F12254-CDB-W01-EQP-PRO-00755_02 LIFTING AND RIGGING EQUIPMENT INPECTION ON SITE
F12254-CDB-W01-EQP-PRO-00755_02 LIFTING AND RIGGING EQUIPMENT INPECTION ON SITE
This document is CDB Melchorita property. It cannot be copied or transmitted to third parties without prior authorization.
Type of documents :
PROCEDURE
1 / 12
Doc. N°:
PERU LNG EXPORT PROJECT F12254-CDB-W01-EQP-PRO-00755
MARINE FACILITIES EPC CONTRACT
Rev.: 02 Date : 29-May-09
LIFTING AND RIGGING EQUIPMENT
INPECTION ON SITE Page: 2/12
REVISION SHEET
TABLE OF CONTENTS
3. DEFINITIONS ..........................................................................................................................................4
This document describes the procedures for inspection the Lifting and Rigging Equipment.
It applies to all Cranes, Truck Cranes, Gantry Crane and Rigging Devices.
2. REFERENCE DOCUMENTS
CONTRACT LNG-P/05-0005 Peru LNG Export Project / Marine Facilities EPC Contract
3. DEFINITIONS
DAYLY PRE-OPERATIONAL A visual inspection control carried out by a Competent Person (Daily,
INSPECTION: prior to use, and during shift changes, or whenever operators are
changed).
EXTENSIVE REPAIR: Any repair, alteration or modification to a load sustaining part, gearing,
booms, counterweights, etc.
4. ACTIVITIES DESCRIPTION
4.1 INSPECTION
All mobile crane must be visually inspected daily (documentation required) and monthly
(documentation required) using, as a minimum, the inspection items in the attached
Mobile Crane Requirements table.
Prior to daily use, during shift changes or whenever operators are changed, mobile
cranes shall have Crane Daily Inspection Check List performed by a COMPETENT
person using the appropriate daily and monthly inspection checklist (see appendix A)
The Crane operator is the COMPETENT person to carry out a daily pre-operational
inspection before the shift start-up using a checklist developed in accordance with the
manufacturer’s operator’s manual and the relevant standards. The checklist shall include
(if applicable), but is not restricted to, the following:
• Coolant system
All deficiencies for mobile cranes and other elevating/lifting equipment shall be reported in
the daily pre-operational inspection checklists.
Any defects, reported in the daily pre-operational inspection, that could affect the safe
operation of mobile cranes and other elevating/lifting equipment shall be corrected prior to
use.
Any drips or leaks should be reported to the Works Supervisor to coordinate the immediate
repair.
The periodic inspection frequency for cranes shall be according to crane’s manual.
Cranes that have been involved in any type of incident, causing damage to the crane, shall
have their sticker or certification immediately invalidated. The crane shall not be used until it
has passed a re-inspection. A load test is also required if the damage affects a load bearing
member.
Doc. N°:
PERU LNG EXPORT PROJECT F12254-CDB-W01-EQP-PRO-00755
MARINE FACILITIES EPC CONTRACT
Rev.: 02 Date : 29-May-09
LIFTING AND RIGGING EQUIPMENT
INPECTION ON SITE Page: 7/12
All equipment inspections mentioned in this Instruction, requiring periodic shall be carried out
using the Crane Periodic Inspection Check List (See attachment B)..
Equipment that has failed the periodic inspection shall be removed from service until all
deficiencies have been corrected, and the crane re-inspected and certified by the Inspection
Department. Repairs shall be in conforming to the manufacturer’s instructions and the
relevant standards.
All incoming or extensively repaired crane shall have an initial inspection and a load test
prior to putting into service. The load test shall be conducted by a Competent Person.
The equipment should also be checked for drips and leaks of hydrocarbons or other
chemicals that may result in ground or water contamination.
All main boom sections, including power pinned sections, shall be extended and inspected
for corrosion, proper operation, and damage.
If equipped, swing away boom sections shall be inspected for corrosion and damage.
Where the re-rating of equipment is necessary (e.g., crawlers, truck and wheel-mounted
cranes, etc.), the equipment shall be tested in accordance with relevant standards.
When a Load Test is required, the User shall develop a Load Test. The Load test shall be
carried out by a competent person.
Doc. N°:
PERU LNG EXPORT PROJECT F12254-CDB-W01-EQP-PRO-00755
MARINE FACILITIES EPC CONTRACT
Rev.: 02 Date : 29-May-09
LIFTING AND RIGGING EQUIPMENT
INPECTION ON SITE Page: 8/12
DESCRIPTION FREQUENCY
Records of Crane Periodic Inspection Check List and Crane Daily Inspection Check List for
all elevating/lifting equipment shall be maintained by Maintenance Control Area for the
project duration.
Records of Crane Periodic Inspection Check List and Crane Daily Inspection Check List
shall be maintained by Maintenance Control Area for the project.
Any repairs undertaken in relation to correcting leaks and drips should be documented.
4.1.6 Safety
A copy of the manufacturer’s operator’s manual shall be made available to the operator in
Spanish language to ensure understanding of the equipment characteristics. This manual
shall be kept in the equipment at all times.
The supervisor in charge of the lifting and rigging works is responsible for the safe operation
of any elevating/lifting equipment.
A sign shall be posted on each crane, warning the operator not to reply solely on any
automatic device as a substitute for safe operating practices (e.g., safe load indicators).
All warning signs required by applicable standards shall be posted in the English and
Spanish language.
Doc. N°:
PERU LNG EXPORT PROJECT F12254-CDB-W01-EQP-PRO-00755
MARINE FACILITIES EPC CONTRACT
Rev.: 02 Date : 29-May-09
LIFTING AND RIGGING EQUIPMENT
INPECTION ON SITE Page: 9/12
Any Lifting or Rigging Equipment found to be defective and where the defect will effect the
safe operation of that equipment shall be withdrawn from service.
An ‘Out of Service’ tag shall be placed on the operating control point and the defect details
entered onto the tag. (See appendix C)
The person placing the tag shall notify the supervisor in charge of the equipment of the
defect and will hand the supervisor the ‘Out of Service’ tag stub for positive identification.
The supervisor shall arrange for the repair of the defect by competent serviceman or for the
removal of the defective equipment from the project.
The supervisor will hand the serviceman the ‘Out of Service’ tag stub to ensure that the
correct component is inspected/repaired.
When the equipment has been repaired and successfully tested, the serviceman will remove
the ‘Out of Service’ tag and return both the tag and the tag stub to the supervisor in charge
of the equipment.
No other person shall be permitted to remove an ’Out of Service‘ tag. The breach of this tag
removal procedure shall be considered a serious breach of Project Safety requirements.
Crane suspended personnel platforms (man baskets) shall receive a PERIODIC inspection every
six (6) months, or when dedicated rigging has changed, or in case of any type of incident, causing
damage to the man basket.
Man basket designing has to be approved by CDB engineering and Safety area and follow
quality, safety, technical standards. See Crane Erection & Use of Lifting Equipment Procedure
(See document F12254-CDB-W01-CMT-PRO-00753) for additional requirements.
Doc. N°:
PERU LNG EXPORT PROJECT F12254-CDB-W01-EQP-PRO-00755
MARINE FACILITIES EPC CONTRACT
Rev.: 02 Date : 29-May-09
LIFTING AND RIGGING EQUIPMENT
INPECTION ON SITE Page: 10/12
GRÚA XXXXXX
CDB Melchorita
1/ 25
INFORME TÉCNICO
SOLICITADO POR: CDB Melchorita
==============================================================
1. ANTECEDENTES.
Equipo: XXXXX.
Marca: XXXXX
Modelo: XXXXX
Capacidad: XXXXX
Nº de Serie: XXXXX.
Año de Fabricación: XXXXXX.
Horometro: XXXXXX
2/ 25
c) Las fotos Nº 01 y 02 muestran las condiciones del equipo entregado al momento de
iniciar la evaluación.
3/ 25
2. RESULTADOS
La tabla Nº 01 muestra el resumen de la evaluación.
Tabla Nº 01
4/ 25
CONDICIÓN: ACEPTABLE, NO ACEPTABLE.
5/ 25
Neumáticos, aros, pernos y tuercas
Completado Condición Comentarios
de ajuste
Estado superficial de neumáticos
(medición de cocada, presión de
aire)
Aros: Golpes, abolladuras, roturas,
pinturas.
Tuercas. Existencia y estado, ajuste
visual.
Observaciones:
6/ 25
Extintor Completado Condición Comentarios
Cantidad
Fecha de vencimiento
Estado (seguro, manija pintura).
Observaciones:
7/ 25
Luces traseras Completado Condición Comentarios
Accionamiento
Estado
Observaciones:
Outriggers
Sistemas de control (Operatividad) Completado Condición Comentarios
Accionamiento
Fugas
Engrase
Observaciones:
8/ 25
Motor Completado Condición Comentarios
Presión de aceite motor
Verificar tablero
Observaciones:
9/ 25
Sistemas de control Completado Condición Comentarios
Verificación en tablero
(temperatura)
Observaciones:
10/ 25
Sistemas de sujeción del cable Completado Condición Comentarios
(candados, etc)
Correcto armado
Estado de candados
Observaciones:
11/ 25
Condiciones de las extensiones Completado Condición Comentarios
Engrase
Observaciones:
12/ 25
Condición del gancho secundario Completado Condición Comentarios
Estado de armado del cable-gancho
Estado general
Observaciones:
13/ 25
Freno Completado Condición Comentarios
Accionamiento
Estado
Observaciones:
Sistema hidráulico
Cilindros de levante y mangueras Completado Condición Comentarios
Fugas
Estado en general
Observaciones:
14/ 25
Líneas hidráulicas del tambor Completado Condición Comentarios
principal
Fugas
Estado
Observaciones:
15/ 25
Operación de los instrumentos Completado Condición Comentarios
Estado
Observaciones:
16/ 25
Placas y Stickers
Observaciones:
Observaciones:
Observaciones:
Observaciones:
Otros
17/ 25
4. REPORTE DE INSPECCIÓN POR PARTÍCULAS MAGNÉTICAS (MT)
Estructura Inspeccionada:
Área Examinada Localización de
Zona Inspeccionada Longitud Observaciones
Entera Especifica discontinuidad
Estructura de
---- ---- ----
Outriggers
Estructura del chasis
---- ---- ----
principal de la Grúa
Estructura de los
brazos de levante de ---- ---- ----
la grúa
Estructura del Boom
---- ---- ----
Principal
Estructura de
extensiones del ---- ---- ----
Boom
PRE EXAMINACION:
Preparación de la Superficie: Limpieza utilizando escobilla eléctrica
EQUIPAMIENTO:
• Yugo Magnético Marca PARKER CONTOUR PROBE Modelo:.
• Lámpara de luz Ultravioleta Marca Spectroline modelo:
• Baño de Partículas magnéticas Fluorescentes basadas en medio acuoso
MÉTODO DE INSPECCIÓN
Dry Wet Visible Fluorescent
AC DC Prods Yoke Coil
Magnetic field direction: Circular Longitudinal
POS-EXAMINACIÓN:
Desmagnetización: No es Requerida
Limpieza: No es Requerida
Fecha del Ensayo:
Inspeccionado por:
Autorizado por:
18/ 25
5. REPORTE DE INSPECCIÓN POR ULTRASONIDO (UT)
Posición Dimensiones
Ítem Identificación Evaluación Observaciones
X Y ∆X ∆Y
1
2
3
4
5
6
7
8
Equipo Utilizado:
· Equipo De Ultra Sonido
· ASTM E164 Reference Block 1018 Steel Ser. No
· Transductor de
Fecha del Ensayo :
Inspeccionado por :
Autorizado por :
19/ 25
REPORTE DE INSPECCIÓN VISUAL
20/ 25
REPORTE DE INSPECCIÓN VISUAL
21/ 25
REPORTE DE INSPECCIÓN VISUAL
22/ 25
REPORTE DE INSPECCIÓN VISUAL
23/ 25
REPORTE DE INSPECCIÓN VISUAL
PINS
24/ 25
REPORTE DE INSPECCIÓN VISUAL
25/ 25
Doc. N°:
PERU LNG EXPORT PROJECT F12254-CDB-W01-EQP-PRO-00755
MARINE FACILITIES EPC CONTRACT
Rev.: 02 Date : 29-May-09
LIFTING AND RIGGING EQUIPMENT
INPECTION ON SITE Page: 12/12
Front
Back
TAGS TO HAVE
EYELETS, BE
PRESTRUNG &
LOOPED.
CAUTION CAUTION
UNSAFE UNSAFE
TAGS TO HAVE OUT OF SERVICE OUT OF SERVICE
SEQUENTIAL
NO;s DUPLICATED THIS : ____________________________
THIS TAG CAN ONLY BE REMOVED
ON TOP/ BOTTOM (Nominate Item or plant)
REASON:____________________________________ BY AN AUTHORISED
SECTIONS _____________________________________________ SERVICE PERSON ,
_____________________________________________
_____________________________________________
HAVING COMPLETED REPAIRS
TAG PLACED BY:_____________________________ AND TESTING TO CONFIRM THE
COMPANY :__________________________________ SAFE OPERATING CONDITION
DATE :____/______/_____TIME :________________
OF THIS EQUIPMENT.
LOWER SECTION SIGNED :______________________ No (sequential)
PERFORATED TO ........................................................................................... ............................................................................
THIS : __________________ No (sequential) TAG PLACED BY:________________________________
FACILITATE EASY (Nominate Item or plant) COMPANY :______________________________________
TEAR OFF REASON:____________________________________
_____________________________________________ DATE : _____/_____/_____ TIME : ___________am/pm
_____________________________________________
“This section to be completed and handed to Suoervisor” SIGNED ;_________________________________________