belt was 17:0 17:30
damaged
and
replaced
19-05-2024 Block Electrical Noman BOA Back Blow Stopped 19/5/2024 19/5/2024
1,2 Process Room due to 21:19 21:50
Block-1 alarm "data
transfer"
rectified.

20-05-2024 Block Mechanical Altaf 41 Ring Ring Front steel 20/5/2024 20/5/2024
3,4 Winding Zinser roller 2:20 3:0
72XL bearing
was
replaced!
20-05-2024 Block QCD Naeem 19 Back Finish Stopped 19/5/2024 19/5/2024
1,2 Process er due to 23:15 23:45
Drawi "sliver
ng devation"
alarm,wrap
ping

wa
20-05-2024 Block QCD Naeem 24 Back Finish Stopped 20/5/2024 20/5/2024
1,2 Process er due to 4:54 5:10
Drawi "sliver
ng devation"
alarm,wrap
ping

wa
20-05-2024 Block QCD Naeem 13 Back Finish Stopped 19/5/2024 19/5/2024
1,2 Process er due to 23:30 23:45
Drawi "sliver
ng devation"
alarm,wrap
ping

wa
20-05-2024 Block QCD N 3 Back Finish Stopped 20/5/2024 20/5/2024
1,2 a Process er due to 3:10 3:30
e Drawi "sliver
e ng devation"
m alarm,wrap
ping
wa

20-05-2024 Block QCD N 18 Back Finish Stopped 20/5/2024 20/5/2024


1,2 a Process er against 3:45 4:10
e Drawi "sliver
e ng count
m monitoring"
alarm(re
20-05-2024 Block Electrical W22 Back Finish Stopped 20/5/2024 20/5/2024
3,4 a Process er against 3:55 4:15
q Drawi Delivery
a ng drive
r rotarty
encoder
ala

20-05-2024 Block Mechanical S 32 Back Pre Delivery 19/5/2024 19/5/2024


3,4 h Process Drawing drive 22:0 22:30
o belt(1940)
a got
i damage,R
b eplaced!

20-05-2024 Block Mechanical F 88 Back Card "T-CON" 20/5/2024 20/5/2024


3,4 a Process alarm,foil 0:0 0:30
r paper was
o found.Recti
o fied!
q

20-05-2024 Block Mechanical F 2 Back Card Stopped 19/5/2024 19/5/2024


1,2 a Process due to 23:0 23:30
r timming
o belt(HTD)
o got
q

damage,R
eplac
20-05-2024 Block Mechanical FRPF Back FDP Card Card line # 20/5/2024 20/5/2024
1,2 a Process 2 was 3:0 3:20
r stopped
o due to RPF
o got
q choked,cl

20-05-2024 Block Electrical W34 Back Comber Stopped 20/5/2024 20/5/2024


3,4 a Process against lap 3:0 3:40
q motor
a amplifier
r alarm,Elect
ric

20-05-2024 Block Electrical N 6 Back Simplex Stopped 20/5/2024 20/5/2024


1,2 a Process due to " 10:30 11:15
s Bobbin rail
i encoded
r not
ready"ala

20-05-2024 Block QCD K 18 Back Finish Stopped 20/5/2024 20/5/2024


1,2 a Process er due to " 7:50 8:20
s Drawi Sliver
h ng daviation(-)
i "alarm.Wra
f ppin
20-05-2024 Block QCD K 17 Back Finish Stopped 20/5/2024 20/5/2024
1,2 a Process er due to " 12:15 12:30
s Drawi Sliver
h ng daviation(-)
i "alarm.Wra
f ppin

20-05-2024 Block Electrical N 5 Back Simplex Stopped 20/5/2024 20/5/2024


1,2 a Process due to " 9:30 10:0
s Check
i bobbin rail
r brake"alar
m.Rec

20-05-2024 Block Electrical T 13 Back Inter Stopped 20/5/2024 20/5/2024


1,2 a Process Drawing due to " 6:15 6:40
y Rotary
y can plate
a drive - can
b comm

20-05-2024 Block Mechanical Sajid 12 Ring Ring Traveller 20/5/2024 20/5/2024


1,2 Winding Zinser change 10:30 11:0
72XL
20-05-2024 Block Mechanical Sajid 3 Ring Ring Traveller 20/5/2024 20/5/2024
1,2 Winding Zinser change 11:0 11:40
72XL
20-05-2024 Block Mechanical Sajid 18 Ring Ring Traveller 20/5/2024 20/5/2024
1,2 Winding Zinser change 6:44 7:20
72XL
20-05-2024 Block Mechanical Sajid 21 Ring Ring Traveller 20/5/2024 20/5/2024
1,2 Winding Zinser change 12:20 12:50
72XL
20-05-2024 Block Mechanical Sajid 23 Ring Ring Traveller 20/5/2024 20/5/2024
1,2 Winding Zinser change 7:30 8:0
72XL
20-05-2024 Block Mechanical Sajid 57 Ring Ring Traveller 20/5/2024 20/5/2024
3,4 Winding Zinser change 11:35 12:10
72XL
20-05-2024 Block Mechanical Sajid 45 Ring Ring Count 20/5/2024 20/5/2024
3,4 Winding Zinser change 6:5 6:45
72XL
20-05-2024 Block QCD Qcd 60 Ring Ring Count 20/5/2024 20/5/2024
3,4 Engenier Winding Zinser change 9:30 10:15
72XL
20-05-2024 Block Mechanical Zulfqar 39 Ring Ring Over 20/5/2024 20/5/2024
3,4 Winding Zinser haulling 8:30 13:15
72XL
20-05-2024 Block Mechanical Mohsin 46 Back Car Stopped 20/5/2024 20/5/2024
3,4 Process d due to " T- 13:15 13:45
cone "
alarm
nothing
was found.
20-05-2024 Block QCD Dilshad 35 Back Finish Stopped 20/5/2024 20/5/2024
3,4 Process er due to " 9:3 9:25
Drawi Sliver
ng daviation(-)
" alarm.
Wrapp

20-05-2024 Block Mechanical Sajid 53 Ring Ring Traveler 20/5/2024 20/5/2024


3,4 Winding Zinser changed 14:0 14:33
72XL
20-05-2024 Block Mechanical Sajid 56 Ring Ring Traveler 20/5/2024 20/5/2024
3,4 Winding Zinser changed 14:34 15:5
72XL
20-05-2024 Block Mechanical Zulfqar 9 Ring Ring Overhaulin 20/5/2024 20/5/2024
1,2 Winding Zinser g 14:0 16:15
72XL
20-05-2024 Block QCD A 2 Back Finish Stopped 20/5/2024 20/5/2024
1,2 b Process er due to 14:15 14:40
d Drawi alarm
u ng "sliver
ll deivation "
a wrapping
h
20-05-2024 Block QCD N 16 Back Finish Stopped 20/5/2024 20/5/2024
1,2 a Process er due to 20:5 20:25
e Drawi alarm
e ng "Maximum
m draft
exceeded"

wrap
20-05-2024 Block Electrical S 6 Back Simplex Stopped 20/5/2024 20/5/2024
1,2 a Process due to 17:55 18:35
h alarm
f "Drafting
i system
q hardware

mal
20-05-2024 Block Mechanical U 32 Back Inter Stopped 20/5/2024 20/5/2024
3,4 s Process Drawing due to 18:0 18:30
m Delivery
a belt was
n damaged
and

repla
20-05-2024 Block Mechanical F TST-5 Back Blow Room Stopped 20/5/2024 20/5/2024
3,4 a Process Block-4 due to 19:0 19:30
r alarm
o "Lighting
o /image to
q

bright(F1
20-05-2024 Block Electrical S
Uster Back Blow uster jossi 20/5/2024 20/5/2024
3,4 h
Jossi Process Room line no 19:30 22:0
a Block-4 8( Electrica
f l and
i mechanical
q t
21-05-2024 Block Mechanical altaf 42 Ring Ring Needle 21/5/2024 21/5/2024
3,4 Winding Zinser bearing 1:40 2:10
72XL was
replaced.
21-05-2024 Block QCD a 27 Back Finish Stopped 21/5/2024 21/5/2024
3,4 r Process er due to 0:7 0:25
b Drawi "Maximum
a ng draft"
b alarm,
wrapping
cam

21-05-2024 Block QCD a 32 Back Finish Stopped 21/5/2024 21/5/2024


3,4 r Process er due 4:4 4:21
b Drawi to ,"Sliver
a ng deviation+"
b alarm,
wrappin

21-05-2024 Block Mechanical nisar 7 Back Finish Stopped 21/5/2024 21/5/2024


1,2 Process er due 1:30 2:0
Drawi to ,"Sliver
ng count"
alarm(twice
), wrapp

21-05-2024 Block QCD a 15 Back Finish Stopped 21/5/2024 21/5/2024


1,2 r Process er due 0:20 0:35
b Drawi to ,"Sliver
a ng deviation-"
b alarm,
wrappin

21-05-2024 Block QCD a 15 Back Finish Stopped 21/5/2024 21/5/2024


1,2 r Process er due 1:35 1:45
b Drawi to ,"Sliver
a ng deviation-"
b alarm,
wrappin

21-05-2024 Block QCD a 17 Back Finish Stopped 21/5/2024 21/5/2024


1,2 r Process er due 4:40 4:55
b Drawi to ,"Sliver
a ng deviation+"
b alarm,
wrappin

IFL
Daily Stoppages Report
Date Block Rectified Dep Rectified Person McNo Area Sub Area
Reason
21-05-2024 Block Stop Time
Electrical Nauman Start Time
Blow Back Blow Stopped 20/5/2024 20/5/2024
1,2 Room Process Room because 22:0 22:40
Line-2 Block-1 BOU
photocell
A404 was
interchang
e

21-05-2024 Block Mechanical Waseem 25 Back Simplex Over 21/5/2024 21/5/2024


3,4 Process hauling 8:30 14:0
21-05-2024 Block Mechanical Ikram 22 Back Finish Stopped 21/5/2024 21/5/2024
3,4 Process er due to" 6:0 7:0
Drawi TDL roller
ng spring was
changed".
21-05-2024 Block Mechanical Mohsin 63 Back Card Stop in 21/5/2024 21/5/2024
3,4 Process night shift 6:0 8:0
due to
faulty coil
problem
mac

21-05-2024 Block Mechanical Saif 1 Ring Ring Count 21/5/2024 21/5/2024


1,2 Winding Zinser change + 6:50 8:20
72XL Zero gauge

21-05-2024 Block QCD QCD 14 Ring Ring Count 21/5/2024 21/5/2024


1,2 Engineer Winding Zinser change 6:0 6:30
72XL
21-05-2024 Block QCD QCD 15 Ring Ring Count 21/5/2024 21/5/2024
1,2 Engineer Winding Zinser change 6:45 7:0
72XL
21-05-2024 Block Electrical Awais 6 Ring Ring Stopped 21/5/2024 21/5/2024
1,2 Winding Zinser due to" Fan 9:40 10:0
72XL drive unit
motor
protective
cu

21-05-2024 Block Mechanical Ali Raza 2 Ring Ring Zinser Stopped 21/5/2024 21/5/2024
1,2 Winding 72XL due to" 11:45 12:0
Emergency
stop
terminal"
alarm.Rec
21-05-2024 Block Mechanical Ali Raza 3 Ring Ring Stopped 21/5/2024 21/5/2024
1,2 Winding Zinser due to" 11:50 12:5
72XL Time out
pressurize
griper "
alarm

21-05-2024 Block Mechanical Saif 24 Ring Ring Traveller 21/5/2024 21/5/2024


1,2 Winding Zinser change 10:30 11:10
72XL
21-05-2024 Block Mechanical Saif 54 Ring Ring Traveller 21/5/2024 21/5/2024
3,4 Winding Zinser change 11:40 12:15
72XL
21-05-2024 Block Mechanical Zulfaqar 40 Ring Ring Over 21/5/2024 21/5/2024
3,4 Winding Zinser hauling 8:45 13:0
72XL

IFL
Daily Stoppages Report
Date Block Rectified Dep Rectified Person McNo Area Sub Area
Reason Stop Time Start Time
21-05-2024 Block Mechanical A 31 Ring Ring Stopped 21/5/2024 21/5/2024
3,4 s Winding Zinser due to 12:15 12:30
h 72XL Spindle
r belt tension
a was done.
f

21-05-2024 Block Mechanical A 32 Ring Ring Stopped 21/5/2024 21/5/2024


3,4 s Winding Zinser due to 12:35 12:55
h 72XL Spindle
r belt tension
a was done.
f

21-05-2024 Block Mechanical A 33 Ring Ring Stopped 21/5/2024 21/5/2024


3,4 s Winding Zinser due to 12:40 13:0
h 72XL Spindle
r belt tension
a was done.
f

21-05-2024 Block Mechanical A 60 Ring Ring Stopped 21/5/2024 21/5/2024


3,4 s Winding Zinser due to 11:45 12:10
h 72XL "joint were
r made to
a conveyor
f belt".

21-05-2024 Block QCD D 13 Back Finish Stopped 21/5/2024 21/5/2024


1,2 i Process er due to " 13:25 13:40
l Drawi Sliver
s ng daviation
h (-)"alarm.W
a rappi
f

21-05-2024 Block Mechanical Z 10 Ring Ring Overhaulin 21/5/2024 21/5/2024


1,2 u Winding Zinser g 14:0 16:30
l 72XL
f
i
q
u
r

21-05-2024 Block Mechanical J 1 Ring Ring Zero guage 21/5/2024 21/5/2024


1,2 a Winding Zinser was done 14:30 14:50
v 72XL
e
d
21-05-2024 Block Mechanical Altaf 60 Ring Ring Stopped 21/5/2024 21/5/2024
3,4 Winding Zinser due to flexi 18:0 20:40
72XL drive pin
got
damaged,
Replace

21-05-2024 Block QCD Asif 5 Back Finish Stopped 21/5/2024 21/5/2024


1,2 Process er against 19:40 20:0
Drawi "Sliver
ng devation"
alarm,wrap
ping w
21-05-2024 Block Electrical W7 Back Simplex Stopped 21/5/2024 21/5/2024
1,2 a Process due to 20:0 20:20
q bobbin rail
a encoder
r signal,alar
m.El

21-05-2024 Block Electrical WRPF Back FDP Card Card line # 21/5/2024 21/5/2024
1,2 a Process 1&2 was 16:45 17:0
q stopped
a against
r "Suction
press
21-05-2024 Block QCD Asif 22 Back Finish Stopped 21/5/2024 21/5/2024
3,4 Process er due to 17:44 18:0
Drawi "sliver
ng devation"
alarm,wrap
ping

wa
21-05-2024 Block QCD Asif 28 Back Finish Stopped 21/5/2024 21/5/2024
3,4 Process er due to 19:35 19:50
Drawi "sliver
ng devation"
alarm,wrap
ping

wa

IFL
Daily Stoppages Report
Date Block Rectified Dep Rectified Person McNo Area Sub Area
Reason
21-05-2024 Block Stop Time Asif Start Time
QCD 25 Back Finish Stopped 21/5/2024 21/5/2024
3,4 Process er due to 18:35 18:50
Drawi "maximum
ng draft
exceeded"
alarm,wrap

21-05-2024 Block Mechanical usman 24 Back Finish Stopped 21/5/2024 21/5/2024


3,4 Process er due to 17:45 18:5
Drawi drafting
ng zone
pressure
pipe got lea

21-05-2024 Block Mechanical usman 25 Back Simplex Overhaulin 21/5/2024 21/5/2024


3,4 Process g 14:0 17:0
22-05-2024 Block Mechanical Altaf 34 Ring Ring Stopped 21/5/2024 21/5/2024
3,4 Winding Zinser due to "WF 23:10 23:30
72XL not on
sensor"
alarm,
mechanica
22-05-2024 Block Electrical Altaf+noum 44 Ring Ring Stopped 22/5/2024 22/5/2024
3,4 an Winding Zinser due to " FU 0:35 1:10
72XL doffing bar
system bus
malfunc

22-05-2024 Block QCD Arbab 30 Back Finish Stopped 21/5/2024 21/5/2024


3,4 Process er due to 23:15 23:30
Drawi "Sliver
ng deviation-"
alarm,
wrapping

22-05-2024 Block QCD Arbab 7 Back Finish Stopped 22/5/2024 22/5/2024


1,2 Process er due to 1:12 1:20
Drawi "Sliver
ng deviation-"
alarm,
wrapping

22-05-2024 Block QCD Arbab 15 Back Finish Stopped 21/5/2024 21/5/2024


1,2 Process er due to 23:12 23:25
Drawi "Sliver
ng deviation-"
alarm,
wrapping

22-05-2024 Block QCD Arbab 16 Back Finish Stopped 21/5/2024 21/5/2024


1,2 Process er due to 23:29 23:45
Drawi "Sliver
ng deviation-"
alarm,
wrapping

22-05-2024 Block Electrical sajjad 5 Back Finish Stopped 22/5/2024 22/5/2024


1,2 Process er due to 1:35 1:51
Drawi "Delivery
ng drive rotery
encoder"
ala

22-05-2024 Block Electrical sajjad 13 Back Inter Stopped 22/5/2024 22/5/2024


1,2 Process Drawing due to 2:0 2:21
"Rotery
can plate
drive can
communi

22-05-2024 Block Electrical sajjad 15 Back Simplex Stopped 22/5/2024 22/5/2024


1,2 Process due to 1:10 1:40
"Roving
frame
malfuncatio
n active"

22-05-2024 Block Mechanical gulzar 4 Back Card Stopped 22/5/2024 22/5/2024


1,2 Process due to 0:0 0:30
"TCon"
alarm, a foil
paper was
foun
22-05-2024 Block Electrical sajjad 18 Back Pre Stopped 22/5/2024 22/5/2024
1,2 Process Drawing due to 2:21 2:40
"Blockage
on coiler
plate"
alarm, e

22-05-2024 Block Mechanical Ramzan 43 Ring Cone Stopped 22/5/2024 22/5/2024


3,4 Winding Winding because 0:15 1:0
AC passage
X6 track
pulley's
gear was
ad

22-05-2024 Block Electrical Nauman 46 Ring Ring Zinser Stopped 21/5/2024 22/5/2024
3,4 Winding 72XL because 23:40 0:10
"cowemat
life check"
alarm,
lappet
22-05-2024 Block QCD arbab 7 Back Finish Stopped 22/5/2024 22/5/2024
1,2 Process er because 4:8 4:25
Drawi "Sliver
ng deviation-"
alarm,
wrappin

22-05-2024 Block QCD Miss 16 Ring Ring Count 22/5/2024 22/5/2024


1,2 Aleeza Winding Zinser changed. 6:30 7:15
Anwar 72XL
22-05-2024 Block QCD Miss 17 Ring Ring Count 22/5/2024 22/5/2024
1,2 Aleeza Winding Zinser changed. 6:0 6:45
Anwar 72XL
22-05-2024 Block Mechanical Sajid 8 Ring Ring Traveller 22/5/2024 22/5/2024
1,2 Winding Zinser changed. 7:40 8:15
72XL
22-05-2024 Block Mechanical Ali Raza 24 Ring Ring "Doffing 22/5/2024 22/5/2024
1,2 Winding Zinser bar not 9:0 9:50
72XL swiveled
out"
Alarm!!
22-05-2024 Block Mechanical Zulfiqar 41 Ring Ring Overhaulin 22/5/2024 22/5/2024
3,4 Winding Zinser g 8:30 12:45
72XL
22-05-2024 Block Mechanical Sajid 48 Ring Ring Traveller 22/5/2024 22/5/2024
3,4 Winding Zinser changed. 10:30 11:0
72XL
22-05-2024 Block Mechanical Sajid 58 Ring Ring Traveller 22/5/2024 22/5/2024
3,4 Winding Zinser changed. 11:39 12:10
72XL
22-05-2024 Block Mechanical Sajid 60 Ring Ring Traveller 22/5/2024 22/5/2024
3,4 Winding Zinser changed. 11:0 11:40
72XL
22-05-2024 Block Mechanical Sajid 46 Ring Ring Traveller 22/5/2024 22/5/2024
3,4 Winding Zinser changed. 12:20 12:50
72XL
22-05-2024 Block Mechanical Ashraf 33 Ring Ring Front roller 22/5/2024 22/5/2024
3,4 Winding Zinser bearing 11:10 11:30
72XL changed.
22-05-2024 Block Mechanical Abid 10 Back Simplex Overhaulin 22/5/2024 22/5/2024
1,2 Process g 6:0 14:0
22-05-2024 Block QCD Dilshad 7 Back Finish Sliver 22/5/2024 22/5/2024
1,2 Process er deviation 7:10 7:23
Drawi alarm!
ng wrapping
was 62.10
grains.

22-05-2024 Block QCD Dilshad 17 Back Finish Twice 22/5/2024 22/5/2024


1,2 Process er "Sliver 8:50 9:15
Drawi deviation
ng minus
alarm!
wrapping
was

22-05-2024 Block Electrical Khalil MXU-1 0 Back Blow BRFD 22/5/2024 22/5/2024
3,4 Process Room transport 11:0 12:30
Block-3 fan drive
motor
changef
22-05-2024 Block Mechanical Zulfiqur 11 Ring Ring Overhaulin 22/5/2024 22/5/2024
1,2 Winding Zinser g 14:0 16:20
72XL
22-05-2024 Block Mechanical Sajjid 25 Ring Ring Traveller 22/5/2024 22/5/2024
1,2 Winding Zinser change 14:0 14:35
72XL
22-05-2024 Block Mechanical Sajjid 30 Ring Ring Traveller 22/5/2024 22/5/2024
1,2 Winding Zinser change & 15:50 16:20
72XL spindle
crown
cleaning
was done

22-05-2024 Block Mechanical Ali Raza 20 Ring Ring Suction fan 22/5/2024 22/5/2024
1,2 Winding Zinser pressure 14:15 14:25
72XL pipe got
leaked,joint
was mad

22-05-2024 Block Mechanical Saqib 16 Ring Ring Stopped 22/5/2024 22/5/2024


1,2 Winding Zinser against 20:50 21:30
72XL deflection
pulley got
heatedup,r
ep

22-05-2024 Block Mechanical Khalil 10 Back Simplex Overhaulin 22/5/2024 22/5/2024


1,2 Process g 14:0 16:30
22-05-2024 Block QCD Asif 27 Back Finish Stopped 22/5/2024 22/5/2024
3,4 Process er due to 17:30 17:45
Drawi "Sliver
ng devation"
alarm,wrap
ping

wa
22-05-2024 Block Electrical Tayyab 62 Back Card Stopped 22/5/2024 22/5/2024
3,4 Process due to 16:45 17:10
"Can bus
malfunction
"
alarm,Elect
ri

22-05-2024 Block Mechanical Farooq 66 Back Card Stopped 22/5/2024 22/5/2024


3,4 Process due to "Flat 19:0 20:0
drive"
alarm,top
set pin got
23-05-2024 Block Mechanical Altaf 36 Ring Ring Baloon 22/5/2024 22/5/2024
3,4 Winding Zinser control ring 22:25 22:45
72XL bracket
was
replaced

23-05-2024 Block Mechanical saqib 25 Ring Ring Stopped 23/5/2024 23/5/2024


1,2 Winding Zinser because 1:15 1:31
72XL control ring
bracket
was
changed.

23-05-2024 Block Electrical n 7 Back Simplex Stopped 23/5/2024 23/5/2024


1,2 o Process due to " 3:45 4:0
u Bobbin rail
m encoder
a not ready"
n al

23-05-2024 Block Mechanical g Blow Back Blow Room Blowroom 23/5/2024 23/5/2024
1,2 u Room Process Block-1 line#01 4:40 5:5
l RPF was
z chocked,
a mechanical
r perso

Line-1
23-05-2024 Block Mechanical Sajid 26 Ring Ring Traveller 23/5/2024 23/5/2024
1,2 Winding Zinser change 10:30 11:0
72XL
23-05-2024 Block Mechanical Sajid 14 Ring Ring Traveller 23/5/2024 23/5/2024
1,2 Winding Zinser change 11:0 11:30
72XL
23-05-2024 Block QCD S 4 Ring Ring Count 23/5/2024 23/5/2024
1,2 a Winding Zinser change 7:0 7:15
f 72XL
d
a
r
23-05-2024 Block QCD S 3 Ring Ring Count 23/5/2024 23/5/2024
1,2 a Winding Zinser change 6:0 7:10
f 72XL
d
a
r
23-05-2024 Block Mechanical Sajid 38 Ring Ring Traveller 23/5/2024 23/5/2024
3,4 Winding Zinser change 9:35 10:10
72XL
23-05-2024 Block Mechanical Sajid 59 Ring Ring Traveller 23/5/2024 23/5/2024
3,4 Winding Zinser change 11:45 12:15
72XL
23-05-2024 Block Mechanical Z 42 Ring Ring Over 23/5/2024 23/5/2024
3,4 u Winding Zinser haulling 8:35 12:44
lf 72XL
q
a
r
23-05-2024 Block Mechanical S 1 Back Finish "Maximum 23/5/2024 23/5/2024
1,2 h Process er draft 9:10 9:30
a Drawi exceeded"
b ng alarm.
b wrapping
ir was 61.10

23-05-2024 Block Mechanical S 7 Back Finish "Sliver 23/5/2024 23/5/2024


1,2 h Process er deviation" 12:11 12:30
a Drawi alarm.
b ng wrapping
b was
ir 70.Rectifie

23-05-2024 Block Electrical T 11 Back Simplex "Bobbin rail 23/5/2024 23/5/2024


1,2 a Process encoder 10:30 11:30
y not ready"
y alarm.
a Alarm was
b r

23-05-2024 Block QCD A 35 Back Finish "Sliver 23/5/2024 23/5/2024


3,4 b Process er deviation" 10:15 10:25
d Drawi alarm.Wra
u ng pping was
ll 70.23Rectif
a i
h
23-05-2024 Block Mechanical Abid 26 Back Simplex Under over 23/5/2024 23/5/2024
3,4 Process hauling 7:0 14:0

23-05-2024 Block Mechanical Z 12 Ring Ring Overhaulin 23/5/2024 23/5/2024


1,2 u Winding Zinser g 14:0 16:20
lf 72XL
i
q
u
r
23-05-2024 Block Mechanical A 32 Ring Ring Needle 23/5/2024 23/5/2024
3,4 k Winding Zinser bearing 14:35 14:45
h 72XL was
t replaced!
a
r
23-05-2024 Block Mechanical sajjid 47 Ring Ring Traveller 23/5/2024 23/5/2024
3,4 Winding Zinser change 14:0 14:35
72XL
23-05-2024 Block Mechanical A 59 Ring Ring Stopped 23/5/2024 23/5/2024
3,4 k Winding Zinser due to 15:30 17:0
h 72XL conveyour
t belt got
a damaged,j
r oint wa

23-05-2024 Block Mechanical Altaf 43 Ring Ring Ballon 23/5/2024 23/5/2024


3,4 Winding Zinser control ring 21:0 21:25
72XL bracket
was
replaced.

23-05-2024 Block Mechanical Abid 26 Back Simplex Overhaulin 23/5/2024 23/5/2024


3,4 Process g 14:0 16:0
23-05-2024 Block Mechanical F 61 Back Card T-CON 23/5/2024 23/5/2024
3,4 a Process alarm,foil 18:30 19:0
r paper was
o found
o durning
q cleaning.

23-05-2024 Block Mechanical F RPF Back FDP Card Cotton line 23/5/2024 23/5/2024
3,4 a Process was 14:0 16:0
r stopped
o due to LDF
o main motor
q was

24-05-2024 Block Mechanical Altaf 32 Ring Ring Stopped 23/5/2024 23/5/2024


3,4 Winding Zinser because 23:35 23:44
72XL pressure
gripper
was
replaced

24-05-2024 Block Mechanical Altaf 34 Ring Ring Stopped 23/5/2024 23/5/2024


3,4 Winding Zinser because 22:35 22:55
72XL after doff
ring rail
right side di

24-05-2024 Block Mechanical S 21 Ring Ring Stopped 23/5/2024 23/5/2024


1,2 a Winding Zinser due to 22:25 22:40
q 72XL "Pressurize
i gripper (-
b 5b5) alarm,
M

24-05-2024 Block Mechanical G LDF Back FDP Card Card line 24/5/2024 24/5/2024
3,4 u Process 08 LDF 1:53 2:15
l choked.
z
a
r
24-05-2024 Block Electrical Waqar 25 Back Simplex Stopped 24/5/2024 24/5/2024
3,4 Process due to 2:30 2:50
"Bobbin
timeout off"
alarm,
Electri
24-05-2024 Block Electrical Waqar 13 Back Simplex Bobbin 24/5/2024 24/5/2024
1,2 Process exchanger 2:20 3:0
sensor
adjustment
was done.
24-05-2024 Block QCD Arbab 6 Back Finish Stopped 24/5/2024 24/5/2024
1,2 Process er due to 4:0 4:30
Drawi "Sliver
ng deviation"
alarm,
Wrapping

24-05-2024 Block Mechanical Nisar 1 Back Finish Stopped 23/5/2024 24/5/2024


1,2 Process er due to 23:0 0:0
Drawi "Sliver
ng count
monitoring"
alarm rep

24-05-2024 Block Mechanical Zulifqar 46 Ring Ring Stopped 23/5/2024 24/5/2024


3,4 Winding Zinser due to "No 23:30 5:30
72XL suction
pressure"
alarm,
Rectif

24-05-2024 Block QCD Qcd 5 Ring Ring Count 24/5/2024 24/5/2024


1,2 Engenier Winding Zinser change 6:40 7:0
72XL
24-05-2024 Block QCD Qcd 6 Ring Ring Count 24/5/2024 24/5/2024
1,2 Engenier Winding Zinser change 6:0 6:50
72XL
24-05-2024 Block Mechanical Saif 27 Ring Ring Traveller 24/5/2024 24/5/2024
1,2 Winding Zinser change 7:45 8:20
72XL
24-05-2024 Block Mechanical Saif 4 Ring Ring Traveller 24/5/2024 24/5/2024
1,2 Winding Zinser change 11:0 11:30
72XL
24-05-2024 Block Mechanical Saif 5 Ring Ring Traveller 24/5/2024 24/5/2024
1,2 Winding Zinser change 11:40 12:15
72XL
24-05-2024 Block Mechanical Javaid 29 Ring Ring Stopped 24/5/2024 24/5/2024
1,2 Winding Zinser due to 11:0 11:25
72XL deflection
polly of
spindle belt
wa

24-05-2024 Block Mechanical Javaid 3 Ring Ring Stopped 24/5/2024 24/5/2024


1,2 Winding Zinser due to "FU 9:45 10:0
72XL spindle
warning
temperatur
e"a

24-05-2024 Block Mechanical Saif 36 Ring Ring Traveller 24/5/2024 24/5/2024


3,4 Winding Zinser change 9:40 10:10
72XL
24-05-2024 Block Mechanical Saif 37 Ring Ring Zinser Traveller 24/5/2024 24/5/2024
3,4 Winding 72XL change 9:10 9:40
24-05-2024 Block Mechanical Saif 50 Ring Ring Traveller 24/5/2024 24/5/2024
3,4 Winding Zinser change 10:30 11:20
72XL
24-05-2024 Block Electrical A 37 Ring Ring Stopped 24/5/2024 24/5/2024
3,4 w Winding Zinser due to 10:10 10:30
a 72XL main
i inverter
s was
change .

24-05-2024 Block QCD D 13 Back Finish Stopped 24/5/2024 24/5/2024


1,2 i Process er due to " 7:20 7:40
l Drawi Sliver
s ng daviation
h (+)"alarm.
a Wrappi
d

24-05-2024 Block QCD D 19 Back Finish Stopped 24/5/2024 24/5/2024


3,4 i Process er due to " 12:30 12:50
l Drawi Sliver
s ng daviation
h (+)"alarm.
a Wrappi
d

24-05-2024 Block Electrical T 26 Back Card Stopped 24/5/2024 24/5/2024


3,4 a Process due to " 13:30 14:0
y Cane
y setting "
a alarm.
b

24-05-2024 Block Mechanical i 32 Ring Ring Stopped 24/5/2024 24/5/2024


3,4 f Winding Zinser because 16:0 16:15
t 72XL needle
i bearing
k was
h replaced
a
r

24-05-2024 Block Mechanical Saif 34 Ring Ring traveler 24/5/2024 24/5/2024


3,4 Winding Zinser change 15:5 15:34
72XL
24-05-2024 Block Mechanical Saif 49 Ring Ring traveler 24/5/2024 24/5/2024
3,4 Winding Zinser change 14:30 15:0
72XL
24-05-2024 Block Mechanical A 45 Ring Ring balloon 24/5/2024 24/5/2024
3,4 s Winding Zinser bracket 15:0 15:30
h 72XL was
r replaced
a
f

24-05-2024 Block Mechanical q 2 Ring Ring Wf not on 24/5/2024 24/5/2024


1,2 a Winding Zinser sensor" 14:0 14:20
i 72XL alarm,
s rectified!
e
r
24-05-2024 Block Mechanical J 30 Ring Ring Conveyor 24/5/2024 24/5/2024
1,2 a Winding Zinser belt 15:54 16:13
v 72XL bracket
e adjustment
d was done
24-05-2024 Block Mechanical S 8 Ring Ring stopped 24/5/2024 24/5/2024
1,2 a Winding Zinser because 21:2 21:50
f 72XL conveyor
d belt was
a not
r completed
du

24-05-2024 Block Electrical TRPF Back FDP Card card line 24/5/2024 24/5/2024
3,4 a Process 5,6 were 17:11 17:30
y stopped
y because
a fdps were
b tripp

24-05-2024 Block Electrical T 62 Back Card Stopped 24/5/2024 24/5/2024


3,4 a Process due to 18:30 19:0
y "Can bus
y malfunction
a " alarm,
b electi

24-05-2024 Block Mechanical M5 Back Card Stopped 24/5/2024 24/5/2024


3,4 o Process due to "T 14:50 15:21
h con" alarm,
s (nothing
i was
n found)m

24-05-2024 Block Mechanical f 39 Back Card Stopped 24/5/2024 24/5/2024


3,4 a Process due to "T 17:30 18:0
r con"
o alarm,
o (nothing
q was

found)m
24-05-2024 Block Mechanical f 19 Back Card Stopped 24/5/2024 24/5/2024
1,2 a Process because 17:0 17:30
r doffer belt
o was
o replaced
q

24-05-2024 Block Mechanical u 22 Back Comber Stopped 24/5/2024 24/5/2024


3,4 s Process because 16:30 17:1
m calendar
a roller belt
n was
replaced

24-05-2024 Block Mechanical u 10 Back Comber Stopped 24/5/2024 24/5/2024


3,4 s Process because 17:15 17:44
m "coiler stop
a position"
n alarm, coil
24-05-2024 Block Mechanical u 14 Back Finish Stopped 24/5/2024 24/5/2024
3,4 s Process er because 19:45 20:15
m Drawi "Sliver
a ng count
n monitoring"
alarm, w

25-05-2024 Block QCD A 25 Back Finish "Sliver 24/5/2024 24/5/2024


3,4 r Process er deviation" 22:30 22:45
b Drawi alarm.
a ng Wrapping
b was
69.30.Recti

25-05-2024 Block QCD A 25 Back Finish "Maximum 24/5/2024 24/5/2024


3,4 r Process er draft 22:38 22:45
b Drawi exceeded"
a ng alarm.
b Wrapping
was 70.20

25-05-2024 Block QCD A 28 Back Finish "Sliver 25/5/2024 25/5/2024


3,4 r Process er deviation" 3:20 3:35
b Drawi alarm.
a ng Wrapping
b was
61.60.Recti

25-05-2024 Block QCD A 35 Back Finish "Sliver 25/5/2024 25/5/2024


3,4 r Process er deviation" 0:11 0:25
b Drawi alarm.
a ng Wrapping
b was
70.25.Recti

25-05-2024 Block QCD A 16 Back Finish "Sliver 25/5/2024 25/5/2024


1,2 r Process er deviation" 0:30 0:50
b Drawi alarm.
a ng Wrapping
b was
61.42.Recti

25-05-2024 Block Mechanical N 4 Back Lap Steel roller 25/5/2024 25/5/2024


1,2 a Process Former belt was 0:40 1:20
s changed.R
a ectified
r
25-05-2024 Block Mechanical N 57 Back Card DFK 24/5/2024 24/5/2024
3,4 a Process Opening 22:45 23:15
s roller belt
a was
r changed.R
ectified
25-05-2024 Block QCD E 2 Ring Ring Count 25/5/2024 25/5/2024
1,2 n Winding Zinser Changed 6:35 7:20
g 72XL
i
n
e
e
r

25-05-2024 Block Mechanical Sajid 15 Ring Ring Traveller 25/5/2024 25/5/2024


1,2 Winding Zinser changed 6:10 6:45
72XL
25-05-2024 Block Mechanical Sajid 20 Ring Ring Traveller 25/5/2024 25/5/2024
1,2 Winding Zinser changed 7:40 8:15
72XL
25-05-2024 Block Mechanical Sajid 28 Ring Ring Traveller 25/5/2024 25/5/2024
1,2 Winding Zinser changed 12:0 12:20
72XL
25-05-2024 Block Electrical U 8 Ring Ring Stopped 25/5/2024 25/5/2024
1,2 s Winding Zinser due to" Fu 10:0 10:20
m 72XL spindle
a warning
n temperatur
e" al

25-05-2024 Block Mechanical A 45 Ring Ring Needle 25/5/2024 25/5/2024


3,4 s Winding Zinser bearing 11:20 11:50
h 72XL changed
r
a
f

25-05-2024 Block Mechanical A 58 Ring Ring Bobbin peg 25/5/2024 25/5/2024


3,4 s Winding Zinser conveyor 11:0 11:50
h 72XL belt was
r damaged.
a joints were
f

25-05-2024 Block Mechanical Sajid 57 Ring Ring Traveller 25/5/2024 25/5/2024


3,4 Winding Zinser changed 9:30 10:20
72XL
25-05-2024 Block Mechanical Sajid 31 Ring Ring Traveller 25/5/2024 25/5/2024
3,4 Winding Zinser changed 10:25 10:55
72XL
25-05-2024 Block Mechanical Sajid 33 Ring Ring Traveller 25/5/2024 25/5/2024
3,4 Winding Zinser changed 11:0 11:30
72XL
25-05-2024 Block Mechanical Sajid 35 Ring Ring Traveller 25/5/2024 25/5/2024
3,4 Winding Zinser changed 11:30 12:0
72XL
25-05-2024 Block Mechanical Sajid 56 Ring Ring Traveller 25/5/2024 25/5/2024
3,4 Winding Zinser changed 12:30 13:0
72XL
25-05-2024 Block Mechanical D 43 Ring Ring Over 25/5/2024 25/5/2024
3,4 a Winding Zinser Hauling 8:40 13:0
s 72XL
t
g
e
e
r

25-05-2024 Block QCD D 3 Back Finish Maximum 25/5/2024 25/5/2024


3,4 i Process er draft 13:0 13:15
l Drawi exceded.
s ng Wrapping
h was done.
a (70.5).
d

25-05-2024 Block QCD Dilshad 11 Back Finish Sliver 25/5/2024 25/5/2024


3,4 Process er deviation + 12:10 12:30
Drawi alarm.
ng wrapping
was done.
(73 g

25-05-2024 Block QCD Dilshad 16 Back Finish Sliver 25/5/2024 25/5/2024


3,4 Process er deviation 12:45 13:0
Drawi (-) alarm.
ng wrapping
was done.
(62

25-05-2024 Block Mechanical Abid 11 Back Simplex Over 25/5/2024 25/5/2024


1,2 Process Hauling 6:0 14:0
25-05-2024 Block QCD Dilshad 19 Back Finish Sliver 25/5/2024 25/5/2024
3,4 Process er deviation 11:0 11:20
Drawi (-).
ng wrapping
was done.
(70.43)

25-05-2024 Block QCD Dilshad 24 Back Finish Sliver 25/5/2024 25/5/2024


3,4 Process er deviation 13:0 13:15
Drawi (+).
ng wrapping
was done.
(70.26)

25-05-2024 Block QCD Dilshad 36 Back Finish Sliver 25/5/2024 25/5/2024


3,4 Process er deviation 10:35 10:45
Drawi (-).
ng wrapping
was done.
(70.14)

25-05-2024 Block Mechanical Sajid 51 Ring Ring Traveller 25/5/2024 25/5/2024


3,4 Winding Zinser change. 14:0 14:36
72XL
25-05-2024 Block Mechanical Zulifqar 13 Ring Ring Overhaulin 25/5/2024 25/5/2024
1,2 Winding Zinser g. 14:0 16:20
72XL
25-05-2024 Block Mechanical Akhtar 22 Ring Ring Front steel 25/5/2024 25/5/2024
1,2 Winding Zinser roller 14:23 14:33
72XL bearing got
heated up.
Changed.

25-05-2024 Block Mechanical Akhtar 25 Ring Ring Front steel 25/5/2024 25/5/2024
1,2 Winding Zinser roller 14:40 14:55
72XL bearing got
heated up.
Changed.

25-05-2024 Block QCD Asif 31 Back Finish "Sliver 25/5/2024 25/5/2024


3,4 Process er deviation" 15:6 15:30
Drawi alarm,
ng wrapping
70.13. Can
was

25-05-2024 Block QCD Asif 22 Back Finish "Sliver 25/5/2024 25/5/2024


3,4 Process er deviation" 17:58 18:25
Drawi alarm,
ng wrapping
70.17 Can
was p

25-05-2024 Block Mechanical Usman 19 Back Inter "Suction 25/5/2024 25/5/2024


3,4 Process Drawing pressure" 19:35 19:55
alarm,
Mechanical
person
worked

25-05-2024 Block Mechanical Shabbir 26 Back Break Steel 25/5/2024 25/5/2024


3,4 Process er rollers 14:0 15:10
Drawi were
ng changed.
25-05-2024 Block Electrical Tayyab 18 Back Simplex "Doffing 25/5/2024 25/5/2024
3,4 Process bar 20:25 20:50
encoder
not ready"
alarm,
Electrical

25-05-2024 Block Mechanical Farooq 48 Back Card DFK 25/5/2024 25/5/2024


3,4 Process opening 20:15 21:0
roller belt
was
damaged.
Changed.

25-05-2024 Block QCD Asif 10 Back Finish "Sliver 25/5/2024 25/5/2024


1,2 Process er deviation" 20:31 20:51
Drawi alarm,
ng Wrapping
70.58. Can
was

25-05-2024 Block Mechanical Khalil 11 Back Simplex Overhaulin 25/5/2024 25/5/2024


1,2 Process g. 14:0 16:0
25-05-2024 Block Mechanical Murtaza Radial Back FDP Card Vibration of 25/5/2024 25/5/2024
1,2 Flow Process main motor 15:45 16:45
was
checked.

Fan
26-05-2024 Block Mechanical Ramzan 58 Ring Ring Zinser Stopped 26/5/2024 26/5/2024
3,4 Winding 72XL due to 0:0 0:25
bobbin
conveyour
wasn't
completed(
p
26-05-2024 Block Mechanical Saqib 29 Ring Ring Front roller 25/5/2024 25/5/2024
1,2 Winding Zinser bearing 23:10 23:25
72XL was
replaced
26-05-2024 Block Mechanical Saqib 5 Ring Ring Front roller 26/5/2024 26/5/2024
1,2 Winding Zinser bearing got 2:25 2:50
72XL heated
up,replace
d!
26-05-2024 Block QCD Arbab 18 Back Finish Stopped 25/5/2024 25/5/2024
1,2 Process er due to 23:1 23:25
Drawi "sliver
ng deviation"
alarm,wrap
pinh w

26-05-2024 Block QCD Naeem 20 Back Finish Stopped 25/5/2024 25/5/2024


3,4 Process er due to 23:20 23:40
Drawi "sliver
ng devation "
alarm,wrap
ping w

26-05-2024 Block QCD Naeem 33 Back Finish Stopped 26/5/2024 26/5/2024


3,4 Process er due to 4:55 5:10
Drawi "sliver
ng devation "
alarm, can
was p

26-05-2024 Block Mechanical Nassar 33 Back FDP Drawing 26/5/2024 26/5/2024


3,4 Process Drawing depart was 0:10 0:25
stopped
due to RPF
got

choked,c
26-05-2024 Block Mechanical Nassar 19 Back Comber Stopped 26/5/2024 26/5/2024
3,4 Process due to front 0:30 1:0
steel
roller
belt(1390)
got d
26-05-2024 Block Electrical Sajjad Blow Back Blow Blow room 25/5/2024 25/5/2024
1,2 Room Process Room line # 3,4 22:40 23:0
Line-2 Block-2 was
stopped
due to
communica
t

26-05-2024 Block Mechanical Ali Raza 1 Ring Ring Front roller 26/5/2024 26/5/2024
1,2 Winding Zinser bearing 11:35 11:50
72XL changed.
26-05-2024 Block Mechanical Ali Raza 2 Ring Ring Control 26/5/2024 26/5/2024
1,2 Winding Zinser Ring 10:55 11:20
72XL Balloon
Bracket
repaired.
26-05-2024 Block Mechanical Sajid 52 Ring Ring Traveller 26/5/2024 26/5/2024
3,4 Winding Zinser changed. 10:55 11:25
72XL
26-05-2024 Block Mechanical Sajid 42 Ring Ring Traveller 26/5/2024 26/5/2024
3,4 Winding Zinser changed. 11:25 11:55
72XL
26-05-2024 Block Mechanical Sajid 41 Ring Ring Traveller 26/5/2024 26/5/2024
3,4 Winding Zinser changed. 10:25 10:50
72XL
26-05-2024 Block Mechanical Sajid 39 Ring Ring Traveller 26/5/2024 26/5/2024
3,4 Winding Zinser changed. 11:55 12:25
72XL
26-05-2024 Block Mechanical Javed 44 Ring Ring Overhaulin 26/5/2024 26/5/2024
3,4 Winding Zinser g. 8:40 13:0
72XL
26-05-2024 Block Mechanical Javed 35 Ring Ring Flexi drive 26/5/2024 26/5/2024
3,4 Winding Zinser gear box 6:0 6:40
72XL pin
changed.
26-05-2024 Block Electrical Awais 43 Ring Ring "Fuse 26/5/2024 26/5/2024
3,4 Winding Zinser Spindle 10:0 10:30
72XL Motor
Alarm!"
26-05-2024 Block QCD Kashif 1 Back Finish "Sliver 26/5/2024 26/5/2024
1,2 Process er Deviation 10:30 11:0
Drawi plus"
ng Alarm.
Wrapping
was 70.63

26-05-2024 Block QCD Kashif 21 Back Finish "Sliver 26/5/2024 26/5/2024


1,2 Process er Deviation 11:0 11:20
Drawi minus"
ng Alarm.
Wrapping
wad 61.29

26-05-2024 Block Mechanical Kashif 27 Back Simplex Overhaulin 26/5/2024 26/5/2024


1,2 Process g 8:30 14:0
26-05-2024 Block Electrical Tanveer 25 Back Simplex Ends was 26/5/2024 26/5/2024
1,2 Process loose. 10:30 11:0
Inverter
was
interchang
ed with the

26-05-2024 Block Electrical Tanveer 30 Back Simplex Inverter 26/5/2024 26/5/2024


1,2 Process interchang 10:30 11:0
ed with SM
No.25
26-05-2024 Block Mechanical Jawed 14 Ring Ring Overhaulin 26/5/2024 26/5/2024
1,2 Winding Zinser g. 14:0 16:20
72XL
26-05-2024 Block Mechanical Sajid 1 Ring Ring Traveller 26/5/2024 26/5/2024
1,2 Winding Zinser change. 14:40 15:20
72XL
26-05-2024 Block Mechanical Sajid 19 Ring Ring Traveller 26/5/2024 26/5/2024
1,2 Winding Zinser change. 15:15 15:50
72XL
26-05-2024 Block Mechanical Sajid 29 Ring Ring Traveller 26/5/2024 26/5/2024
1,2 Winding Zinser change. 14:0 14:35
72XL
26-05-2024 Block QCD Asif 23 Back Finish "Sliver 26/5/2024 26/5/2024
3,4 Process er count 18:55 19:10
Drawi monitoring"
ng alarm,
wrapping
69.90. F

26-05-2024 Block Electrical Asif RPF Back FDP FDP 26/5/2024 26/5/2024
3,4 Process Drawing drawing 14:55 15:15
was tripped
from
pannel. It
was restar

26-05-2024 Block Mechanical Abid 27 Back Simplex Overhaulin 26/5/2024 26/5/2024


3,4 Process g. 14:0 17:0
26-05-2024 Block Electrical Asif 30 Back Simplex Flyer 26/5/2024 26/5/2024
3,4 Process encoder 16:0 16:45
was
changed.
26-05-2024 Block Mechanical Farooq 81 Back Card "Thick 26/5/2024 26/5/2024
3,4 Process spot" 17:15 18:0
alarm,
wrapping
70.05.
Rectified.

26-05-2024 Block Mechanical Farooq 3 Back Card "T-Con" 26/5/2024 26/5/2024


1,2 Process alarm, Foil 18:30 19:0
paper was
found.
Rectified.
26-05-2024 Block QCD Asif 10 Back Finish "Sliver 26/5/2024 26/5/2024
1,2 Process er deviation" 17:35 17:45
Drawi alarm,
ng wrapping
64.26 . Can
was

26-05-2024 Block QCD Asif 16 Back Finish "Sliver 26/5/2024 26/5/2024


1,2 Process er deviation" 21:14 21:34
Drawi alarm,
ng wrapping
62.12 . Can
was

27-05-2024 Block Mechanical Saqib 6 Ring Ring Stopped 26/5/2024 26/5/2024


1,2 Winding Zinser due to steel 22:20 22:35
72XL roller
bearing got
heated up,

27-05-2024 Block Mechanical G 36 Back Card Stopped 27/5/2024 27/5/2024


1,2 u Process due to "T- 2:20 2:40
l CON"
z alarm,Mec
a hanical
r person
wor

27-05-2024 Block Mechanical G 4 Back Card Stopped 27/5/2024 27/5/2024


1,2 u Process due to "T- 3:30 4:0
l CON"
z alarm,Mec
a hanical
r person

wor
27-05-2024 Block Mechanical G 47 Back Card Stopped 27/5/2024 27/5/2024
3,4 u Process due to Flat 4:10 4:40
l belt(828)
z got
a
r

damaged,
Replaced
27-05-2024 Block QCD A 21 Back Finish Stopped 26/5/2024 26/5/2024
3,4 r Process er due 22:15 22:25
b Drawi to"Sliver
a ng devation"
b alarm,wrap
ping

was
27-05-2024 Block QCD A 22 Back Finish Stopped 27/5/2024 27/5/2024
3,4 r Process er due 1:45 1:55
b Drawi to"Sliver
a ng devation"
b alarm,wrap
ping

was
27-05-2024 Block QCD A 29 Back Finish Stopped 27/5/2024 27/5/2024
3,4 r Process er due 2:45 3:0
b Drawi to"Sliver
a ng devation"
b alarm,wrap
ping

was
27-05-2024 Block Electrical S 18 Back Comber Stopped 26/5/2024 26/5/2024
1,2 a Process due to "Lap 22:30 23:0
j motor
j sensor
a fault"
d alarm,Elec

27-05-2024 Block Electrical SBOA Back Blow "Data 26/5/2024 27/5/2024


3,4 a Process Room transfer 23:30 0:0
j Block-3 between
j turret and
a console"
d alarm,a

27-05-2024 Block Electrical S 48 Back Card Stopped 27/5/2024 27/5/2024


3,4 a Process due to 3:15 4:0
j "Motor
j protection
a switch has
d trippe

27-05-2024 Block Electrical U 5 Ring Ring Stopped 27/5/2024 27/5/2024


1,2 s Winding Zinser due to "FU 9:45 10:10
m 72XL spindle
a warning
n temperatur
e" al

27-05-2024 Block Mechanical Sajid 18 Ring Ring Traveller 27/5/2024 27/5/2024


1,2 Winding Zinser change 11:0 11:35
72XL
27-05-2024 Block Mechanical Sajid 30 Ring Ring Traveller 27/5/2024 27/5/2024
1,2 Winding Zinser change 10:20 11:0
72XL
27-05-2024 Block Mechanical Sajid 22 Ring Ring Traveller 27/5/2024 27/5/2024
1,2 Winding Zinser change 11:35 12:10
72XL
27-05-2024 Block Mechanical Sajid 60 Ring Ring Traveller 27/5/2024 27/5/2024
3,4 Winding Zinser change 12:15 13:0
72XL
27-05-2024 Block Mechanical Z 45 Ring Ring Over 27/5/2024 27/5/2024
3,4 u Winding Zinser hauling 8:30 12:0
lf 72XL
a
q
a
r
27-05-2024 Block Mechanical Khalil 12 Back Simplex Over 27/5/2024 27/5/2024
1,2 Process Hauling 6:0 14:0
27-05-2024 Block QCD K 34 Back Finish Stopped 27/5/2024 27/5/2024
3,4 a Process er due to " 9:0 9:20
s Drawi Sliver
h ng count"
i alarm.Wra
f pping was

27-05-2024 Block Mechanical Sajjid 44 Ring Ring Traveller 27/5/2024 27/5/2024


1,2 Winding Zinser change 14:0 14:35
72XL
27-05-2024 Block Mechanical Sajjid 43 Ring Ring Traveller 27/5/2024 27/5/2024
1,2 Winding Zinser change 14:35 15:15
72XL
27-05-2024 Block Mechanical Sajjid 40 Ring Ring Front roller 27/5/2024 27/5/2024
1,2 Winding Zinser bearing 14:55 15:5
72XL was
replaced!
27-05-2024 Block Mechanical Sajjid 58 Ring Ring Traveller 27/5/2024 27/5/2024
3,4 Winding Zinser change 15:45 16:20
72XL
27-05-2024 Block Mechanical Z 15 Ring Ring Overhaulin 27/5/2024 27/5/2024
1,2 u Winding Zinser g 14:0 16:20
lf 72XL
i
q
u
r
27-05-2024 Block QCD AR 34 Back Finish Stoppped 27/5/2024 27/5/2024
3,4 Process er due to 16:0 16:20
Drawi "Sliver
ng devation"
alarm,wrap
ping w

27-05-2024 Block QCD AR 24 Back Finish Stoppped 27/5/2024 27/5/2024


3,4 Process er due to 20:10 20:35
Drawi "Sliver
ng devation"
alarm,wrap
ping w

27-05-2024 Block Mechanical GRPF Back FDP Card Stoppped 27/5/2024 27/5/2024
3,4 u Process due to RPF 16:50 17:25
l got
z choked,cle
a ared by
r

mechanic
27-05-2024 Block QCD Rehman 33 Back Finish Sliver 27/5/2024 27/5/2024
3,4 Process er devation 15:15 15:30
Drawi alarm,wrap
ng ping was
done &
can was

28-05-2024 Block Mechanical altaf 40 Ring Ring Needle 28/5/2024 28/5/2024


3,4 Winding Zinser bearing 3:45 4:20
72XL was
replaced.
28-05-2024 Block Mechanical saqib 30 Ring Ring Pressure 28/5/2024 28/5/2024
1,2 Winding Zinser gripper 0:0 0:15
72XL was
changed.
28-05-2024 Block Mechanical shoaib 26 Back Finish Stopped 28/5/2024 28/5/2024
3,4 Process er due to 4:0 4:15
Drawi "Sliver
ng count
monitoring"
alarm, wr

28-05-2024 Block Mechanical farooq 76 Back Card Stopped 28/5/2024 28/5/2024


3,4 Process due to 3:0 3:29
"TCon"
alarm,
nonthing
was found.

28-05-2024 Block Mechanical waqar 26 Back Simplex Stopped 28/5/2024 28/5/2024


3,4 Process due to over 2:0 3:0
head
blower was
problemati
c, K

28-05-2024 Block QCD arbab 18 Back Finish Stopped 28/5/2024 28/5/2024


1,2 Process er due to 0:42 1:0
Drawi "Sliver
ng deviation-"
alarm,
wrapping

28-05-2024 Block Electrical tayyeb 9 Back Simplex Stopped 28/5/2024 28/5/2024


1,2 Process due to 0:31 1:0
"Doffing
bar
encoder
not ready"
ala

28-05-2024 Block Mechanical farooq BOA Back Blow Stopped 28/5/2024 28/5/2024
1,2 Process Room due to 1:20 1:40
Block-1 "Fixed
point x"
alarm,
rectified.

28-05-2024 Block Electrical Khalil BOA Back Blow Blendomat 28/5/2024 28/5/2024
1,2 Process Room e was 10:45 12:30
Block-2 stopped
due to
beater
roller motor

28-05-2024 Block Mechanical Saif 21 Ring Ring Traveller 28/5/2024 28/5/2024


1,2 Winding Zinser change 11:0 11:30
72XL
28-05-2024 Block Mechanical Saif 23 Ring Ring Traveller 28/5/2024 28/5/2024
1,2 Winding Zinser change 10:30 11:0
72XL
28-05-2024 Block Mechanical Saif 45 Ring Ring Traveller 28/5/2024 28/5/2024
3,4 Winding Zinser change 11:30 12:0
72XL
28-05-2024 Block Mechanical Saif 59 Ring Ring Traveller 28/5/2024 28/5/2024
3,4 Winding Zinser change 12:10 12:40
72XL

IFL
Daily Stoppages Report
Date Block Rectified Dep Rectified Person McNo Area Sub Area
Reason
28-05-2024 Block Stop Time
Mechanical A Start Time
51 Ring Ring Zero guage 28/5/2024 28/5/2024
3,4 s Winding Zinser setting was 11:0 11:25
h 72XL done
r
a
f
28-05-2024 Block Mechanical Z 46 Ring Ring Overhaulin 28/5/2024 28/5/2024
3,4 u Winding Zinser g 8:30 12:15
lf 72XL
i
q
u
r
28-05-2024 Block Mechanical W 28 Back Simplex Overhaulin 28/5/2024 28/5/2024
3,4 a Process g 7:0 14:0
s
e
e
m

28-05-2024 Block Mechanical Z 16 Ring Ring Overhaulin 28/5/2024 28/5/2024


1,2 u Winding Zinser g. 14:0 16:20
li 72XL
f
q
a
r
28-05-2024 Block Mechanical Altaf 44 Ring Ring Stopped 28/5/2024 28/5/2024
3,4 Winding Zinser due to 17:30 17:40
72XL lifting rod
clamp got
damaged,
Repla

28-05-2024 Block Mechanical U 10 Back Finish Stopped 28/5/2024 28/5/2024


3,4 s Process er due to 19:0 19:30
m Drawi delivery
a ng belt got
n damaged,
Replaced!

28-05-2024 Block Electrical S 1 Back Break Stopped 28/5/2024 28/5/2024


1,2 a Process er against 20:5 20:55
jj Drawi "speed of
a ng delivery "
d alarm,Elect
ri
28-05-2024 Block Electrical S 11 Back Simplex Stopped 28/5/2024 28/5/2024
1,2 a Process against 21:0 21:20
jj "Bobbin rail
a limit
d switch"
alarm.R

28-05-2024 Block Electrical S 58 Ring Ring Zinser Stopped 28/5/2024 28/5/2024


1,2 a Winding 72XL due to 19:40 20:0
jj "main
a contactor
d dosen't
switch"

ala
28-05-2024 Block Electrical S 29 Back Simplex Stopped 28/5/2024 28/5/2024
3,4 a Process due to 21:45 22:0
jj "bobbin
a time-out"
d alarm,all
ends do

29-05-2024 Block Mechanical I 55 Ring Ring "Incorrect 28/5/2024 28/5/2024


3,4 m Winding Zinser swival 22:45 23:15
r 72XL position"
a alarm.
n Pressure
pipe g

29-05-2024 Block Electrical W 16 Back Simplex "Doffing 29/5/2024 29/5/2024


3,4 a Process bar 4:30 4:45
q encoder
a not
r ready"alar
m. Alarm
was re

29-05-2024 Block Electrical W 29 Back Simplex "Bobbin 28/5/2024 28/5/2024


3,4 a Process timeout 22:0 23:15
q on"alarm.In
a verter and
r
encoder of
b
29-05-2024 Block Mechanical S 14 Back Finish "Sliver 29/5/2024 29/5/2024
1,2 h Process er deviation" 0:19 0:40
o Drawi Alarm
a ng twice.
i Wrapping
b was 60.53

29-05-2024 Block Mechanical S 1 Back Finish "Maximum 29/5/2024 29/5/2024


1,2 h Process er draft 3:20 3:30
o Drawi exceeded"
a ng Alarm .
i Wrapping
b was 70.1

29-05-2024 Block Mechanical Sajid 7 Ring Ring Traveler 29/5/2024 29/5/2024


1,2 Winding Zinser Changed 10:30 11:0
72XL
29-05-2024 Block Mechanical Sajid 11 Ring Ring Traveler 29/5/2024 29/5/2024
1,2 Winding Zinser Changed 11:0 11:30
72XL
29-05-2024 Block Mechanical Sajid 9 Ring Ring Traveler 29/5/2024 29/5/2024
1,2 Winding Zinser Changed 11:30 12:10
72XL
29-05-2024 Block Mechanical Abid 13 Back Simplex Over 29/5/2024 29/5/2024
1,2 Process hauling 7:0 14:0
29-05-2024 Block QCD D 7 Back Finish Stopped 29/5/2024 29/5/2024
1,2 il Process er due to " 6:25 7:0
s Drawi Maximum
h ng draft
a exceeded"
d alarm.Wra

29-05-2024 Block Mechanical Sajid 53 Ring Ring Traveller 29/5/2024 29/5/2024


3,4 Winding Zinser change 12:15 12:45
72XL
29-05-2024 Block Mechanical Z 47 Ring Ring Over 29/5/2024 29/5/2024
3,4 u Winding Zinser hauling 8:50 13:0
l 72XL
f
q
a
r

29-05-2024 Block Mechanical Altaf 61 Back Card Stopped 29/5/2024 29/5/2024


3,4 Process due to "T- 6:0 6:40
Con
"alarm.Rec
tified.
29-05-2024 Block Electrical M 30 Back Simplex Electrical 29/5/2024 29/5/2024
3,4 u Process department 11:0 12:30
b was
e working on
e suction
n fan ,

29-05-2024 Block Mechanical Sajjid 57 Ring Ring Traveller 29/5/2024 29/5/2024


3,4 Winding Zinser change 14:0 14:40
72XL
29-05-2024 Block Mechanical Sajjid 55 Ring Ring Traveller 29/5/2024 29/5/2024
3,4 Winding Zinser change 14:40 15:15
72XL
29-05-2024 Block Mechanical A 53 Ring Ring Steel roller 29/5/2024 29/5/2024
3,4 s Winding Zinser bearing got 15:0 15:15
h 72XL heatedup,r
r eplaced!
a
f

29-05-2024 Block Mechanical S 24 Ring Ring Traveller 29/5/2024 29/5/2024


1,2 a Winding Zinser change 15:10 15:45
j 72XL
j
i
d
29-05-2024 Block Mechanical Z 17 Ring Ring Overhaulin 29/5/2024 29/5/2024
1,2 u Winding Zinser g 14:0 17:15
l 72XL
f
i
q
u
r

29-05-2024 Block Mechanical U 10 Back Inter Stopped 29/5/2024 29/5/2024


1,2 s Process Drawing due to 21:0 21:25
m delivery
a drive
n belt(1940)
got damag

29-05-2024 Block Electrical W2 Back Simplex Stopped 29/5/2024 29/5/2024


1,2 a Process due to 21:0 21:20
q "Bobbin rail
a timeout off"
r alarm,Ele

29-05-2024 Block Electrical W13 Back Simplex Stopped 29/5/2024 29/5/2024


1,2 a Process due to 20:0 20:15
q "Doffing
a slide
r encoder
not
ready"al

29-05-2024 Block Electrical W3 Back Simplex Suction 29/5/2024 29/5/2024


1,2 a Process motor was 14:30 16:15
q replaced
a agaisnt
r abnormal
sound.
29-05-2024 Block QCD Asif 30 Back Finish Stopped 29/5/2024 29/5/2024
3,4 Process er due to 20:55 21:10
Drawi "maximum
ng draft
exceeded"
alarm,Wra
p
29-05-2024 Block QCD Asif 31 Back Finish Stopped 29/5/2024 29/5/2024
3,4 Process er due to 17:45 18:0
Drawi "sliver
ng devation"
alarm,wrap
ping

wa
29-05-2024 Block Mechanical G 78 Back Card Double 29/5/2024 29/5/2024
3,4 u Process timing belt 19:30 20:0
l (1200) was
z damaged.
a Changed.
r
29-05-2024 Block Mechanical GRPF Back FDP Card Card line # 29/5/2024 29/5/2024
3,4 u Process 5 was 16:50 17:15
l stopped
z due to RPF
a nozzle git
r ch

29-05-2024 Block Electrical W36 Back Comber Stopped 29/5/2024 29/5/2024


3,4 a Process due to 15:15 17:0
q "safety
a circuit"
r alarm,Elect
rical t

29-05-2024 Block Electrical W12 Ring Cone Machine 29/5/2024 29/5/2024


3,4 a Winding Winding was 19:50 20:24
q AC stopped
a due
r to EL 01
alarm(twice
).Elec

X6
30-05-2024 Block Mechanical S 12 Ring Ring Stopped 30/5/2024 30/5/2024
1,2 a Winding Zinser because 0:10 1:10
q 72XL conveyor
i was not
b completed
30-05-2024 Block Mechanical Shoaib 7 Back Finish "Sliver 29/5/2024 29/5/2024
1,2 Process er deviation" 21:45 22:0
Drawi alarm.
ng Wrapping
was
70.30.Recti

30-05-2024 Block Mechanical Shoaib 30 Back Finish "Sliver 30/5/2024 30/5/2024


3,4 Process er deviation" 1:55 2:20
Drawi alarm.
ng Wrapping
was
70.17Rectif

30-05-2024 Block Mechanical Farooq Uster Back Blow Cotton line 30/5/2024 30/5/2024
3,4 Jossi Process Room 7 was 4:30 4:50
Block-4 stopped
due to F1
alarm.
Cleanin

30-05-2024 Block Mechanical Farooq 1 Back Car "NCT 29/5/2024 29/5/2024


1,2 Process d Warning" 22:45 23:45
Alarm.
Cleaning
was done
of NCT.

Rec
30-05-2024 Block Electrical Noman 4 Back Finish Sliver 30/5/2024 30/5/2024
1,2 Process er break"Alar 1:0 2:30
Drawi m on
ng Finisher 3.
Sensor
was

inter
30-05-2024 Block Mechanical Sajid 2 Ring Ring Traveller 30/5/2024 30/5/2024
1,2 Winding Zinser change 10:45 11:20
72XL
30-05-2024 Block Mechanical Sajid 3 Ring Ring Traveller 30/5/2024 30/5/2024
1,2 Winding Zinser change 11:45 12:15
72XL
30-05-2024 Block Mechanical Sajid 10 Ring Ring Traveller 30/5/2024 30/5/2024
1,2 Winding Zinser change 12:25 12:55
72XL
30-05-2024 Block Mechanical Sajid 12 Ring Ring Traveller 30/5/2024 30/5/2024
1,2 Winding Zinser change 10:0 10:30
72XL
30-05-2024 Block Mechanical Sajid 25 Ring Ring Traveller 30/5/2024 30/5/2024
1,2 Winding Zinser change 11:15 11:50
72XL
30-05-2024 Block Mechanical Zulfqar 48 Ring Ring Over 30/5/2024 30/5/2024
3,4 Winding Zinser hauling 8:30 12:45
72XL
30-05-2024 Block Electrical Usman 53 Ring Ring Stopped 30/5/2024 30/5/2024
3,4 Winding Zinser due to "FU 11:15 11:30
72XL spindle
warning
temperatur
e"a

30-05-2024 Block QCD Kashif 16 Back Finish Stopped 30/5/2024 30/5/2024


1,2 Process er due to 9:50 10:20
Drawi "Sliver
ng daviation
(+).Wrappi
ng was

30-05-2024 Block Electrical F 11 Back Comber Stopped 30/5/2024 30/5/2024


1,2 a Process due to "M 9:30 10:30
h 001 main
a motor was
d change"
30-05-2024 Block QCD D 24 Back Finish Stopped 30/5/2024 30/5/2024
1,2 il Process er due to " 12:58 13:10
s Drawi Sliver
h ng daviation
a (-)"alarm.W
d rappi

30-05-2024 Block Mechanical Abid 29 Back Simplex Over 30/5/2024 30/5/2024


1,2 Process hauling 8:0 14:0
30-05-2024 Block Mechanical Alyas SPS Ring Cone SPS 03 30/5/2024 30/5/2024
1,2 Winding Transport conveyor 14:0 15:0
belt was
replaced.
System
(CTS)
30-05-2024 Block Mechanical Alyas SPS Ring Cone SPS 02 30/5/2024 30/5/2024
1,2 Winding Transport conveyor 15:0 18:30
belt was
replaced.
System
(CTS)
30-05-2024 Block Mechanical Sajid 56 Ring Ring Traveller 30/5/2024 30/5/2024
3,4 Winding Zinser change. 14:0 14:35
72XL
30-05-2024 Block Mechanical Sajid 40 Ring Ring Traveller 30/5/2024 30/5/2024
3,4 Winding Zinser change. 14:35 15:5
72XL
30-05-2024 Block Mechanical Sajid 54 Ring Ring Traveller 30/5/2024 30/5/2024
3,4 Winding Zinser change. 15:5 15:40
72XL
30-05-2024 Block Electrical M 42 Ring Ring Zinser Stopped 30/5/2024 30/5/2024
3,4 u Winding 72XL because 14:30 15:40
b uster
e sentinal
e position
n was

change
30-05-2024 Block Mechanical Q 38 Ring Ring Zinser "Timeout 30/5/2024 30/5/2024
3,4 a Winding 72XL pressurize 16:45 17:5
i grippers"
s alarm,
e
r
Mechanical
pe
30-05-2024 Block Mechanical Altaf 39 Ring Ring Front steel 30/5/2024 30/5/2024
3,4 Winding Zinser roller 20:0 20:15
72XL bearing got
heated up.
Changed.

30-05-2024 Block Mechanical Z 18 Ring Ring Overhaulin 30/5/2024 30/5/2024


1,2 u Winding Zinser g. 14:0 17:0
li 72XL
f
q
a
r
30-05-2024 Block Electrical Waqar 18 Ring Ring Stopped on 30/5/2024 30/5/2024
1,2 Winding Zinser doff without 19:25 19:40
72XL any alarm,
Electrical
pers

30-05-2024 Block Mechanical Ali Raza 2 Ring Ring Zinser "Swivel in 30/5/2024 30/5/2024
1,2 Winding 72XL not 14:50 15:15
enabled"
alarm,
Mechanical
person

w
30-05-2024 Block QCD Asif 7 Back Finish "Sliver 30/5/2024 30/5/2024
1,2 Process er deviation" 14:30 14:45
Drawi alarm,
ng wrapping
70.48. Can
was

30-05-2024 Block QCD Asif 7 Back Finish "Sliver 30/5/2024 30/5/2024


1,2 Process er deviation" 17:14 17:30
Drawi alarm,
ng wrapping
70.57. Can
was

30-05-2024 Block Electrical Sajjad 26 Back Comber "Safety 30/5/2024 30/5/2024


3,4 Process circuit" 14:15 14:40
alarm,
Electrical
person
worked o

30-05-2024 Block Electrical Asif\ 19 Back Comber Stopped 30/5/2024 30/5/2024


3,4 Shakeel Process because 15:45 15:45
steel roller
belt sensor
was insta

31-05-2024 Block Electrical Tayyab 18 Ring Ring Zinser "RB:Botto 31/5/2024 31/5/2024
1,2 Winding 72XL m 0:15 2:0
emergency
stop limit
switch"
alarm.

Ele
31-05-2024 Block Mechanical Saqqib 23 Ring Ring Ring rail 30/5/2024 31/5/2024
1,2 Winding Zinser tape was 23:0 0:35
72XL broken
from left
side from
head

31-05-2024 Block Mechanical Altaf 50 Ring Ring Gripper 31/5/2024 31/5/2024


3,4 Winding Zinser was 3:10 3:20
72XL damaged
and
pressure
was
leaked.
Gripp

31-05-2024 Block Mechanical Farooq 51 Back Card "Thick 31/5/2024 31/5/2024


3,4 Process spot"alarm. 1:0 1:20
wrapping
was
69.74.Can
was place
31-05-2024 Block Mechanical Farooq 52 Back Card "Thick 31/5/2024 31/5/2024
3,4 Process spot"alarm. 3:0 3:40
wrapping
was
69.94.Can
was place

31-05-2024 Block Mechanical Farooq 63 Back Card "Thick 31/5/2024 31/5/2024


3,4 Process spot"alarm. 2:30 2:45
wrapping
was
70.88.NCT
was clean

31-05-2024 Block Mechanical Farooq 36 Back Card "Thick 30/5/2024 30/5/2024


3,4 Process spot"alarm. 23:30 23:45
wrapping
was
70.40.Can
was place

31-05-2024 Block Mechanical Farooq 27 Back Card "Thick 31/5/2024 31/5/2024


1,2 Process spot"alarm. 0:30 1:1
wrapping
was
69.42.Can
was place

31-05-2024 Block Mechanical Shoaib 35 Back Finish "Sliver 30/5/2024 30/5/2024


3,4 Process er deviation"al 22:25 22:40
Drawi arm.wrappi
ng ng
was 71.30.
Rectif
31-05-2024 Block Mechanical Shoaib 35 Back Finish "Sliver 31/5/2024 31/5/2024
3,4 Process er deviation"al 0:50 1:5
Drawi arm.wrappi
ng ng
was 71.19.
Rectif
31-05-2024 Block Mechanical Shoaib 31 Back Finish "Sliver 31/5/2024 31/5/2024
3,4 Process er deviation"al 0:25 0:40
Drawi arm.wrappi
ng ng
was 71.21.
Rectif
31-05-2024 Block Mechanical Shoaib 23 Back Finish "Sliver 31/5/2024 31/5/2024
3,4 Process er deviation"al 2:20 2:35
Drawi arm.wrappi
ng ng
was 70.53.
Rectif
31-05-2024 Block Electrical Noman 26 Back Simplex "Slide drive 31/5/2024 31/5/2024
3,4 Process inverter 1:25 2:0
malfunction
" Alarm.
Alarm

wa
31-05-2024 Block Mechanical Farooq Uster Back Blow Room "Magic eye 31/5/2024 31/5/2024
1,2 Jossi Process Block-1 net 4:30 4:45
control"alar
m from
couples
of days.
31-05-2024 Block Mechanical Sajid 1 Ring Ring Traveller 31/5/2024 31/5/2024
1,2 Winding Zinser change. 9:35 10:10
72XL
31-05-2024 Block Mechanical Sajid 5 Ring Ring Traveller 31/5/2024 31/5/2024
1,2 Winding Zinser change. 10:25 11:0
72XL
31-05-2024 Block Mechanical Sajid 8 Ring Ring Traveller 31/5/2024 31/5/2024
1,2 Winding Zinser change. 10:55 11:25
72XL
31-05-2024 Block Mechanical Sajid 17 Ring Ring Traveller 31/5/2024 31/5/2024
1,2 Winding Zinser change. 11:25 12:0
72XL
31-05-2024 Block Mechanical Sajid 26 Ring Ring Traveller 31/5/2024 31/5/2024
1,2 Winding Zinser change. 9:0 9:35
72XL
31-05-2024 Block Mechanical Sajid 32 Ring Ring Traveller 31/5/2024 31/5/2024
3,4 Winding Zinser change. 12:0 12:30
72XL
31-05-2024 Block Mechanical Dastgeer 38 Ring Ring Zinser Suction fan 31/5/2024 31/5/2024
3,4 Winding 72XL damper 11:50 12:20
was
blocked.
Mechanical

person
31-05-2024 Block Mechanical Dastgeer 35 Ring Ring Spindle 31/5/2024 31/5/2024
3,4 Winding Zinser belt tention 11:50 12:5
72XL was done.

31-05-2024 Block Mechanical Dastgeer 36 Ring Ring Spindle 31/5/2024 31/5/2024


3,4 Winding Zinser belt tention 11:35 11:45
72XL was done.

31-05-2024 Block Mechanical Dastgeer 37 Ring Ring Spindle 31/5/2024 31/5/2024


3,4 Winding Zinser belt tention 11:45 12:0
72XL was done.

31-05-2024 Block Mechanical Dastgeer 39 Ring Ring Spindle 31/5/2024 31/5/2024


3,4 Winding Zinser belt tention 12:0 12:15
72XL was done.

31-05-2024 Block Electrical Tayyab 18 Ring Ring "FU doffing 31/5/2024 31/5/2024
1,2 Winding Zinser bar 6:15 7:0
72XL overload"
alarm,
Electrical
person
31-05-2024 Block Electrical Usman 19 Ring Ring Zinser "FU spindle 31/5/2024 31/5/2024
1,2 Winding 72XL warning 9:45 10:15
temperatur
e" alarm,

Electrical
31-05-2024 Block Mechanical Asghar 24 Ring Ring Zinser "Timeout 31/5/2024 31/5/2024
1,2 Winding 72XL pressurize 6:20 6:40
grippers"
alarm,
Mechanical
pe
31-05-2024 Block QCD Dilshad 34 Back Finish "Maximum 31/5/2024 31/5/2024
3,4 Process er draft 6:40 6:55
Drawi exceded"
ng alarm,
wrapping
70.10. Rec

31-05-2024 Block QCD Abdurrahm 36 Back Finish "Sliver 31/5/2024 31/5/2024


3,4 an Process er deviation" 11:35 11:50
Drawi alarm,
ng wrapping
70.12.
Rectifie

31-05-2024 Block Electrical Tayyab 8 Back Lap "Slide start 31/5/2024 31/5/2024
3,4 Process Former position not 7:30 8:0
reached"
alarm,
Electric

31-05-2024 Block QCD Naeem 17 Back Finish "Sliver 31/5/2024 31/5/2024


1,2 Process er deviation" 10:20 10:40
Drawi alarm,
ng Wrapping
70.05.
Rectifie

31-05-2024 Block Mechanical Shahzad 4 Back Card Tention 31/5/2024 31/5/2024


1,2 Process belt was 13:20 14:0
damaged.
Replaced.
31-05-2024 Block QCD Kasif 26 Back Finish Stopped 31/5/2024 31/5/2024
3,4 Process er due to 18:44 19:16
Drawi "Maximum
ng draft
exceeded"
alarm, wra

31-05-2024 Block QCD Kasif 31 Back Finish Stopped 31/5/2024 31/5/2024


3,4 Process er due to 15:21 15:40
Drawi "Maximum
ng draft
exceeded"
alarm, wra
31-05-2024 Block Electrical waqar 29 Back Simplex Stopped 31/5/2024 31/5/2024
3,4 Process due to 20:16 20:30
"Bobbin rail
encoder
not ready"
ala

31-05-2024 Block Mechanical Gulzar 75 Back Card Stopped 31/5/2024 31/5/2024


3,4 Process due to 19:0 19:30
"TCon"
alarm, a foil
paper was
foun

31-05-2024 Block Mechanical sajid 48 Ring Ring Traveller 31/5/2024 31/5/2024


3,4 Winding Zinser change 14:29 15:5
72XL
31-05-2024 Block Mechanical sajid 46 Ring Ring Traveller 31/5/2024 31/5/2024
3,4 Winding Zinser change 14:56 15:30
72XL
31-05-2024 Block Mechanical sajid 34 Ring Ring Traveller 31/5/2024 31/5/2024
3,4 Winding Zinser change 15:29 16:0
72XL
31-05-2024 Block Mechanical saqib 18 Ring Ring Stopped 31/5/2024 31/5/2024
1,2 Winding Zinser because 19:15 19:40
72XL deflection
pulley was
changed.
31-05-2024 Block QCD Asif 16 Back Finish Stopped 31/5/2024 31/5/2024
1,2 Process er due to 16:0 16:10
Drawi "Sliver
ng deviation-"
alarm,
wrapping

31-05-2024 Block QCD Asif 18 Back Finish Stopped 31/5/2024 31/5/2024


1,2 Process er due to 14:25 14:40
Drawi "Sliver
ng deviation-"
alarm,
wrapping

31-05-2024 Block Mechanical nadeem 2 Back Comber Stopped 31/5/2024 31/5/2024


1,2 Process because 15:44 16:15
calender
roller belt
changed
31-05-2024 Block Mechanical usman 3 Back Pre Stopped 31/5/2024 31/5/2024
1,2 Process Drawing because 20:20 20:41
calender
roller belt
changed
31-05-2024 Block Mechanical gulzar RPF Back FDP Card Stopped 31/5/2024 31/5/2024
1,2 Process because 20:40 21:10
Card line
number 4,
RPF was
chocke
15 Preve
ntive

35 Preve
ntive

11 Preve
ntive

15 Preve
ntive

14 Preve
ntive

25 Preve
ntive

31 Preve
ntive

30 Preve
ntive
60 Preve
ntive

20 Preve
ntive

35 Preve
ntive

35 Preve
ntive

30 Preve
ntive

35 Preve
ntive

30 Preve
ntive

30 Preve
ntive

60 Preve
ntive

110 Preve
ntive

25 Break
Down

240 Break
Down
15 Break
Down

90 Break
Down

40 Break
Down

17 Break
Down

15 Break
Down

11 Break
Down

40 BreakDow
n

56 BreakDow
n

16 BreakDow
n

70 BreakDow
n
23 BreakDow
n

15 BreakDow
n

26 BreakDow
n

16 BreakDow
n

15 BreakDow
n

15 BreakDow
n

15 BreakDow
n

30 BreakDow
n

60 BreakDow
n

30 BreakDow
n
25 Preve
ntive

81 Preve
ntive

80 Preve
ntive

35 Preve
ntive

30 Preve
ntive

15 Preve
ntive

30 Break
Down

30 Preve
ntive

30 Preve
ntive
34 Preve
ntive

29 Preve
ntive

310 Preve
ntive

20 Preve
ntive

100 Preve
ntive

26 Preve
ntive

30 Preve
ntive

330 Preve
ntive
16 Preve
ntive

165 Preve
ntive

35 Preve
ntive
20 Preve
ntive

35 Preve
ntive

30 Preve
ntive

35 Preve
ntive

40 Preve
ntive

25 Preve
ntive

60 Preve
ntive

25 Preve
ntive

30 Preve
ntive

180 Preve
ntive
90 Preve
ntive
20 Break
Down

30 Break
Down

25 Break
Down

20 Break
Down

60 Break
Down

60 Break
Down

40 Break
Down

25 Break
Down
10 Break
Down

15 Break
Down

20 Break
Down

20 Break
Down

15 Break
Down

15 Preve
ntive

150 Preve
ntive

35 Preve
ntive

20 Preve
ntive

15 Preve
ntive
40 Preve
ntive

240 Preve
ntive

40 Preve
ntive

70 Preve
ntive

15 Preve
ntive

90 Preve
ntive

45 Preve
ntive

180 Preve
ntive

16 Preve
ntive
30 Preve
ntive

19 Preve
ntive

15 Break
Down

30 Break
Down

40 Break
Down

60 Break
Down

30 Break
Down

10 Preve
ntive

270 Preve
ntive
34 Preve
ntive

35 Preve
ntive

35 Preve
ntive

35 Preve
ntive

34 Preve
ntive

15 Preve
ntive

40 Break
Down

25 Break
Down

30 Break
Down

330 Preve
ntive
240 Break
Down

25 Break
Down

From Date 10-05-2024


To Date 01-06-2024
Sub Area Total Time Type
13/5/2024 15 Preventive
16:30

13/5/2024 15 Preventive
17:45

13/5/2024 11 Preventive
16:56

13/5/2024 15 Preventive
16:55

13/5/2024 10 Preventive
17:5

13/5/2024 11 Preventive
17:11

13/5/2024 20 Preventive
17:25

13/5/2024 15 Preventive
17:35

13/5/2024 10 Preventive
17:25

13/5/2024 130 Preventive


16:10

13/5/2024 21 Preventive
14:31

13/5/2024 35 Preventive
15:10
13/5/2024 39 Preventive
15:50

13/5/2024 10 Preventive
19:20

13/5/2024 45 Preventive
15:45

13/5/2024 50 Preventive
15:30

14/5/2024 105 Preventive


2:30

13/5/2024 15 Preventive
22:25

14/5/2024 10 Preventive
3:35

14/5/2024 15 Preventive
2:5

14/5/2024 15 Preventive
1:30
14/5/2024 15 Preventive
5:10

14/5/2024 30 Preventive
4:30

13/5/2024 20 Preventive
23:20

14/5/2024 15 Preventive
5:45

14/5/2024 30 Preventive
10:0

14/5/2024 41 Preventive
11:6

14/5/2024 30 Preventive
11:30

14/5/2024 30 Preventive
11:50

14/5/2024 30 Preventive
12:20

14/5/2024 285 Preventive


13:15

14/5/2024 35 BreakDown
10:0
14/5/2024 15 BreakDown
7:45

14/5/2024 330 Preventive


14:0
14/5/2024 60 BreakDown
14:0

14/5/2024 145 Preventive


16:25

14/5/2024 30 Preventive
14:30

14/5/2024 32 Preventive
15:5

14/5/2024 41 Preventive
15:45

14/5/2024 19 BreakDown
16:59

14/5/2024 13 BreakDown
18:35

14/5/2024 15 BreakDown
19:40

14/5/2024 40 BreakDown
21:10
14/5/2024 35 BreakDown
21:35

14/5/2024 10 BreakDown
19:20

14/5/2024 11 BreakDown
14:11

14/5/2024 10 BreakDown
15:55

14/5/2024 55 BreakDown
20:55

14/5/2024 26 BreakDown
20:11

14/5/2024 30 BreakDown
21:30

15/5/2024 65 BreakDown
1:50

14/5/2024 10 BreakDown
23:40
14/5/2024 20 Preventive
23:15

15/5/2024 15 Preventive
2:50

14/5/2024 30 Preventive
23:0

15/5/2024 35 Preventive
4:55

15/5/2024 120 Preventive


0:0

15/5/2024 50 Preventive
3:30

15/5/2024 35 Preventive
13:0

15/5/2024 35 Preventive
12:25

15/5/2024 90 Preventive
7:30

15/5/2024 35 Preventive
10:0
15/5/2024 29 Preventive
10:49

15/5/2024 30 Preventive
11:20

15/5/2024 30 Preventive
11:50

15/5/2024 285 Preventive


13:15

15/5/2024 155 Preventive


13:0

15/5/2024 331 Preventive


14:1

15/5/2024 300 Preventive


11:0

15/5/2024 15 Preventive
17:55

15/5/2024 150 Preventive


16:30

15/5/2024 31 Preventive
14:32

15/5/2024 29 Preventive
15:2

15/5/2024 29 Preventive
15:29
15/5/2024 30 Preventive
21:0

15/5/2024 35 BreakDown
19:30

15/5/2024 30 BreakDown
20:45

15/5/2024 21 Preventive
21:51

16/5/2024 50 BreakDown
1:0

16/5/2024 15 Preventive
0:0

16/5/2024 20 Preventive
1:11

16/5/2024 30 Preventive
1:30
16/5/2024 30 Preventive
0:0

16/5/2024 30 Preventive
4:15

15/5/2024 30 Preventive
23:40

16/5/2024 15 Preventive
3:25

16/5/2024 120 Preventive


0:0

16/5/2024 35 Preventive
11:25

16/5/2024 35 Preventive
12:0

16/5/2024 30 Preventive
10:55

16/5/2024 165 Preventive


8:45

16/5/2024 30 Preventive
12:30

16/5/2024 270 Preventive


13:0

From Date 10-05-2024


To Date 01-06-2024
Sub Area Total Time Type
16/5/2024 790 Preventive
23:30

16/5/2024 25 Preventive
7:55

16/5/2024 75 Preventive
12:15

16/5/2024 20 Preventive
6:40

16/5/2024 20 Preventive
9:15

16/5/2024 20 Preventive
10:40

16/5/2024 35 Preventive
14:35

16/5/2024 30 Preventive
15:5

16/5/2024 30 Preventive
17:20
16/5/2024 150 Preventive
16:30

16/5/2024 25 Preventive
17:41

16/5/2024 20 Preventive
18:20

16/5/2024 13 Preventive
19:0

16/5/2024 24 Preventive
21:0

16/5/2024 40 BreakDown
21:0

17/5/2024 15 Preventive
4:0

17/5/2024 30 Preventive
2:0

17/5/2024 15 Preventive
1:35
17/5/2024 15 Preventive
3:5

17/5/2024 14 Preventive
4:20

17/5/2024 15 Preventive
4:40

17/5/2024 15 BreakDown
12:45

17/5/2024 30 Preventive
11:45

17/5/2024 30 Preventive
11:5

17/5/2024 35 Preventive
9:40

17/5/2024 30 Preventive
12:20

17/5/2024 20 BreakDown
10:30

17/5/2024 15 BreakDown
11:30
17/5/2024 30 BreakDown
10:0

17/5/2024 15 BreakDown
12:0

17/5/2024 45 Preventive
14:55

17/5/2024 15 Preventive
15:40

17/5/2024 15 Preventive
15:55

17/5/2024 15 Preventive
16:15

17/5/2024 85 BreakDown
17:10

17/5/2024 10 Preventive
17:0
17/5/2024 12 Preventive
17:46

17/5/2024 20 Preventive
21:20

17/5/2024 30 Preventive
17:30

18/5/2024 10 Preventive
0:10

18/5/2024 15 Preventive
3:45

18/5/2024 30 Preventive
0:30

17/5/2024 9 Preventive
22:25

18/5/2024 15 Preventive
2:20
18/5/2024 15 Preventive
3:45

18/5/2024 1456 Preventive


22:16

17/5/2024 30 Preventive
23:30

18/5/2024 30 Preventive
4:45

18/5/2024 35 Preventive
12:45

18/5/2024 40 Preventive
10:10

18/5/2024 30 Preventive
11:0

18/5/2024 30 Preventive
11:30

18/5/2024 30 Preventive
12:0

18/5/2024 40 Preventive
7:10

18/5/2024 40 Preventive
6:40

18/5/2024 270 Preventive


13:0

18/5/2024 25 Preventive
11:40

18/5/2024 40 Preventive
9:20
18/5/2024 85 Preventive
12:25

18/5/2024 19 BreakDown
8:40

18/5/2024 20 BreakDown
12:40

18/5/2024 20 Preventive
10:50

18/5/2024 330 Preventive


14:0
18/5/2024 140 Preventive
16:20

18/5/2024 30 Preventive
14:30

18/5/2024 45 BreakDown
20:45

18/5/2024 30 BreakDown
21:20

18/5/2024 30 BreakDown
22:0

18/5/2024 30 BreakDown
22:0
19/5/2024 30 Preventive
1:5

19/5/2024 25 Preventive
1:25

19/5/2024 15 Preventive
4:30

18/5/2024 40 Preventive
22:20

19/5/2024 15 Preventive
4:10

19/5/2024 10 Preventive
1:30

19/5/2024 30 Preventive
5:0

19/5/2024 30 Preventive
5:0
19/5/2024 30 Preventive
0:30

19/5/2024 20 Preventive
5:30

19/5/2024 35 Preventive
12:35

19/5/2024 30 Preventive
12:0

19/5/2024 29 Preventive
11:0

19/5/2024 30 Preventive
8:15

19/5/2024 40 Preventive
6:45

19/5/2024 245 Preventive


12:45

19/5/2024 31 Preventive
13:0

19/5/2024 15 Preventive
12:30

19/5/2024 19 BreakDown
9:39
19/5/2024 35 BreakDown
7:35

19/5/2024 50 BreakDown
10:50

19/5/2024 60 Preventive
7:0

19/5/2024 330 Preventive


14:0
19/5/2024 40 Preventive
11:40

19/5/2024 15 Preventive
10:45

19/5/2024 15 Preventive
13:10

19/5/2024 40 BreakDown
14:40

19/5/2024 20 BreakDown
17:30

19/5/2024 25 BreakDown
21:15

19/5/2024 35 Preventive
14:35
19/5/2024 35 Preventive
15:40

19/5/2024 30 Preventive
15:5

19/5/2024 20 BreakDown
14:45

19/5/2024 150 Preventive


16:30

19/5/2024 50 BreakDown
20:0

19/5/2024 15 BreakDown
21:15

19/5/2024 40 BreakDown
17:0

19/5/2024 17 Preventive
20:0

19/5/2024 19 Preventive
19:11

19/5/2024 10 Preventive
17:0
19/5/2024 30 BreakDown
17:30

19/5/2024 31 BreakDown
21:50

20/5/2024 40 BreakDown
3:0

19/5/2024 30 Preventive
23:45

20/5/2024 16 Preventive
5:10

19/5/2024 15 Preventive
23:45

20/5/2024 20 Preventive
3:30

20/5/2024 25 Preventive
4:10
20/5/2024 20 Preventive
4:15

19/5/2024 30 Preventive
22:30

20/5/2024 30 Preventive
0:30

19/5/2024 30 Preventive
23:30

20/5/2024 20 Preventive
3:20

20/5/2024 40 Preventive
3:40

20/5/2024 45 BreakDown
11:15

20/5/2024 30 BreakDown
8:20
20/5/2024 15 BreakDown
12:30

20/5/2024 30 BreakDown
10:0

20/5/2024 25 BreakDown
6:40

20/5/2024 30 Preventive
11:0

20/5/2024 40 Preventive
11:40

20/5/2024 36 Preventive
7:20

20/5/2024 30 Preventive
12:50

20/5/2024 30 Preventive
8:0

20/5/2024 35 Preventive
12:10

20/5/2024 40 Preventive
6:45

20/5/2024 45 Preventive
10:15

20/5/2024 285 Preventive


13:15

20/5/2024 30 BreakDown
13:45
20/5/2024 22 BreakDown
9:25

20/5/2024 33 Preventive
14:33

20/5/2024 31 Preventive
15:5

20/5/2024 135 Preventive


16:15

20/5/2024 25 Preventive
14:40

20/5/2024 20 BreakDown
20:25

20/5/2024 40 BreakDown
18:35

20/5/2024 30 BreakDown
18:30

20/5/2024 30 BreakDown
19:30

20/5/2024 150 BreakDown


22:0
21/5/2024 30 BreakDown
2:10

21/5/2024 18 BreakDown
0:25

21/5/2024 17 BreakDown
4:21

21/5/2024 30 BreakDown
2:0

21/5/2024 15 BreakDown
0:35

21/5/2024 10 BreakDown
1:45

21/5/2024 15 BreakDown
4:55

From Date 10-05-2024


To Date 01-06-2024
Sub Area Total Time Type
20/5/2024 40 Preventive
22:40

21/5/2024 330 Preventive


14:0
21/5/2024 60 BreakDown
7:0

21/5/2024 120 BreakDown


8:0

21/5/2024 90 Preventive
8:20

21/5/2024 30 Preventive
6:30

21/5/2024 15 Preventive
7:0

21/5/2024 20 BreakDown
10:0

21/5/2024 15 BreakDown
12:0

21/5/2024 15 BreakDown
12:5

21/5/2024 40 Preventive
11:10

21/5/2024 35 Preventive
12:15

21/5/2024 255 Preventive


13:0

From Date 10-05-2024


To Date 01-06-2024
Sub Area Total Time Type
21/5/2024 15 BreakDown
12:30

21/5/2024 20 BreakDown
12:55

21/5/2024 20 BreakDown
13:0

21/5/2024 25 BreakDown
12:10

21/5/2024 15 BreakDown
13:40

21/5/2024 150 Preventive


16:30

21/5/2024 20 Preventive
14:50

21/5/2024 160 Preventive


20:40

21/5/2024 20 Preventive
20:0
21/5/2024 20 Preventive
20:20

21/5/2024 15 Preventive
17:0

21/5/2024 16 Preventive
18:0

21/5/2024 15 Preventive
19:50

From Date 10-05-2024


To Date 01-06-2024
Sub Area Total Time Type
21/5/2024 15 Preventive
18:50

21/5/2024 20 Preventive
18:5

21/5/2024 180 Preventive


17:0
21/5/2024 20 BreakDown
23:30
22/5/2024 35 BreakDown
1:10

21/5/2024 15 BreakDown
23:30

22/5/2024 8 BreakDown
1:20

21/5/2024 13 BreakDown
23:25

21/5/2024 16 BreakDown
23:45

22/5/2024 16 BreakDown
1:51

22/5/2024 21 BreakDown
2:21

22/5/2024 30 BreakDown
1:40

22/5/2024 30 BreakDown
0:30
22/5/2024 19 BreakDown
2:40

22/5/2024 45 Preventive
1:0

22/5/2024 30 Preventive
0:10

22/5/2024 17 BreakDown
4:25

22/5/2024 45 Preventive
7:15

22/5/2024 45 Preventive
6:45

22/5/2024 35 Preventive
8:15

22/5/2024 50 BreakDown
9:50

22/5/2024 255 Preventive


12:45

22/5/2024 30 Preventive
11:0

22/5/2024 31 Preventive
12:10

22/5/2024 40 Preventive
11:40

22/5/2024 30 Preventive
12:50
22/5/2024 20 Preventive
11:30

22/5/2024 480 Preventive


14:0
22/5/2024 13 Preventive
7:23

22/5/2024 25 Preventive
9:15

22/5/2024 90 Preventive
12:30

22/5/2024 140 Preventive


16:20

22/5/2024 35 Preventive
14:35

22/5/2024 30 Preventive
16:20

22/5/2024 10 Preventive
14:25

22/5/2024 40 Preventive
21:30

22/5/2024 150 Preventive


16:30
22/5/2024 15 Preventive
17:45
22/5/2024 25 Preventive
17:10

22/5/2024 60 Preventive
20:0

22/5/2024 20 Preventive
22:45

23/5/2024 16 BreakDown
1:31

23/5/2024 15 BreakDown
4:0

23/5/2024 25 BreakDown
5:5

23/5/2024 30 Preventive
11:0

23/5/2024 30 Preventive
11:30

23/5/2024 15 Preventive
7:15

23/5/2024 70 Preventive
7:10
23/5/2024 35 Preventive
10:10

23/5/2024 30 Preventive
12:15

23/5/2024 249 Preventive


12:44

23/5/2024 20 Preventive
9:30

23/5/2024 19 Preventive
12:30

23/5/2024 60 Preventive
11:30

23/5/2024 10 Preventive
10:25

23/5/2024 420 Preventive


14:0

23/5/2024 140 Preventive


16:20

23/5/2024 10 Preventive
14:45

23/5/2024 35 Preventive
14:35
23/5/2024 90 Preventive
17:0

23/5/2024 25 Preventive
21:25

23/5/2024 120 Preventive


16:0
23/5/2024 30 Preventive
19:0

23/5/2024 120 Preventive


16:0

23/5/2024 9 Preventive
23:44

23/5/2024 20 Preventive
22:55

23/5/2024 15 BreakDown
22:40

24/5/2024 22 BreakDown
2:15

24/5/2024 20 BreakDown
2:50
24/5/2024 40 BreakDown
3:0

24/5/2024 30 BreakDown
4:30

24/5/2024 60 BreakDown
0:0

24/5/2024 360 BreakDown


5:30

24/5/2024 20 Preventive
7:0

24/5/2024 50 Preventive
6:50

24/5/2024 35 Preventive
8:20

24/5/2024 30 Preventive
11:30

24/5/2024 35 Preventive
12:15

24/5/2024 25 BreakDown
11:25

24/5/2024 15 BreakDown
10:0

24/5/2024 30 Preventive
10:10

24/5/2024 30 Preventive
9:40
24/5/2024 50 Preventive
11:20

24/5/2024 20 BreakDown
10:30

24/5/2024 20 BreakDown
7:40

24/5/2024 20 BreakDown
12:50

24/5/2024 30 BreakDown
14:0

24/5/2024 15 Preventive
16:15

24/5/2024 29 Preventive
15:34

24/5/2024 30 Preventive
15:0

24/5/2024 30 Preventive
15:30

24/5/2024 20 Preventive
14:20
24/5/2024 19 Preventive
16:13

24/5/2024 48 Preventive
21:50

24/5/2024 19 Preventive
17:30

24/5/2024 30 Preventive
19:0

24/5/2024 31 Preventive
15:21

24/5/2024 30 Preventive
18:0

24/5/2024 30 Preventive
17:30

24/5/2024 31 Preventive
17:1

24/5/2024 29 Preventive
17:44
24/5/2024 30 Preventive
20:15

24/5/2024 15 Preventive
22:45

24/5/2024 7 Preventive
22:45

25/5/2024 15 Preventive
3:35

25/5/2024 14 Preventive
0:25

25/5/2024 20 Preventive
0:50

25/5/2024 40 Preventive
1:20

24/5/2024 30 Preventive
23:15
25/5/2024 45 Preventive
7:20

25/5/2024 35 Preventive
6:45

25/5/2024 35 Preventive
8:15

25/5/2024 20 Preventive
12:20

25/5/2024 20 BreakDown
10:20

25/5/2024 30 BreakDown
11:50

25/5/2024 50 BreakDown
11:50

25/5/2024 50 Preventive
10:20

25/5/2024 30 Preventive
10:55

25/5/2024 30 Preventive
11:30

25/5/2024 30 Preventive
12:0

25/5/2024 30 Preventive
13:0
25/5/2024 260 Preventive
13:0

25/5/2024 15 BreakDown
13:15

25/5/2024 20 BreakDown
12:30

25/5/2024 15 BreakDown
13:0

25/5/2024 480 Preventive


14:0
25/5/2024 20 BreakDown
11:20

25/5/2024 15 BreakDown
13:15

25/5/2024 10 BreakDown
10:45

25/5/2024 36 Preventive
14:36

25/5/2024 140 Preventive


16:20
25/5/2024 10 BreakDown
14:33

25/5/2024 15 BreakDown
14:55

25/5/2024 24 BreakDown
15:30

25/5/2024 27 BreakDown
18:25

25/5/2024 20 BreakDown
19:55

25/5/2024 70 BreakDown
15:10

25/5/2024 25 BreakDown
20:50

25/5/2024 45 BreakDown
21:0

25/5/2024 20 BreakDown
20:51

25/5/2024 120 Preventive


16:0
25/5/2024 60 BreakDown
16:45

26/5/2024 25 Preventive
0:25

25/5/2024 15 Preventive
23:25

26/5/2024 25 Preventive
2:50

25/5/2024 24 Preventive
23:25

25/5/2024 20 Preventive
23:40

26/5/2024 15 Preventive
5:10

26/5/2024 15 Preventive
0:25

26/5/2024 30 Preventive
1:0
25/5/2024 20 Preventive
23:0

26/5/2024 15 Preventive
11:50

26/5/2024 25 Preventive
11:20

26/5/2024 30 Preventive
11:25

26/5/2024 30 Preventive
11:55

26/5/2024 25 Preventive
10:50

26/5/2024 30 Preventive
12:25

26/5/2024 260 Preventive


13:0

26/5/2024 40 Preventive
6:40

26/5/2024 30 BreakDown
10:30

26/5/2024 30 BreakDown
11:0

26/5/2024 20 BreakDown
11:20

26/5/2024 330 Preventive


14:0
26/5/2024 30 Preventive
11:0

26/5/2024 30 Preventive
11:0

26/5/2024 140 Preventive


16:20

26/5/2024 40 Preventive
15:20

26/5/2024 35 Preventive
15:50

26/5/2024 35 Preventive
14:35

26/5/2024 15 BreakDown
19:10

26/5/2024 20 BreakDown
15:15

26/5/2024 180 Preventive


17:0
26/5/2024 45 BreakDown
16:45

26/5/2024 45 BreakDown
18:0

26/5/2024 30 BreakDown
19:0
26/5/2024 10 BreakDown
17:45

26/5/2024 20 BreakDown
21:34

26/5/2024 15 Preventive
22:35

27/5/2024 20 Preventive
2:40

27/5/2024 30 Preventive
4:0

27/5/2024 30 Preventive
4:40

26/5/2024 10 Preventive
22:25

27/5/2024 10 Preventive
1:55
27/5/2024 15 Preventive
3:0

26/5/2024 30 Preventive
23:0

27/5/2024 30 Preventive
0:0

27/5/2024 45 Preventive
4:0

27/5/2024 25 BreakDown
10:10

27/5/2024 35 Preventive
11:35

27/5/2024 40 Preventive
11:0

27/5/2024 35 Preventive
12:10

27/5/2024 45 Preventive
13:0

27/5/2024 210 Preventive


12:0

27/5/2024 480 Preventive


14:0
27/5/2024 20 BreakDown
9:20

27/5/2024 35 Preventive
14:35

27/5/2024 40 Preventive
15:15

27/5/2024 10 Preventive
15:5

27/5/2024 35 Preventive
16:20

27/5/2024 140 Preventive


16:20

27/5/2024 20 Preventive
16:20

27/5/2024 25 Preventive
20:35

27/5/2024 35 Preventive
17:25

27/5/2024 15 Preventive
15:30

28/5/2024 35 BreakDown
4:20
28/5/2024 15 BreakDown
0:15

28/5/2024 15 BreakDown
4:15

28/5/2024 29 BreakDown
3:29

28/5/2024 60 BreakDown
3:0

28/5/2024 18 BreakDown
1:0

28/5/2024 29 BreakDown
1:0

28/5/2024 20 BreakDown
1:40

28/5/2024 105 Preventive


12:30

28/5/2024 30 Preventive
11:30

28/5/2024 30 Preventive
11:0
28/5/2024 30 Preventive
12:0

28/5/2024 30 Preventive
12:40

From Date 10-05-2024


To Date 01-06-2024
Sub Area Total Time Type
28/5/2024 25 Preventive
11:25

28/5/2024 225 Preventive


12:15

28/5/2024 420 Preventive


14:0

28/5/2024 140 Preventive


16:20

28/5/2024 10 BreakDown
17:40

28/5/2024 30 BreakDown
19:30

28/5/2024 50 Preventive
20:55
28/5/2024 20 Preventive
21:20

28/5/2024 20 Preventive
20:0

28/5/2024 15 Preventive
22:0

28/5/2024 30 Preventive
23:15

29/5/2024 15 Preventive
4:45

28/5/2024 75 BreakDown
23:15

29/5/2024 21 Preventive
0:40

29/5/2024 10 Preventive
3:30

29/5/2024 30 Preventive
11:0
29/5/2024 30 Preventive
11:30

29/5/2024 40 Preventive
12:10

29/5/2024 420 Preventive


14:0
29/5/2024 35 BreakDown
7:0

29/5/2024 30 Preventive
12:45

29/5/2024 250 Preventive


13:0

29/5/2024 40 BreakDown
6:40

29/5/2024 90 BreakDown
12:30

29/5/2024 40 Preventive
14:40

29/5/2024 35 Preventive
15:15

29/5/2024 15 Preventive
15:15

29/5/2024 35 Preventive
15:45
29/5/2024 195 Preventive
17:15

29/5/2024 25 Preventive
21:25

29/5/2024 20 Preventive
21:20

29/5/2024 15 Preventive
20:15

29/5/2024 135 Preventive


16:15

29/5/2024 15 Preventive
21:10

29/5/2024 15 Preventive
18:0

29/5/2024 30 BreakDown
20:0
29/5/2024 25 BreakDown
17:15

29/5/2024 105 BreakDown


17:0

29/5/2024 34 BreakDown
20:24

30/5/2024 60 Preventive
1:10

29/5/2024 15 Preventive
22:0

30/5/2024 25 Preventive
2:20

30/5/2024 20 Preventive
4:50

29/5/2024 60 Preventive
23:45
30/5/2024 90 BreakDown
2:30

30/5/2024 35 Preventive
11:20

30/5/2024 30 Preventive
12:15

30/5/2024 30 Preventive
12:55

30/5/2024 30 Preventive
10:30

30/5/2024 35 Preventive
11:50

30/5/2024 255 Preventive


12:45

30/5/2024 15 BreakDown
11:30

30/5/2024 30 BreakDown
10:20

30/5/2024 60 BreakDown
10:30

30/5/2024 12 BreakDown
13:10

30/5/2024 360 Preventive


14:0
30/5/2024 60 BreakDown
15:0
30/5/2024 210 BreakDown
18:30

30/5/2024 35 Preventive
14:35

30/5/2024 30 Preventive
15:5

30/5/2024 35 Preventive
15:40

30/5/2024 70 Preventive
15:40

30/5/2024 20 BreakDown
17:5

30/5/2024 15 BreakDown
20:15

30/5/2024 180 Preventive


17:0

30/5/2024 15 BreakDown
19:40

30/5/2024 25 BreakDown
15:15
30/5/2024 15 BreakDown
14:45

30/5/2024 16 BreakDown
17:30

30/5/2024 25 BreakDown
14:40

30/5/2024 0 BreakDown
15:45

31/5/2024 105 BreakDown


2:0

31/5/2024 95 BreakDown
0:35

31/5/2024 10 BreakDown
3:20

31/5/2024 20 Preventive
1:20
31/5/2024 40 Preventive
3:40

31/5/2024 15 Preventive
2:45

30/5/2024 15 Preventive
23:45

31/5/2024 31 Preventive
1:1

30/5/2024 15 Preventive
22:40

31/5/2024 15 Preventive
1:5

31/5/2024 15 Preventive
0:40

31/5/2024 15 Preventive
2:35

31/5/2024 35 BreakDown
2:0
31/5/2024 15 BreakDown
4:45

31/5/2024 35 Preventive
10:10

31/5/2024 35 Preventive
11:0

31/5/2024 30 Preventive
11:25

31/5/2024 35 Preventive
12:0

31/5/2024 35 Preventive
9:35

31/5/2024 30 Preventive
12:30

31/5/2024 30 BreakDown
12:20

31/5/2024 15 BreakDown
12:5

31/5/2024 10 BreakDown
11:45

31/5/2024 15 BreakDown
12:0

31/5/2024 15 BreakDown
12:15

31/5/2024 45 BreakDown
7:0
31/5/2024 30 BreakDown
10:15

31/5/2024 20 BreakDown
6:40

31/5/2024 15 BreakDown
6:55

31/5/2024 15 BreakDown
11:50

31/5/2024 30 BreakDown
8:0

31/5/2024 20 BreakDown
10:40

31/5/2024 40 BreakDown
14:0

31/5/2024 32 BreakDown
19:16

31/5/2024 19 BreakDown
15:40
31/5/2024 14 BreakDown
20:30

31/5/2024 30 BreakDown
19:30

31/5/2024 36 BreakDown
15:5

31/5/2024 34 BreakDown
15:30

31/5/2024 31 BreakDown
16:0

31/5/2024 25 BreakDown
19:40

31/5/2024 10 BreakDown
16:10

31/5/2024 15 BreakDown
14:40

31/5/2024 31 BreakDown
16:15

31/5/2024 21 BreakDown
20:41

31/5/2024 30 BreakDown
21:10

Total Time 38,182.00